[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-898216":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},898216,582,1,"单选题","(2014年)根据《建设项目工程总承包合同示范文本》（GF-2011-0126)，下列属于施工变更的是（）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","对区域内标准标高的调整",false,{"key":16,"text":17,"correct":14},"B","对备品备件采购数量的增减",{"key":19,"text":20,"correct":21},"C","发包人对竣工试验合格的项目重新进行竣工试验",true,{"key":23,"text":24,"correct":14},"D","因发包人原因暂停工程超过45天，调减收影响的部分工程","本题考查的是工程总承包合同价款的调整。施工变更的范围包括： ①因设计变更，造成施工方法改变、设备、材料、部件和工程量的增减；②发包人要求增加的附加试验、改变试验地点；③在发包人提供的项目基础资料和现场障碍资料之外，新增加的施工障碍处理；④发包人对竣工试验经验收或试为验收合格的项目，通知重新进行竣工试验；⑤因执行基准日期之后新颁布的法律、标准、规范引起的变更；⑥上诉变更所需的附加工作。",{"id":6,"name":27,"category":28,"favorite":29},"建设工程计价","建筑工程",0]