[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-898126":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},898126,582,1,"单选题","（2019年真题）国际工程分包费与直接费、间接费平行并列时，总包商对分包商的管理费应列入（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","间接费",false,{"key":16,"text":17,"correct":18},"B","分包费",true,{"key":20,"text":21,"correct":14},"C","盈余",{"key":23,"text":24,"correct":14},"D","上级单位管理费","P228-235 在国际工程标价中，对分包费的处理有两种方法： 一种方法是将分包费列入直接费中，即考虑间接费时包含了对分包的管理费；另一种方法是将分包费与直接费、间接费平行并列，在估算分包费时适当加入对分包商的管理费即可。",{"id":6,"name":27,"category":28,"favorite":29},"建设工程计价","建筑工程",0]