[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-897924":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},897924,582,1,"单选题","（2019年真题）编制预算定额人工日消耗量时，实际工程现场运距超过预算定额取定运距时的用工应计入（ ）",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","超运距用工",false,{"key":16,"text":17,"correct":14},"B","辅助用工",{"key":19,"text":20,"correct":21},"C","二次搬运费",true,{"key":23,"text":24,"correct":14},"D","人工幅度差","P76-84 超运距是指劳动定额中已包括的材料、半成品场内水平搬运距离与预算定额所考虑的现场材料、半成品堆放地点到操作地点的水平运输距离之差。需要指出，实际工程现场运距超过预算定额取定运距时，可另行计算现场二次搬运费。",{"id":6,"name":27,"category":28,"favorite":29},"建设工程计价","建筑工程",0]