[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-898207":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},898207,582,1,"单选题","（2019年真题）编制竣工结算文件时，应按国家、省级或行业建设主管部门的规定计价的是（）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","劳动保险费",false,{"key":16,"text":17,"correct":14},"B","总承包服务费",{"key":19,"text":20,"correct":21},"C","安全文明施工费",true,{"key":23,"text":24,"correct":14},"D","现场签证费","P258-262 编制竣工结算文件时，措施项目中的总价项目应依据合同约定的项目和金额计算; 如发生调整的，以发、承包双方确认调整的金额计算，其中安全文明施工费必须按照国家或省级、行业建设主管部门的规定计算。",{"id":6,"name":27,"category":28,"favorite":29},"建设工程计价","建筑工程",0]