[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-898090":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},898090,582,1,"单选题","（2019年真题）投标人复核招标工程量清单时发现了遗漏,是否向招标人提出修改意见取决于（）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","招标文件规定是否允许提出增补",false,{"key":16,"text":17,"correct":14},"B","遗漏工程量的大小",{"key":19,"text":20,"correct":21},"C","投标人的投标策略",true,{"key":23,"text":24,"correct":14},"D","遗漏项目是否在工程量计算规范附录中有列项","P198-199 针对招标工程量清单中工程量的遗漏或错误,是否向招标人提出修改意见取决于投标策略。",{"id":6,"name":27,"category":28,"favorite":29},"建设工程计价","建筑工程",0]