[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-897853":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},897853,582,1,"单选题","(2014年)作为工程定额体系的重要组成部分，预算定额是（）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","完成一定计价单位的某一施工过程所需要消耗的人工、材料和机械台班数量标准",false,{"key":16,"text":17,"correct":18},"B","完成一定计量单位合格分项工程和结构构件所需消耗的人工、材料、施工机械台班数量及其费用标准",true,{"key":20,"text":21,"correct":14},"C","完成单位合格扩大分项工程所需消耗的人工、材料和施工机械台班数量及费用标准",{"key":23,"text":24,"correct":14},"D","完成一个规定计量单位建筑安装产品的费用消耗标准","预算定额，是在正常的施工条件下，完成一定计量单位合格分项工程和结构构件所需消耗的人工、材料机械台班数量及其相应费用标准。",{"id":6,"name":27,"category":28,"favorite":29},"建设工程计价","建筑工程",0]