[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-898098":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},898098,582,1,"单选题","(2013年)关于合同价款与合同类型，下列说法正确的是()。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","招标文件与投标文件不一致的地方，以招标文件为准",false,{"key":16,"text":17,"correct":14},"B","中标人应当自中标通知书收到之日起30天内与招标人订立书面合同",{"key":19,"text":20,"correct":14},"C","工期特别近、技术特别复杂的项目应采用总价合同",{"key":22,"text":23,"correct":24},"D","实行工程量清单计价的工程，应采用单价合同",true,"实行工程量清单计价的建筑工程，鼓励发承包双方采用单价方式确定合同价款。 选项A错，招标文件与投标文件不一致的地方，以投标文件为准；选项B错，招标人和中标人应当在自中标通知书发出之日起30天内订立合同；选项C错，建设规模较小，技术难度较低，工期较短，且施工图设计已审查批准的建设工程可以采用总价合同，紧急抢险、救灾以及施工技术特别复杂的建设工程可以采用成本加酬金合同。",{"id":6,"name":27,"category":28,"favorite":29},"建设工程计价","建筑工程",0]