[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-581-6":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":602},{"id":5,"name":6,"category":7,"favorite":8},581,"建设工程造价管理基础知识","建筑工程",0,6,50,2873,[13,34,46,58,67,79,91,103,115,127,139,151,163,175,187,199,211,223,235,247,259,271,283,294,306,318,329,341,349,361,373,383,395,407,419,431,443,455,467,478,486,498,510,522,534,542,554,566,578,590],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":27,"analysis":33},895038,1,"单选题","下列费用中，不属于工程建设其他费用中工程保险费的是（）。",[19,23,26,30],{"key":20,"text":21,"correct":22},"A","建筑安装工程一切险保费",false,{"key":24,"text":25,"correct":22},"B","引进设备财产保险保费",{"key":27,"text":28,"correct":29},"C","危险作业意外伤害险保费",true,{"key":31,"text":32,"correct":22},"D","人身意外伤害险保费","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":24,"analysis":33},895039,"关于征地补偿费用的说法中，正确的是（）。",[38,40,42,44],{"key":20,"text":39,"correct":22},"征地补偿费标准为该地被征用前三年平均年产值的4~6 倍",{"key":24,"text":41,"correct":29},"土地补偿费归农村集体经济组织所有",{"key":27,"text":43,"correct":22},"地上附着物及青苗补偿费归农村集体所有",{"key":31,"text":45,"correct":22},"被征用耕地的安置补助费最高不超过被征用前三年平均年产值的30 倍",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":31,"analysis":33},895040,"下列费用项目中，属于工程建设其他费中研究试验费的是( )。",[50,52,54,56],{"key":20,"text":51,"correct":22},"新产品试制费",{"key":24,"text":53,"correct":22},"水文地质勘察费",{"key":27,"text":55,"correct":22},"特殊设备安全监督检验费",{"key":31,"text":57,"correct":29},"委托专业机构验证设计参数而发生的验证费",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":27,"analysis":33},895041,"下列费用中，不属于工程建设其他费用中工程保险费的是()。",[62,63,64,66],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":22},{"key":27,"text":65,"correct":29},"工伤保险费",{"key":31,"text":32,"correct":22},{"id":68,"libraryId":5,"type":15,"typeLabel":16,"stem":69,"options":70,"answer":27,"analysis":33},895042,"某行政大厅工程项目，建设期为3 年，建设期内在第1 年和第2 年均衡获得的贷款额分别为2000 万元，第3 年均衡获得的贷款额为1500 万元，贷款年利率为6%，期内只计息不支付，建设期应计利息为（）万元。",[71,73,75,77],{"key":20,"text":72,"correct":22},"359.62",{"key":24,"text":74,"correct":22},"525.00",{"key":27,"text":76,"correct":29},"543.22",{"key":31,"text":78,"correct":22},"719.23",{"id":80,"libraryId":5,"type":15,"typeLabel":16,"stem":81,"options":82,"answer":20,"analysis":33},895043,"根据我国现行规定，关于预备费的说法中，不正确的是（）。",[83,85,87,89],{"key":20,"text":84,"correct":29},"基本预备费以工程费用为计算基数",{"key":24,"text":86,"correct":22},"实行工程保险的工程项目，基本预备费应适当降低",{"key":27,"text":88,"correct":22},"价差预备费以静态投资为计算基数",{"key":31,"text":90,"correct":22},"价差预备费应包括利率、汇率调整增加的费用",{"id":92,"libraryId":5,"type":15,"typeLabel":16,"stem":93,"options":94,"answer":31,"analysis":33},895044,"某建设项目工程费用为7200 万元，工程建设其他费用为1800 万元,基本预备费为400 万元，项目前期年限1 年,建设期3 年，各年度完成投资计划额的比例分别为20%、40%与40%,年涨价率为6%，则该项目建设期第2年价差预备费为（）万元。",[95,97,99,101],{"key":20,"text":96,"correct":22},"451.63",{"key":24,"text":98,"correct":22},"464.74",{"key":27,"text":100,"correct":22},"564.54",{"key":31,"text":102,"correct":29},"589.63",{"id":104,"libraryId":5,"type":15,"typeLabel":16,"stem":105,"options":106,"answer":27,"analysis":33},895046,"例：某建设项目建设期为三年，各年分别获得贷款2000 万元、4000 万元和2000 万元，贷款分年度均衡发放，年利率为6%，建设期利息只计息不支付，则建设期第三年应计贷款利息为（）万元。",[107,109,111,113],{"key":20,"text":108,"correct":22},"420.016",{"key":24,"text":110,"correct":22},"434.616",{"key":27,"text":112,"correct":29},"438.216",{"key":31,"text":114,"correct":22},"467.216",{"id":116,"libraryId":5,"type":15,"typeLabel":16,"stem":117,"options":118,"answer":24,"analysis":33},895047,"某项目建设前期可视为0 年，建设期3 年，在第一年静态投资2000 万元，第二年2000 万元，第三年1000万元，年均投资价格上涨率为5%,则该项目的价差预备费为()万元。",[119,121,123,125],{"key":20,"text":120,"correct":22},"250.00",{"key":24,"text":122,"correct":29},"330,98",{"key":27,"text":124,"correct":22},"462.63",{"key":31,"text":126,"correct":22},"570.25",{"id":128,"libraryId":5,"type":15,"typeLabel":16,"stem":129,"options":130,"answer":20,"analysis":33},895048,"某建设项目工程费用为2000 万元，工程建设其他费用为800 万元，已知基本预备费费率为10%,项目建设前期为1 年,建设期3 年，各年投资计划额为:第1 年20%,第2 年50%，第3 年30%。若年涨价率为5%，则该项目建设期间价差预备费为（）万元。",[131,133,135,137],{"key":20,"text":132,"correct":29},"418.61",{"key":24,"text":134,"correct":22},"334.30",{"key":27,"text":136,"correct":22},"323.4",{"key":31,"text":138,"correct":22},"505.01",{"id":140,"libraryId":5,"type":15,"typeLabel":16,"stem":141,"options":142,"answer":20,"analysis":33},895049,"关于建设期利息的说法，正确的是()。",[143,145,147,149],{"key":20,"text":144,"correct":29},"建设期利息包括在建设期内发生的为工程项目筹集资金的融资费用利息",{"key":24,"text":146,"correct":22},"总贷款分年均衡发放时，建设期利息计算可按当年借款在年初支用考虑",{"key":27,"text":148,"correct":22},"建设期利息不包括国外贷款银行以年利率方式收取的各种管理费",{"key":31,"text":150,"correct":22},"建设期利息不包括国内代理机构以年利率方式收取的转贷费和担保费",{"id":152,"libraryId":5,"type":15,"typeLabel":16,"stem":153,"options":154,"answer":31,"analysis":33},895050,"预备费包括基本预备费和价差预备费，其中价差预备费的计算应是( )。",[155,157,159,161],{"key":20,"text":156,"correct":22},"以编制年份的静态投资额为基数，采用单利方法",{"key":24,"text":158,"correct":22},"以编制年份的静态投资额为基数，采用复利方法",{"key":27,"text":160,"correct":22},"以估算年份价格水平的投资额为基数，采用单利方法",{"key":31,"text":162,"correct":29},"以估算年份价格水平的投资额为基数，采用复利方法",{"id":164,"libraryId":5,"type":15,"typeLabel":16,"stem":165,"options":166,"answer":20,"analysis":33},895051,"关于我国现行建设项目投资构成的说法中，正确的是()。",[167,169,171,173],{"key":20,"text":168,"correct":29},"固定资产投资为建设投资和建设期利息之和",{"key":24,"text":170,"correct":22},"工程费用为直接费、间接费、利润和税金之和",{"key":27,"text":172,"correct":22},"生产性建设项目总投资为建设投资和建设期利息之和",{"key":31,"text":174,"correct":22},"工程造价为工程费用、工程建设其他费用和预备费之和",{"id":176,"libraryId":5,"type":15,"typeLabel":16,"stem":177,"options":178,"answer":24,"analysis":33},895052,"下列费用中，属于生产准备费的是()。",[179,181,183,185],{"key":20,"text":180,"correct":22},"专利技术使用费",{"key":24,"text":182,"correct":29},"生产职工培训费",{"key":27,"text":184,"correct":22},"市政公用设施费",{"key":31,"text":186,"correct":22},"工程保险费",{"id":188,"libraryId":5,"type":15,"typeLabel":16,"stem":189,"options":190,"answer":31,"analysis":33},895053,"某建设项目，经投资估算确定的工程费用为2100万元，工程建设其他费为900万元，项目建设期为2年，每年各完成投资计划50%。年均投资价格上涨率为10%，基本预备费费率为5%，项目建设前期1年。该项目建设期的价差预备费为()万元。",[191,193,195,197],{"key":20,"text":192,"correct":22},"350.67",{"key":24,"text":194,"correct":22},"396.86",{"key":27,"text":196,"correct":22},"443.88",{"key":31,"text":198,"correct":29},"665.83",{"id":200,"libraryId":5,"type":15,"typeLabel":16,"stem":201,"options":202,"answer":27,"analysis":33},895054,"某新建项目，建设期4年，分年均衡进行贷款，第一年贷款1000万元，以后各年贷款均为500万元，年贷款利率为6%，建设期内利息只计息不支付，该项目建设期利息为()万元。",[203,205,207,209],{"key":20,"text":204,"correct":22},"76.80",{"key":24,"text":206,"correct":22},"106.80",{"key":27,"text":208,"correct":29},"366.30",{"key":31,"text":210,"correct":22},"389.35",{"id":212,"libraryId":5,"type":15,"typeLabel":16,"stem":213,"options":214,"answer":24,"analysis":33},895055,"某新建项目，建设期2年，第一年贷款200万元，第二年贷款500万元。贷款在年度内均衡发放。根据贷款协定：年利率为8%，每半年计息一次，贷款本息均在项目投产后偿还，则该项目建设期的贷款利息是()万元。",[215,217,219,221],{"key":20,"text":216,"correct":22},"44.16",{"key":24,"text":218,"correct":29},"45.55",{"key":27,"text":220,"correct":22},"22.08",{"key":31,"text":222,"correct":22},"37.39",{"id":224,"libraryId":5,"type":15,"typeLabel":16,"stem":225,"options":226,"answer":24,"analysis":33},895056,"某项目建设期为2年，分年均衡进行贷款，在建设期第一年贷款2000万元，第2年贷款3000万元，贷款年利率为8%，建设期内利息只计息不支付，则该项目第二年的建设期贷款利息估算为()万元。",[227,229,231,233],{"key":20,"text":228,"correct":22},"80.4",{"key":24,"text":230,"correct":29},"286.4",{"key":27,"text":232,"correct":22},"160",{"key":31,"text":234,"correct":22},"240",{"id":236,"libraryId":5,"type":15,"typeLabel":16,"stem":237,"options":238,"answer":27,"analysis":33},895057,"某建设项目建设期为三年，各年分别获得贷款2000万元、4000万元和2000万元，贷款分年度均衡发放，年利率为6%，建设期利息只计息不支付，则建设期第二年应计利息为()万元。",[239,241,243,245],{"key":20,"text":240,"correct":22},"120.0",{"key":24,"text":242,"correct":22},"240.0",{"key":27,"text":244,"correct":29},"243.6",{"key":31,"text":246,"correct":22},"367.2",{"id":248,"libraryId":5,"type":15,"typeLabel":16,"stem":249,"options":250,"answer":31,"analysis":33},895058,"一般自然灾害造成的损失和预防自然灾害所采取的措施费用，应计入()。",[251,253,255,257],{"key":20,"text":252,"correct":22},"现场经费",{"key":24,"text":254,"correct":22},"施工企业管理费",{"key":27,"text":256,"correct":22},"价差预备费",{"key":31,"text":258,"correct":29},"基本预备费",{"id":260,"libraryId":5,"type":15,"typeLabel":16,"stem":261,"options":262,"answer":24,"analysis":33},895059,"某项目共需要贷款资金900万元，建设期为3年，按年度均衡筹资，第一年贷款为300万元，第二年贷款为400万元，建设期内只计利息但不支付，年利率为10%，则第2年的建设期利息应为（）万元。",[263,265,267,269],{"key":20,"text":264,"correct":22},"50",{"key":24,"text":266,"correct":29},"51.5",{"key":27,"text":268,"correct":22},"71.5",{"key":31,"text":270,"correct":22},"86.65",{"id":272,"libraryId":5,"type":15,"typeLabel":16,"stem":273,"options":274,"answer":27,"analysis":33},895060,"某建设项目静态投资20000万元，项目建设前期年限为1年，建设期为2年，计划每年完成投资50%，年均投资价格上涨率为5%，该项目建设期价差预备费为（）万元。",[275,277,279,281],{"key":20,"text":276,"correct":22},"1006.25",{"key":24,"text":278,"correct":22},"1525.00",{"key":27,"text":280,"correct":29},"2056.56",{"key":31,"text":282,"correct":22},"2601.25",{"id":284,"libraryId":5,"type":15,"typeLabel":16,"stem":285,"options":286,"answer":27,"analysis":33},895061,"根据我国现行规定，关于预备费的说法中，正确的是()。",[287,288,290,292],{"key":20,"text":84,"correct":22},{"key":24,"text":289,"correct":22},"实行工程保险的工程项目，基本预备费应适当提高",{"key":27,"text":291,"correct":29},"价差预备费以工程费用、工程建设其他费用和基本预备费之和为计算基数",{"key":31,"text":293,"correct":22},"价差预备费不包括利率、汇率调整增加的费用",{"id":295,"libraryId":5,"type":15,"typeLabel":16,"stem":296,"options":297,"answer":27,"analysis":33},895062,"根据我国现行建设项目投资构成，下列费用项目中属于建设期利息包含内容的是()。",[298,300,302,304],{"key":20,"text":299,"correct":22},"建设单位建设期后发生的利息",{"key":24,"text":301,"correct":22},"施工单位建设期长期贷款利息",{"key":27,"text":303,"correct":29},"国内代理机构收取的贷款管理费",{"key":31,"text":305,"correct":22},"国外贷款机构收取的转贷费",{"id":307,"libraryId":5,"type":15,"typeLabel":16,"stem":308,"options":309,"answer":27,"analysis":33},895063,"某新建项目，建设期3年，第一年贷款300万元，第二年贷款600万元，第三年没有贷款。贷款在年度内均衡发放。根据贷款协定：年利率为4%，以年利率方式收取的担保费和管理费率共计2%，贷款本息均在项目投产后偿还，则该项目第三年的贷款利息是()万元。",[310,312,314,316],{"key":20,"text":311,"correct":22},"36.00",{"key":24,"text":313,"correct":22},"54.54",{"key":27,"text":315,"correct":29},"56.73",{"key":31,"text":317,"correct":22},"58.38",{"id":319,"libraryId":5,"type":15,"typeLabel":16,"stem":320,"options":321,"answer":24,"analysis":33},895064,"某建设项目在竣工验收时，为了鉴定一项隐蔽工程质量，进行了必要挖掘，则该项挖掘费用应计入()。",[322,324,325,327],{"key":20,"text":323,"correct":22},"涨价预备费",{"key":24,"text":258,"correct":29},{"key":27,"text":326,"correct":22},"间接费",{"key":31,"text":328,"correct":22},"其他间接费",{"id":330,"libraryId":5,"type":15,"typeLabel":16,"stem":331,"options":332,"answer":27,"analysis":33},895065,"某项目建设期内第一年贷款100万元，第二年贷款200万元，贷款在各年内均衡发放，且均衡偿还，年利率10%，建设期内利息只计息不支付，则建设期利息为()万元。",[333,335,337,339],{"key":20,"text":334,"correct":22},"30",{"key":24,"text":336,"correct":22},"40",{"key":27,"text":338,"correct":29},"25.5",{"key":31,"text":340,"correct":22},"41",{"id":342,"libraryId":5,"type":15,"typeLabel":16,"stem":343,"options":344,"answer":31,"analysis":33},895066,"某建设项目工程费用为7200万元，工程建设其他费用为1800万元，基本预备费为400万元，项目前期年限1年，建设期3年，各年度完成投资计划额的比例分别为20%、40%与40%，年涨价率为6%，则该项目建设期第二年价差预备费为()万元。",[345,346,347,348],{"key":20,"text":96,"correct":22},{"key":24,"text":98,"correct":22},{"key":27,"text":100,"correct":22},{"key":31,"text":102,"correct":29},{"id":350,"libraryId":5,"type":15,"typeLabel":16,"stem":351,"options":352,"answer":24,"analysis":33},895067,"某新建项目，建设期2年，建设期内贷款分年度均衡发放，且只计息不还款，第1年贷款600万元，第2年贷款400万元，年利率为7%。则该项目的建设期利息为()万元。",[353,355,357,359],{"key":20,"text":354,"correct":22},"77.00",{"key":24,"text":356,"correct":29},"78.47",{"key":27,"text":358,"correct":22},"112.00",{"key":31,"text":360,"correct":22},"114.94",{"id":362,"libraryId":5,"type":15,"typeLabel":16,"stem":363,"options":364,"answer":27,"analysis":33},895068,"自行组织培训或委托其他单位培训的人员工资、工资性补贴、职工福利费、差旅交通费、劳动保护费、学习资料费等支出应计入()。",[365,367,369,371],{"key":20,"text":366,"correct":22},"建筑安装工程费",{"key":24,"text":368,"correct":22},"建设单位管理费",{"key":27,"text":370,"correct":29},"生产准备",{"key":31,"text":372,"correct":22},"联合试运转费",{"id":374,"libraryId":5,"type":15,"typeLabel":16,"stem":375,"options":376,"answer":24,"analysis":33},895069,"在我国建设项目投资构成中，超规超限设备运输增加的费用属于( )。",[377,379,380,382],{"key":20,"text":378,"correct":22},"设备及工器具购置费",{"key":24,"text":258,"correct":29},{"key":27,"text":381,"correct":22},"工程建设其他费",{"key":31,"text":366,"correct":22},{"id":384,"libraryId":5,"type":15,"typeLabel":16,"stem":385,"options":386,"answer":27,"analysis":33},895070,"按现行对基本预备费内容的规定，不属于基本预备费范围的是()费用。",[387,389,391,393],{"key":20,"text":388,"correct":22},"设计变更增加的",{"key":24,"text":390,"correct":22},"局部地基处理增加的",{"key":27,"text":392,"correct":29},"利率调整增加的",{"key":31,"text":394,"correct":22},"预防自然灾害采取的措施",{"id":396,"libraryId":5,"type":15,"typeLabel":16,"stem":397,"options":398,"answer":31,"analysis":33},895071,"工料单价不包括的内容是（）。",[399,401,403,405],{"key":20,"text":400,"correct":22},"人工费",{"key":24,"text":402,"correct":22},"材料费",{"key":27,"text":404,"correct":22},"机械费",{"key":31,"text":406,"correct":29},"企业管理费",{"id":408,"libraryId":5,"type":15,"typeLabel":16,"stem":409,"options":410,"answer":20,"analysis":33},895072,"在编制工程概预算时，下列说法正确的是（）。",[411,413,415,417],{"key":20,"text":412,"correct":29},"工程概预算的形成过程就是依据工程定额、预算价格和取费标准，经过不同层次的计算形成相应造价的过程",{"key":24,"text":414,"correct":22},"工程概预算编制的基本构造要素包括人工、材料和施工机械",{"key":27,"text":416,"correct":22},"工程量计算书是根据施工图编制的",{"key":31,"text":418,"correct":22},"投资估算指标是确定工程单价的依据",{"id":420,"libraryId":5,"type":15,"typeLabel":16,"stem":421,"options":422,"answer":27,"analysis":33},895073,"关于预算定额性质与特点的说法，不正确的是（）。",[423,425,427,429],{"key":20,"text":424,"correct":22},"一种计价性定额",{"key":24,"text":426,"correct":22},"以分项工程为对象编制",{"key":27,"text":428,"correct":29},"反映平均先进水平",{"key":31,"text":430,"correct":22},"以施工定额为基础编制",{"id":432,"libraryId":5,"type":15,"typeLabel":16,"stem":433,"options":434,"answer":27,"analysis":33},895074,"关于工程定额计价模式的说法，不正确的是（）。",[435,437,439,441],{"key":20,"text":436,"correct":22},"编制建设工程造价的基本过程包括工程量计算和工程计价",{"key":24,"text":438,"correct":22},"定额的特点是具有相对稳定性",{"key":27,"text":440,"correct":29},"定额计价中不考虑不可预见费",{"key":31,"text":442,"correct":22},"定额在计价中起指导性作用",{"id":444,"libraryId":5,"type":15,"typeLabel":16,"stem":445,"options":446,"answer":27,"analysis":33},895075,"下面所列工程建设定额中，属于按定额编制程序和用途分类的是（）。",[447,449,451,453],{"key":20,"text":448,"correct":22},"机械台班消耗定额",{"key":24,"text":450,"correct":22},"行业通用定额",{"key":27,"text":452,"correct":29},"投资估算指标",{"key":31,"text":454,"correct":22},"补充定额",{"id":456,"libraryId":5,"type":15,"typeLabel":16,"stem":457,"options":458,"answer":24,"analysis":33},895076,"下列工程计价的标准和依据中，适用于项目建设前期各阶段对建设投资进行预测和估计的是（）。",[459,461,463,465],{"key":20,"text":460,"correct":22},"工程量清单计价规范",{"key":24,"text":462,"correct":29},"工程定额",{"key":27,"text":464,"correct":22},"工程量清单计量规范",{"key":31,"text":466,"correct":22},"工程承包合同文件",{"id":468,"libraryId":5,"type":15,"typeLabel":16,"stem":469,"options":470,"answer":31,"analysis":33},895077,"该工程定额是在项目建议书和可行性研究阶段编制投资估算、计算投资需要量时使用的一种定额，往往以独立的单项工程或完整的工程项目为计算对象，编制内容是所有项目费用之和，其编制基础仍然离不开预算定额、概算定额。此工程定额是（）。",[471,473,475,477],{"key":20,"text":472,"correct":22},"预算定额",{"key":24,"text":474,"correct":22},"概算定额",{"key":27,"text":476,"correct":22},"概算指标",{"key":31,"text":452,"correct":29},{"id":479,"libraryId":5,"type":15,"typeLabel":16,"stem":480,"options":481,"answer":24,"analysis":33},895078,"下列工程计价的标准和依据中，适用于项目建设前期各阶段对建设投资进行预测和估计的是()。",[482,483,484,485],{"key":20,"text":460,"correct":22},{"key":24,"text":462,"correct":29},{"key":27,"text":464,"correct":22},{"key":31,"text":466,"correct":22},{"id":487,"libraryId":5,"type":15,"typeLabel":16,"stem":488,"options":489,"answer":27,"analysis":33},895079,"工程量清单计价模式下，企业定额是编制()的依据。",[490,492,494,496],{"key":20,"text":491,"correct":22},"招标控制价",{"key":24,"text":493,"correct":22},"招标文件",{"key":27,"text":495,"correct":29},"投标报价",{"key":31,"text":497,"correct":22},"清单工程量",{"id":499,"libraryId":5,"type":15,"typeLabel":16,"stem":500,"options":501,"answer":24,"analysis":33},895080,"作为工程定额体系的重要组成部分，预算定额是( )。",[502,504,506,508],{"key":20,"text":503,"correct":22},"完成一定计价单位的某一施工过程所需要消耗的人工、材料和机械台班数量标准",{"key":24,"text":505,"correct":29},"完成一定计量单位合格分项工程和结构构件所需消耗的人工、材料、施工机械台班数量及其费用标准",{"key":27,"text":507,"correct":22},"完成单位合格扩大分项工程所需消耗的人工、材料和施工机械台班数量及费用标准",{"key":31,"text":509,"correct":22},"完成一个规定计量单位建筑安装产品的费用消耗标准",{"id":511,"libraryId":5,"type":15,"typeLabel":16,"stem":512,"options":513,"answer":31,"analysis":33},895081,"依法必须采用工程量清单招标的建设项目，投标人需要采用而招标人不需采用的计价依据是（）。",[514,516,518,520],{"key":20,"text":515,"correct":22},"国家、地区或行业定额资料",{"key":24,"text":517,"correct":22},"工程造价信息、资料和指数",{"key":27,"text":519,"correct":22},"计价活动相关规章规程",{"key":31,"text":521,"correct":29},"企业定额",{"id":523,"libraryId":5,"type":15,"typeLabel":16,"stem":524,"options":525,"answer":20,"analysis":33},895082,"任何一个建设项目都可以分解为一个或几个()。",[526,528,530,532],{"key":20,"text":527,"correct":29},"单项工程",{"key":24,"text":529,"correct":22},"单位工程",{"key":27,"text":531,"correct":22},"单元工程",{"key":31,"text":533,"correct":22},"分部工程",{"id":535,"libraryId":5,"type":15,"typeLabel":16,"stem":536,"options":537,"answer":31,"analysis":33},895083,"工料单价不包括()。",[538,539,540,541],{"key":20,"text":400,"correct":22},{"key":24,"text":402,"correct":22},{"key":27,"text":404,"correct":22},{"key":31,"text":406,"correct":29},{"id":543,"libraryId":5,"type":15,"typeLabel":16,"stem":544,"options":545,"answer":31,"analysis":33},895084,"劳动消耗定额主要表现形式是()。",[546,548,550,552],{"key":20,"text":547,"correct":22},"产量定额",{"key":24,"text":549,"correct":22},"台班定额",{"key":27,"text":551,"correct":22},"工日定额",{"key":31,"text":553,"correct":29},"时间定额",{"id":555,"libraryId":5,"type":15,"typeLabel":16,"stem":556,"options":557,"answer":24,"analysis":33},895085,"关于建设工程的分部组合计价，下列说法正确的是（）。",[558,560,562,564],{"key":20,"text":559,"correct":22},"适用于没有具体图样和工程量清单的建设项目计价",{"key":24,"text":561,"correct":29},"要求将建设项目细分到最基本的构造单元",{"key":27,"text":563,"correct":22},"是利用产出函数进行计价",{"key":31,"text":565,"correct":22},"具有自上而下、由粗到细的计价组合特点",{"id":567,"libraryId":5,"type":15,"typeLabel":16,"stem":568,"options":569,"answer":20,"analysis":33},895086,"工程计价的基本原理表达式：分部分项工程费=∑[()×相应单价]。",[570,572,574,576],{"key":20,"text":571,"correct":29},"基本构造单元工程量",{"key":24,"text":573,"correct":22},"分项工程量",{"key":27,"text":575,"correct":22},"单位清单工程量",{"key":31,"text":577,"correct":22},"检验批工程量",{"id":579,"libraryId":5,"type":15,"typeLabel":16,"stem":580,"options":581,"answer":24,"analysis":33},895087,"下列说法中，准确表述工程计价基本原理的是()。",[582,584,586,588],{"key":20,"text":583,"correct":22},"项目的分解",{"key":24,"text":585,"correct":29},"分部分项工程费=∑[基本构造单元工程量（定额项目或清单项目）×相应单价]",{"key":27,"text":587,"correct":22},"工程计量与工程定额",{"key":31,"text":589,"correct":22},"项目的划分和工程量的计算",{"id":591,"libraryId":5,"type":15,"typeLabel":16,"stem":592,"options":593,"answer":31,"analysis":33},895088,"工程量清单计价中，不是编制投标报价和招标控制价时共同依据的资料是()。",[594,596,598,600],{"key":20,"text":595,"correct":22},"资料和指数",{"key":24,"text":597,"correct":22},"国家、地区或行业定额",{"key":27,"text":599,"correct":22},"工程造价信息",{"key":31,"text":601,"correct":29},"投标人拟定的施工组织设计方案",[603,606,609,612,615,618],{"id":15,"name":604,"category":7,"favorite":605},"领导干部任职前廉政法规知识测试题",92,{"id":607,"name":608,"category":7,"favorite":15},595,"建筑结构与设备",{"id":610,"name":611,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":613,"name":614,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":616,"name":617,"category":7,"favorite":8},534,"BIM工程师",{"id":619,"name":617,"category":7,"favorite":8},535]