[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-898123":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},898123,582,1,"单选题","(2018年)国内派出参与国际工程的工人工资构成中应包括（ ）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","国内标准工资，不包括国内附加工资和补贴",false,{"key":16,"text":17,"correct":14},"B","国内、国际差旅费，不包括派出工人的企业收取的管理费",{"key":19,"text":20,"correct":14},"C","按当地市场预测的工资预涨费",{"key":22,"text":23,"correct":24},"D","按当地工人保险费标准计算的保险费",true,"出国期间的总费用包括出国准备到回国修整结束后的全部费用。主要包括：①国内工资，包括标准工资、附加工资和补贴；②派出工人的企业收取的管理费；③服装费、卧具及住房费；④国内、国际差旅费；⑤国外津贴费和伙食费；⑥奖金及加班费；⑦福利费；⑧工资预涨费，按我国工资现行规定计算，工期较短的工程可不考虑；⑨保险费，按当地工人保险费标准计算，故选D。",{"id":6,"name":27,"category":28,"favorite":29},"建设工程计价","建筑工程",0]