[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-898058":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},898058,582,1,"单选题","（2019年真题）依据工程所在地区颁发的计价定额等编制最高投标限价、进行分项工程综合单价组价时,首先应确定的是（ ）",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","风险范围与幅度",false,{"key":16,"text":17,"correct":14},"B","工程造价信息确定的人工单价等",{"key":19,"text":20,"correct":21},"C","定额项目名称及工程量",true,{"key":23,"text":24,"correct":14},"D","管理费率和利润率","P190-195 在综合单价的组价过程中，首先依据提供的工程量清单和施工图纸，按照工程所在地区颁发的计价定额的规定，确定所组价的定额项目名称，并计算出相应的工程量。",{"id":6,"name":27,"category":28,"favorite":29},"建设工程计价","建筑工程",0]