[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-581-8":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":604},{"id":5,"name":6,"category":7,"favorite":8},581,"建设工程造价管理基础知识","建筑工程",0,8,50,2873,[13,34,46,58,70,82,94,105,117,129,137,149,161,173,185,197,206,214,226,238,246,257,269,281,293,305,317,329,341,353,365,377,389,401,413,425,436,448,460,472,484,496,508,520,532,544,556,568,580,592],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":27,"analysis":33},895140,1,"单选题","下列属于建筑工程概算指标的是()。",[19,23,26,30],{"key":20,"text":21,"correct":22},"A","机械设备工程概算指标",false,{"key":24,"text":25,"correct":22},"B","电气设备及安装工程概算指标",{"key":27,"text":28,"correct":29},"C","采暖工程概算指标",true,{"key":31,"text":32,"correct":22},"D","器具及生产家具购置费概算指标","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":31,"analysis":33},895141,"关于概算指标的编制，下列说法中正确的是()。",[38,40,42,44],{"key":20,"text":39,"correct":22},"概算指标分为建筑安装工程概算指标和设备工器具概算指标",{"key":24,"text":41,"correct":22},"综合概算指标的准确性高于单项概算指标",{"key":27,"text":43,"correct":22},"单项形式的概算指标对工程结构形式可不作说明",{"key":31,"text":45,"correct":29},"构筑物的概算指标以预算书确定的价值为准，不必进行建筑面积换算",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":24,"analysis":33},895142,"下列工程中，属于概算指标编制对象的是()。",[50,52,54,56],{"key":20,"text":51,"correct":22},"分项工程",{"key":24,"text":53,"correct":29},"单位工程",{"key":27,"text":55,"correct":22},"分部工程",{"key":31,"text":57,"correct":22},"工序或施工过程",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":31,"analysis":33},895143,"概算定额与预算定额的主要不同之处在于()。",[62,64,66,68],{"key":20,"text":63,"correct":22},"贯彻的水平原则不同",{"key":24,"text":65,"correct":22},"表达的主要内容不同",{"key":27,"text":67,"correct":22},"表达的方式不同",{"key":31,"text":69,"correct":29},"项目划分和综合扩大程度不同",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":31,"analysis":33},895144,"概算定额基价不包括()。",[74,76,78,80],{"key":20,"text":75,"correct":22},"人工费",{"key":24,"text":77,"correct":22},"材料费",{"key":27,"text":79,"correct":22},"机械费",{"key":31,"text":81,"correct":29},"措施费",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":20,"analysis":33},895145,"概算定额与预算定额的差异主要表现在（）的不同。",[86,88,90,92],{"key":20,"text":87,"correct":29},"项目划分",{"key":24,"text":89,"correct":22},"主要工程内容",{"key":27,"text":91,"correct":22},"主要表达方式",{"key":31,"text":93,"correct":22},"基本使用方法",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":27,"analysis":33},895146,"下列各项中，属于概算定额编制对象的是()。",[98,99,101,103],{"key":20,"text":53,"correct":22},{"key":24,"text":100,"correct":22},"分项工程和结构构件",{"key":27,"text":102,"correct":29},"扩大的分项工程或扩大的结构构件",{"key":31,"text":104,"correct":22},"建设项目、单项工程、单位工程",{"id":106,"libraryId":5,"type":15,"typeLabel":16,"stem":107,"options":108,"answer":27,"analysis":33},895147,"下列用工项目中，属于预算定额与劳动定额人工幅度差的是（）。",[109,111,113,115],{"key":20,"text":110,"correct":22},"施工机械辅助用工",{"key":24,"text":112,"correct":22},"超过预算定额取定运距增加的运输用工",{"key":27,"text":114,"correct":29},"班组操作地点转移用工",{"key":31,"text":116,"correct":22},"机械维修引起的操作人员停工",{"id":118,"libraryId":5,"type":15,"typeLabel":16,"stem":119,"options":120,"answer":20,"analysis":33},895148,"在计算预算定额人工工日消耗量时，基本用工中除包括完成定额计量单位的主要用工外，还应包括（）。",[121,123,125,127],{"key":20,"text":122,"correct":29},"劳动定额规定应增（减）计算的用工",{"key":24,"text":124,"correct":22},"劳动定额内不包括的材料加工用工",{"key":27,"text":126,"correct":22},"施工中不可避免的其他零星用工",{"key":31,"text":128,"correct":22},"质量检查和隐蔽",{"id":130,"libraryId":5,"type":15,"typeLabel":16,"stem":131,"options":132,"answer":31,"analysis":33},895149,"概算定额与预算定额的主要不同之处在于（）。",[133,134,135,136],{"key":20,"text":63,"correct":22},{"key":24,"text":65,"correct":22},{"key":27,"text":67,"correct":22},{"key":31,"text":69,"correct":29},{"id":138,"libraryId":5,"type":15,"typeLabel":16,"stem":139,"options":140,"answer":27,"analysis":33},895150,"下列用时中，同时包含在劳动定额和预算定额人工消耗量中的是（）。",[141,143,145,147],{"key":20,"text":142,"correct":22},"隐蔽工程验收的影响时间",{"key":24,"text":144,"correct":22},"工序搭接发生的停歇时间",{"key":27,"text":146,"correct":29},"不可避免的中断时间",{"key":31,"text":148,"correct":22},"加工材料所需的时间",{"id":150,"libraryId":5,"type":15,"typeLabel":16,"stem":151,"options":152,"answer":27,"analysis":33},895151,"关于预算定额人工、材料、机械台班消耗量的计算和确认，下列说法中正确的是（）。",[153,155,157,159],{"key":20,"text":154,"correct":22},"人工消耗中包含超出预算定额取定运距后的超运距用工",{"key":24,"text":156,"correct":22},"材料损耗量按照材料消耗量的一定比例计算",{"key":27,"text":158,"correct":29},"各种胶结、涂料等材料的配合比用料，按换算法计算",{"key":31,"text":160,"correct":22},"按小组产量计算机械台班产量时，机械幅度差系数取10%",{"id":162,"libraryId":5,"type":15,"typeLabel":16,"stem":163,"options":164,"answer":27,"analysis":33},895152,"在预算定额的编制阶段，下列选项中不属于确定编制细则阶段内容的是（）",[165,167,169,171],{"key":20,"text":166,"correct":22},"统一编制表格及编制方法",{"key":24,"text":168,"correct":22},"统一计算口径、计量单位和小数点位数",{"key":27,"text":170,"correct":29},"统一项目划分和工程量计算规则",{"key":31,"text":172,"correct":22},"统一名称、专业用语和符号代码",{"id":174,"libraryId":5,"type":15,"typeLabel":16,"stem":175,"options":176,"answer":31,"analysis":33},895153,"在预算定额人工工日消耗量计算时，已知完成单位合格产品的基本用工为22 工日，超运距用工为4 工日，辅助用工为2 工日，人工幅度差系数为12%，则预算定额中的人工工日消耗量为（）工日。",[177,179,181,183],{"key":20,"text":178,"correct":22},"3.36",{"key":24,"text":180,"correct":22},"25.36",{"key":27,"text":182,"correct":22},"28",{"key":31,"text":184,"correct":29},"31.36",{"id":186,"libraryId":5,"type":15,"typeLabel":16,"stem":187,"options":188,"answer":20,"analysis":33},895154,"某挖土机挖土一次循环工作时间为50s，每次循环平均挖土量为0.5m3，机械正常利用系数为0.8。机械幅度差系数为25%，按8 小时工作制考虑，挖土方预算定额的施工机具消耗量为（）台班\u002F1000m3。",[189,191,193,195],{"key":20,"text":190,"correct":29},"5.43",{"key":24,"text":192,"correct":22},"7.2",{"key":27,"text":194,"correct":22},"8",{"key":31,"text":196,"correct":22},"8.68",{"id":198,"libraryId":5,"type":15,"typeLabel":16,"stem":199,"options":200,"answer":20,"analysis":33},895155,"在计算预算定额人工消耗量时，基本用工中除包括完成定额计量单位的主要用工外，还应包括()。",[201,202,203,204],{"key":20,"text":122,"correct":29},{"key":24,"text":124,"correct":22},{"key":27,"text":126,"correct":22},{"key":31,"text":205,"correct":22},"质量检查和隐蔽工程验收用工",{"id":207,"libraryId":5,"type":15,"typeLabel":16,"stem":208,"options":209,"answer":31,"analysis":33},895156,"在预算定额人工工日消耗量计算时，已知完成单位合格产品的基本用工为22工日，超运距用工为4工日，辅助用工为2工日，人工幅度差系数是12%，则预算定额中的人工工日消耗量为()工日。",[210,211,212,213],{"key":20,"text":178,"correct":22},{"key":24,"text":180,"correct":22},{"key":27,"text":182,"correct":22},{"key":31,"text":184,"correct":29},{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":24,"analysis":33},895157,"在计算预算定额人工工日消耗量时，对于工种间的工序搭接及交叉作业相互配合影响所发生的停歇用工，应列入()。",[218,220,222,224],{"key":20,"text":219,"correct":22},"辅助用工",{"key":24,"text":221,"correct":29},"人工幅度差",{"key":27,"text":223,"correct":22},"基本用工",{"key":31,"text":225,"correct":22},"超运距用工",{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":31,"analysis":33},895158,"完成某单位分部分项工程需要基本用工4.2工日，超运距用工0.3工日，辅助用工1工日，人工幅度差系数为10%，则该单位分部分项工程预算定额人工消耗量为（）工日。",[230,232,234,236],{"key":20,"text":231,"correct":22},"5.92",{"key":24,"text":233,"correct":22},"5.95",{"key":27,"text":235,"correct":22},"6.02",{"key":31,"text":237,"correct":29},"6.05",{"id":239,"libraryId":5,"type":15,"typeLabel":16,"stem":240,"options":241,"answer":20,"analysis":33},895159,"某挖土机挖土一次正常循环工作时间为50s，每次循环平均挖土量为0.5m3，机械正常利用系数为0.8，机械幅度差系数为25%，按8小时工作制考虑，挖土方预算定额的机械台班消耗量为( )台班\u002F1000m3。",[242,243,244,245],{"key":20,"text":190,"correct":29},{"key":24,"text":192,"correct":22},{"key":27,"text":194,"correct":22},{"key":31,"text":196,"correct":22},{"id":247,"libraryId":5,"type":15,"typeLabel":16,"stem":248,"options":249,"answer":31,"analysis":33},895160,"在计算预算定额人工工日消耗量时，包含在人工幅度差内的用工是（）。",[250,251,253,255],{"key":20,"text":225,"correct":22},{"key":24,"text":252,"correct":22},"材料加工用工",{"key":27,"text":254,"correct":22},"机械土方工程的配合用工",{"key":31,"text":256,"correct":29},"工种交叉作业相互影响的停歇用工",{"id":258,"libraryId":5,"type":15,"typeLabel":16,"stem":259,"options":260,"answer":20,"analysis":33},895161,"下列工程项目总投资构成项中，应计入单项工程投资估算指标中的是()。",[261,263,265,267],{"key":20,"text":262,"correct":29},"生产家具购置费",{"key":24,"text":264,"correct":22},"基本预备费",{"key":27,"text":266,"correct":22},"涨价预备费",{"key":31,"text":268,"correct":22},"铺底流动资金",{"id":270,"libraryId":5,"type":15,"typeLabel":16,"stem":271,"options":272,"answer":31,"analysis":33},895162,"下列施工机械的停歇时间，不在预算定额机械幅度差中考虑的是（）。",[273,275,277,279],{"key":20,"text":274,"correct":22},"机械维修引起的停歇",{"key":24,"text":276,"correct":22},"工程质量检查引起的停歇",{"key":27,"text":278,"correct":22},"机械转移工作面引起的停歇",{"key":31,"text":280,"correct":29},"进行准备与结束工作时引起的停歇",{"id":282,"libraryId":5,"type":15,"typeLabel":16,"stem":283,"options":284,"answer":20,"analysis":33},895163,"单位工程投资估算指标的内容应该是( )。",[285,287,289,291],{"key":20,"text":286,"correct":29},"建筑安装工程费用",{"key":24,"text":288,"correct":22},"设备购置费用",{"key":27,"text":290,"correct":22},"设备、工器具购置费用",{"key":31,"text":292,"correct":22},"建筑安装工程费用与设备、工器具购置费用之和",{"id":294,"libraryId":5,"type":15,"typeLabel":16,"stem":295,"options":296,"answer":31,"analysis":33},895164,"下列工人工作时间消耗中，属于有效工作时间的是()。",[297,299,301,303],{"key":20,"text":298,"correct":22},"因混凝土养护引起的停工时间",{"key":24,"text":300,"correct":22},"偶然停工（停水、停电）增加的时间",{"key":27,"text":302,"correct":22},"产品质量不合格返工的工作时间",{"key":31,"text":304,"correct":29},"准备施工工具花费的时间",{"id":306,"libraryId":5,"type":15,"typeLabel":16,"stem":307,"options":308,"answer":31,"analysis":33},895165,"通过计时观察，完成某工程的基本工时为6h\u002F㎡，辅助工作时间为工序作业时间的8%。规范时间占工作时间的15%，则完成该工程的时间定额是()工日／㎡。",[309,311,313,315],{"key":20,"text":310,"correct":22},"0.93",{"key":24,"text":312,"correct":22},"0.94",{"key":27,"text":314,"correct":22},"0.95",{"key":31,"text":316,"correct":29},"0.96",{"id":318,"libraryId":5,"type":15,"typeLabel":16,"stem":319,"options":320,"answer":27,"analysis":33},895166,"砌筑一砖厚砖墙，灰缝厚度为10mm，砖的施工损耗率为1.5%，场外运输损耗率为1%。砖的规格为240mm×115mm×53mm，则每m3砖墙工程中砖的定额消耗量为()块。",[321,323,325,327],{"key":20,"text":322,"correct":22},"515.56",{"key":24,"text":324,"correct":22},"520.64",{"key":27,"text":326,"correct":29},"537.04",{"key":31,"text":328,"correct":22},"542.33",{"id":330,"libraryId":5,"type":15,"typeLabel":16,"stem":331,"options":332,"answer":31,"analysis":33},895167,"下列对于测时法的特征描述中，正确的是( )。",[333,335,337,339],{"key":20,"text":334,"correct":22},"测时法既适用于测定重复的循环工作时间，也适用于测定非循环工作时间",{"key":24,"text":336,"correct":22},"选择测时法比接续测时法准确、完善，但观察技术也较之复杂",{"key":27,"text":338,"correct":22},"当所测定的各工序的延续时间比较短时，接续测时法较选择测时法方便",{"key":31,"text":340,"correct":29},"测时法的观察次数应该根据误差理论和经验数据相结合的方法来确定",{"id":342,"libraryId":5,"type":15,"typeLabel":16,"stem":343,"options":344,"answer":20,"analysis":33},895169,"某出料容量750L的混凝土搅拌机，每循环一次的正常延续时间为9min，机械正常利用系数为0.9.按8小时工作制考虑，该机械的台班产量定额为（）。",[345,347,349,351],{"key":20,"text":346,"correct":29},"36m3\u002F台班",{"key":24,"text":348,"correct":22},"40m3\u002F台班",{"key":27,"text":350,"correct":22},"0.28台班\u002Fm3",{"key":31,"text":352,"correct":22},"0.25台班\u002Fm3",{"id":354,"libraryId":5,"type":15,"typeLabel":16,"stem":355,"options":356,"answer":20,"analysis":33},895170,"运输汽车装载保温泡沫板，因体积大但重量不足而引起的汽车在降低负荷的情况下工作的时间属于机器工作时间消耗中的()。",[357,359,361,363],{"key":20,"text":358,"correct":29},"有效工作时间",{"key":24,"text":360,"correct":22},"不可避免的无负荷工作时间",{"key":27,"text":362,"correct":22},"多余工作时间",{"key":31,"text":364,"correct":22},"低负荷下的工作时间",{"id":366,"libraryId":5,"type":15,"typeLabel":16,"stem":367,"options":368,"answer":27,"analysis":33},895171,"根据计时观察法测定某人工挖基坑二类土1m3的有关数据如下：基本工作时间180min，辅助工作时间占工序作业时间的百分比为10%，规范时间占工作日时间百分比为20%，则挖该基坑1m3的定额时间为()min。",[369,371,373,375],{"key":20,"text":370,"correct":22},"243.0",{"key":24,"text":372,"correct":22},"247.5",{"key":27,"text":374,"correct":29},"250.0",{"key":31,"text":376,"correct":22},"257.1",{"id":378,"libraryId":5,"type":15,"typeLabel":16,"stem":379,"options":380,"answer":24,"analysis":33},895172,"确定材料消耗量时，现场技术测定法主要用来测定材料()。",[381,383,385,387],{"key":20,"text":382,"correct":22},"消耗量定额",{"key":24,"text":384,"correct":29},"损耗定额",{"key":27,"text":386,"correct":22},"净用量定额",{"key":31,"text":388,"correct":22},"必需消耗量",{"id":390,"libraryId":5,"type":15,"typeLabel":16,"stem":391,"options":392,"answer":24,"analysis":33},895173,"根据计时观测资料得知：每平方米标准砖墙勾缝时间为10min，辅助工作时间占工序作业时间的比例为5%，准备结束时间、不可避免中断时间、休息时间占工作班时间的比例分别为3%、2%、15%。则每立方米砌体1标准砖厚的砖墙勾缝的产量定额为()m3／工日。",[393,395,397,399],{"key":20,"text":394,"correct":22},"8.621",{"key":24,"text":396,"correct":29},"8.772",{"key":27,"text":398,"correct":22},"9.174",{"key":31,"text":400,"correct":22},"14.493",{"id":402,"libraryId":5,"type":15,"typeLabel":16,"stem":403,"options":404,"answer":27,"analysis":33},895174,"某土方施工机械一次循环的正常时间为2.2min，每循环工作一次挖土0.5m3，工作班的延续时间为8h，机械正常利用系数为0.85。则该土方施工机械的产量定额为()m3\u002F台班。",[405,407,409,411],{"key":20,"text":406,"correct":22},"7.01",{"key":24,"text":408,"correct":22},"7.48",{"key":27,"text":410,"correct":29},"92.73",{"key":31,"text":412,"correct":22},"448.80",{"id":414,"libraryId":5,"type":15,"typeLabel":16,"stem":415,"options":416,"answer":31,"analysis":33},895175,"砌筑每立方米一砖厚砖墙，砖(240mm×115mm×53mm)的净用量为529块，灰缝厚度为10mm，砖的损耗率为1%，砂浆的损耗率为2%。则每立方米一砖厚砖墙的砂浆消耗量为()m3。",[417,419,421,423],{"key":20,"text":418,"correct":22},"0.217",{"key":24,"text":420,"correct":22},"0.222",{"key":27,"text":422,"correct":22},"0.226",{"key":31,"text":424,"correct":29},"0.231",{"id":426,"libraryId":5,"type":15,"typeLabel":16,"stem":427,"options":428,"answer":20,"analysis":33},895176,"在工人工作时间分类中，由于材料供应不及时引起工作班内的工时损失应列入()。",[429,431,433,435],{"key":20,"text":430,"correct":29},"施工本身造成的停工时间",{"key":24,"text":432,"correct":22},"非施工本身造成的停工时间",{"key":27,"text":434,"correct":22},"准备与结束工作时间",{"key":31,"text":146,"correct":22},{"id":437,"libraryId":5,"type":15,"typeLabel":16,"stem":438,"options":439,"answer":27,"analysis":33},895177,"用计时观察法测定时间消耗的诸多方法中，精确度较高的方法是()。",[440,442,444,446],{"key":20,"text":441,"correct":22},"数示法",{"key":24,"text":443,"correct":22},"图示法",{"key":27,"text":445,"correct":29},"接续法",{"key":31,"text":447,"correct":22},"选择法",{"id":449,"libraryId":5,"type":15,"typeLabel":16,"stem":450,"options":451,"answer":27,"analysis":33},895178,"在编制材料定额消耗量时，用于确定材料损耗定额的方法主要是()。",[452,454,456,458],{"key":20,"text":453,"correct":22},"理论计算法",{"key":24,"text":455,"correct":22},"经验统计法",{"key":27,"text":457,"correct":29},"现场技术测定法",{"key":31,"text":459,"correct":22},"实验室试验法",{"id":461,"libraryId":5,"type":15,"typeLabel":16,"stem":462,"options":463,"answer":20,"analysis":33},895179,"当确定测时法的观察次数时，通常考虑的因素是（ ）。",[464,466,468,470],{"key":20,"text":465,"correct":29},"算数平均值的精确度及数列的稳定系数",{"key":24,"text":467,"correct":22},"算数平均值的精确度及已经达到的功效水平的稳定程度",{"key":27,"text":469,"correct":22},"被测定的工人人数及数列的稳定系数",{"key":31,"text":471,"correct":22},"被测定的工人人数及同时测定不同类型施工过程的数目",{"id":473,"libraryId":5,"type":15,"typeLabel":16,"stem":474,"options":475,"answer":24,"analysis":33},895180,"已知每平方米砖墙的勾缝时间为8min，则每立方米一砖半厚墙所需的勾缝时间为( ) min。",[476,478,480,482],{"key":20,"text":477,"correct":22},"12. 00",{"key":24,"text":479,"correct":29},"21. 92",{"key":27,"text":481,"correct":22},"22. 22",{"key":31,"text":483,"correct":22},"33. 33",{"id":485,"libraryId":5,"type":15,"typeLabel":16,"stem":486,"options":487,"answer":27,"analysis":33},895181,"确定施工机械台班定额消耗量前需计算机械时间利用系数，其计算公式正确的是（）。",[488,490,492,494],{"key":20,"text":489,"correct":22},"机械时间利用系数=机械纯工作1h正常生产率×工作班纯工作时间",{"key":24,"text":491,"correct":22},"机械时间利用系数=1\u002F机械台班产量定额",{"key":27,"text":493,"correct":29},"机械时间利用系数=机械在一个工作班内纯工作时间\u002F一个工作班延续时间（8h）",{"key":31,"text":495,"correct":22},"机械时间利用系数=一个工作班延续时间（8h）\u002F机械在一个工作班内纯工作时间",{"id":497,"libraryId":5,"type":15,"typeLabel":16,"stem":498,"options":499,"answer":20,"analysis":33},895182,"已知砌筑1m3砖墙中砖净量和损耗量分别为529块、6块，百块砖体积按0.146m3计算，砂浆损耗率为10%。则砌筑1m3砖墙的砂浆用量为（）m3。",[500,502,504,506],{"key":20,"text":501,"correct":29},"0.250",{"key":24,"text":503,"correct":22},"0.253",{"key":27,"text":505,"correct":22},"0.241",{"key":31,"text":507,"correct":22},"0.243",{"id":509,"libraryId":5,"type":15,"typeLabel":16,"stem":510,"options":511,"answer":27,"analysis":33},895183,"下列因素中，影响施工过程的技术因素是()。",[512,514,516,518],{"key":20,"text":513,"correct":22},"工人技术水平",{"key":24,"text":515,"correct":22},"操作方法",{"key":27,"text":517,"correct":29},"机械设备性能",{"key":31,"text":519,"correct":22},"劳动组织",{"id":521,"libraryId":5,"type":15,"typeLabel":16,"stem":522,"options":523,"answer":31,"analysis":33},895184,"关于工序特征的描述，下列说法中正确的是()。",[524,526,528,530],{"key":20,"text":525,"correct":22},"劳动者、工作地点不变，劳动工具、劳动对象可变",{"key":24,"text":527,"correct":22},"劳动对象、劳动工具不变，劳动者、工作地点可变",{"key":27,"text":529,"correct":22},"劳动对象、劳动工具、工作地点不变，劳动者可变",{"key":31,"text":531,"correct":29},"劳动者、劳动对象和使用的劳动工具均不发生变化",{"id":533,"libraryId":5,"type":15,"typeLabel":16,"stem":534,"options":535,"answer":31,"analysis":33},895185,"下列施工机械消耗时间中，属于机械必需消耗时间的是()。",[536,538,540,542],{"key":20,"text":537,"correct":22},"未及时供料引起的机械停工时间",{"key":24,"text":539,"correct":22},"由于气候条件引起的机械停工时间",{"key":27,"text":541,"correct":22},"装料不足时的机械运转时间",{"key":31,"text":543,"correct":29},"因机械保养而中断使用的时间",{"id":545,"libraryId":5,"type":15,"typeLabel":16,"stem":546,"options":547,"answer":24,"analysis":33},895186,"已知1㎡墙勾缝时间为8min，则1m3一砖半厚墙所需的勾缝时间为()min。",[548,550,552,554],{"key":20,"text":549,"correct":22},"12.00",{"key":24,"text":551,"correct":29},"21.92",{"key":27,"text":553,"correct":22},"22.22",{"key":31,"text":555,"correct":22},"33.33",{"id":557,"libraryId":5,"type":15,"typeLabel":16,"stem":558,"options":559,"answer":27,"analysis":33},895187,"出料容量为500L的砂浆搅拌机，每循环工作一次，需要运料、装料、搅拌、卸料和中断的时间分别为120s、30s、180s、30s、30s，其中运料与其他循环组成部分交叠的时间为30s。机械正常利用系数为0.8，则500L砂浆搅拌机的产量定额为()m3\u002F台班。(1m3=1000L)",[560,562,564,566],{"key":20,"text":561,"correct":22},"27.43",{"key":24,"text":563,"correct":22},"29.54",{"key":27,"text":565,"correct":29},"32.00",{"key":31,"text":567,"correct":22},"48.00",{"id":569,"libraryId":5,"type":15,"typeLabel":16,"stem":570,"options":571,"answer":24,"analysis":33},895188,"正常施工条件下，完成单位合格建筑产品所需某材料的不可避免损耗量为0.90kg，已知该材料的损耗率为7.20%，则其总消耗量为( )kg。",[572,574,576,578],{"key":20,"text":573,"correct":22},"13.5",{"key":24,"text":575,"correct":29},"13.4",{"key":27,"text":577,"correct":22},"12.5",{"key":31,"text":579,"correct":22},"11.6",{"id":581,"libraryId":5,"type":15,"typeLabel":16,"stem":582,"options":583,"answer":31,"analysis":33},895189,"用水泥砂浆砌筑2m3砖墙，标准砖（240mm×115mm×53mm）的总耗用量为1113块。已知砖的损耗率为5%，则标准砖、砂浆的净用量分别为（）。",[584,586,588,590],{"key":20,"text":585,"correct":22},"1057块、0.372m3",{"key":24,"text":587,"correct":22},"1057块、0.454m3",{"key":27,"text":589,"correct":22},"1060块、0.372m3",{"key":31,"text":591,"correct":29},"1060块、0.449m3",{"id":593,"libraryId":5,"type":15,"typeLabel":16,"stem":594,"options":595,"answer":24,"analysis":33},895190,"测编定额时，需对施工过程进行分解。对比工作过程的特点，工序还应具有的特征是()。",[596,598,600,602],{"key":20,"text":597,"correct":22},"人员编制不变",{"key":24,"text":599,"correct":29},"劳动工具不变",{"key":27,"text":601,"correct":22},"工作地点不变",{"key":31,"text":603,"correct":22},"工作时段不变",[605,608,611,614,617,620],{"id":15,"name":606,"category":7,"favorite":607},"领导干部任职前廉政法规知识测试题",92,{"id":609,"name":610,"category":7,"favorite":15},595,"建筑结构与设备",{"id":612,"name":613,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":615,"name":616,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":618,"name":619,"category":7,"favorite":8},534,"BIM工程师",{"id":621,"name":619,"category":7,"favorite":8},535]