[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-898253":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},898253,582,1,"单选题","根据世界银行工程项目总建设成本的构成，以下各项中属于直接建设成本的是（ ）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","前期研究、勘查费用",false,{"key":16,"text":17,"correct":14},"B","施工现场监督的费用",{"key":19,"text":20,"correct":14},"C","工厂投料试车必需的材料费用",{"key":22,"text":23,"correct":24},"D","建筑保险和债券",true,"直接建设成本是与项目建设直接有关的费用，土地征购费、场外设施费、场地费用、设备安装费、管道系统费用、电气设备费用等，还包括临时设备、临时公共设施及场地的维持费，营地设施及其管理，建筑保险和债券。",{"id":6,"name":27,"category":28,"favorite":29},"建设工程计价","建筑工程",0]