[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-897807":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},897807,582,1,"单选题","（2019年真题）根据现行工程量计算规范，适宜采用分部分项工程项目清单计价方式计价的措施项目费是（）",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","二次搬运费",false,{"key":16,"text":17,"correct":18},"B","超高施工增加费",true,{"key":20,"text":21,"correct":14},"C","已完工程及设备保护费",{"key":23,"text":24,"correct":14},"D","地上、地下设施临时保护费","P15-20 应予计量的措施项目，基本与分部分项工程费的计算方法基本相同，包括：脚手架费、混凝土模板及支架(撑）费、垂直运输费、超高施工增加费、大型机械设备进出场及安拆费、施工排水、降水费。",{"id":6,"name":27,"category":28,"favorite":29},"建设工程计价","建筑工程",0]