[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-581-52":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":736},{"id":5,"name":6,"category":7,"favorite":8},581,"建设工程造价管理基础知识","建筑工程",0,52,50,2873,[13,38,52,67,82,97,110,125,140,154,169,184,199,214,228,243,257,272,287,302,317,332,346,360,375,389,403,418,432,443,457,471,485,499,514,528,542,556,570,584,598,612,626,640,655,665,679,694,708,722],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},897440,2,"多选题","关于施工图预算对投资方的作用，下列说法中正确的有（）。",[19,23,26,30,33],{"key":20,"text":21,"correct":22},"A","是控制施工图设计不突破设计概算的重要措施",true,{"key":24,"text":25,"correct":22},"B","是控制造价及资金合理使用的依据",{"key":27,"text":28,"correct":29},"C","是投标报价的基础",false,{"key":31,"text":32,"correct":29},"D","是与施工预算进行“两算”对比的依据",{"key":34,"text":35,"correct":29},"E","是调配施工力量、组织材料供应的依据","AB","",{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":36,"analysis":37},897441,"下列关于施工图预算对施工企业的作用，表述正确的是()。",[42,44,46,48,50],{"key":20,"text":43,"correct":22},"施工图预算是进行“两算”对比的依据",{"key":24,"text":45,"correct":22},"施工图预算是建筑工程预算包干的依据",{"key":27,"text":47,"correct":29},"施工图是控制造价及资金合理使用的依据",{"key":31,"text":49,"correct":29},"施工图预算是确定工程招标控制价的依据",{"key":34,"text":51,"correct":29},"施工图预算是施工图设计不突破设计概算的重要措施",{"id":53,"libraryId":5,"type":15,"typeLabel":16,"stem":54,"options":55,"answer":66,"analysis":37},897442,"下列费用项目中，属于单项工程施工图预算编制范围之内的是()。",[56,58,60,62,64],{"key":20,"text":57,"correct":22},"特殊构筑物的土建工程费",{"key":24,"text":59,"correct":22},"采暖工程的安装工程费",{"key":27,"text":61,"correct":29},"厂房贷款的建设期利息费用",{"key":31,"text":63,"correct":22},"工器具和生产家具购置费",{"key":34,"text":65,"correct":22},"空调工程的调试工程费","ABDE",{"id":68,"libraryId":5,"type":15,"typeLabel":16,"stem":69,"options":70,"answer":81,"analysis":37},897443,"采用全费用综合单价法编制施工图预算，下列说法中正确的是（）。",[71,73,75,77,79],{"key":20,"text":72,"correct":29},"计算直接费后应编制工料分析表",{"key":24,"text":74,"correct":22},"全费用综合单价中应包括规费和税金",{"key":27,"text":76,"correct":22},"综合计取的措施项目费以分部分项工程费和可计量的措施项目费之和为基数计算",{"key":31,"text":78,"correct":29},"编制综合单价分析表时，工料机消耗量与单价均应来预算定额",{"key":34,"text":80,"correct":29},"分部分项工程量与措施项目费之和即为建筑安装工程施工图预算费用","BC",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":96,"analysis":37},897444,"下列内容中，属于施工图预算编制依据的是()。",[86,88,90,92,94],{"key":20,"text":87,"correct":22},"国家、行业和地方有关规定",{"key":24,"text":89,"correct":22},"项目相关文件、合同、协议等",{"key":27,"text":91,"correct":22},"工程所在地的人工、材料、设备、施工机具预算价格",{"key":31,"text":93,"correct":29},"工程建设其他费定额",{"key":34,"text":95,"correct":22},"项目的管理模式、发包模式及施工条件","ABCE",{"id":98,"libraryId":5,"type":15,"typeLabel":16,"stem":99,"options":100,"answer":109,"analysis":37},897445,"下列内容中，属于建筑安装工程施工图预算编制依据的是()。",[101,102,104,106,107],{"key":20,"text":87,"correct":22},{"key":24,"text":103,"correct":22},"相应工程造价管理机构发布的预算定额",{"key":27,"text":105,"correct":22},"施工图设计文件及相关标准图集和规范",{"key":31,"text":93,"correct":29},{"key":34,"text":108,"correct":29},"工程分析表","ABC",{"id":111,"libraryId":5,"type":15,"typeLabel":16,"stem":112,"options":113,"answer":124,"analysis":37},897446,"施工图预算是建设程序中一个重要的技术经济文件，下列各项中属于施工图预算对投资方的作用的是( )。",[114,116,118,120,122],{"key":20,"text":115,"correct":29},"调配施工力量、组织材料供应的依据",{"key":24,"text":117,"correct":22},"控制造价及资金合理使用的依据",{"key":27,"text":119,"correct":22},"确定合同价款、拨付工程进度款的依据",{"key":31,"text":121,"correct":29},"建筑工程预算包干的依据",{"key":34,"text":123,"correct":22},"确定工程招标控制价的依据","BCE",{"id":126,"libraryId":5,"type":15,"typeLabel":16,"stem":127,"options":128,"answer":139,"analysis":37},897447,"编制施工图预算的过程中，包括在预算单价法中、但不包括在实物法中的工作内容有（）。",[129,131,133,135,137],{"key":20,"text":130,"correct":29},"套用预算定额",{"key":24,"text":132,"correct":29},"汇总人材机费用",{"key":27,"text":134,"correct":22},"计算未计价材料费",{"key":31,"text":136,"correct":22},"计算材料价差",{"key":34,"text":138,"correct":29},"计算其他费用","CD",{"id":141,"libraryId":5,"type":15,"typeLabel":16,"stem":142,"options":143,"answer":81,"analysis":37},897448,"下列表格中，属于单位设备及安装工程预算书构成内容的有（）。",[144,146,148,150,152],{"key":20,"text":145,"correct":29},"工器具及生产家具购置费计算表",{"key":24,"text":147,"correct":22},"设备及安装工程预算表",{"key":27,"text":149,"correct":22},"设备及安装工程取费表",{"key":31,"text":151,"correct":29},"综合预算表",{"key":34,"text":153,"correct":29},"总预算表",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":168,"analysis":37},897449,"根据《招标投标法》 ， 工程施工项目招标信息发布的说法， 正确的有( )。",[158,160,162,164,166],{"key":20,"text":159,"correct":29},"指定媒介可以酌情收取额外费用",{"key":24,"text":161,"correct":22},"招标文件售出后不予退还",{"key":27,"text":163,"correct":29},"招标人应至少在两家指定的媒介发布招标公告",{"key":31,"text":165,"correct":29},"招标人可以对招标文件所附的设计文件向投标人收取一定的费用",{"key":34,"text":167,"correct":22},"自招标文件出售之日起至停止出售之日止， 最短不得少于 5 日","BE",{"id":170,"libraryId":5,"type":15,"typeLabel":16,"stem":171,"options":172,"answer":183,"analysis":37},897450,"关于建设工程施工招标标前会议的说法， 正确的有（ ） 。",[173,175,177,179,181],{"key":20,"text":174,"correct":22},"标签会议是招标人按投标须知在规定的时间、 地点召开的会议",{"key":24,"text":176,"correct":29},"标前会议纪要与招标文件不一致时， 应以招标文件为准",{"key":27,"text":178,"correct":22},"标前会议结束后， 招标人应将会议纪要用书面形式发给每个投标人",{"key":31,"text":180,"correct":22},"招标人可以根据实际情况在标前会议上确定延长投标截止时间",{"key":34,"text":182,"correct":29},"招标人的答复函件对问题的答复须注明问题来源","ACD",{"id":185,"libraryId":5,"type":15,"typeLabel":16,"stem":186,"options":187,"answer":198,"analysis":37},897451,"根据《中华人民共和国招标投标法实施条例》（中华人民共和国国务院令第613号）第八条，可以采用邀请招标的有（ ）。",[188,190,192,194,196],{"key":20,"text":189,"correct":29},"国有资金占控股地位",{"key":24,"text":191,"correct":22},"技术复杂、有特殊要求或者受自然环境限制，只有少量潜在投标人可供选择",{"key":27,"text":193,"correct":29},"国有资金占主导地位",{"key":31,"text":195,"correct":22},"采用公开招标方式的费用占项目合同金额的比例过大",{"key":34,"text":197,"correct":29},"公开招标程序过于繁琐的","BD",{"id":200,"libraryId":5,"type":15,"typeLabel":16,"stem":201,"options":202,"answer":213,"analysis":37},897452,"根据我国有关法规规定， 建设工程施工招标应具备的条件包括( )。",[203,205,207,209,211],{"key":20,"text":204,"correct":29},"招标人已经委托了招标代理单位",{"key":24,"text":206,"correct":29},"施工图设计已经全部完成",{"key":27,"text":208,"correct":22},"有相应资金或资金来源已经落实",{"key":31,"text":210,"correct":22},"应当履行审批手续的初步设计及概算已获批准",{"key":34,"text":212,"correct":22},"应当履行核准手续的招标范围和招标方式等已获核准","CDE",{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":139,"analysis":37},897453,"根据《招标投标法》 和相关法律法规， 下列评标委员会的做法中。 正确的是（ ）。",[218,220,222,224,226],{"key":20,"text":219,"correct":29},"招标人代表不可以作为评标委员会成员",{"key":24,"text":221,"correct":29},"评标委员会成员中， 经济技术专家的人数不得少于总数的 1\u002F2",{"key":27,"text":223,"correct":22},"评标委员会的人数必须为 5 人以上单数",{"key":31,"text":225,"correct":22},"与投标人有利害关系的人不得进入相关项目的评标委员会",{"key":34,"text":227,"correct":29},"评标委员会成员的名单在开标时应当公布",{"id":229,"libraryId":5,"type":15,"typeLabel":16,"stem":230,"options":231,"answer":242,"analysis":37},897454,"下列属于招标人不合理限制、 排斥投标人的行为的有（ ）",[232,234,236,238,240],{"key":20,"text":233,"correct":22},"就同一个招标项目， 向潜在投标人提供有差别的信息",{"key":24,"text":235,"correct":29},"对非特定行业的业绩、 奖项作为加分条件",{"key":27,"text":237,"correct":22},"组织部分潜在投标人踏勘项目现场",{"key":31,"text":239,"correct":22},"对潜在投标人采取不同的资格审查或评标标准",{"key":34,"text":241,"correct":22},"限定或指定特定的专利或者品牌","ACDE",{"id":244,"libraryId":5,"type":15,"typeLabel":16,"stem":245,"options":246,"answer":242,"analysis":37},897455,"根据2015年《政府采购法实施条例》和2013年《电子招标投标办法》的规定，下列说法错误的是（ ）。",[247,249,251,253,255],{"key":20,"text":248,"correct":22},"政府采购工程依法不进行招标的，应当只能依照竞争性谈判方式进行采购",{"key":24,"text":250,"correct":29},"政府采购工程依法不进行招标的，可以依照单一来源采购方式进行采购",{"key":27,"text":252,"correct":22},"招标投标交易场所可以以营利为目的",{"key":31,"text":254,"correct":22},"数据电文形式与纸质形式的招标投标活动的法律效力不同",{"key":34,"text":256,"correct":22},"投标截止时间后送达的投标文件，电子招标投标交易平台可以拒收",{"id":258,"libraryId":5,"type":15,"typeLabel":16,"stem":259,"options":260,"answer":271,"analysis":37},897456,"关于招标投标活动中， 投标人提出异议的说法， 正确的是（ ）。",[261,263,265,267,269],{"key":20,"text":262,"correct":29},"对招标文件有异议的， 必须在投标截止日前提出",{"key":24,"text":264,"correct":22},"对资格预审文件有异议的， 必须在资格预审申请截止前 2 日提出",{"key":27,"text":266,"correct":29},"投标人认为招标活动不符合相关法律规定的， 可以在知道或者应当知道之日起 15 日向有关部门投诉",{"key":31,"text":268,"correct":22},"收到对招标文件异议后， 招标人应当在 3 日内进行答复； 答复前， 招标活动应当暂停。",{"key":34,"text":270,"correct":22},"对资格预审文件、 招标文件、 开标及对依法必须进行招标项目的评标结果有异议的， 应当先向招标人提出异议， 再向有关部门投诉。","BDE",{"id":273,"libraryId":5,"type":15,"typeLabel":16,"stem":274,"options":275,"answer":286,"analysis":37},897457,"下列情形中， 依法可以不招标的项目有( )。",[276,278,280,282,284],{"key":20,"text":277,"correct":22},"需要使用不可替代的施工专有技术的项目",{"key":24,"text":279,"correct":29},"采购人的全资子公司能够自行建设的",{"key":27,"text":281,"correct":22},"需要向原中标人采购工程， 否则将影响施工或者功能配套要求的",{"key":31,"text":283,"correct":29},"只有少量潜在投标人可供选择的项目",{"key":34,"text":285,"correct":22},"已通过招标方式选定的特许经营项目投资人依法能够自行建设的","ACE",{"id":288,"libraryId":5,"type":15,"typeLabel":16,"stem":289,"options":290,"answer":301,"analysis":37},897458,"关于电子招标投标的说法， 正确的是（ ）。",[291,293,295,297,299],{"key":20,"text":292,"correct":22},"投标人在投标截止时间前可以撤回投标文件",{"key":24,"text":294,"correct":22},"数据电文形式与纸质形式的招标投标活动具有同等的法律效力",{"key":27,"text":296,"correct":29},"投标截止时间后送达的投标文件， 电子招标投标平台不得拒收",{"key":31,"text":298,"correct":22},"依法必须进行公开招标项目的招标公告应在电子招标投标交易平台和国家指定的招标公告媒介同步发布",{"key":34,"text":300,"correct":29},"投标人应当在投标截止时间前完成投标文件的传输递交， 但不可补充、 修改投标文件","ABD",{"id":303,"libraryId":5,"type":15,"typeLabel":16,"stem":304,"options":305,"answer":316,"analysis":37},897459,"下列情形中， 视为投标人相互串通投标的有（ ）",[306,308,310,312,314],{"key":20,"text":307,"correct":22},"不同投标人的投标文件相互混装",{"key":24,"text":309,"correct":29},"属于同一集团、 协会、 商会等组织成员的投标人按照该组织要求协同投标",{"key":27,"text":311,"correct":29},"招标人授意投标人撤换、 修改投标文件",{"key":31,"text":313,"correct":22},"不同投标人委托同一单位办理投标",{"key":34,"text":315,"correct":29},"单位负责人为同一人或者存在控股、 管理关系的不同单位参加同一招标项目不同标段的投标","AD",{"id":318,"libraryId":5,"type":15,"typeLabel":16,"stem":319,"options":320,"answer":331,"analysis":37},897460,"投标人须知是招标人向投标人传递基础信息的文件， 投标人应特别注意其中的( )。",[321,323,325,327,329],{"key":20,"text":322,"correct":22},"招标工程的范围和详细内容",{"key":24,"text":324,"correct":29},"招标人的职责权利",{"key":27,"text":326,"correct":29},"施工技术说明",{"key":31,"text":328,"correct":22},"投标文件的组成",{"key":34,"text":330,"correct":22},"重要的时间安排","ADE",{"id":333,"libraryId":5,"type":15,"typeLabel":16,"stem":334,"options":335,"answer":316,"analysis":37},897461,"下列情形中， 招标人应当拒收的投标文件有（ ）。",[336,338,340,342,344],{"key":20,"text":337,"correct":22},"逾期送送达的",{"key":24,"text":339,"correct":29},"投标人未提交投标保证金的",{"key":27,"text":341,"correct":29},"投标人的法定代表人未到场的",{"key":31,"text":343,"correct":22},"未按招标文件要求密封的",{"key":34,"text":345,"correct":29},"投标人对招标文件有异议的",{"id":347,"libraryId":5,"type":15,"typeLabel":16,"stem":348,"options":349,"answer":213,"analysis":37},897462,"某港口建设项目向社会公开招标，招标文件中明确规定提交投标文件的截止时间为2014年6月2日上午9点，则下列说法正确的有（ ）。",[350,352,354,356,358],{"key":20,"text":351,"correct":29},"开标时间为2014年6月2日上午9点至2014年6月3日上午9点之间",{"key":24,"text":353,"correct":29},"开标由该市建设行政主管部门主持",{"key":27,"text":355,"correct":22},"开标邀请所有投标人参加",{"key":31,"text":357,"correct":22},"开标时，可由投标人检查投标文件的密封情况",{"key":34,"text":359,"correct":22},"招标人对2014年6月2日上午9点15分送达的投标文件不予受理",{"id":361,"libraryId":5,"type":15,"typeLabel":16,"stem":362,"options":363,"answer":374,"analysis":37},897463,"关于施工招标文件，下列说法中正确的有()。",[364,366,368,370,372],{"key":20,"text":365,"correct":22},"招标文件应包括拟签合同的主要条款",{"key":24,"text":367,"correct":22},"当进行资格预审时，招标文件中应包括投标邀请书",{"key":27,"text":369,"correct":29},"自招标文件开始发出之日起至投标截止之日最短不得少于15天",{"key":31,"text":371,"correct":29},"招标文件不得说明评标委员会的组建方法",{"key":34,"text":373,"correct":22},"招标文件应明确评标方法","ABE",{"id":376,"libraryId":5,"type":15,"typeLabel":16,"stem":377,"options":378,"answer":66,"analysis":37},897464,"关于投标文件的编制与递交，下列说法中正确的有()。",[379,381,383,385,387],{"key":20,"text":380,"correct":22},"投标函附录在满足招标文件实质性要求的基础上，提出比招标文中要求更能吸引招标人的承诺",{"key":24,"text":382,"correct":22},"当投标文件的正本与副本不一致时以正本为准",{"key":27,"text":384,"correct":29},"允许递交备选投标方案时，所有投标人的备选方案应同等对待",{"key":31,"text":386,"correct":22},"在要求提交投标文件的截止时间后送达的投票文件为无效的投标文件",{"key":34,"text":388,"correct":22},"境内投标人以现金形式提交的投标保证金应当出自投标人的基本账户",{"id":390,"libraryId":5,"type":15,"typeLabel":16,"stem":391,"options":392,"answer":183,"analysis":37},897465,"下列选项中，属于投标文件的有()。",[393,395,397,399,401],{"key":20,"text":394,"correct":22},"投标保证金",{"key":24,"text":396,"correct":29},"工程量清单",{"key":27,"text":398,"correct":22},"联合体协议书",{"key":31,"text":400,"correct":22},"资格审查资料",{"key":34,"text":402,"correct":29},"评标办法",{"id":404,"libraryId":5,"type":15,"typeLabel":16,"stem":405,"options":406,"answer":417,"analysis":37},897466,"投标文件应当对招标文件作出实质性响应的内容有()。",[407,409,411,413,415],{"key":20,"text":408,"correct":29},"报价",{"key":24,"text":410,"correct":22},"工期",{"key":27,"text":412,"correct":22},"投标有效期",{"key":31,"text":414,"correct":22},"质量要求",{"key":34,"text":416,"correct":22},"招标范围","BCDE",{"id":419,"libraryId":5,"type":15,"typeLabel":16,"stem":420,"options":421,"answer":96,"analysis":37},897467,"下列关于投标文件的递交，描述正确的有()。",[422,424,426,428,430],{"key":20,"text":423,"correct":22},"在招标文件要求提交投标文件的截止时间后送达或未送达指定地点的投标文件，为无效的投标文件",{"key":24,"text":425,"correct":22},"联合体投标的，投标保证金由牵头人或联合体各方提交",{"key":27,"text":427,"correct":22},"投标保证金的数额不得超过项目估算价的2%，且最高不超过80万元",{"key":31,"text":429,"correct":29},"一般项目投标有效期为120天左右",{"key":34,"text":431,"correct":22},"在招标文件规定的投标有效期内，投标人要求撤销或修改其投标文件，投标保证金不予返还",{"id":433,"libraryId":5,"type":15,"typeLabel":16,"stem":434,"options":435,"answer":271,"analysis":37},897468,"关于投标文件的编制与递交，下列说法中正确的有（）。",[436,438,439,440,442],{"key":20,"text":437,"correct":29},"投标函附录中可以提出比招标文件要求更能吸弓i 招标人的承诺",{"key":24,"text":382,"correct":22},{"key":27,"text":384,"correct":29},{"key":31,"text":441,"correct":22},"在要求提交投票文件的截止时间后送达的投票文件为无效的投标文件",{"key":34,"text":388,"correct":22},{"id":444,"libraryId":5,"type":15,"typeLabel":16,"stem":445,"options":446,"answer":213,"analysis":37},897469,"关于其他项目清单的编制，说法正确的有()。",[447,449,451,453,455],{"key":20,"text":448,"correct":29},"暂列金额是预见肯定要发生而暂时无法明确数额的费用项目",{"key":24,"text":450,"correct":29},"专业工程暂估价应包括除规费以外的所有综合单价构成内容",{"key":27,"text":452,"correct":22},"暂估价中的材料、工程设备单价应按招标工程量清单中列出的单价计入综合单价",{"key":31,"text":454,"correct":22},"总承包服务费包括对发包人自行采购的材料、工程设备等进行保管以及施工现场管理、竣工资料汇总整理等服务所需的费用",{"key":34,"text":456,"correct":22},"招标人应预计总承包服务费并按投标人的投标报价向投标人支付该项费用",{"id":458,"libraryId":5,"type":15,"typeLabel":16,"stem":459,"options":460,"answer":66,"analysis":37},897470,"关于工程量清单中的项目特征描述，下列表述正确的是( )。",[461,463,465,467,469],{"key":20,"text":462,"correct":22},"应符合工程量计算规范附录的规定",{"key":24,"text":464,"correct":22},"应能满足确定综合单价的需要",{"key":27,"text":466,"correct":29},"不能直接采用详见××图集的方式",{"key":31,"text":468,"correct":22},"可以采用文字描述和详见××图号的方式",{"key":34,"text":470,"correct":22},"应结合拟建工程实际",{"id":472,"libraryId":5,"type":15,"typeLabel":16,"stem":473,"options":474,"answer":109,"analysis":37},897471,"关于招标分部分项工程量清单的项目特征描述，应遵循的编制原则有()。",[475,477,479,481,483],{"key":20,"text":476,"correct":22},"按专业工程量计算规范附录的规定，结合拟建工程实际描述",{"key":24,"text":478,"correct":22},"其他独有特征，由清单编制人视项目具体情况确定",{"key":27,"text":480,"correct":22},"要满足确定综合单价的需要",{"key":31,"text":482,"correct":29},"应详细描述分部分项工程的施工工艺和方法",{"key":34,"text":484,"correct":29},"对于采用标准图集的项目，可直接描述为“详见××图集”",{"id":486,"libraryId":5,"type":15,"typeLabel":16,"stem":487,"options":488,"answer":301,"analysis":37},897472,"下列关于招标工程量清单的描述，说法正确的有()。",[489,491,493,495,497],{"key":20,"text":490,"correct":22},"招标工程量清单是招标文件的组成部分，可以由招标人委托的工程造价咨询人编制",{"key":24,"text":492,"correct":22},"招标人对工程量清单中各分部分项工程工程量的准确性和完整性负责",{"key":27,"text":494,"correct":29},"由于措施项目投标人可自行选择，因此招标人无须对措施项目工程量的准确性和完整性负责",{"key":31,"text":496,"correct":22},"招标工程量清单编制前也要进行现场踏勘",{"key":34,"text":498,"correct":29},"招标工程量清单编制时需进行先进施工组织设计方案的编制，以提高施工水平",{"id":500,"libraryId":5,"type":15,"typeLabel":16,"stem":501,"options":502,"answer":513,"analysis":37},897473,"在分部分项工程量清单编制计算工程量时，应依据的计算原则包括()。",[503,505,507,509,511],{"key":20,"text":504,"correct":22},"计算口径一致",{"key":24,"text":506,"correct":22},"按工程量计算规则计算",{"key":27,"text":508,"correct":22},"按图纸计算",{"key":31,"text":510,"correct":22},"按一定顺序计算",{"key":34,"text":512,"correct":29},"根据工程内容和定额项目计算","ABCD",{"id":515,"libraryId":5,"type":15,"typeLabel":16,"stem":516,"options":517,"answer":109,"analysis":37},897474,"下列有关暂列金额的表述，正确的是()。",[518,520,522,524,526],{"key":20,"text":519,"correct":22},"用于施工合同签订时尚未确定或者不可预见的所需材料、设备、服务的采购",{"key":24,"text":521,"correct":22},"用于施工中可能发生的工程变更、合同约定调整因素出现时的工程价款调整",{"key":27,"text":523,"correct":22},"用于发生的索赔、现场签证确认等的费用",{"key":31,"text":525,"correct":29},"用于支付必然发生但暂时不能确定价格的材料的单价",{"key":34,"text":527,"correct":29},"指招标人在工程量清单中暂定但未包括在合同价款中的一笔款项",{"id":529,"libraryId":5,"type":15,"typeLabel":16,"stem":530,"options":531,"answer":66,"analysis":37},897475,"关于招标工程量清单的编制，下列说法正确的有()。",[532,534,536,538,540],{"key":20,"text":533,"correct":22},"若采用标准图集能够全部满足项目特征描述的要求，项目特征描述可直接采用“详见××图集”的方式",{"key":24,"text":535,"correct":22},"措施项目清单的编制需考虑工程本身、水文、气象、环境、安全等多种因素",{"key":27,"text":537,"correct":29},"以“项”为计量单位的专业工程暂估价一般应包括管理费、规费、利润、税金等",{"key":31,"text":539,"correct":22},"工程量清单总说明应对工程概况、工程招标及分包范围、工程质量要求等进行描述",{"key":34,"text":541,"correct":22},"T程量清单编制依据包括设计文件、招标文件、施工现场情况、常规施工方案等",{"id":543,"libraryId":5,"type":15,"typeLabel":16,"stem":544,"options":545,"answer":183,"analysis":37},897476,"关于工程量清单编制的说法，正确的有（）。",[546,548,550,552,554],{"key":20,"text":547,"correct":22},"脚手架工程应列入以综合单价形式计价的措施项目清单",{"key":24,"text":549,"correct":29},"暂估价用于支付可能发生也可能不发生的材料及专业工程",{"key":27,"text":551,"correct":22},"材料暂估价中的材料包括应计入建安费中的设备",{"key":31,"text":553,"correct":22},"暂列金额是招标人考虑工程建设工程中不可预见、不能确定的因素而暂定的一笔费用",{"key":34,"text":555,"correct":29},"计日工清单中由招标人列项，招标人填写数量与单价",{"id":557,"libraryId":5,"type":15,"typeLabel":16,"stem":558,"options":559,"answer":301,"analysis":37},897477,"根据《建设工程工程量清单计价规范》GB50500—2013，招标控制价中综合单价中应考虑的风险因素包括（）。",[560,562,564,566,568],{"key":20,"text":561,"correct":22},"项目管理的复杂性",{"key":24,"text":563,"correct":22},"项目的技术难度",{"key":27,"text":565,"correct":29},"人工单价的市场变化",{"key":31,"text":567,"correct":22},"材料价格的市场风险",{"key":34,"text":569,"correct":29},"税金、规费的政策变化",{"id":571,"libraryId":5,"type":15,"typeLabel":16,"stem":572,"options":573,"answer":513,"analysis":37},897478,"复核工程量是投标人编制投标报价前的一项重要工作。通过复核工程量，便于投标人（）。",[574,576,578,580,582],{"key":20,"text":575,"correct":22},"决定报价尺度",{"key":24,"text":577,"correct":22},"采取合适的施工方法",{"key":27,"text":579,"correct":22},"选用合适的施工机具",{"key":31,"text":581,"correct":22},"决定投入劳动力数量",{"key":34,"text":583,"correct":29},"选用合适的承包方法",{"id":585,"libraryId":5,"type":15,"typeLabel":16,"stem":586,"options":587,"answer":213,"analysis":37},897479,"关于施工投标报价中下列说法中正确的有（）。",[588,590,592,594,596],{"key":20,"text":589,"correct":29},"投标人应逐项计算工程量，复核工程量清单",{"key":24,"text":591,"correct":29},"投标人应修改错误的工程量，并通知招标人",{"key":27,"text":593,"correct":22},"投标人可以不向招标人提出复核工程量中发现的遗漏",{"key":31,"text":595,"correct":22},"投标人可以通过复核防止由于订货超量带来的浪费",{"key":34,"text":597,"correct":22},"投标人应根据复核工程量的结果选择适用的施工设备",{"id":599,"libraryId":5,"type":15,"typeLabel":16,"stem":600,"options":601,"answer":513,"analysis":37},897480,"关于联合体投标，下列说法中正确的有()。",[602,604,606,608,610],{"key":20,"text":603,"correct":22},"联合体各方应当指定牵头人",{"key":24,"text":605,"correct":22},"各方签订共同投标协议后，不得再以自己的名义在同一项目单独投标",{"key":27,"text":607,"correct":22},"联合体投标应当向招标人提交由所有联合体成员法定代表人签署的授权书",{"key":31,"text":609,"correct":22},"同一专业的单位组成联合体，资质等级就低不就高",{"key":34,"text":611,"correct":29},"提交投标保证金必须由牵头人实施",{"id":613,"libraryId":5,"type":15,"typeLabel":16,"stem":614,"options":615,"answer":331,"analysis":37},897481,"关于发承包双方在工程施工阶段的风险分摊原则，下列说法正确的有()。",[616,618,620,622,624],{"key":20,"text":617,"correct":22},"发承包双方应当在合同中对市场价格波动导致风险的范围和幅度予以约定",{"key":24,"text":619,"correct":29},"承包人承担5%以内的材料价格风险和10%以内的工程设备、施工机具使用费风险",{"key":27,"text":621,"correct":29},"对于政府定价或政府指导价管理的原材料价格发生变动的风险，承包人应适当承担",{"key":31,"text":623,"correct":22},"对于承包人根据自身技术水平、管理、经营状况能够自主控制的风险，发包人不予承担",{"key":34,"text":625,"correct":22},"承包人的管理费、利润的风险应由承包人自己承担",{"id":627,"libraryId":5,"type":15,"typeLabel":16,"stem":628,"options":629,"answer":271,"analysis":37},897482,"下列行为中属于串通投标的有()。",[630,632,634,636,638],{"key":20,"text":631,"correct":29},"不同投标人的投标文件异常一致或者投标报价呈规律性差异",{"key":24,"text":633,"correct":22},"投标人之间就投标文件的实质性内容进行沟通",{"key":27,"text":635,"correct":29},"不同投标人的投标保证金从同一单位或者个人的账户转出",{"key":31,"text":637,"correct":22},"招标人在开标前开启投标文件并将有关信息泄露给其他投标人",{"key":34,"text":639,"correct":22},"属于同一集团、协会、商会等组织成员的投标人按照该组织要求协同投标",{"id":641,"libraryId":5,"type":15,"typeLabel":16,"stem":642,"options":643,"answer":654,"analysis":37},897483,"根据我国现行施工招标投标管理规定，投标有效期的确定一般应考虑的因素有（）。",[644,646,648,650,652],{"key":20,"text":645,"correct":29},"投标报价需要的时间",{"key":24,"text":647,"correct":22},"组织评标需要的时间",{"key":27,"text":649,"correct":22},"确定中标人需要的时间",{"key":31,"text":651,"correct":22},"签订合同需要的时间",{"key":34,"text":653,"correct":29},"提交履约保证金需要的时间","BCD",{"id":656,"libraryId":5,"type":15,"typeLabel":16,"stem":657,"options":658,"answer":513,"analysis":37},897484,"关于联合体投标，下列说法正确的有（）。",[659,660,662,663,664],{"key":20,"text":603,"correct":22},{"key":24,"text":661,"correct":22},"各方签订共同投标协议后不得再以自己的名义在同一项目单独投标",{"key":27,"text":607,"correct":22},{"key":31,"text":609,"correct":22},{"key":34,"text":611,"correct":29},{"id":666,"libraryId":5,"type":15,"typeLabel":16,"stem":667,"options":668,"answer":213,"analysis":37},897485,"施工成本分析是在成本形成过程中，将施工项目的成本核算资料与（）进行比较，以了解成本变动情况。",[669,671,673,675,677],{"key":20,"text":670,"correct":29},"类似施工项目的预算成本",{"key":24,"text":672,"correct":29},"本施工项目的实际成本",{"key":27,"text":674,"correct":22},"本施工项目的目标成本",{"key":31,"text":676,"correct":22},"本施工项目的预算成本",{"key":34,"text":678,"correct":22},"类似施工项目的实际成本",{"id":680,"libraryId":5,"type":15,"typeLabel":16,"stem":681,"options":682,"answer":693,"analysis":37},897486,"下列施工成本管理措施中，属于经济措施的有（）。",[683,685,687,689,691],{"key":20,"text":684,"correct":29},"使用添加剂降低水泥消耗",{"key":24,"text":686,"correct":29},"选用合适的合同结构",{"key":27,"text":688,"correct":22},"及时落实业主签证",{"key":31,"text":690,"correct":29},"采用新材料降低成本",{"key":34,"text":692,"correct":22},"通过偏差分析找出成本超支潜在问题","CE",{"id":695,"libraryId":5,"type":15,"typeLabel":16,"stem":696,"options":697,"answer":374,"analysis":37},897487,"工程项目成本管理的基础工作包括（）",[698,700,702,704,706],{"key":20,"text":699,"correct":22},"建立成本管理责任体系",{"key":24,"text":701,"correct":22},"建立企业内部施工定额",{"key":27,"text":703,"correct":29},"及时进行成本核算",{"key":31,"text":705,"correct":29},"编制项目成本计划",{"key":34,"text":707,"correct":22},"科学设计成本核算账册",{"id":709,"libraryId":5,"type":15,"typeLabel":16,"stem":710,"options":711,"answer":374,"analysis":37},897488,"关于赢得值法及相关评价指标的说法，正确的有（）。",[712,714,716,718,720],{"key":20,"text":713,"correct":22},"赢得值法可定量判断进度、费用的执行效果",{"key":24,"text":715,"correct":22},"理想状态是已完工作实际费用、计划工作预算费用和已完工作预算费用三条曲线靠的很近并平稳上升",{"key":27,"text":717,"correct":29},"进度偏差为负值时，表示实际进度快于计划进度",{"key":31,"text":719,"correct":29},"费用（进度）偏差适用于在同一项目和不同项目比较中采用",{"key":34,"text":721,"correct":22},"采用赢得值法可以克服进度、费用分开控制的缺点",{"id":723,"libraryId":5,"type":15,"typeLabel":16,"stem":724,"options":725,"answer":242,"analysis":37},897489,"关于赢得值及其曲线的说法，正确的有（）。",[726,728,730,732,734],{"key":20,"text":727,"correct":22},"最理想状态是已完工作实际费用，计划工作预算费用和已完工作预算费用三条曲线靠得很近并平稳上升",{"key":24,"text":729,"correct":29},"进度偏差是相对值指标，相对值越大的项目，表明偏离程度越严重",{"key":27,"text":731,"correct":22},"如果已完工作实际费用，计划工作预算费用和已完工作预算费用三条曲线离散度不断增加，则预示着可能发生关系到项目成败的重大问题",{"key":31,"text":733,"correct":22},"在费用、进度控制中引入赢得值可以克服将费用、进度分开控制的缺点",{"key":34,"text":735,"correct":22},"同一项目采用费用偏差和费用绩效指数进行分析，结论是一致的",[737,741,744,747,750,753],{"id":738,"name":739,"category":7,"favorite":740},1,"领导干部任职前廉政法规知识测试题",92,{"id":742,"name":743,"category":7,"favorite":738},595,"建筑结构与设备",{"id":745,"name":746,"category":7,"favorite":738},715,"招标采购专业知识与法律法规",{"id":748,"name":749,"category":7,"favorite":738},848,"市政方向-通用基础",{"id":751,"name":752,"category":7,"favorite":8},534,"BIM工程师",{"id":754,"name":752,"category":7,"favorite":8},535]