[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-581-7":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":589},{"id":5,"name":6,"category":7,"favorite":8},581,"建设工程造价管理基础知识","建筑工程",0,7,50,2873,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,190,202,212,224,236,248,260,272,284,296,308,320,332,341,353,365,377,386,398,410,419,427,436,446,458,467,475,487,497,505,517,529,541,553,565,577],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":24,"analysis":33},895089,1,"单选题","工程计量工作包括工程项目的划分和工程量的计算，下列关于工程计量工作的说法中正确的是（）。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","项目划分须按预算定额规定的定额子项进行",false,{"key":24,"text":25,"correct":26},"B","通过项目划分确定单位工程基本构造单元",true,{"key":28,"text":29,"correct":22},"C","工程量的计算须按工程量清单计算规范的规则进行计算",{"key":31,"text":32,"correct":22},"D","工程量的计算应依据施工图设计文件，不应依据施工组织设计文件","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":28,"analysis":33},895090,"下面所列工程建设定额中，属于按定额编制程序和用途分类的是()。",[38,40,42,44],{"key":20,"text":39,"correct":22},"机械台班消耗定额",{"key":24,"text":41,"correct":22},"行业统一定额",{"key":28,"text":43,"correct":26},"投资估算指标",{"key":31,"text":45,"correct":22},"补充定额",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":20,"analysis":33},895091,"工程量清单计价的基础公式正确的是()",[50,52,54,56],{"key":20,"text":51,"correct":26},"分部分项工程费=∑（分部分项工程量×相应分部分项综合单价）",{"key":24,"text":53,"correct":22},"其他项目费=暂估价+计日工+总承包服务费",{"key":28,"text":55,"correct":22},"单位工程报价=分部分项工程费+措施项目费+其他项目费+规费",{"key":31,"text":57,"correct":22},"建设项目总报价=∑单位工程报价",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":20,"analysis":33},895092,"下列属于按定额反映的生产要素消耗内容分类的是()。",[62,64,66,68],{"key":20,"text":63,"correct":26},"劳动消耗定额",{"key":24,"text":65,"correct":22},"施工定额",{"key":28,"text":67,"correct":22},"预算定额",{"key":31,"text":69,"correct":22},"企业定额",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":28,"analysis":33},895093,"下列关于工程计价的说法中，正确的是（）。",[74,76,78,80],{"key":20,"text":75,"correct":22},"工程计价包含计算工程量和套定额两个环节",{"key":24,"text":77,"correct":22},"建筑安装工程费=∑基本构造单元工程量×相应单价",{"key":28,"text":79,"correct":26},"工程计价包括工程单价的确定和总价的计算",{"key":31,"text":81,"correct":22},"工程计价中的工程单价仅指综合单价",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":31,"analysis":33},895094,"根据我国建设市场发展现状，工程量清单计价和计量规范主要适用于（）。",[86,88,90,92],{"key":20,"text":87,"correct":22},"项目建设前期各阶段工程造价的估量",{"key":24,"text":89,"correct":22},"项目初步设计阶段概算的预测",{"key":28,"text":91,"correct":22},"项目施工图设计阶段预算的预测",{"key":31,"text":93,"correct":26},"项目合同价格的形式和后续合同价格的管理",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":24,"analysis":33},895095,"在工程概预算编制时，下列说法正确的是()。",[98,100,102,104],{"key":20,"text":99,"correct":22},"工程概预算的形成过程就是依据工程定额、预算价格和取费标准，经过不同层次的计算形成相应造价的过程",{"key":24,"text":101,"correct":26},"工程概预算编制的基本构造要素包括人工、材料和施工机具使用费",{"key":28,"text":103,"correct":22},"工程量计算书是根据施工图编制的",{"key":31,"text":105,"correct":22},"投资估算指标是确定工料单价的依据",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":28,"analysis":33},895096,"《建设工程工程量清单计价规范》GB50500-2013规定，分部分项工程量清单项目编码的第三级为表示()的顺序码。",[110,112,114,116],{"key":20,"text":111,"correct":22},"分项工程",{"key":24,"text":113,"correct":22},"扩大分项工程",{"key":28,"text":115,"correct":26},"分部工程",{"key":31,"text":117,"correct":22},"专业工程",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":20,"analysis":33},895097,"措施项目清单编制中，下列适用于以“项”为单位计价的措施项目费是()。",[122,124,126,128],{"key":20,"text":123,"correct":26},"已完工程及设备保护费",{"key":24,"text":125,"correct":22},"超高施工增加费",{"key":28,"text":127,"correct":22},"大型机械设备进出场及安拆费",{"key":31,"text":129,"correct":22},"施工排水、降水费",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":20,"analysis":33},895098,"招标工程清单编制时，在总承包服务费计价表中，应由招标人填写的内容是()。",[134,136,138,140],{"key":20,"text":135,"correct":26},"服务内容",{"key":24,"text":137,"correct":22},"项目价值",{"key":28,"text":139,"correct":22},"费率",{"key":31,"text":141,"correct":22},"金额",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":20,"analysis":33},895099,"有关社会保障费的计算基础，正确的是()。",[146,148,150,152],{"key":20,"text":147,"correct":26},"定额人工费",{"key":24,"text":149,"correct":22},"直接费",{"key":28,"text":151,"correct":22},"人工费+机械费",{"key":31,"text":153,"correct":22},"直接工程费",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":31,"analysis":33},895100,"关于工程量清单中的计日工，下列说法中正确的是（）。",[158,160,162,164],{"key":20,"text":159,"correct":22},"即指零星工作所消耗的人工工时",{"key":24,"text":161,"correct":22},"在投标时计入总价，其数量和单价由投标人填报",{"key":28,"text":163,"correct":22},"应按投标文件载明的数量和单价进行结算",{"key":31,"text":165,"correct":26},"在编制招标工程量清单时，暂定数量由招标人填写",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":24,"analysis":33},895101,"有关其他项目清单的表述，下列内容中正确的是()。",[170,172,174,176],{"key":20,"text":171,"correct":22},"暂列金额能保证合同结算价格不会超过合同价格",{"key":24,"text":173,"correct":26},"投标人应将材料暂估单价计入工程量清单综合单价报价中",{"key":28,"text":175,"correct":22},"专业工程的暂估价一般应是综合暂估价，应当包括管理费、利润、规费、税金在内",{"key":31,"text":177,"correct":22},"计日工适用的所谓零星工作一般是指合同约定之内的因变更而产生的额外工作",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":31,"analysis":33},895102,"若清单计价规范中的项目名称有缺陷，则处理方法是()。",[182,184,186,188],{"key":20,"text":183,"correct":22},"招标人作补充，并与投标人协商后执行",{"key":24,"text":185,"correct":22},"投标人作补充，并与招标人协商后执行",{"key":28,"text":187,"correct":22},"投标人作补充，并报当地工程造价管理机构（省级）备案",{"key":31,"text":189,"correct":26},"招标人作补充，并报当地工程造价管理机构（省级）备案",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":31,"analysis":33},895103,"下列费用项目中，应由投标人确定额度，并计入其他项目清单与计价汇总表中的是()。",[194,196,198,200],{"key":20,"text":195,"correct":22},"暂列金额",{"key":24,"text":197,"correct":22},"材料暂估价",{"key":28,"text":199,"correct":22},"专业工程暂估价",{"key":31,"text":201,"correct":26},"总承包服务费",{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":28,"analysis":33},895104,"根据《建设工程工程量清单计价规范》GB50500-2013的规定，在合同约定之外的或者因变更而产生的、工程量清单中没有相应的项目的额外工作，尤其是那些难以事先商定价格的额外工作，应计列入()之中。",[206,207,209,211],{"key":20,"text":195,"correct":22},{"key":24,"text":208,"correct":22},"暂估价",{"key":28,"text":210,"correct":26},"计日工",{"key":31,"text":201,"correct":22},{"id":213,"libraryId":5,"type":15,"typeLabel":16,"stem":214,"options":215,"answer":28,"analysis":33},895105,"在编制分部分项工程量清单时，通常无须描述的是()。",[216,218,220,222],{"key":20,"text":217,"correct":22},"工程结构",{"key":24,"text":219,"correct":22},"使用材质",{"key":28,"text":221,"correct":26},"工作内容",{"key":31,"text":223,"correct":22},"安装位置",{"id":225,"libraryId":5,"type":15,"typeLabel":16,"stem":226,"options":227,"answer":31,"analysis":33},895106,"有关计日工的表述，下列说法中正确的是( )。",[228,230,232,234],{"key":20,"text":229,"correct":22},"计日工表中的项目名称、数量和单价应由招标人填写",{"key":24,"text":231,"correct":22},"计日工表通常只对额外消耗的人工工时和单价进行约定",{"key":28,"text":233,"correct":22},"计日工适用的所谓零星工作一般是指变更而产生的、工程量清单中没有相应项目的额外工作，但通常是在合同约定之内",{"key":31,"text":235,"correct":26},"计日工是为了解决现场发生的零星工作的计价而设立的",{"id":237,"libraryId":5,"type":15,"typeLabel":16,"stem":238,"options":239,"answer":24,"analysis":33},895108,"关于建筑安装工程费用中的规费，下列说法中正确的是（）。",[240,242,244,246],{"key":20,"text":241,"correct":22},"规费是指由县级及以上有关权力部门规定必须缴纳或计取的费用",{"key":24,"text":243,"correct":26},"规费包括工程排污费和住房公积金",{"key":28,"text":245,"correct":22},"投标人在投标报价时填写的规费可高于规定的标准",{"key":31,"text":247,"correct":22},"社会保险费中包括建筑安装工程一切险的投保费用",{"id":249,"libraryId":5,"type":15,"typeLabel":16,"stem":250,"options":251,"answer":28,"analysis":33},895109,"编制工程量清单出现计算规范附录中未包括的清单项目时，编制人应作补充，下列有关编制补充项目的说法中正确的是（）。",[252,254,256,258],{"key":20,"text":253,"correct":22},"补充项目编码应由B与三位阿拉伯数字组成",{"key":24,"text":255,"correct":22},"补充项目应报县级工程造价管理机构备案",{"key":28,"text":257,"correct":26},"补充项目的工作内容应予以明确",{"key":31,"text":259,"correct":22},"补充项目编码应顺序编制，起始序号由编制人根据需要自主确定",{"id":261,"libraryId":5,"type":15,"typeLabel":16,"stem":262,"options":263,"answer":28,"analysis":33},895110,"采用工程量清单计价方式招标时，对工程量清单的完整性和准确性负责的是()。",[264,266,268,270],{"key":20,"text":265,"correct":22},"编制招标文件的招标代理人",{"key":24,"text":267,"correct":22},"编制清单的工程造价咨询人",{"key":28,"text":269,"correct":26},"发布招标文件的招标人",{"key":31,"text":271,"correct":22},"确定中标的投标人",{"id":273,"libraryId":5,"type":15,"typeLabel":16,"stem":274,"options":275,"answer":20,"analysis":33},895111,"关于分部分项工程量清单编制的说法，正确的是()。",[276,278,280,282],{"key":20,"text":277,"correct":26},"施工工程量大于按计算规则计算出的工程量的部分，由投标人在综合单价中考虑",{"key":24,"text":279,"correct":22},"在清单项目“工程内容”中包含的工作内容必须进行项目特征的描述",{"key":28,"text":281,"correct":22},"计价规范中就某一清单项目给出两个及以上计量单位时应选择最方便计算的单位",{"key":31,"text":283,"correct":22},"同一标段的工程量清单中含有多个项目特征相同的单位工程时，可采用相同的项目编码",{"id":285,"libraryId":5,"type":15,"typeLabel":16,"stem":286,"options":287,"answer":20,"analysis":33},895112,"除另有说明外，分部分项工程量清单表中的工程量应等于()。",[288,290,292,294],{"key":20,"text":289,"correct":26},"实体工程量",{"key":24,"text":291,"correct":22},"实体工程量+施工损耗",{"key":28,"text":293,"correct":22},"实体工程量+施工需要增加的工程量",{"key":31,"text":295,"correct":22},"实体工程量+措施工程量",{"id":297,"libraryId":5,"type":15,"typeLabel":16,"stem":298,"options":299,"answer":24,"analysis":33},895113,"根据《建设工程工程量清单计价规范》GB50500-2013，关于暂估价的说法中，正确的是()。",[300,302,304,306],{"key":20,"text":301,"correct":22},"材料、工程设备暂估价表中只填写原材料、燃料、构配件的暂估价",{"key":24,"text":303,"correct":26},"材料暂估价应纳入分部分项工程量清单项目综合单价",{"key":28,"text":305,"correct":22},"专业工程暂估价指完成专业工程的建筑安装工程费",{"key":31,"text":307,"correct":22},"专业工程暂估价由专业工程承包人填写",{"id":309,"libraryId":5,"type":15,"typeLabel":16,"stem":310,"options":311,"answer":20,"analysis":33},895114,"在工程量清单中，最能体现分部分项工程项目自身价值的本质是( )。",[312,314,316,318],{"key":20,"text":313,"correct":26},"项目特征",{"key":24,"text":315,"correct":22},"项目编码",{"key":28,"text":317,"correct":22},"项目名称",{"key":31,"text":319,"correct":22},"项目计量单位",{"id":321,"libraryId":5,"type":15,"typeLabel":16,"stem":322,"options":323,"answer":28,"analysis":33},895115,"在工程量清单的编制过程中，暂列金额通常是由()提供的。",[324,326,328,330],{"key":20,"text":325,"correct":22},"监理人",{"key":24,"text":327,"correct":22},"招标人与投标人协商后",{"key":28,"text":329,"correct":26},"招标人",{"key":31,"text":331,"correct":22},"投标人",{"id":333,"libraryId":5,"type":15,"typeLabel":16,"stem":334,"options":335,"answer":24,"analysis":33},895116,"根据《建设工程工程量清单计价规范》GB50500—2013，关于材料和专业工程暂估价的说法中，正确的是()。",[336,338,339,340],{"key":20,"text":337,"correct":22},"材料暂估价表中只填写原材料、燃料、构配件的暂估价",{"key":24,"text":303,"correct":26},{"key":28,"text":305,"correct":22},{"key":31,"text":307,"correct":22},{"id":342,"libraryId":5,"type":15,"typeLabel":16,"stem":343,"options":344,"answer":24,"analysis":33},895117,"专业工程的暂估价一般应是()。",[345,347,349,351],{"key":20,"text":346,"correct":22},"综合暂估价，应当包括的管理费、利润、规费、税金等取费",{"key":24,"text":348,"correct":26},"综合暂估价，应当包括除规费和税金以外的管理费、利润等取费",{"key":28,"text":350,"correct":22},"综合暂估价，应当包括除规费以外的管理费、利润、税金等取费",{"key":31,"text":352,"correct":22},"综合暂估价，应当包括除税金以外的管理费、利润、规费等取费",{"id":354,"libraryId":5,"type":15,"typeLabel":16,"stem":355,"options":356,"answer":31,"analysis":33},895118,"分部分项工程量清单项目编码以五级编码设置，其中第四级编码为()。",[357,359,361,363],{"key":20,"text":358,"correct":22},"工程分类顺序码",{"key":24,"text":360,"correct":22},"专业工程顺序码",{"key":28,"text":362,"correct":22},"分部工程顺序码",{"key":31,"text":364,"correct":26},"分项工程项目名称顺序码",{"id":366,"libraryId":5,"type":15,"typeLabel":16,"stem":367,"options":368,"answer":24,"analysis":33},895119,"根据《建设工程工程量清单计价规范》GB 50500-2013，关于计日工，下列说法中正确的是（）。",[369,371,373,375],{"key":20,"text":370,"correct":22},"计日工表包括各种人工，不应包括材料、施工机械",{"key":24,"text":372,"correct":26},"计日工按综合单价计价，按标时应计入投标总价",{"key":28,"text":374,"correct":22},"计日工表中的项目名称由招标人填写，工程数量由投标人填写",{"key":31,"text":376,"correct":22},"计日工单价由投标人自主确定，并按计日工表中所列数量结算",{"id":378,"libraryId":5,"type":15,"typeLabel":16,"stem":379,"options":380,"answer":24,"analysis":33},895120,"招标人在工程量清单中提供的用于支付宝必然发生但暂不能确定价格的材料、工程设备单价及专业工程金额是（）。",[381,382,383,384],{"key":20,"text":195,"correct":22},{"key":24,"text":208,"correct":26},{"key":28,"text":201,"correct":22},{"key":31,"text":385,"correct":22},"价差预备费",{"id":387,"libraryId":5,"type":15,"typeLabel":16,"stem":388,"options":389,"answer":28,"analysis":33},895121,"下列关于工程量清单计价的说法不正确的是（）。",[390,392,394,396],{"key":20,"text":391,"correct":22},"招标工程量清单应由具有编制能力的招标人或受其委托，具有相应资质的工程造价咨询人或招标代理人编制",{"key":24,"text":393,"correct":22},"采用工程量清单方式招标，招标工程量清单必须作为招标文件的组成部分",{"key":28,"text":395,"correct":26},"招标工程量清单的准确性和完整性由投标人负责",{"key":31,"text":397,"correct":22},"招标工程量清单应以单位（项）工程为单位编制",{"id":399,"libraryId":5,"type":15,"typeLabel":16,"stem":400,"options":401,"answer":31,"analysis":33},895122,"下列措施项目中,适合采用综合单价方式计价的是（）。",[402,404,406,408],{"key":20,"text":403,"correct":22},"已完工程及设备保护",{"key":24,"text":405,"correct":22},"二次搬运费",{"key":28,"text":407,"correct":22},"安全文明施工",{"key":31,"text":409,"correct":26},"混凝土、钢筋混凝土模板",{"id":411,"libraryId":5,"type":15,"typeLabel":16,"stem":412,"options":413,"answer":28,"analysis":33},895123,"根据《建设工程工程量清单计价规范》（GB50500—013）的规定，在合同约定之外的或者因变更而产生的、工程量清单中没有的且难以事先商定价格的额外工作，应计列入（）之中。",[414,415,416,417],{"key":20,"text":195,"correct":22},{"key":24,"text":208,"correct":22},{"key":28,"text":210,"correct":26},{"key":31,"text":418,"correct":22},"措施项目费",{"id":420,"libraryId":5,"type":15,"typeLabel":16,"stem":421,"options":422,"answer":28,"analysis":33},895124,"采用工程量清单计价方式招标时，对工程量清单的完整性和准确性负责的是（）。",[423,424,425,426],{"key":20,"text":265,"correct":22},{"key":24,"text":267,"correct":22},{"key":28,"text":269,"correct":26},{"key":31,"text":271,"correct":22},{"id":428,"libraryId":5,"type":15,"typeLabel":16,"stem":429,"options":430,"answer":24,"analysis":33},895125,"《建设工程工程量清单计价规范》（GB50500—2013）规定,招标时用于合同约定调整因素出现时的工程材料价款调整的费用应计人（）中。",[431,433,434,435],{"key":20,"text":432,"correct":22},"分部分项综合单价",{"key":24,"text":195,"correct":26},{"key":28,"text":197,"correct":22},{"key":31,"text":201,"correct":22},{"id":437,"libraryId":5,"type":15,"typeLabel":16,"stem":438,"options":439,"answer":20,"analysis":33},895126,"工程量清单计价模式下，在招投标阶段对尚未确定的某分部分项工程费，应列入（）中。",[440,441,443,444],{"key":20,"text":195,"correct":26},{"key":24,"text":442,"correct":22},"基本预备费",{"key":28,"text":208,"correct":22},{"key":31,"text":445,"correct":22},"工程建设其他费",{"id":447,"libraryId":5,"type":15,"typeLabel":16,"stem":448,"options":449,"answer":24,"analysis":33},895127,"分部分项工程量清单项目的工程量应以实体工程量为准,对于施工中的各种损耗和需要增加的工程量，投标人投标报价时，应在（）中考虑。",[450,452,454,456],{"key":20,"text":451,"correct":22},"措施项目",{"key":24,"text":453,"correct":26},"该清单项目的单价",{"key":28,"text":455,"correct":22},"其他项目清单",{"key":31,"text":457,"correct":22},"预留金",{"id":459,"libraryId":5,"type":15,"typeLabel":16,"stem":460,"options":461,"answer":24,"analysis":33},895128,"有关其他项目清单的表述，下列内容中正确的是（）。",[462,463,464,466],{"key":20,"text":171,"correct":22},{"key":24,"text":173,"correct":26},{"key":28,"text":465,"correct":22},"专业工程的暂估价一般是综合暂估价，应当包括管理费、利润、规费和税金",{"key":31,"text":177,"correct":22},{"id":468,"libraryId":5,"type":15,"typeLabel":16,"stem":469,"options":470,"answer":28,"analysis":33},895129,"《建设工程工程量清单计价规范》（GB50500-2013）规定，分部分项工程量清单项目编码的第三级为表示（）的顺序码。",[471,472,473,474],{"key":20,"text":111,"correct":22},{"key":24,"text":113,"correct":22},{"key":28,"text":115,"correct":26},{"key":31,"text":117,"correct":22},{"id":476,"libraryId":5,"type":15,"typeLabel":16,"stem":477,"options":478,"answer":31,"analysis":33},895130,"若投标人对某个工程量清单项目的单价和合价未予填报，则（）。",[479,481,483,485],{"key":20,"text":480,"correct":22},"招标人应及时通知投标人补充填报",{"key":24,"text":482,"correct":22},"表明投标人不负责该项任务",{"key":28,"text":484,"correct":22},"表明投标人认为该分项工程数量有误，需调整后再报价",{"key":31,"text":486,"correct":26},"视此项费用已在其他单价和合价中考虑",{"id":488,"libraryId":5,"type":15,"typeLabel":16,"stem":489,"options":490,"answer":20,"analysis":33},895131,"在编制措施项目清单时，关于混凝土模板及支架费项目，应在清单中列明()",[491,492,494,496],{"key":20,"text":315,"correct":26},{"key":24,"text":493,"correct":22},"计算基础",{"key":28,"text":495,"correct":22},"取费费率",{"key":31,"text":221,"correct":22},{"id":498,"libraryId":5,"type":15,"typeLabel":16,"stem":499,"options":500,"answer":24,"analysis":33},895132,"对于招标人在招标文件中提供的用于支付必然发生但暂时不能确定价格的材料金额计()。",[501,502,503,504],{"key":20,"text":195,"correct":22},{"key":24,"text":208,"correct":26},{"key":28,"text":210,"correct":22},{"key":31,"text":199,"correct":22},{"id":506,"libraryId":5,"type":15,"typeLabel":16,"stem":507,"options":508,"answer":20,"analysis":33},895133,"投资估算指标的编制步骤不包括（）。",[509,511,513,515],{"key":20,"text":510,"correct":26},"对比分析阶段",{"key":24,"text":512,"correct":22},"收集整理资料阶段",{"key":28,"text":514,"correct":22},"平衡调整阶段",{"key":31,"text":516,"correct":22},"测算审查阶段",{"id":518,"libraryId":5,"type":15,"typeLabel":16,"stem":519,"options":520,"answer":28,"analysis":33},895134,"下列关于投资估算指标的说法中，正确的是()",[521,523,525,527],{"key":20,"text":522,"correct":22},"只反映项目建设前期的动态投资",{"key":24,"text":524,"correct":22},"一般分为综合指标和单项工程指标两个层次",{"key":28,"text":526,"correct":26},"要考虑影响投资的动态因素",{"key":31,"text":528,"correct":22},"建设项目综合指标为各单项工程投资之和",{"id":530,"libraryId":5,"type":15,"typeLabel":16,"stem":531,"options":532,"answer":20,"analysis":33},895135,"下列各项指标，不属于投资估算指标内容的是()。",[533,535,537,539],{"key":20,"text":534,"correct":26},"分部分项工程指标",{"key":24,"text":536,"correct":22},"单位工程指标",{"key":28,"text":538,"correct":22},"单项工程指标",{"key":31,"text":540,"correct":22},"建设项目综合指标",{"id":542,"libraryId":5,"type":15,"typeLabel":16,"stem":543,"options":544,"answer":28,"analysis":33},895136,"下列属于建筑工程概算指标的是（）。",[545,547,549,551],{"key":20,"text":546,"correct":22},"机械设备工程概算指标",{"key":24,"text":548,"correct":22},"电气设备及安装工程概算指标",{"key":28,"text":550,"correct":26},"采暖工程概算指标",{"key":31,"text":552,"correct":22},"器具及生产家具购置费概算指标",{"id":554,"libraryId":5,"type":15,"typeLabel":16,"stem":555,"options":556,"answer":24,"analysis":33},895137,"下列不属于概算指标编制依据的是（）。",[557,559,561,563],{"key":20,"text":558,"correct":22},"标准设计图纸",{"key":24,"text":560,"correct":26},"施工图设计",{"key":28,"text":562,"correct":22},"工程造价资料",{"key":31,"text":564,"correct":22},"施工规范",{"id":566,"libraryId":5,"type":15,"typeLabel":16,"stem":567,"options":568,"answer":24,"analysis":33},895138,"概算指标与概算定额的区别在于（）。",[569,571,573,575],{"key":20,"text":570,"correct":22},"概算指标是与设计阶段相适应的计价依据",{"key":24,"text":572,"correct":26},"概算指标通常是以单位工程为对象",{"key":28,"text":574,"correct":22},"概算指标的编制应遵循平均水平的原则",{"key":31,"text":576,"correct":22},"概算定额中含有消耗量指标",{"id":578,"libraryId":5,"type":15,"typeLabel":16,"stem":579,"options":580,"answer":20,"analysis":33},895139,"在概算指标编制时，关于不同类型工程应选取的计算单位，下列说法中符合要求的是()。",[581,583,585,587],{"key":20,"text":582,"correct":26},"安装工程以占设备购置费的百分比表示",{"key":24,"text":584,"correct":22},"建筑工程以综合生产能力的单位投资表示",{"key":28,"text":586,"correct":22},"构筑物以每m3的投资表示",{"key":31,"text":588,"correct":22},"建设项目以使用功能的单位投资表示",[590,593,596,599,602,605],{"id":15,"name":591,"category":7,"favorite":592},"领导干部任职前廉政法规知识测试题",92,{"id":594,"name":595,"category":7,"favorite":15},595,"建筑结构与设备",{"id":597,"name":598,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":600,"name":601,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":603,"name":604,"category":7,"favorite":8},534,"BIM工程师",{"id":606,"name":604,"category":7,"favorite":8},535]