[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-897940":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},897940,582,1,"单选题","（2019年真题）工程造价指标测算中，各类造价数据的时间需求符合造价指标的时间要求。下列造价数据的时间选取符合规定的是（ ）",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","投资估算采用投资估算书编制完成日期",true,{"key":16,"text":17,"correct":18},"B","最高投标限价采用投标截止日期",false,{"key":20,"text":21,"correct":18},"C","合同价采用合同签订日期",{"key":23,"text":24,"correct":18},"D","结算价采用工程结算日期","P105-109 建设工程造价指标的时间应符合下列规定： 1) 投资估算、设计概算、招标控制价应采用成果文件编制完成日期； 2) 合同价应采用工程开工日期； 3) 结算价应采用工程竣工日期。 投资估算的成果文件称作投资估算书。",{"id":6,"name":27,"category":28,"favorite":29},"建设工程计价","建筑工程",0]