[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-898042":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},898042,582,1,"单选题","(2010年)下列关于招标控制价的说法中，正确的是()。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","招标控制价必须由招标人编制",false,{"key":16,"text":17,"correct":14},"B","招标控制价只需公布总价",{"key":19,"text":20,"correct":14},"C","招标人不得对招标控制价提出异议",{"key":22,"text":23,"correct":24},"D","招标控制价不应上调或下浮",true,"(3)招标控制价应当依据工程量清单、工程计价有关规定和市场价格信息等编制。招标控制价应在招标文件中公布，对所编制的招标控制价不得进行上浮或下调。招标人应当在招标时公布招标控制价的总价，以及各单位工程的分部分项工程费、措施项目费、其他项目 费规费和税金。",{"id":6,"name":27,"category":28,"favorite":29},"建设工程计价","建筑工程",0]