[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-898307":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},898307,582,1,"单选题","当采用概算指标法编制建筑工程概算时，拟建工程结构特征与概算指标有局部差异时的调整，调整公式中的单价通常是（ ）",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","工料单价",false,{"key":16,"text":17,"correct":14},"B","全费用单价",{"key":19,"text":20,"correct":21},"C","综合单价",true,{"key":23,"text":24,"correct":14},"D","成本单价","结构变化修正概算指标=J+Q1P1-Q2P2,P1 为换入结构的综合单价，P2 为换出结构的综合单价。",{"id":6,"name":27,"category":28,"favorite":29},"建设工程计价","建筑工程",0]