[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-898041":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},898041,582,1,"单选题","(2010年)关于招标文件的澄清，下列说法中错误的是()。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","招标文件的澄清应在投标截止时间14天前发出",true,{"key":16,"text":17,"correct":18},"B","招标文件的澄清应不指明所澄清问题的来源",false,{"key":20,"text":21,"correct":18},"C","投标人收到澄清后的确认时间可以采用一个相对的时间",{"key":23,"text":24,"correct":18},"D","投标人收到澄清后的确认时间可以采用一个绝对的时间","招标文件的澄清将在规定的投标截止时间15天前以书面形式发给所有购买招标文件的投标人，但不指明澄清问题的来源。如果澄清发出的时间距投标截止时间不足15天，相应推迟投标截止时间。",{"id":6,"name":27,"category":28,"favorite":29},"建设工程计价","建筑工程",0]