[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-581-9":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":583},{"id":5,"name":6,"category":7,"favorite":8},581,"建设工程造价管理基础知识","建筑工程",0,9,50,2873,[13,34,46,58,70,82,94,106,118,130,138,150,162,174,186,194,202,214,226,237,249,257,269,280,292,304,316,328,340,352,364,376,388,400,412,424,436,446,454,466,478,490,502,514,526,538,546,554,562,571],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":24,"analysis":33},895191,1,"单选题","在各种计时观察法中，精确度最高的是()。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","选择法测时",false,{"key":24,"text":25,"correct":26},"B","接续法测时",true,{"key":28,"text":29,"correct":22},"C","写实记录法",{"key":31,"text":32,"correct":22},"D","工作日写实法","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":20,"analysis":33},895192,"在机械工作时间消耗的分类中，由于工人装料数量不足引起的砂浆搅拌机不能满载工作的时间属于()。",[38,40,42,44],{"key":20,"text":39,"correct":26},"低负荷下的工作时间",{"key":24,"text":41,"correct":22},"机械的多余工作时间",{"key":28,"text":43,"correct":22},"违反劳动纪律引起的机械时间损失",{"key":31,"text":45,"correct":22},"有根据地降低负荷下的工作时间",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":24,"analysis":33},895193,"在确定材料定额消耗量时，利用实验室试验法主要是为了编制()。",[50,52,54,56],{"key":20,"text":51,"correct":22},"材料损耗定额",{"key":24,"text":53,"correct":26},"材料净用量定额",{"key":28,"text":55,"correct":22},"材料消耗定额",{"key":31,"text":57,"correct":22},"劳动定额",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":24,"analysis":33},895194,"编制材料损耗定额的主要方法是()。",[62,64,66,68],{"key":20,"text":63,"correct":22},"实验室试验法",{"key":24,"text":65,"correct":26},"现场技术测定法",{"key":28,"text":67,"correct":22},"现场统计法",{"key":31,"text":69,"correct":22},"理论计算法",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":31,"analysis":33},895195,"下列对工人工作时间中辅助工作时间的理解，正确的是()。",[74,76,78,80],{"key":20,"text":75,"correct":22},"在辅助工作时间里，能使产品的形状大小、性质或位置发生变化",{"key":24,"text":77,"correct":22},"基本工作时间的结束，往往就是辅助工作时间的开始",{"key":28,"text":79,"correct":22},"辅助工作一般是机械操作",{"key":31,"text":81,"correct":26},"在机手并动的情况下，辅助工作是在机械运转过程中进行的，为避免重复则不应再计辅助工作时间的消耗",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":28,"analysis":33},895196,"下列对工人工作时间中休息时间的理解，正确的是()。",[86,88,90,92],{"key":20,"text":87,"correct":22},"在定额时间中不进行计算",{"key":24,"text":89,"correct":22},"休息时间即停工时间",{"key":28,"text":91,"correct":26},"它属于必需消耗的工作时间",{"key":31,"text":93,"correct":22},"休息时间的长短是一定的，即8小时工作时间以外的时间",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":31,"analysis":33},895197,"经现场观测，完成10m3某分项工程需消耗某种材料2.76m3，其中现场内材料运输及施工操作过程中的损耗量0.095m3，则该种材料的损耗率为()。",[98,100,102,104],{"key":20,"text":99,"correct":22},"3.64%",{"key":24,"text":101,"correct":22},"3.57%",{"key":28,"text":103,"correct":22},"3.44%",{"key":31,"text":105,"correct":26},"3.56%",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":24,"analysis":33},895198,"据计时观测资料得知：每平方米标准砖墙勾缝时间为10min，辅助工作时间占工序作业时间的比例为5%，准备结束时间、不可避免中断时间、休息时间占工作班时间的比例分别为3%、2%、15%。则每立方米砌体标准砖厚砖墙勾缝的产量定额为( )m3／工日。",[110,112,114,116],{"key":20,"text":111,"correct":22},"8. 621",{"key":24,"text":113,"correct":26},"8.772",{"key":28,"text":115,"correct":22},"9. 174",{"key":31,"text":117,"correct":22},"14. 493",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":20,"analysis":33},895199,"已知某挖土机挖土的一次正常循环工作时间是2min，每循环工作一次挖土0.5m3，工作班的延续时间为8h，机械正常利用系数为0.8，则其产量定额为( )m3\u002F台班。",[122,124,126,128],{"key":20,"text":123,"correct":26},"96",{"key":24,"text":125,"correct":22},"120",{"key":28,"text":127,"correct":22},"150",{"key":31,"text":129,"correct":22},"300",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":24,"analysis":33},895200,"在对材料消耗过程测定与观察的基础上，通过完成产品数量和材料消耗量的计算而确定各种材料消耗定额的方法是( )。",[134,135,136,137],{"key":20,"text":63,"correct":22},{"key":24,"text":65,"correct":26},{"key":28,"text":67,"correct":22},{"key":31,"text":69,"correct":22},{"id":139,"libraryId":5,"type":15,"typeLabel":16,"stem":140,"options":141,"answer":24,"analysis":33},895201,"通过计时观察资料得知：人工挖二类土1m3 的基本工作时间为6h，辅助工作时间占工序作业时间的2%。准备与结束工作时间、不可避免的中断时间、休息时间分别占工作日的3%、2%、18%。则该人工挖二类土的时间定额是（）工日／m3。",[142,144,146,148],{"key":20,"text":143,"correct":22},"0.7",{"key":24,"text":145,"correct":26},"0.994",{"key":28,"text":147,"correct":22},"1.006",{"key":31,"text":149,"correct":22},"1.307",{"id":151,"libraryId":5,"type":15,"typeLabel":16,"stem":152,"options":153,"answer":28,"analysis":33},895202,"某工程现场采用出料容量500L 的混凝土搅拌机,每一次循环中,装料、搅拌、卸料、中断需要的时间分别为1、3、1、1min,机械正常利用系数为0.9,则该机械的台班产量定额1 为（）m3／台班。",[154,156,158,160],{"key":20,"text":155,"correct":22},"32",{"key":24,"text":157,"correct":22},"34",{"key":28,"text":159,"correct":26},"36",{"key":31,"text":161,"correct":22},"38",{"id":163,"libraryId":5,"type":15,"typeLabel":16,"stem":164,"options":165,"answer":28,"analysis":33},895203,"施工过程可以分为工序、工作过程和综合工作工程，其分类标准是（）。",[166,168,170,172],{"key":20,"text":167,"correct":22},"工艺特点",{"key":24,"text":169,"correct":22},"工具设备的机械化程度",{"key":28,"text":171,"correct":26},"组织复杂程度",{"key":31,"text":173,"correct":22},"施工过程性质",{"id":175,"libraryId":5,"type":15,"typeLabel":16,"stem":176,"options":177,"answer":20,"analysis":33},895204,"在工人工作时间分类中，由于材料供应不及时引起工作班内的工时损失应列入（）。",[178,180,182,184],{"key":20,"text":179,"correct":26},"施工本身造成的停工时间",{"key":24,"text":181,"correct":22},"非施工本身造成的停工时间",{"key":28,"text":183,"correct":22},"准备与结束工作时间",{"key":31,"text":185,"correct":22},"不可避免的中断时间",{"id":187,"libraryId":5,"type":15,"typeLabel":16,"stem":188,"options":189,"answer":31,"analysis":33},895205,"在机械工作时间消耗的分类中，由于工人装料数量不足引起的汽车在降低复核的情况下工作所延续的时间属于（）。",[190,191,192,193],{"key":20,"text":45,"correct":22},{"key":24,"text":41,"correct":22},{"key":28,"text":43,"correct":22},{"key":31,"text":39,"correct":26},{"id":195,"libraryId":5,"type":15,"typeLabel":16,"stem":196,"options":197,"answer":24,"analysis":33},895206,"主要用来编制材料净用量定额的方法是（）。",[198,199,200,201],{"key":20,"text":65,"correct":22},{"key":24,"text":63,"correct":26},{"key":28,"text":67,"correct":22},{"key":31,"text":69,"correct":22},{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":28,"analysis":33},895207,"出料容量为500L 的砂浆搅拌机，每循环工作一次，需要运料、装料、搅拌、卸料和中断的时间分别为120s、30s、180s、30s、30s,其中运料与其他循环组成部分交叠的时间为30s。机械正常利用系数为0.8，则500L 砂浆搅拌机的产量定额为（）m3／台班。（1m3=1000L）",[206,208,210,212],{"key":20,"text":207,"correct":22},"27.43",{"key":24,"text":209,"correct":22},"29.54",{"key":28,"text":211,"correct":26},"32.00",{"key":31,"text":213,"correct":22},"48.00",{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":31,"analysis":33},895208,"通过计时观察，完成某工程的基本工时为6h／m3,辅助工作时间为工序作业时间的8%，规范时间占工作时间的15%，则完成该工程的时间定额是（）工日／m3。",[218,220,222,224],{"key":20,"text":219,"correct":22},"0.93",{"key":24,"text":221,"correct":22},"0.94",{"key":28,"text":223,"correct":22},"0.95",{"key":31,"text":225,"correct":26},"0.96",{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":24,"analysis":33},895209,"根据计时观察资料得知：每㎡标准砖墙勾缝时间为10min，辅助工作时间占工序作业时间的比例为5%，准备结束时间、不可避免中断时间、休息时间占工作班时间的比例分别为3%、2%、15%。则每立方米砌体标准砖厚砖墙勾缝的产量定额为（）3／工日。",[230,232,233,235],{"key":20,"text":231,"correct":22},"8.621",{"key":24,"text":113,"correct":26},{"key":28,"text":234,"correct":22},"9.174",{"key":31,"text":236,"correct":22},"14.493",{"id":238,"libraryId":5,"type":15,"typeLabel":16,"stem":239,"options":240,"answer":31,"analysis":33},895210,"下列工人工作时间消耗中，属于有效工作时间的是（）。",[241,243,245,247],{"key":20,"text":242,"correct":22},"因混凝土养护引起的停工时间",{"key":24,"text":244,"correct":22},"偶然停工（停水、停电）增加的时间",{"key":28,"text":246,"correct":22},"产品质量不合格返工的工作时间",{"key":31,"text":248,"correct":26},"准备施工工具花费的时间",{"id":250,"libraryId":5,"type":15,"typeLabel":16,"stem":251,"options":252,"answer":24,"analysis":33},895211,"在对材料消耗过程测定与观察的基础上，通过完成产品数量和材料消耗量的计算而确定各种材料消耗定额的方法是（）。",[253,254,255,256],{"key":20,"text":63,"correct":22},{"key":24,"text":65,"correct":26},{"key":28,"text":67,"correct":22},{"key":31,"text":69,"correct":22},{"id":258,"libraryId":5,"type":15,"typeLabel":16,"stem":259,"options":260,"answer":31,"analysis":33},895212,"关于工序特征的描述、下列说法中正确的是（）。",[261,263,265,267],{"key":20,"text":262,"correct":22},"工作者、工作地点不变，劳动工具、劳动对象可变",{"key":24,"text":264,"correct":22},"劳动对象、劳动工具不变，工作者、工作地点可变",{"key":28,"text":266,"correct":22},"劳动对象、劳动工具、工作地点不变，工作者可变",{"key":31,"text":268,"correct":26},"工作者、劳动对象、劳动工具和工作地点均不变",{"id":270,"libraryId":5,"type":15,"typeLabel":16,"stem":271,"options":272,"answer":28,"analysis":33},895213,"根据施工过程工时研究结果，与工人所担负的工作量大小无关的必须消耗时间是（）。",[273,275,277,278],{"key":20,"text":274,"correct":22},"基本工作时间",{"key":24,"text":276,"correct":22},"辅助工作时间",{"key":28,"text":183,"correct":26},{"key":31,"text":279,"correct":22},"多余工作时间",{"id":281,"libraryId":5,"type":15,"typeLabel":16,"stem":282,"options":283,"answer":24,"analysis":33},895214,"下列机械工作时间中，属于有效工作时间的是（）。",[284,286,288,290],{"key":20,"text":285,"correct":22},"筑路机在工作区末端的调头时间",{"key":24,"text":287,"correct":26},"体积达标而未达到载重吨位的货物汽车运输时间",{"key":28,"text":289,"correct":22},"机械在工作地点之前的转移时间",{"key":31,"text":291,"correct":22},"装车数量不足而在低负荷下工作的时间",{"id":293,"libraryId":5,"type":15,"typeLabel":16,"stem":294,"options":295,"answer":20,"analysis":33},895215,"某施工机械原值为50000元，耐用总台班为2000台班，一次检修费为3000元，检修周期为4，台维护费系数为20%，每台班发生的其他费用合计为30元／台班，忽略残值和资金时间价值，除税系数为1，则该机械的台班单价为()元。",[296,298,300,302],{"key":20,"text":297,"correct":26},"60.40",{"key":24,"text":299,"correct":22},"62.20",{"key":28,"text":301,"correct":22},"65.40",{"key":31,"text":303,"correct":22},"67.20",{"id":305,"libraryId":5,"type":15,"typeLabel":16,"stem":306,"options":307,"answer":28,"analysis":33},895216,"某施工机械耐用总台班为800台班，检修次数数为3，一次检修费用为1200元，除税系数为1，则该机械的台班检修费为()元。",[308,310,312,314],{"key":20,"text":309,"correct":22},"7.5",{"key":24,"text":311,"correct":22},"6.0",{"key":28,"text":313,"correct":26},"4.5",{"key":31,"text":315,"correct":22},"3.0",{"id":317,"libraryId":5,"type":15,"typeLabel":16,"stem":318,"options":319,"answer":31,"analysis":33},895217,"某大型施工机械需配机上司机、机上操作人员各一名，若年制度工作日为250天，年工作台班为200台班，人工日工资单价均为100元\u002F工日，则该施工机械的台班人工费为（）元\u002F台班。",[320,322,324,326],{"key":20,"text":321,"correct":22},"100",{"key":24,"text":323,"correct":22},"125",{"key":28,"text":325,"correct":22},"200",{"key":31,"text":327,"correct":26},"250",{"id":329,"libraryId":5,"type":15,"typeLabel":16,"stem":330,"options":331,"answer":24,"analysis":33},895218,"施工机械耐用总台班数，指机械从投入使用至()前的总台班数。",[332,334,336,338],{"key":20,"text":333,"correct":22},"大修",{"key":24,"text":335,"correct":26},"报废",{"key":28,"text":337,"correct":22},"一项工程竣工",{"key":31,"text":339,"correct":22},"满5年",{"id":341,"libraryId":5,"type":15,"typeLabel":16,"stem":342,"options":343,"answer":20,"analysis":33},895219,"施工机械台班单价中的养路费及车船使用税中的保险费是指()。",[344,346,348,350],{"key":20,"text":345,"correct":26},"强制保险费",{"key":24,"text":347,"correct":22},"非强制保险费",{"key":28,"text":349,"correct":22},"强制和非强制保险费",{"key":31,"text":351,"correct":22},"司机危险作业意外伤害保险费",{"id":353,"libraryId":5,"type":15,"typeLabel":16,"stem":354,"options":355,"answer":31,"analysis":33},895220,"下列施工机械的费用项目中，不能计入施工机械台班单价的是()。",[356,358,360,362],{"key":20,"text":357,"correct":22},"施工机械年检费",{"key":24,"text":359,"correct":22},"小型施工机械安装费",{"key":28,"text":361,"correct":22},"定期保养所用的辅料费",{"key":31,"text":363,"correct":26},"机上司机劳动保险费",{"id":365,"libraryId":5,"type":15,"typeLabel":16,"stem":366,"options":367,"answer":24,"analysis":33},895221,"某施工机械原始购置费为4万元，耐用总台班为2000台班，检修周期为5个，每次检修费为3000元，维护费系数为0.5，每台班人工、燃料动力及其他费用为65元，机械残值率为5%。不考虑资金的时间价值，则该机械的台班单价为()元／台班。",[368,370,372,374],{"key":20,"text":369,"correct":22},"91.44",{"key":24,"text":371,"correct":26},"93.00",{"key":28,"text":373,"correct":22},"95.25",{"key":31,"text":375,"correct":22},"95.45",{"id":377,"libraryId":5,"type":15,"typeLabel":16,"stem":378,"options":379,"answer":28,"analysis":33},895222,"在计算材料单价时，若同一种材料因来源地、交货地、供货单位、生产厂家不同，而有几种价格时，根据( )进行加权平均。",[380,382,384,386],{"key":20,"text":381,"correct":22},"不同来源地供货距离",{"key":24,"text":383,"correct":22},"不同来源地供货范围",{"key":28,"text":385,"correct":26},"不同来源地供货数量比例",{"key":31,"text":387,"correct":22},"不同来源地供货方式",{"id":389,"libraryId":5,"type":15,"typeLabel":16,"stem":390,"options":391,"answer":28,"analysis":33},895223,"某挖掘机配司机1人，若年制度工作日为245天，年工作台班为220台班，人工工日单价为80元，则该挖掘机的人工费为（）元\u002F台班。",[392,394,396,398],{"key":20,"text":393,"correct":22},"71.8",{"key":24,"text":395,"correct":22},"80.0",{"key":28,"text":397,"correct":26},"89.1",{"key":31,"text":399,"correct":22},"132.7",{"id":401,"libraryId":5,"type":15,"typeLabel":16,"stem":402,"options":403,"answer":31,"analysis":33},895224,"某工地商品混凝土的采购有关费用如下表所示，材料价格适用于17%增值税，采用两票制。原价和运杂费均为含税价格。该商品混凝土的材料单价为( )元\u002Fm3。数据如下：供应价格：300元\u002Fm3 运杂费：20元\u002Fm3 运输损耗率1% 采购及保管费5%",[404,406,408,410],{"key":20,"text":405,"correct":22},"323. 2",{"key":24,"text":407,"correct":22},"338. 15",{"key":28,"text":409,"correct":22},"339. 15",{"key":31,"text":411,"correct":26},"291.03",{"id":413,"libraryId":5,"type":15,"typeLabel":16,"stem":414,"options":415,"answer":24,"analysis":33},895225,"按照现行规定，生产工人根据国家法律、法规和政策规定执行国家或社会义务等原因按计时工资标准或计件工资标准的一定比例支付的工资属于()。",[416,418,420,422],{"key":20,"text":417,"correct":22},"计时工资",{"key":24,"text":419,"correct":26},"特殊情况下支付的工资",{"key":28,"text":421,"correct":22},"计件工资",{"key":31,"text":423,"correct":22},"津贴补贴",{"id":425,"libraryId":5,"type":15,"typeLabel":16,"stem":426,"options":427,"answer":28,"analysis":33},895226,"下列费用项目中，应计入进口材料运杂费中的是()。",[428,430,432,434],{"key":20,"text":429,"correct":22},"国际运费",{"key":24,"text":431,"correct":22},"国际运输保险费",{"key":28,"text":433,"correct":26},"到岸后外埠中转运输费",{"key":31,"text":435,"correct":22},"进口环节税费",{"id":437,"libraryId":5,"type":15,"typeLabel":16,"stem":438,"options":439,"answer":31,"analysis":33},895227,"根据国家相关法律、法规和政策规定，因停工学习、执行国家或社会义务等原因，按计时工资标准支付的工资属于人工日工资单价中的( )。",[440,442,444,445],{"key":20,"text":441,"correct":22},"基本工资",{"key":24,"text":443,"correct":22},"奖金",{"key":28,"text":423,"correct":22},{"key":31,"text":419,"correct":26},{"id":447,"libraryId":5,"type":15,"typeLabel":16,"stem":448,"options":449,"answer":24,"analysis":33},895228,"人工日工资单价的组成中，停工学习时支付的工资属于()。",[450,451,452,453],{"key":20,"text":417,"correct":22},{"key":24,"text":419,"correct":26},{"key":28,"text":443,"correct":22},{"key":31,"text":423,"correct":22},{"id":455,"libraryId":5,"type":15,"typeLabel":16,"stem":456,"options":457,"answer":31,"analysis":33},895229,"下列费用项目中，应计入建筑安装工程材料单价的是()。",[458,460,462,464],{"key":20,"text":459,"correct":22},"材料一般性鉴定检查费",{"key":24,"text":461,"correct":22},"材料二次搬运费",{"key":28,"text":463,"correct":22},"新结构、新材料试验费",{"key":31,"text":465,"correct":26},"材料工地管理费",{"id":467,"libraryId":5,"type":15,"typeLabel":16,"stem":468,"options":469,"answer":28,"analysis":33},895230,"下列施工机械，其安拆及场外运费计算到施工机械台班单价中的是()。",[470,472,474,476],{"key":20,"text":471,"correct":22},"不需安拆的施工机械",{"key":24,"text":473,"correct":22},"利用辅助设施移动的施工机械，其辅助设施（包括轨道和枕木）等的折旧、搭设和拆除等费用可单独计算",{"key":28,"text":475,"correct":26},"安拆简单、移动需要起重及运输机械的轻型施工机械",{"key":31,"text":477,"correct":22},"安拆复杂、移动需要起重及运输机械的重型施工机械，其安拆费及场外运费单独计算",{"id":479,"libraryId":5,"type":15,"typeLabel":16,"stem":480,"options":481,"answer":24,"analysis":33},895231,"某施工机械预计使用9年，使用期内有3个检修周期，检修间隔台班为800台班，一次检修费为4500元，除税系数为1，则其台班检修费为()元。",[482,484,486,488],{"key":20,"text":483,"correct":22},"1.88",{"key":24,"text":485,"correct":26},"3.75",{"key":28,"text":487,"correct":22},"5.63",{"key":31,"text":489,"correct":22},"16.88",{"id":491,"libraryId":5,"type":15,"typeLabel":16,"stem":492,"options":493,"answer":31,"analysis":33},895232,"某施工机械配备司机2人，若年制度工作日为254天，年工作台班为250台班，人工日工资单价为80元，则该施工机械的台班人工费为( )元／台班。",[494,496,498,500],{"key":20,"text":495,"correct":22},"78. 72",{"key":24,"text":497,"correct":22},"81. 28",{"key":28,"text":499,"correct":22},"157. 44",{"key":31,"text":501,"correct":26},"162. 56",{"id":503,"libraryId":5,"type":15,"typeLabel":16,"stem":504,"options":505,"answer":20,"analysis":33},895233,"关于材料单价的计算，下列计算公式中正确的是（）。",[506,508,510,512],{"key":20,"text":507,"correct":26},"（供应价格+运杂费）×（1+运输损耗率）×（1+采购及保管费率）",{"key":24,"text":509,"correct":22},"（供应价格+运杂费）\u002F（1-运输耗损率）×（1-采购及保管费率）",{"key":28,"text":511,"correct":22},"（供应价格+运杂费）×（1+采购及保管费率）\u002F1-采购及保管费率",{"key":31,"text":513,"correct":22},"（供应价格+运杂费）×（1+运输损耗率）\u002F1-采购及保管费率",{"id":515,"libraryId":5,"type":15,"typeLabel":16,"stem":516,"options":517,"answer":31,"analysis":33},895234,"某材料自甲、乙两地采购，甲地采购量为400t,原价为180 元／t,运杂费为30 元／t；乙地采购量为300t,原价为200 元／t，运杂费为28 元／t，该材料运输损耗率和采购保管费费率分别为1%、2%,则该材料的基价为（）元\u002Ft。",[518,520,522,524],{"key":20,"text":519,"correct":22},"223.37",{"key":24,"text":521,"correct":22},"223.40",{"key":28,"text":523,"correct":22},"224.24",{"key":31,"text":525,"correct":26},"224.29",{"id":527,"libraryId":5,"type":15,"typeLabel":16,"stem":528,"options":529,"answer":20,"analysis":33},895235,"在编制现浇混凝土柱预算定额时,测定每10m3 混凝土柱工程量需消耗10.5m3 的混凝土。现场采用500L 的混凝土搅拌机，测得搅拌机每循环一次需4min。机械的正常利用系数为0.85。若机械幅度差系数为0，则该现浇混凝土柱10m3 需消耗混凝土搅拌机（）台班。",[530,532,534,536],{"key":20,"text":531,"correct":26},"0.206",{"key":24,"text":533,"correct":22},"0.196",{"key":28,"text":535,"correct":22},"0.157",{"key":31,"text":537,"correct":22},"0.149",{"id":539,"libraryId":5,"type":15,"typeLabel":16,"stem":540,"options":541,"answer":24,"analysis":33},895236,"某施工机械原始购置费为4 万元,耐用总台班为2000 台班，大修周期为5 个,每次大修费为3000 元，台班经常修理费系数为0.5，每台班人工、燃料动力及其他费用为65 元，机械残值率为5%。不考虑资金的时间价值，则该机械的台班单价为（）元\u002F台班。",[542,543,544,545],{"key":20,"text":369,"correct":22},{"key":24,"text":371,"correct":26},{"key":28,"text":373,"correct":22},{"key":31,"text":375,"correct":22},{"id":547,"libraryId":5,"type":15,"typeLabel":16,"stem":548,"options":549,"answer":28,"analysis":33},895237,"某施工机械耐用总台班为800 台班，大修周期数为4,每次大修理费用为1200 元，则该机械的台班大修理费为（）元。",[550,551,552,553],{"key":20,"text":309,"correct":22},{"key":24,"text":311,"correct":22},{"key":28,"text":313,"correct":26},{"key":31,"text":315,"correct":22},{"id":555,"libraryId":5,"type":15,"typeLabel":16,"stem":556,"options":557,"answer":24,"analysis":33},895238,"某施工机械预计使用9 年，使用期内有3 个大修理周期，大修间隔台班为800 台班，一次大修理费为4500元，则其台班大修理费为（）元。",[558,559,560,561],{"key":20,"text":483,"correct":22},{"key":24,"text":485,"correct":26},{"key":28,"text":487,"correct":22},{"key":31,"text":489,"correct":22},{"id":563,"libraryId":5,"type":15,"typeLabel":16,"stem":564,"options":565,"answer":31,"analysis":33},895239,"下列施工机械的费用项目中，不能计入施工机械台班单价的是（）。",[566,567,568,570],{"key":20,"text":357,"correct":22},{"key":24,"text":359,"correct":22},{"key":28,"text":569,"correct":22},"定期保养所用辅料费",{"key":31,"text":363,"correct":26},{"id":572,"libraryId":5,"type":15,"typeLabel":16,"stem":573,"options":574,"answer":24,"analysis":33},895240,"关于施工机械安拆费和场外运费的说法，正确的是()。",[575,577,579,581],{"key":20,"text":576,"correct":22},"安拆费指安拆一次所需的人工、材料和机械使用费之和",{"key":24,"text":578,"correct":26},"安拆费中包括机械辅助设施的折旧费",{"key":28,"text":580,"correct":22},"安拆复杂、移动需要起重及运输机械的重型施工机械，其安拆费及场外运费不予计算",{"key":31,"text":582,"correct":22},"固定在车间的施工机械，计算安拆费及场外运费",[584,587,590,593,596,599],{"id":15,"name":585,"category":7,"favorite":586},"领导干部任职前廉政法规知识测试题",92,{"id":588,"name":589,"category":7,"favorite":15},595,"建筑结构与设备",{"id":591,"name":592,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":594,"name":595,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":597,"name":598,"category":7,"favorite":8},534,"BIM工程师",{"id":600,"name":598,"category":7,"favorite":8},535]