[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-898032":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},898032,582,1,"单选题","(2014年)下列内容中，属于招标工程量清单编制依据的是（）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","分部分项工程清单",false,{"key":16,"text":17,"correct":18},"B","拟定的招标文件",true,{"key":20,"text":21,"correct":14},"C","招标控制价",{"key":23,"text":24,"correct":14},"D","潜在招标人的潜质及能力","本题考查的是工程量清单编制依据。其中包括：清单计价规范、设计文件、招标文件、施工现场情况、工程特点和施工方案。",{"id":6,"name":27,"category":28,"favorite":29},"建设工程计价","建筑工程",0]