[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-897920":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},897920,582,1,"单选题","(2016年)下列材料损耗，应计入预算定额材料损耗量的是()。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","场外运输损耗",false,{"key":16,"text":17,"correct":14},"B","工地仓储损耗",{"key":19,"text":20,"correct":14},"C","一般性检验鉴定损耗",{"key":22,"text":23,"correct":24},"D","施工加工损耗",true,"材料损耗量，指在正常条件下不可避免的材料损耗，如现场内材料运输及施工操作过程中的损耗等。",{"id":6,"name":27,"category":28,"favorite":29},"建设工程计价","建筑工程",0]