[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-581-53":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":731},{"id":5,"name":6,"category":7,"favorite":8},581,"建设工程造价管理基础知识","建筑工程",0,53,50,2873,[13,38,53,68,83,98,113,128,142,157,172,187,202,217,231,245,260,275,289,303,317,330,344,358,372,386,401,415,427,441,455,469,480,494,508,522,534,548,563,577,592,602,617,631,646,660,674,688,703,717],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},897490,2,"多选题","某工程主要工作是混凝土浇筑，中标的综合单价是400 元\u002Fm2，计划工程量是8000m3。施工过程中因原材料价格提高使实际单位为500 元\u002Fm3，实际完成并经监理工程师确认的工程师是9000m3。若采用赢得值法进行综合分析，正确的结论有（）。",[19,23,27,30,33],{"key":20,"text":21,"correct":22},"A","已完工作预算费用为360 万元",true,{"key":24,"text":25,"correct":26},"B","费用偏差为90 万元，费用节省",false,{"key":28,"text":29,"correct":22},"C","已完工作实际费用为450 万元",{"key":31,"text":32,"correct":26},"D","进度偏差为40 万元，进度拖延",{"key":34,"text":35,"correct":22},"E","计划工作预算费用为320 万元","ACE","",{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":52,"analysis":37},897491,"工程项目施工成本控制的依据有（）。",[42,44,46,48,50],{"key":20,"text":43,"correct":26},"可行性研究报告",{"key":24,"text":45,"correct":22},"成本计划",{"key":28,"text":47,"correct":22},"工程承包合同",{"key":31,"text":49,"correct":22},"进度报告",{"key":34,"text":51,"correct":22},"工程变更","BCDE",{"id":54,"libraryId":5,"type":15,"typeLabel":16,"stem":55,"options":56,"answer":67,"analysis":37},897492,"关于施工成本计划编制的说法，正确的有（）。",[57,59,61,63,65],{"key":20,"text":58,"correct":26},"在编制施工成本支出计划时，无需考虑不可预见费",{"key":24,"text":60,"correct":26},"施工成本可分解为人工费、材料费、机械费、间接费和税金",{"key":28,"text":62,"correct":22},"编制施工成本计划可利用控制项目进度的网络进度计划",{"key":31,"text":64,"correct":22},"编制施工成本计划的关键是确立目标成本",{"key":34,"text":66,"correct":22},"按进度编制的施工成本计划可以用“时间-成本累积曲线”来表示","CDE",{"id":69,"libraryId":5,"type":15,"typeLabel":16,"stem":70,"options":71,"answer":82,"analysis":37},897493,"编制施工成本计划时，施工成本包括（）。",[72,74,76,78,80],{"key":20,"text":73,"correct":22},"人工费",{"key":24,"text":75,"correct":22},"材料费",{"key":28,"text":77,"correct":22},"施工机具使用费",{"key":31,"text":79,"correct":22},"企业管理费",{"key":34,"text":81,"correct":26},"税金","ABCD",{"id":84,"libraryId":5,"type":15,"typeLabel":16,"stem":85,"options":86,"answer":97,"analysis":37},897494,"建设工程项目施工成本计划的编制依据有（）。",[87,89,91,93,95],{"key":20,"text":88,"correct":26},"建设投资估算书",{"key":24,"text":90,"correct":22},"项目管理实施规划",{"key":28,"text":92,"correct":22},"相关设计文件",{"key":31,"text":94,"correct":22},"价格信息",{"key":34,"text":96,"correct":26},"施工招标公告","BCD",{"id":99,"libraryId":5,"type":15,"typeLabel":16,"stem":100,"options":101,"answer":112,"analysis":37},897495,"某商品混凝土目标成本与实际成本对比如下表，关于其成本分析的说法，正确的有（）。",[102,104,106,108,110],{"key":20,"text":103,"correct":26},"产量增加使成本增加了28600 元",{"key":24,"text":105,"correct":22},"实际成本与目标成本的差额是51536",{"key":28,"text":107,"correct":22},"单价提高使成本增加了26624 元",{"key":31,"text":109,"correct":26},"该商品混凝土目标成本是497696 元",{"key":34,"text":111,"correct":22},"损耗率下降使成本减少了4832 元","BCE",{"id":114,"libraryId":5,"type":15,"typeLabel":16,"stem":115,"options":116,"answer":127,"analysis":37},897496,"单位工程竣工成本分析包括的内容有（）。",[117,119,121,123,125],{"key":20,"text":118,"correct":26},"目标利润分析",{"key":24,"text":120,"correct":26},"目标成本分析",{"key":28,"text":122,"correct":26},"预算成本分析",{"key":31,"text":124,"correct":22},"主要资源节超对比分析",{"key":34,"text":126,"correct":22},"主要技术节约措施及其经济效果分析","DE",{"id":129,"libraryId":5,"type":15,"typeLabel":16,"stem":130,"options":131,"answer":82,"analysis":37},897497,"下列各项中属于表格核算法的优点的是（）",[132,134,136,138,140],{"key":20,"text":133,"correct":22},"简单易懂",{"key":24,"text":135,"correct":22},"实用性较好",{"key":28,"text":137,"correct":22},"操作简单",{"key":31,"text":139,"correct":22},"表格格式自由",{"key":34,"text":141,"correct":26},"覆盖面较大",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":156,"analysis":37},897498,"专项成本分析中，工期成本分析一般采取的方法有（）。",[146,148,150,152,154],{"key":20,"text":147,"correct":26},"构成比率法",{"key":24,"text":149,"correct":26},"成本盈亏异常分析",{"key":28,"text":151,"correct":22},"比较法",{"key":31,"text":153,"correct":22},"因素分析法",{"key":34,"text":155,"correct":26},"差额计算法","CD",{"id":158,"libraryId":5,"type":15,"typeLabel":16,"stem":159,"options":160,"answer":171,"analysis":37},897499,"下列关于分部分项工程施工成本分析的说法，正确的有（）。",[161,163,165,167,169],{"key":20,"text":162,"correct":22},"分部分项工程成本分析是施工项目成本分析的基础",{"key":24,"text":164,"correct":22},"成本分析的对象为已完成分部分项工程",{"key":28,"text":166,"correct":26},"须对施工项目中的所有分部分项工程进行成本分析",{"key":31,"text":168,"correct":26},"要进行估算成本与目标成本的比较",{"key":34,"text":170,"correct":22},"要进行预算成本、目标成本和实际成本的\"三算\"对比，分别计算实际偏差和目标偏差","ABE",{"id":173,"libraryId":5,"type":15,"typeLabel":16,"stem":174,"options":175,"answer":186,"analysis":37},897500,"下列指标中，属于对项目管理机构成本考核的有（ ）。",[176,178,180,182,184],{"key":20,"text":177,"correct":22},"项目成本降低额",{"key":24,"text":179,"correct":22},"项目成本降低率",{"key":28,"text":181,"correct":26},"施工生产总成本",{"key":31,"text":183,"correct":26},"劳动力不均衡系数",{"key":34,"text":185,"correct":26},"生产能力利用率","AB",{"id":188,"libraryId":5,"type":15,"typeLabel":16,"stem":189,"options":190,"answer":201,"analysis":37},897501,"在国际工程承包中，根据FIDIC《施工合同条件》（1999年版），因工程量变更可以调整合同规定非率或价格的条件包括（）。",[191,193,195,197,199],{"key":20,"text":192,"correct":22},"实际工程量比工程量表中规定的工程量变动大于10%",{"key":24,"text":194,"correct":22},"该工程量的变更与相对应费率的乘积超过了中标金额的0.01%",{"key":28,"text":196,"correct":22},"由于工程量的变动直接造成单位工程量费用的变动超过1%",{"key":31,"text":198,"correct":26},"原工程量全部删减，其替代工程的费用对合同总价无影响",{"key":34,"text":200,"correct":26},"该部分工程量是合同中规定的“固定费率项目”","ABC",{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":216,"analysis":37},897502,"FIDIC条件下，工程变更的范围包括()。",[206,208,210,212,214],{"key":20,"text":207,"correct":26},"删除某项工程，转由他人实施",{"key":24,"text":209,"correct":22},"任何部分标高、尺寸、位置变化",{"key":28,"text":211,"correct":26},"因施工需要，施工机械日常检修时间变更",{"key":31,"text":213,"correct":22},"工程质量改变",{"key":34,"text":215,"correct":22},"合同中的任何工程内容的数量改变","BDE",{"id":218,"libraryId":5,"type":15,"typeLabel":16,"stem":219,"options":220,"answer":52,"analysis":37},897503,"承包人向发包人提交的索赔报告，其内容包括（ ）。",[221,223,225,227,229],{"key":20,"text":222,"correct":26},"索赔意向通知",{"key":24,"text":224,"correct":22},"索赔证据",{"key":28,"text":226,"correct":22},"索赔事件总述",{"key":31,"text":228,"correct":22},"索赔的论证",{"key":34,"text":230,"correct":22},"索赔款项（或工期）计算书",{"id":232,"libraryId":5,"type":15,"typeLabel":16,"stem":233,"options":234,"answer":67,"analysis":37},897504,"承包商索赔成立应具备的前提条件有（ ）。",[235,237,239,241,243],{"key":20,"text":236,"correct":26},"造成费用增加或工期损失数额巨大，超出了正常的承受范围",{"key":24,"text":238,"correct":26},"索赔费用计算正确，并且容易分析",{"key":28,"text":240,"correct":22},"与合同对照，事件已造成了承包人工程项目成本的额外支出或直接工期损失",{"key":31,"text":242,"correct":22},"造成费用增加或工期损失的原因，按合同约定不属于承包人的行为责任或风险责任",{"key":34,"text":244,"correct":22},"承包人按合同规定的程序和时间提交索赔意向通知书和索赔报告",{"id":246,"libraryId":5,"type":15,"typeLabel":16,"stem":247,"options":248,"answer":259,"analysis":37},897505,"根据《建设工程工程量清单计价规范》，关于计日工的说法正确的有（）",[249,251,253,255,257],{"key":20,"text":250,"correct":22},"发包人通知承包人以计日工方式实施的零星工作，承包人应予执行",{"key":24,"text":252,"correct":22},"采用计日工计价的任何一项工作，承包人都应每天提交报表和有关凭证报送监理人审查",{"key":28,"text":254,"correct":22},"计日工由承包人汇总后，列入最近一期进度付款申请单，由监理人审查并经发包人批准后列入进度付款",{"key":31,"text":256,"correct":26},"计日工是承包人完成合同范围内的零星项目按合同约定的单价计价的一种方式",{"key":34,"text":258,"correct":22},"已标价工程量清单或预算书中无相应的计日工单价的，按照合理的成本与利润构成的原则，由合同当事人确定计日工的单价","ABCE",{"id":261,"libraryId":5,"type":15,"typeLabel":16,"stem":262,"options":263,"answer":274,"analysis":37},897506,"工程量必须按照相关工程现行国家计量规范规定的工程量计算规则计算。以下说法正确的是()。",[264,266,268,270,272],{"key":20,"text":265,"correct":22},"因承包人原因造成的超出合同工程范围施工或返工的工程量，发包人不予计量",{"key":24,"text":267,"correct":26},"规定单价合同、总价合同、成本加酬金合同适用一样的计量方法",{"key":28,"text":269,"correct":22},"成本加酬金合同按照单价合同的计量规定进行计量",{"key":31,"text":271,"correct":22},"单价合同若发现招标工程量清单中出现缺项、工程量偏差，或因工程变更引起工程量的增减，应按承包人在履行合同义务中完成的工程量计算",{"key":34,"text":273,"correct":22},"总价合同除按照工程变更规定引起的工程量增减外，总价合同各项目的工程量是承包人用于结算的最终工程量","ACDE",{"id":276,"libraryId":5,"type":15,"typeLabel":16,"stem":277,"options":278,"answer":82,"analysis":37},897508,"下列有关工程欠款的利息支付说法正确的是()。",[279,281,283,285,287],{"key":20,"text":280,"correct":22},"当事人对欠付工程价款利息计付标准有约定的，按照约定处理；没有约定的，按照中国人民银行发布的同期同类贷款利率计息",{"key":24,"text":282,"correct":22},"利息从应付工程价款之日计付",{"key":28,"text":284,"correct":22},"建设工程已实际交付的，计息日为交付之日",{"key":31,"text":286,"correct":22},"建设工程没有交付的，计息日为提交竣工结算文件之日",{"key":34,"text":288,"correct":26},"建设工程未交付，工程价款也未结算的，计息日为开工日期",{"id":290,"libraryId":5,"type":15,"typeLabel":16,"stem":291,"options":292,"answer":82,"analysis":37},897509,"在工程合同价款纠纷案件处理中，需做工程造价司法鉴定的，应委托具有相应资质的工程造价咨询人进行，以下说法正确的是()。",[293,295,297,299,301],{"key":20,"text":294,"correct":22},"工程造价咨询人应在收到工程造价司法鉴定资料后10天内，根据自身专业能力和证据资料，判断能否胜任该项委托，如不能，应辞去该项委托",{"key":24,"text":296,"correct":22},"工程造价咨询人在鉴定过程中要求鉴定项目当事人对缺陷资料进行补充的，应征得鉴定项目委托人同意，或者协调鉴定项目各方当事人共同签认",{"key":28,"text":298,"correct":22},"工程造价咨询人在鉴定项目合同有效的情况下应根据合同约定进行鉴定，不得任意改变双方合法的合意",{"key":31,"text":300,"correct":22},"工程造价咨询人出具正式鉴定意见书之前，可报请鉴定项目委托人向鉴定项目各方当事人发出鉴定意见书征求意见稿，并指明应书面答复的期限及其不答复的相应法律责任",{"key":34,"text":302,"correct":26},"经鉴定项目委托人同意等待鉴定项目当事人提交、补充证据，质证所用的时间计入鉴定期限",{"id":304,"libraryId":5,"type":15,"typeLabel":16,"stem":305,"options":306,"answer":201,"analysis":37},897511,"承包人应在每个计量周期到期后，向发包人提交已完成工程进度款支付申请，支付申请包括的内容有()。",[307,309,311,313,315],{"key":20,"text":308,"correct":22},"累计已完成的合同价款",{"key":24,"text":310,"correct":22},"本期合计完成的合同价款",{"key":28,"text":312,"correct":22},"本期合计应扣减的金额",{"key":31,"text":314,"correct":26},"累计已调整的合同金额",{"key":34,"text":316,"correct":26},"预计下期将完成的合同价款",{"id":318,"libraryId":5,"type":15,"typeLabel":16,"stem":319,"options":320,"answer":259,"analysis":37},897512,"下列属于承包人提交的进度款支付申请内容的有()。",[321,322,324,326,328],{"key":20,"text":308,"correct":22},{"key":24,"text":323,"correct":22},"累计已实际支付的合同价款",{"key":28,"text":325,"correct":22},"本周期应支付的安全文明施工费",{"key":31,"text":327,"correct":26},"实际应支付的竣工结算款",{"key":34,"text":329,"correct":22},"本周期应扣回的预付款",{"id":331,"libraryId":5,"type":15,"typeLabel":16,"stem":332,"options":333,"answer":82,"analysis":37},897513,"下列属于工程造价咨询人员出具的工程造价鉴定书内容的有()。",[334,336,338,340,342],{"key":20,"text":335,"correct":22},"委托鉴定的内容",{"key":24,"text":337,"correct":22},"鉴定结论",{"key":28,"text":339,"correct":22},"鉴定过程说明",{"key":31,"text":341,"correct":22},"鉴定的依据",{"key":34,"text":343,"correct":26},"鉴定的成本",{"id":345,"libraryId":5,"type":15,"typeLabel":16,"stem":346,"options":347,"answer":67,"analysis":37},897514,"以下关于合同价款纠纷处理的说法，正确的有()。",[348,350,352,354,356],{"key":20,"text":349,"correct":26},"承包人在合同约定的期限内没有完工，发包人可请求解除合同，应予支持",{"key":24,"text":351,"correct":26},"发包人未按约定支付工程价款的，承包人可请求解除合同，应予支持",{"key":28,"text":353,"correct":22},"发包人提供的主要建筑材料不符合强制性标准，致使承包人无法施工，且经催告仍未履行相应义务的，承包人可请求解除合同，应予支持",{"key":31,"text":355,"correct":22},"承包人超越资质等级许可的业务范围签订施工合同，在竣工前取得相应资质等级，当事人请求按照无效合同处理的，不予支持",{"key":34,"text":357,"correct":22},"建设工程未经竣工验收，发包人擅自使用后，又以使用部分质量不符合约定为由主张权利的，不予支持",{"id":359,"libraryId":5,"type":15,"typeLabel":16,"stem":360,"options":361,"answer":82,"analysis":37},897515,"建设工程合同价款纠纷的解决途径主要有四种，即和解、调解、仲裁和诉讼。以下有关说法正确的是()。",[362,364,366,368,370],{"key":20,"text":363,"correct":22},"合同价款争议发生后，发承包双方任何时候都可以进行协商。协商达成一致的，双方应签订书面和解协议，和解协议对发承包双方均有约束力",{"key":24,"text":365,"correct":22},"合同价款争议发生后，发承包双方可就工程计价依据的争议以书面形式提请工程造价管理机构对争议以书面文件进行解释或认定",{"key":28,"text":367,"correct":22},"发承包双方或一方在收到工程造价管理机构书面解释或认定后，仍可按照合同约定的争议解决方式提请仲裁或诉讼",{"key":31,"text":369,"correct":22},"合同履行期间，发承包双方可以协议调换或终止任何调解人，但发包人或承包人都不能单独采取行动。除非双方另有协议，在最终结清支付证书生效后，调解人的任期即终止",{"key":34,"text":371,"correct":26},"仲裁应在竣工之前进行，但发包人、承包人、调解人各自的义务不得因在工程实施期间进行仲裁而有所改变",{"id":373,"libraryId":5,"type":15,"typeLabel":16,"stem":374,"options":375,"answer":274,"analysis":37},897516,"关于合同价款纠纷的处理，下列说法中正确的有()。",[376,378,380,382,384],{"key":20,"text":377,"correct":22},"借用有资质的建筑施工企业名义与他人签订建设工程施工合同的行为无效",{"key":24,"text":379,"correct":26},"当事人对垫资利息有约定且约定的利息高于同期同类贷款利率的应予支持",{"key":28,"text":381,"correct":22},"当事人对建筑工程的计价标准或计价方法有约定的按约定结算工程价款",{"key":31,"text":383,"correct":22},"对于阴阳合同，其价款结算应以备案的中标合同作为依据",{"key":34,"text":385,"correct":22},"建设工程未交付，工程价款也未结算的，则工程欠款的计算日为当事人的起诉之日",{"id":387,"libraryId":5,"type":15,"typeLabel":16,"stem":388,"options":389,"answer":400,"analysis":37},897517,"下列关于预付款担保的说法中，正确的是( )。",[390,392,394,396,398],{"key":20,"text":391,"correct":22},"预付款担保应在施工合同签订后，预付款支付前提供",{"key":24,"text":393,"correct":26},"预付款担保必须采用银行保函的形式",{"key":28,"text":395,"correct":22},"承包人中途毁约，中止工程，发包人有权从预付款担保金额中获得预付款补偿",{"key":31,"text":397,"correct":22},"发包人应在预付款扣完后将预付款保函退还承包人",{"key":34,"text":399,"correct":26},"在预付款全部扣回之前，预付款保函应始终保持有效，且担保金额应保持不变","ACD",{"id":402,"libraryId":5,"type":15,"typeLabel":16,"stem":403,"options":404,"answer":186,"analysis":37},897518,"工程造价咨询人在进行工程造价鉴定时，应自行收集而非由委托人提供的鉴定资料有（）。",[405,407,409,411,413],{"key":20,"text":406,"correct":22},"适用于鉴定项目的规章、规范性文件和定额",{"key":24,"text":408,"correct":22},"鉴定项目同期同类型工程的技术经济指标",{"key":28,"text":410,"correct":26},"鉴定项目施工过程中的施工组织、质量、工期等工程资料",{"key":31,"text":412,"correct":26},"鉴定项目的施工合同及补充协议",{"key":34,"text":414,"correct":26},"鉴定项目所涉及实物标的的现场勘验资料",{"id":416,"libraryId":5,"type":15,"typeLabel":16,"stem":417,"options":418,"answer":97,"analysis":37},897519,"关于预付款担保，下列说法中正确的有()。",[419,421,423,424,425],{"key":20,"text":420,"correct":26},"预付款担保应在施工合同签订后、预付款支付后提供",{"key":24,"text":422,"correct":22},"预付款担保可以采用银行保函的形式",{"key":28,"text":395,"correct":22},{"key":31,"text":397,"correct":22},{"key":34,"text":426,"correct":26},"在预付款全部扣回之前，预付款保函应始终保持有效，且担保金额应始终保持不变",{"id":428,"libraryId":5,"type":15,"typeLabel":16,"stem":429,"options":430,"answer":127,"analysis":37},897520,"我国现行合同条件下，下列关于工程预付款的叙述中，正确的有()。",[431,433,435,437,439],{"key":20,"text":432,"correct":26},"工程预付款主要用于采购建材、招募工人和租赁设备",{"key":24,"text":434,"correct":26},"建筑工程的预付款额度一般不超过当年建筑工程量的30%",{"key":28,"text":436,"correct":26},"安装工程的预付款额度一般不超过当年安装工程量的15%",{"key":31,"text":438,"correct":22},"承发包双方应当在专用条款内约定发包人向承包人预付工程款的时间和额度",{"key":34,"text":440,"correct":22},"工程预付款的预付时间应不迟于约定的开工日期前7天",{"id":442,"libraryId":5,"type":15,"typeLabel":16,"stem":443,"options":444,"answer":400,"analysis":37},897521,"采用双方约定争议调解人方式解决合同价款纠纷，其程序正确的有()。",[445,447,449,451,453],{"key":20,"text":446,"correct":22},"发承包双方可以在合同签订后共同约定争议调解人",{"key":24,"text":448,"correct":26},"发生争议，应由承包人将该争议以书面形式提交调解人，并将副本抄送发包人",{"key":28,"text":450,"correct":22},"调解人收到调解委托后28天内提出调解书",{"key":31,"text":452,"correct":22},"发承包双方接受调解书的，经双方签字后作为合同的补充文件",{"key":34,"text":454,"correct":26},"若发承包任一方对调解有异议，应在收到调解书14天内向另一方发出异议通知",{"id":456,"libraryId":5,"type":15,"typeLabel":16,"stem":457,"options":458,"answer":112,"analysis":37},897525,"关于进度款支付程序，下列说法中正确的有（）。",[459,461,463,465,467],{"key":20,"text":460,"correct":26},"承包人应在每个计量周期到期后14 天内向发包人提交已完工程进度款支付申请",{"key":24,"text":462,"correct":22},"发包人应在收到承包人进度款支付申请后的14 天内审核并签发进度款支付证书",{"key":28,"text":464,"correct":22},"发包人应在签发进度款支付证书后的14 天内向承包人支付进度款",{"key":31,"text":466,"correct":26},"双方对部分清单计量结果有争议，发包人应待争议解决后再向承包人支付进度款",{"key":34,"text":468,"correct":22},"发包人在收到催告付款通告后的14 天内，按承包人支付申请的金额向承包人支付进度款",{"id":470,"libraryId":5,"type":15,"typeLabel":16,"stem":471,"options":472,"answer":274,"analysis":37},897526,"关于合同价款纠纷的处理，下列说法中正确的有（）。",[473,474,476,477,478],{"key":20,"text":377,"correct":22},{"key":24,"text":475,"correct":26},"当事人对垫资利息有约定且约定的利息高于同期同类货款利率的应予支持",{"key":28,"text":381,"correct":22},{"key":31,"text":383,"correct":22},{"key":34,"text":479,"correct":22},"建设工程未交付，工程价款也未结算的，则工程欠款的计息日为当事人的起诉之日",{"id":481,"libraryId":5,"type":15,"typeLabel":16,"stem":482,"options":483,"answer":201,"analysis":37},897527,"承包商采购的用于永久工程的材料和设备，合同通用条款规定，期中支付证书中应包括一笔用于预支已运至现场用于永久工程的材料和设备款额，下列有关说法正确的是()。",[484,486,488,490,492],{"key":20,"text":485,"correct":22},"装运后付款的材料和设备，要求此类材料和设备已经运至工程所在国，并正在运往现场的途中",{"key":24,"text":487,"correct":22},"装运后付款的材料和设备，承包商应提交保函金额与应付的预支总额相等的银行保函",{"key":28,"text":489,"correct":22},"装运后付款的材料和设备，承包商提交的保函有效期持续到此类材料和设备已经运至现场并妥善存放，而且承包商已经采取了防护措施为止",{"key":31,"text":491,"correct":26},"运至现场后付款的材料和设备，要求此类材料和设备已经运至现场，但可先不安排存放",{"key":34,"text":493,"correct":26},"工程师确认用于永久工程的材料和设备符合预支条件后，应当根据审查承包商提交的相关文件确定此类材料和设备的实际费用，作为期中支付证书中应增加的款额",{"id":495,"libraryId":5,"type":15,"typeLabel":16,"stem":496,"options":497,"answer":112,"analysis":37},897528,"根据《建设项目工程总承包合同示范文本》(GF-2011-0216)，以下情形中，属于应对合同价款进行调整的有()。",[498,500,502,504,506],{"key":20,"text":499,"correct":26},"合同变更",{"key":24,"text":501,"correct":22},"法律法规变化影响的合同价格增减",{"key":28,"text":503,"correct":22},"工程造价管理部门公布的价格调整造成工程成本增减",{"key":31,"text":505,"correct":26},"一周内停水、停电等造成累计停工超过8小时",{"key":34,"text":507,"correct":22},"发包人批准的变更估算的增减",{"id":509,"libraryId":5,"type":15,"typeLabel":16,"stem":510,"options":511,"answer":216,"analysis":37},897529,"国际工程合同价款结算中，关于预付款下列说法中正确的有()。",[512,514,516,518,520],{"key":20,"text":513,"correct":26},"首次预付款的支付时间以收到预付款保函和颁发中标函之日两者中较早者为准",{"key":24,"text":515,"correct":22},"预付款应在支付证书中按百分比扣减的方式偿还",{"key":28,"text":517,"correct":26},"当期中支付证书中累计总额超过中标合同价（含暂定金额）的10％开始扣减",{"key":31,"text":519,"correct":22},"在预付款完全偿还之前承包商应保证预付款保函一直有效",{"key":34,"text":521,"correct":22},"如在预付款保函截止日期前28天预付款还未完全偿还，则承包商应相应延长保函期限",{"id":523,"libraryId":5,"type":15,"typeLabel":16,"stem":524,"options":525,"answer":216,"analysis":37},897530,"国际工程合同价款结算中，关于预付款下列说法中正确的有（）。",[526,528,529,531,532],{"key":20,"text":527,"correct":26},"首次预付款的支付时间以收到预付款保函和领发中标函之日两者中较早者为准",{"key":24,"text":515,"correct":22},{"key":28,"text":530,"correct":26},"当期中支付证书中累计总额超过中标合同价(含暂定金额)的10%开始扣减",{"key":31,"text":519,"correct":22},{"key":34,"text":533,"correct":22},"如在预付款保函截止日期前28 天预付款还未完全偿还，则承包商应相应延长保函期限",{"id":535,"libraryId":5,"type":15,"typeLabel":16,"stem":536,"options":537,"answer":52,"analysis":37},897531,"在合同履行过程中因不可抗力解除合同的价款结算与支付说法正确的是()。",[538,540,542,544,546],{"key":20,"text":539,"correct":26},"由于不可抗力解除合同的，承包人应自行支付撤离现场所需的费用",{"key":24,"text":541,"correct":22},"发包人应向承包人支付已实施或部分实施的措施项目应付价款",{"key":28,"text":543,"correct":22},"发包人应向承包人支付承包人为合同工程合理订购且已交付的材料和工程设备货款",{"key":31,"text":545,"correct":22},"发包人一经支付材料和工程设备货款，则该材料和工程设备成为发包人的财产",{"key":34,"text":547,"correct":22},"发包人应向承包人支付承包人为完成合同工程而预期开支的任何合理费用",{"id":549,"libraryId":5,"type":15,"typeLabel":16,"stem":550,"options":551,"answer":562,"analysis":37},897532,"关于建设工程竣工结算的办理，下列说法中正确的有（ ）。",[552,554,556,558,560],{"key":20,"text":553,"correct":22},"竣工结算文件经发承包人双方签字确认的，应当作为工程结算的依据",{"key":24,"text":555,"correct":26},"竣工结算文件由发包人组织编制，承包人组织核对",{"key":28,"text":557,"correct":26},"工程造价咨询机构审核结论与承包人竣工结算文件不一致时，以造价咨询机构审核意见为准",{"key":31,"text":559,"correct":22},"合同双方对复核后的竣工结算有异议时，可以就无异议部分的工程办理不完全竣工结算",{"key":34,"text":561,"correct":22},"有异议部分由发承包双方协商解决，协商不成的, 按照合同约定的争议解决方式处理","ADE",{"id":564,"libraryId":5,"type":15,"typeLabel":16,"stem":565,"options":566,"answer":400,"analysis":37},897533,"根据《建设工程工程量清单计价规范》GB 50500-2013，关于工程竣工结算的计价原则，下列说法正确的是（）。",[567,569,571,573,575],{"key":20,"text":568,"correct":22},"计日工按发包人实际签证确认的事项计算",{"key":24,"text":570,"correct":26},"总承包服务费依据合同约定金额计算，不得调整",{"key":28,"text":572,"correct":22},"暂列金额应减去工程价款调整金额计算，余额归发包人",{"key":31,"text":574,"correct":22},"规费和税金应按国家或省级、行业建设主管部门的规定计算",{"key":34,"text":576,"correct":26},"总价措施项目应依据合同约定的项目和金额计算，不得调整",{"id":578,"libraryId":5,"type":15,"typeLabel":16,"stem":579,"options":580,"answer":591,"analysis":37},897534,"发包人对工程质量有异议，竣工结算仍应按合同约定办理的情形有（）。",[581,583,585,587,589],{"key":20,"text":582,"correct":22},"工程已竣工验收的",{"key":24,"text":584,"correct":22},"工程已竣工未验收，但实际投入使用的",{"key":28,"text":586,"correct":26},"工程已竣工未验收，且未实际投入使用的",{"key":31,"text":588,"correct":22},"工程停建，对无质量争议的部分",{"key":34,"text":590,"correct":26},"工程停建，对有质量争议的部分","ABD",{"id":593,"libraryId":5,"type":15,"typeLabel":16,"stem":594,"options":595,"answer":562,"analysis":37},897535,"关于建设工程竣工结算的办理，下列说法中正确的有（）。",[596,597,598,599,600],{"key":20,"text":553,"correct":22},{"key":24,"text":555,"correct":26},{"key":28,"text":557,"correct":26},{"key":31,"text":559,"correct":22},{"key":34,"text":601,"correct":22},"承包人对工程造价咨询企业的审核意见有异议的，可以向工程造价管理机构申请调解",{"id":603,"libraryId":5,"type":15,"typeLabel":16,"stem":604,"options":605,"answer":616,"analysis":37},897536,"关于无形资产价值确定的说法中，正确的有（）",[606,608,610,612,614],{"key":20,"text":607,"correct":22},"无形资产计价入账后，应在其有效使用期内分期摊销",{"key":24,"text":609,"correct":26},"专利权转让价格必须按成本估价",{"key":28,"text":611,"correct":22},"自创专利权的价值为开发过程中的实际支出",{"key":31,"text":613,"correct":26},"自创的非专利技术一般作为无形资产入账",{"key":34,"text":615,"correct":26},"通过行政划拨的土地，其土地使用权作为无形资产核算","AC",{"id":618,"libraryId":5,"type":15,"typeLabel":16,"stem":619,"options":620,"answer":112,"analysis":37},897537,"下列关于共同费用分摊计入新增固定资产价值的表述，正确的是（）。",[621,623,625,627,629],{"key":20,"text":622,"correct":26},"建设单位管理费按建筑、安装工程造价总额作比例分摊",{"key":24,"text":624,"correct":22},"土地征用费按建筑工程造价比例分摊",{"key":28,"text":626,"correct":22},"建筑工程设计费按建筑工程造价比例分摊",{"key":31,"text":628,"correct":26},"生产工艺流程系统设计费按需安装设备价值总额作比例分摊",{"key":34,"text":630,"correct":22},"地质勘察费按建筑工程造价比例分摊",{"id":632,"libraryId":5,"type":15,"typeLabel":16,"stem":633,"options":634,"answer":645,"analysis":37},897538,"建设项目竣工财务决算表中，属于“资金来源”的有（）。",[635,637,639,641,643],{"key":20,"text":636,"correct":22},"专项建设基金拨款",{"key":24,"text":638,"correct":22},"项目资本公积金",{"key":28,"text":640,"correct":26},"有价证券",{"key":31,"text":642,"correct":22},"待冲基建支出",{"key":34,"text":644,"correct":22},"未交税金","ABDE",{"id":647,"libraryId":5,"type":15,"typeLabel":16,"stem":648,"options":649,"answer":52,"analysis":37},897539,"根据国家现行有关竣工结算的规定，建设项目财务决算报表包括()。",[650,652,654,656,658],{"key":20,"text":651,"correct":26},"建设项目竣工财务决算审批表",{"key":24,"text":653,"correct":22},"建设项目概况表",{"key":28,"text":655,"correct":22},"基本建设项目竣工财务决算表",{"key":31,"text":657,"correct":22},"建设项目交付使用资产明细表",{"key":34,"text":659,"correct":22},"建设项目交付使用资产总表",{"id":661,"libraryId":5,"type":15,"typeLabel":16,"stem":662,"options":663,"answer":82,"analysis":37},897540,"按照财政部、国家发展改革委和住房城乡建设部的有关文件规定，竣工决算是由()组成。",[664,666,668,670,672],{"key":20,"text":665,"correct":22},"竣工财务决算说明书",{"key":24,"text":667,"correct":22},"竣工财务决算报表",{"key":28,"text":669,"correct":22},"工程竣工图",{"key":31,"text":671,"correct":22},"工程竣工造价对比分析",{"key":34,"text":673,"correct":26},"工程结算文件",{"id":675,"libraryId":5,"type":15,"typeLabel":16,"stem":676,"options":677,"answer":591,"analysis":37},897541,"下列资金项目中，属于“基本建设项目竣工财务决算表”中资金来源的有()。",[678,680,682,684,686],{"key":20,"text":679,"correct":22},"预算拨款",{"key":24,"text":681,"correct":22},"项目资本金",{"key":28,"text":683,"correct":26},"应收生产单位投资借款",{"key":31,"text":685,"correct":22},"基建借款",{"key":34,"text":687,"correct":26},"待核销基建支出",{"id":689,"libraryId":5,"type":15,"typeLabel":16,"stem":690,"options":691,"answer":702,"analysis":37},897542,"土地使用权的取得方式影响竣工结算新增资产的核定，下列土地使用权的作价应作为无形资产核算的有()。",[692,694,696,698,700],{"key":20,"text":693,"correct":22},"通过支付土地出让金取得的土地使用权",{"key":24,"text":695,"correct":26},"通过行政划拨取得的土地使用权",{"key":28,"text":697,"correct":26},"通过划拨转让取得的出让土地使用权",{"key":31,"text":699,"correct":22},"已补交土地出让价款，作价入股的土地使用权",{"key":34,"text":701,"correct":26},"租借房屋的土地使用权","AD",{"id":704,"libraryId":5,"type":15,"typeLabel":16,"stem":705,"options":706,"answer":702,"analysis":37},897543,"关于新增固定资产价值的确定，下列说法中正确的有()。",[707,709,711,713,715],{"key":20,"text":708,"correct":22},"新增固定资产价值是以独立发挥生产能力的单项工程为对象计算的",{"key":24,"text":710,"correct":26},"分期分批交付的工程，应在最后一期（批）交付时一次性计算新增固定资产价值",{"key":28,"text":712,"correct":26},"凡购置的达到固定资产标准不需安装的设备，应计入新增固定资产价值",{"key":31,"text":714,"correct":22},"运输设备等固定资产，仅计算采购成本，不计分摊的“待摊投资”",{"key":34,"text":716,"correct":26},"建设单位管理费按建筑工程、安装工程以及不须安装设备价值总额按比例分摊",{"id":718,"libraryId":5,"type":15,"typeLabel":16,"stem":719,"options":720,"answer":36,"analysis":37},897544,"下列内容中，属于竣工决算的编制依据的有()。",[721,723,725,727,729],{"key":20,"text":722,"correct":22},"项目计划任务书及立项批复文件",{"key":24,"text":724,"correct":26},"工程量清单",{"key":28,"text":726,"correct":22},"会计核算及财务管理资料",{"key":31,"text":728,"correct":26},"工程建设其他费用定额",{"key":34,"text":730,"correct":22},"工程签证、工程索赔等合同价款调整文件",[732,736,739,742,745,748],{"id":733,"name":734,"category":7,"favorite":735},1,"领导干部任职前廉政法规知识测试题",92,{"id":737,"name":738,"category":7,"favorite":733},595,"建筑结构与设备",{"id":740,"name":741,"category":7,"favorite":733},715,"招标采购专业知识与法律法规",{"id":743,"name":744,"category":7,"favorite":733},848,"市政方向-通用基础",{"id":746,"name":747,"category":7,"favorite":8},534,"BIM工程师",{"id":749,"name":747,"category":7,"favorite":8},535]