[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-581-56":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":746},{"id":5,"name":6,"category":7,"favorite":8},581,"建设工程造价管理基础知识","建筑工程",0,56,50,2873,[13,38,53,68,83,98,112,127,142,157,171,186,200,215,230,245,259,273,287,302,316,331,346,360,375,389,404,418,432,446,460,475,489,504,518,533,547,561,576,590,604,619,633,647,661,675,689,703,718,732],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},897645,2,"多选题","(2013年)某建设项目由厂房、办公楼、宿舍等单项工程组成，则可包含在各单项工程综合概算中的内容有()。",[19,23,26,30,33],{"key":20,"text":21,"correct":22},"A","机械设备及安装工程概算",true,{"key":24,"text":25,"correct":22},"B","电气设备及安装工程概算",{"key":27,"text":28,"correct":29},"C","工程建设其他费用概算",false,{"key":31,"text":32,"correct":22},"D","特殊构筑物工程概算",{"key":34,"text":35,"correct":29},"E","流动资金概算","ABD","",{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":52,"analysis":37},897646,"(2014年)建筑工程概算的编制方法主要有（）",[42,44,46,48,50],{"key":20,"text":43,"correct":29},"设备价值百分比法",{"key":24,"text":45,"correct":22},"概算定额法",{"key":27,"text":47,"correct":29},"综合吨位指标法",{"key":31,"text":49,"correct":22},"概算指标法",{"key":34,"text":51,"correct":22},"类似工程预算法","BDE",{"id":54,"libraryId":5,"type":15,"typeLabel":16,"stem":55,"options":56,"answer":67,"analysis":37},897647,"(2015年)关于施工图预算对投资方的作用，下列说法中正确的有( )。",[57,59,61,63,65],{"key":20,"text":58,"correct":22},"是控制施工图设计不突破设计概算的重要措施",{"key":24,"text":60,"correct":22},"是控制造价及资金合理使用的依据",{"key":27,"text":62,"correct":29},"是投标报价的基础",{"key":31,"text":64,"correct":29},"是与施工预算进行“两算”对比的依据",{"key":34,"text":66,"correct":29},"是调配施工力量、组织材料供应的依据","AB",{"id":69,"libraryId":5,"type":15,"typeLabel":16,"stem":70,"options":71,"answer":82,"analysis":37},897648,"(2016年)施工图预算对投资方、施工企业都具有十分重要的作用。下列选项中仅属于对施工企业作用的有()。",[72,74,76,78,80],{"key":20,"text":73,"correct":29},"确定合同价款的依据",{"key":24,"text":75,"correct":29},"控制资金合理使用的依据",{"key":27,"text":77,"correct":22},"控制工程施工成本的依据",{"key":31,"text":79,"correct":22},"调配施工力量的依据",{"key":34,"text":81,"correct":29},"办理工程结算的依据","CD",{"id":84,"libraryId":5,"type":15,"typeLabel":16,"stem":85,"options":86,"answer":97,"analysis":37},897649,"根据《工程建设项目施工招标投标法》，工程施工项目招标信息发布时，正确的有（）。（2014）",[87,89,91,93,95],{"key":20,"text":88,"correct":29},"指定媒介可以酌情收取额费用",{"key":24,"text":90,"correct":22},"招标文件售出后不予退还",{"key":27,"text":92,"correct":29},"招标人应至少在两家指定的媒介发布招标公告",{"key":31,"text":94,"correct":29},"招标人可以对招标文件所附的设计文件向投标人收取一定费用",{"key":34,"text":96,"correct":22},"自招标文件出售之日起至停止出售之日止，最短不得少于5个工作日","BE",{"id":99,"libraryId":5,"type":15,"typeLabel":16,"stem":100,"options":101,"answer":52,"analysis":37},897650,"投标人须知是招标人向投标人传递的基础信息文件，投标人应特别注意其中的( )。（2013）",[102,104,106,108,110],{"key":20,"text":103,"correct":29},"招标人的责权利",{"key":24,"text":105,"correct":22},"招标工程的范围和详细内容",{"key":27,"text":107,"correct":29},"施工技术说明",{"key":31,"text":109,"correct":22},"投标文件的组成",{"key":34,"text":111,"correct":22},"重要的时间安排",{"id":113,"libraryId":5,"type":15,"typeLabel":16,"stem":114,"options":115,"answer":126,"analysis":37},897651,"依据《中华人民共和国招标投标法实施条例》，招标人以不合理条件限制、排斥投标人的行为有（ ）。2017",[116,118,120,122,124],{"key":20,"text":117,"correct":22},"就同一招标项目向投标人提供有差别的项目信息",{"key":24,"text":119,"correct":22},"就同一招标项目对投标人采取不同的资格审查标准",{"key":27,"text":121,"correct":22},"招标项目以获得鲁班奖工程业绩作为加分条件",{"key":31,"text":123,"correct":22},"招标项目指定特定的专利作为中标条件",{"key":34,"text":125,"correct":29},"依照招标项目的总体特点设定专门的技术条件","ABCD",{"id":128,"libraryId":5,"type":15,"typeLabel":16,"stem":129,"options":130,"answer":141,"analysis":37},897652,"【2018年真题】下列情形中，依法可以不招标的项目有（ ）。",[131,133,135,137,139],{"key":20,"text":132,"correct":22},"需要使用不可替代的施工专有技术的项目",{"key":24,"text":134,"correct":29},"采购人的全资子公司能够自行建设的",{"key":27,"text":136,"correct":22},"需要向原中标人采购工程，否则将影响施工或者功能配套要求的",{"key":31,"text":138,"correct":29},"只有少量潜在投标人可供选择的项目",{"key":34,"text":140,"correct":22},"已通过招标方式选定的特许经营项目投资人依法能够自行建设的","ACE",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":156,"analysis":37},897653,"【2017年真题】下列招标情形中，属于不合理条件限制、排斥潜在投标人或者投标人的有（ ）。",[146,148,150,152,154],{"key":20,"text":147,"correct":22},"就同一招标项目向潜在投标人或者投标人提供有差别的项目信息",{"key":24,"text":149,"correct":22},"设定的资格、技术、上午条件与招标项目的具体特点和实际需要不相适应",{"key":27,"text":151,"correct":22},"先订或者指定特定的专利、商标、品牌、原产地或者供应商",{"key":31,"text":153,"correct":29},"对不同的潜在投标人或者投标人采取相同的资格审查或者评标标准",{"key":34,"text":155,"correct":22},"依法必须进行招标的项目以特定行业的业绩、奖项作为加分条件或者中标条件","ABCE",{"id":158,"libraryId":5,"type":15,"typeLabel":16,"stem":159,"options":160,"answer":126,"analysis":37},897654,"【2016年真题】根据《和暂行规定》，下列文件属于投标文件内容的有（ ）。",[161,163,165,167,169],{"key":20,"text":162,"correct":22},"投标函及其附录",{"key":24,"text":164,"correct":22},"施工组织设计",{"key":27,"text":166,"correct":22},"项目管理机构",{"key":31,"text":168,"correct":22},"法定代表人身份证明",{"key":34,"text":170,"correct":29},"投标邀请书",{"id":172,"libraryId":5,"type":15,"typeLabel":16,"stem":173,"options":174,"answer":185,"analysis":37},897655,"【2018年真题】下列情形中，招标人应当拒收的投标文件有（ ）。",[175,177,179,181,183],{"key":20,"text":176,"correct":22},"逾期送送达的",{"key":24,"text":178,"correct":29},"投标人未提交投标保证金的",{"key":27,"text":180,"correct":29},"投标人的法定代表人未到场的",{"key":31,"text":182,"correct":22},"未按招标文件要求密封的",{"key":34,"text":184,"correct":29},"投标人对招标文件有异议的","AD",{"id":187,"libraryId":5,"type":15,"typeLabel":16,"stem":188,"options":189,"answer":52,"analysis":37},897656,"(2013年)关于投标文件的编制与递交，下列说法中正确的有()。",[190,192,194,196,198],{"key":20,"text":191,"correct":29},"投标函附录中不可以提出比招标文件要求更能吸引招标人的承诺",{"key":24,"text":193,"correct":22},"当投标文件的正本与副本不一致时以正本为准",{"key":27,"text":195,"correct":29},"允许递交备选投标方案时，所有投标人的备选方案应同等对待",{"key":31,"text":197,"correct":22},"在要求提交投标文件的截止时间后送达的投标文件为无效的投标文件",{"key":34,"text":199,"correct":22},"境内投标人以现金形式提交的投标保证金应当出自投标人的基本账户",{"id":201,"libraryId":5,"type":15,"typeLabel":16,"stem":202,"options":203,"answer":214,"analysis":37},897657,"(2016年)投标文件应当对招标文件作出实质性响应的内容有()。",[204,206,208,210,212],{"key":20,"text":205,"correct":29},"报价",{"key":24,"text":207,"correct":22},"工期",{"key":27,"text":209,"correct":22},"投标有效期",{"key":31,"text":211,"correct":22},"质量要求",{"key":34,"text":213,"correct":22},"招标范围","BCDE",{"id":216,"libraryId":5,"type":15,"typeLabel":16,"stem":217,"options":218,"answer":229,"analysis":37},897658,"(2015年)关于招标工程量清单的编制，下列说法正确的是( )。",[219,221,223,225,227],{"key":20,"text":220,"correct":22},"若采用标准图集能够全部满足项目特征描进的要求，项目特征描进可直接采用“详见xx图”的格式",{"key":24,"text":222,"correct":22},"措施项目清单的编制需考虑工程本身、水文、气象、环境、安全等多种因素",{"key":27,"text":224,"correct":29},"以“项”为计量单位的专业工程暂估价一般应包括管理费、规费、利润、税金等",{"key":31,"text":226,"correct":22},"工程量清单总说明应对工程概况、工程招标及分包范围、工程质量要求等进行描进",{"key":34,"text":228,"correct":22},"工程量清单编制依据包括设计文件、招标文件、施工现场情况、常规施工方案等","ABDE",{"id":231,"libraryId":5,"type":15,"typeLabel":16,"stem":232,"options":233,"answer":244,"analysis":37},897659,"(2013年)关于施工招标文件，下列说法中正确的有()。",[234,236,238,240,242],{"key":20,"text":235,"correct":22},"招标文件应包括拟签合同的主要条款",{"key":24,"text":237,"correct":22},"当进行资格预审时，招标文件中应包括投标邀请书",{"key":27,"text":239,"correct":29},"自招标文件开始发出之日起至投标截止之日最短不得少于5天",{"key":31,"text":241,"correct":29},"招标文件不得说明评标委员会的组建方法",{"key":34,"text":243,"correct":22},"招标文件应明确评标方法","ABE",{"id":246,"libraryId":5,"type":15,"typeLabel":16,"stem":247,"options":248,"answer":36,"analysis":37},897660,"(2015年)根据《建设工程工程量清单计价规》(GE50500-2010)，招标控制价中综合单价中应考虑的风险因素包括()。",[249,251,253,255,257],{"key":20,"text":250,"correct":22},"项目管理的复杂性",{"key":24,"text":252,"correct":22},"项目的技术难度",{"key":27,"text":254,"correct":29},"人工单价的市场变化",{"key":31,"text":256,"correct":22},"材料价格的市场风险",{"key":34,"text":258,"correct":29},"税金、规费的政策变化",{"id":260,"libraryId":5,"type":15,"typeLabel":16,"stem":261,"options":262,"answer":229,"analysis":37},897661,"(2014年)关于工程量清单中的项目特征描述，下列表述正确的是（）",[263,265,267,269,271],{"key":20,"text":264,"correct":22},"应符合工程量计算规范附录的规定",{"key":24,"text":266,"correct":22},"应能满足确定综合单价的需要",{"key":27,"text":268,"correct":29},"不能直接采用详见××图集的方式",{"key":31,"text":270,"correct":22},"可以采用文字描述和详见××图号的方式",{"key":34,"text":272,"correct":22},"应结合拟建工程的实际",{"id":274,"libraryId":5,"type":15,"typeLabel":16,"stem":275,"options":276,"answer":126,"analysis":37},897662,"(2015年)复核工程量是投标人编制投标报价前的一项重要工作。通过复核工程量，便于投标人( )。",[277,279,281,283,285],{"key":20,"text":278,"correct":22},"决定报价尺度",{"key":24,"text":280,"correct":22},"采取合适的施工方法",{"key":27,"text":282,"correct":22},"选用合适的施工机具",{"key":31,"text":284,"correct":22},"决定投入劳动力数量",{"key":34,"text":286,"correct":29},"选用合适的承包方式",{"id":288,"libraryId":5,"type":15,"typeLabel":16,"stem":289,"options":290,"answer":301,"analysis":37},897663,"(2015年)根据《建设工程工程量清单计价规范》( GB 50500-2013)，在其他项目清单中，应由投标人自主确定价格的有()。",[291,293,295,297,299],{"key":20,"text":292,"correct":29},"暂列金额",{"key":24,"text":294,"correct":29},"专业工程暂估价",{"key":27,"text":296,"correct":29},"材料暂估单价",{"key":31,"text":298,"correct":22},"计日工单价",{"key":34,"text":300,"correct":22},"总承包服务费","DE",{"id":303,"libraryId":5,"type":15,"typeLabel":16,"stem":304,"options":305,"answer":36,"analysis":37},897664,"(2015年)投标报价的调查询价阶段，总承包商对分包人询价时应注意的事项包括（）。",[306,308,310,312,314],{"key":20,"text":307,"correct":22},"分包标函的完整性",{"key":24,"text":309,"correct":22},"分包人的质量保证措施",{"key":27,"text":311,"correct":29},"分包人的成本和利润",{"key":31,"text":313,"correct":22},"分包工程单价所含内容",{"key":34,"text":315,"correct":29},"分包工程施工进度计划",{"id":317,"libraryId":5,"type":15,"typeLabel":16,"stem":318,"options":319,"answer":330,"analysis":37},897665,"（2017 年考题）根据我国现行施工招标投标管理规定，投标有效期的确定一般应考虑的因素有（ ）。",[320,322,324,326,328],{"key":20,"text":321,"correct":29},"投标报价需要的时间",{"key":24,"text":323,"correct":22},"组织评标需要的时间",{"key":27,"text":325,"correct":22},"确定中标人需要的时间",{"key":31,"text":327,"correct":22},"签订合同需要的时间",{"key":34,"text":329,"correct":29},"提交履约保证金需要的时间","BCD",{"id":332,"libraryId":5,"type":15,"typeLabel":16,"stem":333,"options":334,"answer":345,"analysis":37},897666,"某工程按月编制的成本计划如下图所示，若6 月、7 月实际完成的成本为700 万元和1000 万元，其余月份的实际成本与计划相同，则关于成本偏差的说法，正确的有（ ）。",[335,337,339,341,343],{"key":20,"text":336,"correct":29},"A．第7 个月末的计划成本累计值为3500 万元",{"key":24,"text":338,"correct":22},"B．第6 个月末的实际成本累计值为2550 万元",{"key":27,"text":340,"correct":22},"第6 个月末的计划成本累计值为2650 万元",{"key":31,"text":342,"correct":29},"若绘制S 型曲线，全部工作必须按照最早开工时间计算",{"key":34,"text":344,"correct":22},"第7 个月末的实际成本累计值为3550 万元","BCE",{"id":347,"libraryId":5,"type":15,"typeLabel":16,"stem":348,"options":349,"answer":301,"analysis":37},897667,"关于施工成本控制中材料用量控制及其方法的说法，正确的有（ ）。",[350,352,354,356,358],{"key":20,"text":351,"correct":29},"A．对于有消耗定额的材料，适合由作业者包干控制",{"key":24,"text":353,"correct":29},"B．指标控制是以消耗定额为依据，实行限额发料制度",{"key":27,"text":355,"correct":29},"对于部分小型及零星材料，在规定限额内分期分批领用",{"key":31,"text":357,"correct":22},"计量控制包括材料物资的收发计量检查和投料计量检查",{"key":34,"text":359,"correct":22},"对于没有消耗定额的材料，应制定领用材料指标，据以控制发料",{"id":361,"libraryId":5,"type":15,"typeLabel":16,"stem":362,"options":363,"answer":374,"analysis":37},897668,"某土方开挖工程于某年1 月开工，根据进度安排，同年2 月份计划完成土方量4000m3，计划单价80 元\u002Fm3。时至同年2 月底，实际完成工程量为4500m3，实际单价为78 元\u002Fm3，通过赢得值法分析可得到（ ）。",[364,366,368,370,372],{"key":20,"text":365,"correct":22},"A．进度提前完成40000 元工作量",{"key":24,"text":367,"correct":29},"B．进度延误完成40000 元工作量",{"key":27,"text":369,"correct":22},"费用节支9000 元",{"key":31,"text":371,"correct":29},"费用超支9000 元",{"key":34,"text":373,"correct":29},"费用超支31000 元","AC",{"id":376,"libraryId":5,"type":15,"typeLabel":16,"stem":377,"options":378,"answer":82,"analysis":37},897669,"若需对不同的工程项目做费用和进度的比较，进行分析适宜采用的评价指标有（ ）。",[379,381,383,385,387],{"key":20,"text":380,"correct":29},"A．费用偏差",{"key":24,"text":382,"correct":29},"B．进度偏差",{"key":27,"text":384,"correct":22},"费用绩效指数",{"key":31,"text":386,"correct":22},"进度绩效指数",{"key":34,"text":388,"correct":29},"项目完工预算",{"id":390,"libraryId":5,"type":15,"typeLabel":16,"stem":391,"options":392,"answer":403,"analysis":37},897670,"关于施工成本分析基本方法的用途的说法，正确的有（ ）。",[393,395,397,399,401],{"key":20,"text":394,"correct":22},"A．比较法通过技术经济指标的对比，检查目标的完成情况，分析产生差异的原因",{"key":24,"text":396,"correct":29},"B．差额计算法将两个性质不同而又相关的指标加以对比，求出比率",{"key":27,"text":398,"correct":22},"因素分析法可用来分析各种因素对成本的影响程度",{"key":31,"text":400,"correct":22},"动态比率法将同类指标不同时期的数值进行对比，分析指标的发展方向和速度",{"key":34,"text":402,"correct":29},"相关比率法通过构成比率，考察各成本项目占成本总量的比重","ACD",{"id":405,"libraryId":5,"type":15,"typeLabel":16,"stem":406,"options":407,"answer":141,"analysis":37},897671,"某工程主要工作是混凝土浇筑，中标的综合单价是400元\u002Fm2，计划工程量是8000m3。施工过程中因原材料价格提高使实际单价为500\u002F元m3，实际完成并经监理工程师确认的工程量是9000m3。若采用赢得值法进行综合分析，正确的结论有（ ）。",[408,410,412,414,416],{"key":20,"text":409,"correct":22},"已完工作预算费用为360万元",{"key":24,"text":411,"correct":29},"费用偏差为90万元，费用节省",{"key":27,"text":413,"correct":22},"已完工作实际费用为450万元",{"key":31,"text":415,"correct":29},"进度偏差为40万元，进度拖延",{"key":34,"text":417,"correct":22},"计划工作预算费用为320万元",{"id":419,"libraryId":5,"type":15,"typeLabel":16,"stem":420,"options":421,"answer":156,"analysis":37},897672,"承包商可以提出索赔的条件有（ ）。",[422,424,426,428,430],{"key":20,"text":423,"correct":22},"A．发包人违反合同给承包人造成时间、费用的损失",{"key":24,"text":425,"correct":22},"B．因工程变更造成的时间、费用损失",{"key":27,"text":427,"correct":22},"发包人提出提前竣工而造成承包人的费用增加",{"key":31,"text":429,"correct":29},"货款利率上调造成贷款利息增加",{"key":34,"text":431,"correct":22},"发包人延误支付期限造成承包人的损失",{"id":433,"libraryId":5,"type":15,"typeLabel":16,"stem":434,"options":435,"answer":229,"analysis":37},897673,"在价格调整公式中，P0 代表约定的付款证书中承包人应得到的已完成工程量的金额，此项金额在确定时不计取的费用有（ ）。",[436,438,440,442,444],{"key":20,"text":437,"correct":22},"A．价格调整",{"key":24,"text":439,"correct":22},"B．质量保证金扣留和支付",{"key":27,"text":441,"correct":29},"调整的合同价款",{"key":31,"text":443,"correct":22},"约定的变更及其他金额",{"key":34,"text":445,"correct":22},"预付款的支付和扣回",{"id":447,"libraryId":5,"type":15,"typeLabel":16,"stem":448,"options":449,"answer":403,"analysis":37},897674,"某合同工程履行期间发生设计变更，导致已标价工程量清单中某分部分项工程的工程数量发生变化。关于该分部分项工程综合单价的调整，下列说法正确的有（ ）。",[450,452,454,456,458],{"key":20,"text":451,"correct":22},"A．工程量偏差在l5%以内，采用已标价项目的综合单价",{"key":24,"text":453,"correct":29},"B．工程量增加15%以上时，增加部分的综合单价应予调高",{"key":27,"text":455,"correct":22},"工程量增加15%以上时，增加部分的综合单价应予调低",{"key":31,"text":457,"correct":22},"工程量减少15,%以上时，减少后剩余部分的综合单价应予调高",{"key":34,"text":459,"correct":29},"工程量减少15%以上时，减少后剩余部分的综合单价应予调低",{"id":461,"libraryId":5,"type":15,"typeLabel":16,"stem":462,"options":463,"answer":474,"analysis":37},897675,"承包商索赔成立应具备的前提条件有（ ）。",[464,466,468,470,472],{"key":20,"text":465,"correct":29},"A．造成费用增加或工期损失数额巨大，超出了正常的承受范围",{"key":24,"text":467,"correct":29},"B．索赔费用计算正确，并且容易分析",{"key":27,"text":469,"correct":22},"与合同对照，事件已造成了承包人工程项目成本的额外支出或直接工期损失",{"key":31,"text":471,"correct":22},"造成费用增加或工期损失的原因，按合同约定不属于承包人的行为责任或风险责任",{"key":34,"text":473,"correct":22},"承包人按合同规定的程序和时间提交索赔意向通知和索赔报告","CDE",{"id":476,"libraryId":5,"type":15,"typeLabel":16,"stem":477,"options":478,"answer":214,"analysis":37},897676,"承包人向发包人提交的索赔报告，其内容包括（ ）。",[479,481,483,485,487],{"key":20,"text":480,"correct":29},"A．索赔意向通知",{"key":24,"text":482,"correct":22},"B．索赔证据",{"key":27,"text":484,"correct":22},"索赔事件总述",{"key":31,"text":486,"correct":22},"索赔合理性论证",{"key":34,"text":488,"correct":22},"索赔款项（或工期)计算书",{"id":490,"libraryId":5,"type":15,"typeLabel":16,"stem":491,"options":492,"answer":503,"analysis":37},897677,"(2013年)关于合同价款纠纷的处理，下列说法中正确的有()。",[493,495,497,499,501],{"key":20,"text":494,"correct":22},"借用有资质的建筑施工企业名义与他人签订建设工程施工合同的行为无效",{"key":24,"text":496,"correct":29},"当事人对垫资利息有约定且约定的利息高于同期同类贷款利率的应予支持",{"key":27,"text":498,"correct":22},"当事人对建筑工程的计价标准或计价方法有约定的按约定结算工程价款",{"key":31,"text":500,"correct":22},"对于阴阳合同，其价款结算应以备案的中标合同作为依据",{"key":34,"text":502,"correct":22},"建设工程未交付，工程价款也未结算的，则工程欠款的计息日为当事人的起诉之日","ACDE",{"id":505,"libraryId":5,"type":15,"typeLabel":16,"stem":506,"options":507,"answer":67,"analysis":37},897678,"(2015年)工程造价咨询人在进行工程造价鉴定时，应自行收集而非由委托人提供的鉴定资料有( )。",[508,510,512,514,516],{"key":20,"text":509,"correct":22},"适用于鉴定项目的规章、规范性文件和定额",{"key":24,"text":511,"correct":22},"鉴定项目同期同类型工程的技术经济指标",{"key":27,"text":513,"correct":29},"鉴定项目施工过程中的施工组织、质量、工期等工程资料",{"key":31,"text":515,"correct":29},"鉴定项目的施工合同及补充协议",{"key":34,"text":517,"correct":29},"鉴定项目所涉及实物标的的现场勘验资料",{"id":519,"libraryId":5,"type":15,"typeLabel":16,"stem":520,"options":521,"answer":532,"analysis":37},897679,"(2016年)承包人应在每个计量周期到期后，向发包人提交已完工程进度款支付申请，支付申请包括的内容有()。",[522,524,526,528,530],{"key":20,"text":523,"correct":22},"累计已完成的合同价款",{"key":24,"text":525,"correct":22},"本期合计完成的合同价款",{"key":27,"text":527,"correct":22},"本期合计应扣减的金额",{"key":31,"text":529,"correct":29},"累计已调整的合同金额",{"key":34,"text":531,"correct":29},"预计下期将完成的合同价款","ABC",{"id":534,"libraryId":5,"type":15,"typeLabel":16,"stem":535,"options":536,"answer":156,"analysis":37},897680,"(2016年)工程造价咨询人开展工程造价司法鉴定工作时，正确的做法有()。",[537,539,541,543,545],{"key":20,"text":538,"correct":22},"应按仲裁.诉讼程序和要求进行鉴定",{"key":24,"text":540,"correct":22},"应依法出庭接受鉴定项目方当事人对鉴定意向书的质询",{"key":27,"text":542,"correct":22},"应自行收集适用于鉴定项目的工程造价信息",{"key":31,"text":544,"correct":29},"应自行对现场进行勘验",{"key":34,"text":546,"correct":22},"是鉴定项目一方当事人、代理人的，应自行回避",{"id":548,"libraryId":5,"type":15,"typeLabel":16,"stem":549,"options":550,"answer":403,"analysis":37},897681,"(2014年)下列关于预付款担保的说法中，正确的是（）",[551,553,555,557,559],{"key":20,"text":552,"correct":22},"预付款担保应在施工合同签订后预付款支付前提供",{"key":24,"text":554,"correct":29},"预付款担保必须采用银行保函的形式",{"key":27,"text":556,"correct":22},"承包人中途毁约，中止工程，发包人有权从预付款担保金额中获得预付款补偿",{"key":31,"text":558,"correct":22},"发包人应在预付款扣完后将预付款保函退还承包人",{"key":34,"text":560,"correct":29},"在预付款全部扣回之前，预付款保函应始终保持有效，且担保金额应保持不变",{"id":562,"libraryId":5,"type":15,"typeLabel":16,"stem":563,"options":564,"answer":575,"analysis":37},897682,"(2014年)关于建设工程竣工结算的办理，下列说法中正确的有（）",[565,567,569,571,573],{"key":20,"text":566,"correct":22},"竣工结算文件经发承包人双方签字确认的，应当作为工程结算的依据",{"key":24,"text":568,"correct":29},"竣工结算文件由发包人组织编制，承包人组织核对",{"key":27,"text":570,"correct":29},"工程造价咨询机构审核结论与承包人竣工结算文件不一致时，以造价咨询机构审核意见为准",{"key":31,"text":572,"correct":22},"合同双方对复核后的竣工结算有异议时，可以就无异议部分的工程办理不完全竣工结算",{"key":34,"text":574,"correct":22},"承包人对工程造价咨询企业的审核意见有异议的，可以向工程造价管理机构申请调解","ADE",{"id":577,"libraryId":5,"type":15,"typeLabel":16,"stem":578,"options":579,"answer":229,"analysis":37},897683,"工程项目选择合同计价形式时，主要依据的是（ ）。",[580,582,584,586,588],{"key":20,"text":581,"correct":22},"A．设计图纸深度",{"key":24,"text":583,"correct":22},"B．工期长短",{"key":27,"text":585,"correct":29},"工程招标方式",{"key":31,"text":587,"correct":22},"工程规模",{"key":34,"text":589,"correct":22},"工程复杂程度",{"id":591,"libraryId":5,"type":15,"typeLabel":16,"stem":592,"options":593,"answer":141,"analysis":37},897684,"某工程采用公开招标的方式进行招标，按照《建设工程工程量清单计价规范》GB50500+-2013，该工程合同价款的约定应遵循的规定包括（ ）。",[594,596,598,600,602],{"key":20,"text":595,"correct":22},"A．合同价款应在中标通知书发出之日起30 日内约定",{"key":24,"text":597,"correct":29},"B．合同价款约定只需约定工程价款的计算与结算方式",{"key":27,"text":599,"correct":22},"合同价款应依据招标文件和中标人的投标文件约定",{"key":31,"text":601,"correct":29},"招标文件与中标人投标文件不一致的地方应以招标文件为准",{"key":34,"text":603,"correct":22},"招标文件与中标人投标文件不一致的地方应以投标文件为准",{"id":605,"libraryId":5,"type":15,"typeLabel":16,"stem":606,"options":607,"answer":618,"analysis":37},897685,"根据《标准施工招标文件》中合同条款的相关规定，在合同工程履行期间，发生下列（ ）事项，承包人可以向发包人索赔利润。",[608,610,612,614,616],{"key":20,"text":609,"correct":29},"A．法律变化引起的价格调整",{"key":24,"text":611,"correct":22},"B．发包人原因导致的工程损失",{"key":27,"text":613,"correct":22},"发包人原因造成工期延误",{"key":31,"text":615,"correct":29},"承包人遇到不利物质条件",{"key":34,"text":617,"correct":29},"发包人要求承包人提前竣工","BC",{"id":620,"libraryId":5,"type":15,"typeLabel":16,"stem":621,"options":622,"answer":156,"analysis":37},897686,"某桥梁工程在施工过程中，由于发包人修改桥梁设计，导致承包人暂停施工1 个月，由此承包人可索赔的费用有（ ）。",[623,625,627,629,631],{"key":20,"text":624,"correct":22},"A．窝工费",{"key":24,"text":626,"correct":22},"B．材料价格上涨费",{"key":27,"text":628,"correct":22},"机械台班上涨费",{"key":31,"text":630,"correct":29},"利润",{"key":34,"text":632,"correct":22},"现场管理费",{"id":634,"libraryId":5,"type":15,"typeLabel":16,"stem":635,"options":636,"answer":229,"analysis":37},897687,"承包人根据已办理的竣工结算文件，向发包人提交竣工结算款支付申请。该申请中包括的主要内容有（ ）。",[637,639,641,643,645],{"key":20,"text":638,"correct":22},"A．竣工结算合同价款总额",{"key":24,"text":640,"correct":22},"B．累计已实际支付的合同价款",{"key":27,"text":642,"correct":29},"累计已扣除的各种款项金额",{"key":31,"text":644,"correct":22},"实际应支付的竣工结算款金额",{"key":34,"text":646,"correct":22},"应扣留的质量保证金",{"id":648,"libraryId":5,"type":15,"typeLabel":16,"stem":649,"options":650,"answer":374,"analysis":37},897688,"(2011年)关于无形资产价值确定的说法中，正确的有()。",[651,653,655,657,659],{"key":20,"text":652,"correct":22},"无形资产计价入账后，应在其有效使用期内分期摊销",{"key":24,"text":654,"correct":29},"专利权转让价格必须按成本估价",{"key":27,"text":656,"correct":22},"自创专利权的价值为开发过程中的实际支出",{"key":31,"text":658,"correct":29},"自创的非专利技术一般作为无形资产入账",{"key":34,"text":660,"correct":29},"通过行政划拨的土地，其土地使用权作为无形资产核算",{"id":662,"libraryId":5,"type":15,"typeLabel":16,"stem":663,"options":664,"answer":575,"analysis":37},897689,"(2013年)关于新增固定资产价值的确定，下列说法中正确的有()。",[665,667,669,671,673],{"key":20,"text":666,"correct":22},"新增固定资产价值是以独立发挥生产能力的单项工程为对象计算的",{"key":24,"text":668,"correct":29},"分期分批交付的工程，应在最后一期（批）交付时一次性计算新增固定资产价值",{"key":27,"text":670,"correct":29},"凡购置的达到固定资产标准不需安装的设备，应计入新增固定资产价值",{"key":31,"text":672,"correct":22},"运输设备等固定资产，仅计算采购成本，不计分摊的“待摊投资”",{"key":34,"text":674,"correct":22},"建设单位管理费按建筑工程、安装工程以及需安装设备价值总额按比例分摊",{"id":676,"libraryId":5,"type":15,"typeLabel":16,"stem":677,"options":678,"answer":52,"analysis":37},897690,"(2016年)关于新增固定资产价值的确定，下列说法中正确的有()。",[679,681,683,685,687],{"key":20,"text":680,"correct":29},"以单位工程为对象计算",{"key":24,"text":682,"correct":22},"以验收合格、正式移交生产或使用为前提",{"key":27,"text":684,"correct":29},"分期分批交付生产的工程，按最后一批交付时间统一计算",{"key":31,"text":686,"correct":22},"包括达到固定资产标准不需要安装的设备和工器具的价值",{"key":34,"text":688,"correct":22},"是建设项目竣工投产后所增加的固定资产价值",{"id":690,"libraryId":5,"type":15,"typeLabel":16,"stem":691,"options":692,"answer":185,"analysis":37},897691,"关于合同形式的说法， 正确的有（ ） 。",[693,695,697,699,701],{"key":20,"text":694,"correct":22},"建设工程合同应当采用书面形式",{"key":24,"text":696,"correct":29},"电子数据交换不能直接作为书面合同",{"key":27,"text":698,"correct":29},"合同有书面和口头两种形式",{"key":31,"text":700,"correct":22},"电话不是合同的书面形式",{"key":34,"text":702,"correct":29},"书面形式限制了当事人对合同内容的协商",{"id":704,"libraryId":5,"type":15,"typeLabel":16,"stem":705,"options":706,"answer":717,"analysis":37},897692,"根据《合同法》 规定， 属于效力待定合同的有（ ）",[707,709,711,713,715],{"key":20,"text":708,"correct":29},"限制民事行为能力人订立的合同经法定代理人追认的",{"key":24,"text":710,"correct":22},"行为人超越代理权限以被代理人名义订立的合同",{"key":27,"text":712,"correct":29},"限制民事行为能力人签订的纯获利益的合同",{"key":31,"text":714,"correct":22},"房屋租赁人将其租赁的房屋出售所签订的买卖合同",{"key":34,"text":716,"correct":29},"法定代表人越权订立合同且相对人知道该情形的","BD",{"id":719,"libraryId":5,"type":15,"typeLabel":16,"stem":720,"options":721,"answer":156,"analysis":37},897693,"合同当事人承担违约责任的形式有（ ）",[722,724,726,728,730],{"key":20,"text":723,"correct":22},"支付违约金",{"key":24,"text":725,"correct":22},"支付赔偿金",{"key":27,"text":727,"correct":22},"采取补救措施",{"key":31,"text":729,"correct":29},"追缴财产",{"key":34,"text":731,"correct":22},"继续履行",{"id":733,"libraryId":5,"type":15,"typeLabel":16,"stem":734,"options":735,"answer":185,"analysis":37},897694,"《建筑法》规定的建筑许可内容有（）。",[736,738,740,742,744],{"key":20,"text":737,"correct":22},"建筑工程施工许可",{"key":24,"text":739,"correct":29},"建筑工程监理许可",{"key":27,"text":741,"correct":29},"建筑工程规划许可",{"key":31,"text":743,"correct":22},"从业资格许可",{"key":34,"text":745,"correct":29},"建设投资规模许可",[747,751,754,757,760,763],{"id":748,"name":749,"category":7,"favorite":750},1,"领导干部任职前廉政法规知识测试题",92,{"id":752,"name":753,"category":7,"favorite":748},595,"建筑结构与设备",{"id":755,"name":756,"category":7,"favorite":748},715,"招标采购专业知识与法律法规",{"id":758,"name":759,"category":7,"favorite":748},848,"市政方向-通用基础",{"id":761,"name":762,"category":7,"favorite":8},534,"BIM工程师",{"id":764,"name":762,"category":7,"favorite":8},535]