[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-581-55":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":738},{"id":5,"name":6,"category":7,"favorite":8},581,"建设工程造价管理基础知识","建筑工程",0,55,50,2873,[13,38,52,66,81,96,111,126,141,156,170,184,199,214,228,242,257,272,287,302,317,331,344,358,372,386,401,415,429,443,457,471,485,499,513,527,541,555,569,582,596,610,624,638,653,667,681,695,709,724],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},897595,2,"多选题","(2010年)应用控制图法控制生产过程质量时，表明点子在控制界限内排列有缺陷的有()。",[19,23,27,30,33],{"key":20,"text":21,"correct":22},"A","点子连续在中心线一侧出现5个以上",false,{"key":24,"text":25,"correct":26},"B","连续7个以上的点子上升或下降",true,{"key":28,"text":29,"correct":22},"C","连续7个点中至少有5个点在同一侧",{"key":31,"text":32,"correct":26},"D","连续3个点落在两倍标准偏差与三倍标准偏差控制界限之间",{"key":34,"text":35,"correct":26},"E","点子出现周期性波动","BDE","",{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":36,"analysis":37},897596,"(2014年)建设单位编制的工程项目建设总进度计划包括的内容有（ ）。",[42,44,46,48,50],{"key":20,"text":43,"correct":22},"竣工投产交付使用计划表",{"key":24,"text":45,"correct":26},"工程项目一览表",{"key":28,"text":47,"correct":22},"年度建设资金平衡表",{"key":31,"text":49,"correct":26},"工程项目进度平衡表",{"key":34,"text":51,"correct":26},"投资计划年度分配表",{"id":53,"libraryId":5,"type":15,"typeLabel":16,"stem":54,"options":55,"answer":65,"analysis":37},897597,"(2016年)采用控制图法控制生产过程质量时，说明点子在控制界限内排列有缺陷的情形有()。",[56,58,59,61,63],{"key":20,"text":57,"correct":26},"点子连续在中心线一侧出现7个以上",{"key":24,"text":25,"correct":26},{"key":28,"text":60,"correct":22},"连续11个点子落在一倍标准偏差控制界限之外",{"key":31,"text":62,"correct":22},"点子落在两倍标准偏差控制界限之外",{"key":34,"text":64,"correct":22},"点子落在三倍标准偏差控制界限附近","AB",{"id":67,"libraryId":5,"type":15,"typeLabel":16,"stem":68,"options":69,"answer":80,"analysis":37},897598,"(2012年)采用频数分布直方图分析工程质量波动情况时，如果出现孤岛型分布，说明()。",[70,72,74,76,78],{"key":20,"text":71,"correct":22},"数据分组不当",{"key":24,"text":73,"correct":26},"少量材料不合格",{"key":28,"text":75,"correct":22},"组距确定不当",{"key":31,"text":77,"correct":26},"短时间内工人操作不熟练",{"key":34,"text":79,"correct":22},"两个分布相混淆","BD",{"id":82,"libraryId":5,"type":15,"typeLabel":16,"stem":83,"options":84,"answer":95,"analysis":37},897599,"(2015年)下列项目目标控制方法中，可用于控制工程质量的有( )。",[85,87,89,91,93],{"key":20,"text":86,"correct":22},"S曲线法",{"key":24,"text":88,"correct":26},"控制图法",{"key":28,"text":90,"correct":26},"排列图法",{"key":31,"text":92,"correct":26},"直方图法",{"key":34,"text":94,"correct":22},"横道图法","BCD",{"id":97,"libraryId":5,"type":15,"typeLabel":16,"stem":98,"options":99,"answer":110,"analysis":37},897600,"(2013年)关于措施费中超高施工增加费，下列说法正确的有()。",[100,102,104,106,108],{"key":20,"text":101,"correct":22},"单层建筑檐口高度超过30m时计算",{"key":24,"text":103,"correct":26},"多层建筑超过6层时计算",{"key":28,"text":105,"correct":26},"包括建筑超高引起的人工功效降低费",{"key":31,"text":107,"correct":22},"不包括通信联络设备的使用费",{"key":34,"text":109,"correct":26},"按建筑物超高部分建筑面积以“m2”为单位计算","BCE",{"id":112,"libraryId":5,"type":15,"typeLabel":16,"stem":113,"options":114,"answer":125,"analysis":37},897601,"(2013年)下列施工企业支出的费用项目中，属于建筑安装工程企业管理费的有()。",[115,117,119,121,123],{"key":20,"text":116,"correct":26},"技术开发费",{"key":24,"text":118,"correct":26},"印花税",{"key":28,"text":120,"correct":22},"已完工程及设备保护费",{"key":31,"text":122,"correct":22},"材料采购及保管费",{"key":34,"text":124,"correct":26},"财产保险费","ABE",{"id":127,"libraryId":5,"type":15,"typeLabel":16,"stem":128,"options":129,"answer":140,"analysis":37},897602,"(2014年)下列有关安全文明费的说法中，正确的有（）",[130,132,134,136,138],{"key":20,"text":131,"correct":26},"安全文明施工费包括临时设施费",{"key":24,"text":133,"correct":22},"现场生活用洁净燃料费属于环境保护费",{"key":28,"text":135,"correct":26},"“三宝”、“四口”、“五临边”等防护费用属于安全施工费",{"key":31,"text":137,"correct":22},"消防设施与消防器材的配置费用属于文明施工费",{"key":34,"text":139,"correct":22},"施工现场搭设的临时文化福利用房的费用属于文明施工费","AC",{"id":142,"libraryId":5,"type":15,"typeLabel":16,"stem":143,"options":144,"answer":155,"analysis":37},897603,"(2016年)根据我国现行建筑安装工程费用项目组成规定，下列施工企业发生的费用中，应计入企业管理费的是()。",[145,147,149,151,153],{"key":20,"text":146,"correct":26},"建筑材料、构件一般性鉴定检查费",{"key":24,"text":148,"correct":26},"支付给企业离休干部的经费",{"key":28,"text":150,"correct":22},"施工现场工程排污费",{"key":31,"text":152,"correct":26},"履约担保所发生的费用",{"key":34,"text":154,"correct":22},"施工生产用仪器仪表使用费","ABD",{"id":157,"libraryId":5,"type":15,"typeLabel":16,"stem":158,"options":159,"answer":125,"analysis":37},897604,"(2015年)为了便于措施项目费的确定和调整，通常采用分部分项工程量清单方式编制的措施项目有( )。",[160,162,164,166,168],{"key":20,"text":161,"correct":26},"脚手架工程",{"key":24,"text":163,"correct":26},"垂直运输工程",{"key":28,"text":165,"correct":22},"二次搬运工程",{"key":31,"text":167,"correct":22},"已完工程及设备保护",{"key":34,"text":169,"correct":26},"施工排水降水",{"id":171,"libraryId":5,"type":15,"typeLabel":16,"stem":172,"options":173,"answer":125,"analysis":37},897605,"(2016年)应予计量的措施项目费包括()。",[174,176,178,180,182],{"key":20,"text":175,"correct":26},"垂直运输费",{"key":24,"text":177,"correct":26},"排水.降水费",{"key":28,"text":179,"correct":22},"冬雨季施工增加费",{"key":31,"text":181,"correct":22},"临时设施费",{"key":34,"text":183,"correct":26},"超高施工增加费",{"id":185,"libraryId":5,"type":15,"typeLabel":16,"stem":186,"options":187,"answer":198,"analysis":37},897606,"(2015年)根据我国现行建筑安装工程费用项目组成的规定，下列费用中属于安全文明施工中临时设施费的有()。",[188,190,192,194,196],{"key":20,"text":189,"correct":26},"现场采用砖砌围挡的安砌费用",{"key":24,"text":191,"correct":22},"现场围挡的墙面美化费用",{"key":28,"text":193,"correct":22},"施工现场的操作场地的硬化费用",{"key":31,"text":195,"correct":26},"施工现场规定范围内临时简易道路的铺设费用",{"key":34,"text":197,"correct":22},"地下室施工时所采用的照明设备的安拆费用","AD",{"id":200,"libraryId":5,"type":15,"typeLabel":16,"stem":201,"options":202,"answer":213,"analysis":37},897607,"(2014年)按我国现行建筑安装工程费用项目组成的规定，下列属于企业管理费内容的有（）",[203,205,207,209,211],{"key":20,"text":204,"correct":26},"企业管理人员办公用的文具、纸张等费用",{"key":24,"text":206,"correct":22},"企业施工生成和管理使用的属于固定资产的交通工具的购置、维修费",{"key":28,"text":208,"correct":22},"对建筑以及材料、构件和建筑安装进行特殊签定检查所发生的检验试验费",{"key":31,"text":210,"correct":26},"按全部职工工资总额比例计提的工会经费",{"key":34,"text":212,"correct":26},"为施工生产筹集资金、履约担保所发生的财务费用","ADE",{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":110,"analysis":37},897608,"(2014年)国产非标准设备按其成本估算其原价时，下列计算式中正确的有（）",[218,220,222,224,226],{"key":20,"text":219,"correct":22},"材料费=材料净重×每吨材料综合价",{"key":24,"text":221,"correct":26},"加工费=设备总重量×设备每单位重量加工费",{"key":28,"text":223,"correct":26},"辅助材料费=设备总重量×辅助材料费指标",{"key":31,"text":225,"correct":22},"增值税=进项税额-当期销项税额",{"key":34,"text":227,"correct":26},"当期销项税额=销售额×适用增值税率",{"id":229,"libraryId":5,"type":15,"typeLabel":16,"stem":230,"options":231,"answer":36,"analysis":37},897609,"(2015年)关于设备购置费的构成和计算，下列说法中正确的有( )。",[232,234,236,238,240],{"key":20,"text":233,"correct":22},"国产标准设备的原价中，一般不包含备件的价格",{"key":24,"text":235,"correct":26},"成本计算估价法常用于非标准设备原价的价格",{"key":28,"text":237,"correct":22},"进口设备原价是指进口设备到岸价",{"key":31,"text":239,"correct":26},"国产非标准设备原价中包含非标准设备设计费",{"key":34,"text":241,"correct":26},"达到固定资产标准的工器具，其购置费用应计入设备购置费中",{"id":243,"libraryId":5,"type":15,"typeLabel":16,"stem":244,"options":245,"answer":256,"analysis":37},897610,"(2016年)关于生产准备及开办费，下列说法中正确的有()。",[246,248,250,252,254],{"key":20,"text":247,"correct":26},"包括自行组织培训和委托其他单位培训的相关费用",{"key":24,"text":249,"correct":22},"包括正常生产所需的生产办公家具用具的购置费用",{"key":28,"text":251,"correct":22},"包括正常生活所需的生活家具用具的购置费用",{"key":31,"text":253,"correct":22},"包括含备品备件在内的第一套不够固定资产标准的生产工具购置费用",{"key":34,"text":255,"correct":26},"可按设计定员乘以人均生产准备费指标计算","AE",{"id":258,"libraryId":5,"type":15,"typeLabel":16,"stem":259,"options":260,"answer":271,"analysis":37},897611,"(2014年)下列费用中，属于“与项目建设有关的其他建设费用”的有（）",[261,263,265,267,269],{"key":20,"text":262,"correct":26},"建设单位管理费",{"key":24,"text":264,"correct":26},"工程监理费",{"key":28,"text":266,"correct":26},"建设单位临时设施费",{"key":31,"text":268,"correct":22},"施工单位临时设施费",{"key":34,"text":270,"correct":26},"市政公用设施费","ABCE",{"id":273,"libraryId":5,"type":15,"typeLabel":16,"stem":274,"options":275,"answer":286,"analysis":37},897612,"(2015年)关于建设用地取得及费用，下列说法中正确的有( )。",[276,278,280,282,284],{"key":20,"text":277,"correct":26},"通过出让获得国有土地使用权的方式有招标、拍卖、挂牌和协议",{"key":24,"text":279,"correct":22},"工业、商业、旅游、娱乐用地的土地使用权出让最长年限为40年",{"key":28,"text":281,"correct":26},"以划拨方式取得的土地使用权，因企业改制不再符合划拨用地目录，应实行有偿使用",{"key":31,"text":283,"correct":22},"通过市场机制获得的土地使用权，不再承担征地补偿费或拆迂补偿费",{"key":34,"text":285,"correct":26},"搬拆补助费的标准，由各省、自治区、直辖市人民政府规定","ACE",{"id":288,"libraryId":5,"type":15,"typeLabel":16,"stem":289,"options":290,"answer":301,"analysis":37},897613,"(2013年)关于工程建设其他费中的场地准备及临时设施费，下列说法正确的有()。",[291,293,295,297,299],{"key":20,"text":292,"correct":26},"场地准备费是指为施工而进行的土地“三通一平”或“七通一平”的费用",{"key":24,"text":294,"correct":26},"其中的大型土石方工程应进入工程费中的总图运输费",{"key":28,"text":296,"correct":26},"新建项目的场地准备和临时设施费应根据实际工程重估算",{"key":31,"text":298,"correct":26},"场地准备和临时设施费=工程费用×费率+拆除清理费",{"key":34,"text":300,"correct":22},"委托施工单位修建临时设施时应计入施工单位措施费中","ABCD",{"id":303,"libraryId":5,"type":15,"typeLabel":16,"stem":304,"options":305,"answer":316,"analysis":37},897614,"(2016年)关于工程量清单计价和定额计价，下列计价公式中正确的有()。",[306,308,310,312,314],{"key":20,"text":307,"correct":22},"单位工程直接费=∑（假定建筑安装产品工程量×工料单价）+措施费",{"key":24,"text":309,"correct":22},"单位工程概预算费=单位工程直接费+企业管理费+利润+税金",{"key":28,"text":311,"correct":26},"分部分项工程费=∑（分部分项工程量×分部分项工程综合单价）",{"key":31,"text":313,"correct":26},"措施项目费=∑按“项”计算的措施项目费+∑（措施项目工程量×措施项目综合单价）",{"key":34,"text":315,"correct":26},"单位工程报价=分部分项工程费+措施项目费+其他项目费+规费+税金","CDE",{"id":318,"libraryId":5,"type":15,"typeLabel":16,"stem":319,"options":320,"answer":286,"analysis":37},897615,"(2014年)按定额的编制程序和用途，建设工程定额可划分为（）",[321,323,325,327,329],{"key":20,"text":322,"correct":26},"施工定额",{"key":24,"text":324,"correct":22},"企业定额",{"key":28,"text":326,"correct":26},"预算定额",{"key":31,"text":328,"correct":22},"补充定额",{"key":34,"text":330,"correct":26},"投资估算指标",{"id":332,"libraryId":5,"type":15,"typeLabel":16,"stem":333,"options":334,"answer":286,"analysis":37},897616,"(2014年)下列措施项目中，应按分部分项工程量清单编制方式编制的有（）",[335,337,339,341,342],{"key":20,"text":336,"correct":26},"超高施工增加",{"key":24,"text":338,"correct":22},"建筑物的临时保护设施",{"key":28,"text":340,"correct":26},"大型机械设备进出场及安拆",{"key":31,"text":167,"correct":22},{"key":34,"text":343,"correct":26},"施工排水.降水",{"id":345,"libraryId":5,"type":15,"typeLabel":16,"stem":346,"options":347,"answer":301,"analysis":37},897617,"(2013年)下列工程项目中，必须采用工程量清单计价的有()。",[348,350,352,354,356],{"key":20,"text":349,"correct":26},"使用各级财政预算资金的项目",{"key":24,"text":351,"correct":26},"使用国家发行债券所筹资金的项目",{"key":28,"text":353,"correct":26},"国有资金投资总额占50%以上的项目",{"key":31,"text":355,"correct":26},"使用国家政策性货款的项目",{"key":34,"text":357,"correct":22},"使用国际金融机构货款的项目",{"id":359,"libraryId":5,"type":15,"typeLabel":16,"stem":360,"options":361,"answer":80,"analysis":37},897618,"(2014年)关于措施项目工程量清单编制与计价，下列说法中正确的是（）",[362,364,366,368,370],{"key":20,"text":363,"correct":22},"不能计算工程量的措施项目也可以采用分部分项工程量清单方式编制",{"key":24,"text":365,"correct":26},"安全文明施工费按总价方式编制，其计算基础可为“定额基价”、“定额人工费”",{"key":28,"text":367,"correct":22},"总价措施项目清单表应列明计量单位、费率、金额等内容",{"key":31,"text":369,"correct":26},"除安全文明施工费外的其他总价措施项目的计算基础可为“定额人工费”",{"key":34,"text":371,"correct":22},"按施工方案计算的总价措施项目可以只需填“金额”数值",{"id":373,"libraryId":5,"type":15,"typeLabel":16,"stem":374,"options":375,"answer":213,"analysis":37},897619,"(2016年)关于暂估价的计算和填写，下列说法中正确的有()。",[376,378,380,382,384],{"key":20,"text":377,"correct":26},"暂估价数量和拟用项目应结合工程量清单中“暂估价表”予以补充说明",{"key":24,"text":379,"correct":22},"材料暂估价应由招标人填写暂估单价，无须指出拟用于哪些清单项目",{"key":28,"text":381,"correct":22},"工程设备暂估价不应纳入分部分项工程综合单价",{"key":31,"text":383,"correct":26},"专业工程暂估价应分不同专业，列出明细表",{"key":34,"text":385,"correct":26},"专业工程暂估价由招标人填写，并计入投标总价",{"id":387,"libraryId":5,"type":15,"typeLabel":16,"stem":388,"options":389,"answer":400,"analysis":37},897620,"（2017年考题）根据《建设工程工程量清单计价规范》(GB50500-2013)，关于工程量清清单计价的有关要求，下列说法中正确的有（ ）。",[390,392,394,396,398],{"key":20,"text":391,"correct":22},"事业单位自有资金投资的建设工程发承包，可以不采用工程量清单计价",{"key":24,"text":393,"correct":26},"使用国有资金投资的建设工程发承包，必须采用工程量清单计价",{"key":28,"text":395,"correct":26},"招标工程量清单应以单位工程为单位编制",{"key":31,"text":397,"correct":22},"工程量清单计价方式下，必须采用单价合同",{"key":34,"text":399,"correct":22},"招标工程量清单的准确性和完整性由编制人负责","BC",{"id":402,"libraryId":5,"type":15,"typeLabel":16,"stem":403,"options":404,"answer":65,"analysis":37},897621,"(2013年)预算定额中人工、材料、机械台班消耗量的确定方法包括()。",[405,407,409,411,413],{"key":20,"text":406,"correct":26},"以施工定额为基础确定",{"key":24,"text":408,"correct":26},"以现场观察测定资料为基础计算",{"key":28,"text":410,"correct":22},"以工程量计算规则为依据计算",{"key":31,"text":412,"correct":22},"以各类费用定额为基础确定",{"key":34,"text":414,"correct":22},"以工程结算资料为依据计算",{"id":416,"libraryId":5,"type":15,"typeLabel":16,"stem":417,"options":418,"answer":95,"analysis":37},897622,"(2015年)下列与施工机械工作相关的时间中，应包括在预算定额机械台班消耗量中，但不包括在施工定额中的有()。",[419,421,423,425,427],{"key":20,"text":420,"correct":22},"低负荷下工作时间",{"key":24,"text":422,"correct":26},"机械施工不可避免的工序间歇",{"key":28,"text":424,"correct":26},"机械维修引起的停歇时间",{"key":31,"text":426,"correct":26},"开工时工作量不饱满所损失的时间",{"key":34,"text":428,"correct":22},"不可避免的中断时间",{"id":430,"libraryId":5,"type":15,"typeLabel":16,"stem":431,"options":432,"answer":36,"analysis":37},897623,"(2015年)下列有关概算定额与概算指标关系的表述中，正确有（）。",[433,435,437,439,441],{"key":20,"text":434,"correct":22},"概算定额以单位工程为对象，概算指标以单项工程为对象",{"key":24,"text":436,"correct":26},"概算定额以预算定额为基础，概算指标主要来自各种预算和结算资料",{"key":28,"text":438,"correct":22},"概算定额适用于初步设计阶段，概算指标不适用于初步设计阶段",{"key":31,"text":440,"correct":26},"概算指标比概算定额更加综合与扩大",{"key":34,"text":442,"correct":26},"概算定额是编制概算指标的依据",{"id":444,"libraryId":5,"type":15,"typeLabel":16,"stem":445,"options":446,"answer":198,"analysis":37},897624,"按照编制程序和用途，建设工程定额包括施工定额、预算定额、概算定额、概算指标和投资估算指标，下列关于这些定额的表述中正确的有（ ）。",[447,449,451,453,455],{"key":20,"text":448,"correct":26},"．预算定额是以施工定额为基础综合扩大编制的",{"key":24,"text":450,"correct":22},"．投资估算指标只确定单项工程建设所需费用的标准",{"key":28,"text":452,"correct":22},"概算指标是以扩大的分部分项工程为对象编制的",{"key":31,"text":454,"correct":26},"在这些定额中只有施工定额是企业性质的定额",{"key":34,"text":456,"correct":22},"概算定额是以整个建筑物或构筑物为对象编制的",{"id":458,"libraryId":5,"type":15,"typeLabel":16,"stem":459,"options":460,"answer":110,"analysis":37},897625,"(2015年)关于投资估算指标，下列说法中正确的有( )。",[461,463,465,467,469],{"key":20,"text":462,"correct":22},"应以单项工程为编制对象",{"key":24,"text":464,"correct":26},"是反映建设总投资的经济指标",{"key":28,"text":466,"correct":26},"概略程度与可行性研究工作深度相适应",{"key":31,"text":468,"correct":22},"编制基础包括概算定额，不包括预算定额",{"key":34,"text":470,"correct":26},"可根据历史预算资料和价格变动资料等编制",{"id":472,"libraryId":5,"type":15,"typeLabel":16,"stem":473,"options":474,"answer":36,"analysis":37},897626,"(2013年)为保证写实记录法数据的可靠性，写实记录延续时间的确定，应满足的要求有()。",[475,477,479,481,483],{"key":20,"text":476,"correct":22},"算术平均值精确度",{"key":24,"text":478,"correct":26},"被测定个人或小组的最低数量",{"key":28,"text":480,"correct":22},"测定的数列的稳定系数",{"key":31,"text":482,"correct":26},"测定总延续时间的最小值",{"key":34,"text":484,"correct":26},"测定完成产品的最低次数",{"id":486,"libraryId":5,"type":15,"typeLabel":16,"stem":487,"options":488,"answer":498,"analysis":37},897627,"(2014年)下列施工工作时间分类选项中，属于工人有效工作时间的有（）",[489,491,493,495,497],{"key":20,"text":490,"correct":26},"基本工作时间",{"key":24,"text":492,"correct":22},"休息时间",{"key":28,"text":494,"correct":26},"辅助工作时间",{"key":31,"text":496,"correct":26},"准备与结束工作时间",{"key":34,"text":428,"correct":22},"ACD",{"id":500,"libraryId":5,"type":15,"typeLabel":16,"stem":501,"options":502,"answer":110,"analysis":37},897628,"(2013年)下列材料单价的构成费用，包含在采购及保管费中进行计算的有()。",[503,505,507,509,511],{"key":20,"text":504,"correct":22},"运杂费",{"key":24,"text":506,"correct":26},"仓储费",{"key":28,"text":508,"correct":26},"工地管理费",{"key":31,"text":510,"correct":22},"运输损耗",{"key":34,"text":512,"correct":26},"仓储损耗",{"id":514,"libraryId":5,"type":15,"typeLabel":16,"stem":515,"options":516,"answer":155,"analysis":37},897629,"(2015年)下列费用项目中，应计入人工日工资单价的有( )。",[517,519,521,523,525],{"key":20,"text":518,"correct":26},"计件工资",{"key":24,"text":520,"correct":26},"劳动竞赛奖金",{"key":28,"text":522,"correct":22},"劳动保护费",{"key":31,"text":524,"correct":26},"流动施工津贴",{"key":34,"text":526,"correct":22},"职工福利费",{"id":528,"libraryId":5,"type":15,"typeLabel":16,"stem":529,"options":530,"answer":80,"analysis":37},897630,"(2016年)下列定额测定方法中，主要用于测定材料净用量的有()。",[531,533,535,537,539],{"key":20,"text":532,"correct":22},"现场技术测定法",{"key":24,"text":534,"correct":26},"实验室试验法",{"key":28,"text":536,"correct":22},"现场统计法",{"key":31,"text":538,"correct":26},"理论计算法",{"key":34,"text":540,"correct":22},"写实记录法",{"id":542,"libraryId":5,"type":15,"typeLabel":16,"stem":543,"options":544,"answer":286,"analysis":37},897631,"(2014年)影响定额动态人工日工资单价的因素包括（）",[545,547,549,551,553],{"key":20,"text":546,"correct":26},"人工日工资单价的组成内容",{"key":24,"text":548,"correct":22},"社会工资差额",{"key":28,"text":550,"correct":26},"劳动力市场供需变化",{"key":31,"text":552,"correct":22},"社会最低工资水平",{"key":34,"text":554,"correct":26},"政府推行的社会保障与福利政策",{"id":556,"libraryId":5,"type":15,"typeLabel":16,"stem":557,"options":558,"answer":155,"analysis":37},897632,"下列关于施工定额的说法中正确的有（ ）。",[559,561,563,565,567],{"key":20,"text":560,"correct":26},"A．施工定额属于企业定额的性质，可用于工程的施工管理",{"key":24,"text":562,"correct":26},"B．施工定额是建设工程定额中的基础性定额",{"key":28,"text":564,"correct":22},"施工定额以分部分项工程为研究对象",{"key":31,"text":566,"correct":26},"施工定额以工序为研究对象",{"key":34,"text":568,"correct":22},"施工定额是编制施工图预算的重要基础",{"id":570,"libraryId":5,"type":15,"typeLabel":16,"stem":571,"options":572,"answer":581,"analysis":37},897633,"施工作业的定额时间，是在拟定基本工作时间和（ ）的基础上编制的。",[573,575,577,579,580],{"key":20,"text":574,"correct":22},"A．偶然时间",{"key":24,"text":576,"correct":26},"B．辅助工作时间",{"key":28,"text":578,"correct":26},"准备与结束时间",{"key":31,"text":428,"correct":26},{"key":34,"text":492,"correct":26},"BCDE",{"id":583,"libraryId":5,"type":15,"typeLabel":16,"stem":584,"options":585,"answer":110,"analysis":37},897634,"材料消耗定额是在合理和节约使用材料的条件下，生产单位合格产品所需消耗的资源的数量标准，包括（ ）。",[586,588,590,592,594],{"key":20,"text":587,"correct":22},"A．在运往工地过程中材料的损耗量",{"key":24,"text":589,"correct":26},"B．直接使用在工程实体上的材料的净用量",{"key":28,"text":591,"correct":26},"在施工操作过程中不可避免的材料损耗量",{"key":31,"text":593,"correct":22},"在施工现场出现的不合格材料的数量",{"key":34,"text":595,"correct":26},"在施工现场运输过程中不可避免的材料损耗量",{"id":597,"libraryId":5,"type":15,"typeLabel":16,"stem":598,"options":599,"answer":110,"analysis":37},897635,"下列方法中，可以用来确定材料净用量的方法有（ ）。",[600,602,604,606,608],{"key":20,"text":601,"correct":22},"A．统计法",{"key":24,"text":603,"correct":26},"B．理论计算法",{"key":28,"text":605,"correct":26},"测定法",{"key":31,"text":607,"correct":22},"观察法",{"key":34,"text":609,"correct":26},"图纸计算法",{"id":611,"libraryId":5,"type":15,"typeLabel":16,"stem":612,"options":613,"answer":271,"analysis":37},897636,"编制施工机械台班使用定额时，需要进行的工作包括（ ）。",[614,616,618,620,622],{"key":20,"text":615,"correct":26},"A．拟定施工机械工作的正常施工条件",{"key":24,"text":617,"correct":26},"B．确定机械的利用系数",{"key":28,"text":619,"correct":26},"确定机械纯工作1 小时的正常生产率",{"key":31,"text":621,"correct":22},"对施工机械的工作时间进行划分",{"key":34,"text":623,"correct":26},"拟定工人小组的定额时间",{"id":625,"libraryId":5,"type":15,"typeLabel":16,"stem":626,"options":627,"answer":301,"analysis":37},897637,"影响施工现场周转性材料梢耗的主要因素有（ ）。",[628,630,632,634,636],{"key":20,"text":629,"correct":26},"A．第一次制造时的材料消耗量",{"key":24,"text":631,"correct":26},"B．每周转使用一次材料的损耗",{"key":28,"text":633,"correct":26},"周转使用次数",{"key":31,"text":635,"correct":26},"周转材料的最终回收及其回收折价",{"key":34,"text":637,"correct":22},"材料的测算方法",{"id":639,"libraryId":5,"type":15,"typeLabel":16,"stem":640,"options":641,"answer":652,"analysis":37},897638,"(2013年)把各种不能直接相加的现象还原为价值形态，先相加再相除，用以反映观测对象变化趋势的指数属于()。",[642,644,646,648,650],{"key":20,"text":643,"correct":22},"个体指数",{"key":24,"text":645,"correct":22},"环比指数",{"key":28,"text":647,"correct":22},"平均指数",{"key":31,"text":649,"correct":26},"综合指数",{"key":34,"text":651,"correct":26},"总指数","DE",{"id":654,"libraryId":5,"type":15,"typeLabel":16,"stem":655,"options":656,"answer":286,"analysis":37},897639,"(2014年)建设项目工程造价指数是由（）指数综合得到的",[657,659,661,663,665],{"key":20,"text":658,"correct":26},"设备、工器具价格指数",{"key":24,"text":660,"correct":22},"人工费价格指数",{"key":28,"text":662,"correct":26},"建筑安装工程造价指数",{"key":31,"text":664,"correct":22},"材料价格指数",{"key":34,"text":666,"correct":26},"工程建设其它费用指数",{"id":668,"libraryId":5,"type":15,"typeLabel":16,"stem":669,"options":670,"answer":125,"analysis":37},897640,"(2016年)关于工程造价指数，下列说法中正确的有()。",[671,673,675,677,679],{"key":20,"text":672,"correct":26},"平均指数是综合指数的变形",{"key":24,"text":674,"correct":26},"设备、工器具价格指数属于总指数",{"key":28,"text":676,"correct":22},"建筑安装工程造价指数用拉氏指数变性后的加权平均指数表示",{"key":31,"text":678,"correct":22},"单项工程造价指数用派氏公式计算的综合指数表示",{"key":34,"text":680,"correct":26},"建设项目造价指数是质量指标指数",{"id":682,"libraryId":5,"type":15,"typeLabel":16,"stem":683,"options":684,"answer":498,"analysis":37},897641,"(2014年)在选择建设地点（厂址）时，应尽量满足下列需求（）",[685,687,689,691,693],{"key":20,"text":686,"correct":26},"节约土地，尽量少占耕地，降低土地补偿费用",{"key":24,"text":688,"correct":22},"建设地点（厂址）的地下水位应与地下建筑物的基准面持平",{"key":28,"text":690,"correct":26},"尽量选择人口相对稀疏的地区，减少拆迁移民数量",{"key":31,"text":692,"correct":26},"尽量选择在工程地质、水文地质较好的地段",{"key":34,"text":694,"correct":22},"厂区地形求平坦，避免山地",{"id":696,"libraryId":5,"type":15,"typeLabel":16,"stem":697,"options":698,"answer":65,"analysis":37},897642,"(2016年)关于投资决策阶段流动资金的估算，下列说法中正确的有()。",[699,701,703,705,707],{"key":20,"text":700,"correct":26},"流动资金周转额的大小与生产规模及周转速度直接相关",{"key":24,"text":702,"correct":26},"分项详细估算时，需要计算各类流动资产和流动负债的年周转次数",{"key":28,"text":704,"correct":22},"当年发生的流动资金借款应按半年计息",{"key":31,"text":706,"correct":22},"流动资金借贷利息应计入建设期贷款利息",{"key":34,"text":708,"correct":22},"不同生产负荷下的流动资金按100%生产负荷下的流动资金乘以生产负荷百分比计算",{"id":710,"libraryId":5,"type":15,"typeLabel":16,"stem":711,"options":712,"answer":723,"analysis":37},897643,"(2015年)建设规模是影响工程造价的主要固素之一，项目决策阶段合理确定建设规模的主要方法有( )。",[713,715,717,719,721],{"key":20,"text":714,"correct":26},"盈亏平衡产量分析法",{"key":24,"text":716,"correct":26},"平均成本法",{"key":28,"text":718,"correct":26},"生产能力平衡法",{"key":31,"text":720,"correct":22},"单位生产能力估算法",{"key":34,"text":722,"correct":22},"回归分析法","ABC",{"id":725,"libraryId":5,"type":15,"typeLabel":16,"stem":726,"options":727,"answer":723,"analysis":37},897644,"(2015年)直接套用概算指标编制单位建筑工程设计概算时，拟建工程应符合的条件包括( )。",[728,730,732,734,736],{"key":20,"text":729,"correct":26},"建设地点与概算指标中的工程建设地点相同",{"key":24,"text":731,"correct":26},"工程特征与概算指标中的工程特征基本相同",{"key":28,"text":733,"correct":26},"建筑面积与概算指标中的工程建筑面积相差不大",{"key":31,"text":735,"correct":22},"建造时间与概算指标中工程建造时间相近",{"key":34,"text":737,"correct":22},"物价水平与概算指标中工程的物价水平基本",[739,743,746,749,752,755],{"id":740,"name":741,"category":7,"favorite":742},1,"领导干部任职前廉政法规知识测试题",92,{"id":744,"name":745,"category":7,"favorite":740},595,"建筑结构与设备",{"id":747,"name":748,"category":7,"favorite":740},715,"招标采购专业知识与法律法规",{"id":750,"name":751,"category":7,"favorite":740},848,"市政方向-通用基础",{"id":753,"name":754,"category":7,"favorite":8},534,"BIM工程师",{"id":756,"name":754,"category":7,"favorite":8},535]