[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-581-50":3},{"library":4,"page":9,"limit":9,"total":10,"questions":11,"related":676},{"id":5,"name":6,"category":7,"favorite":8},581,"建设工程造价管理基础知识","建筑工程",0,50,2873,[12,37,52,67,82,97,106,121,135,150,159,174,186,200,214,228,239,249,261,273,282,297,312,326,335,350,365,380,394,408,422,436,450,464,475,489,503,517,531,543,558,573,588,599,613,625,636,650,659,667],{"id":13,"libraryId":5,"type":14,"typeLabel":15,"stem":16,"options":17,"answer":35,"analysis":36},897338,2,"多选题","当确定测时法的观察次数时，需要重点考虑的因素是()。",[18,22,26,29,32],{"key":19,"text":20,"correct":21},"A","同时测定施工过程的类型数",false,{"key":23,"text":24,"correct":25},"B","要求的算术平均值精确度",true,{"key":27,"text":28,"correct":21},"C","被测定的工人人数",{"key":30,"text":31,"correct":25},"D","数列的稳定系数",{"key":33,"text":34,"correct":21},"E","完成产品的可能次数等","BD","",{"id":38,"libraryId":5,"type":14,"typeLabel":15,"stem":39,"options":40,"answer":51,"analysis":36},897339,"下列施工工作的时间分类选项中，属于工人有效工作时间的有（）。",[41,43,45,47,49],{"key":19,"text":42,"correct":25},"基本工作时间",{"key":23,"text":44,"correct":21},"休息时间",{"key":27,"text":46,"correct":25},"辅助工作时间",{"key":30,"text":48,"correct":25},"准备与结束工作时间",{"key":33,"text":50,"correct":21},"不可避免的中断时间","ACD",{"id":53,"libraryId":5,"type":14,"typeLabel":15,"stem":54,"options":55,"answer":66,"analysis":36},897340,"通过计时观察，完成某工程的基本工作时间为6h／m3，辅助工作时间占工序作业时间的8%,准备与结束工作时间、不可避免的中断时间、休息时间分别占工作班时间的3%、10%、2%，则下列计算结果中正确的有（）。",[56,58,60,62,64],{"key":19,"text":57,"correct":25},"基本工作时间为0.750 工日／m3",{"key":23,"text":59,"correct":25},"工序作业时间为0.815 工日／m3",{"key":27,"text":61,"correct":21},"辅助工作时间为0.060 工日／m3",{"key":30,"text":63,"correct":21},"规范时间为0.122 工日／m3",{"key":33,"text":65,"correct":25},"定额时间为0.959 工日／m3","ABE",{"id":68,"libraryId":5,"type":14,"typeLabel":15,"stem":69,"options":70,"answer":81,"analysis":36},897341,"施工中材料的消耗分为必须消耗的材料和损失的材料。在确定材料定额消耗量时，必须消耗的材料包括（）。",[71,73,75,77,79],{"key":19,"text":72,"correct":25},"直接用于建筑和安装工程的材料",{"key":23,"text":74,"correct":21},"不可避免的场外运输损耗材料",{"key":27,"text":76,"correct":25},"不可避免的场内运输损耗材料",{"key":30,"text":78,"correct":21},"不可避免的现场仓储损耗材料",{"key":33,"text":80,"correct":25},"不可避免的施工过程中损耗材料","ACE",{"id":83,"libraryId":5,"type":14,"typeLabel":15,"stem":84,"options":85,"answer":96,"analysis":36},897342,"影响建筑材料预算价格变动的因素包括（）。",[86,88,90,92,94],{"key":19,"text":87,"correct":21},"定额材料消耗量",{"key":23,"text":89,"correct":25},"材料生产成本",{"key":27,"text":91,"correct":25},"运输距离",{"key":30,"text":93,"correct":25},"市场供求",{"key":33,"text":95,"correct":25},"材料供应体制","BCDE",{"id":98,"libraryId":5,"type":14,"typeLabel":15,"stem":99,"options":100,"answer":35,"analysis":36},897343,"当确定测时法的观察次数时，需要重点考虑的因素是（）。",[101,102,103,104,105],{"key":19,"text":20,"correct":21},{"key":23,"text":24,"correct":25},{"key":27,"text":28,"correct":21},{"key":30,"text":31,"correct":25},{"key":33,"text":34,"correct":21},{"id":107,"libraryId":5,"type":14,"typeLabel":15,"stem":108,"options":109,"answer":120,"analysis":36},897344,"关于测定时间消耗的工作日写实法的特点的说法中，正确的有（）。",[110,112,114,116,118],{"key":19,"text":111,"correct":21},"工作日写实法用于检查定额执行情况时，需要测定3-4 次",{"key":23,"text":113,"correct":25},"能够获得整个工作班内各种工时的消耗量",{"key":27,"text":115,"correct":25},"需要记录产品数量和影响工时消耗的各种因素",{"key":30,"text":117,"correct":21},"记录时间时需要将有效工作时间分成不同组成部分",{"key":33,"text":119,"correct":25},"应按工时消耗的性质分类记录各类工时消耗量","BCE",{"id":122,"libraryId":5,"type":14,"typeLabel":15,"stem":123,"options":124,"answer":35,"analysis":36},897345,"下列费用项目中，应计入建筑安装工程人工单价的有()。",[125,127,129,131,133],{"key":19,"text":126,"correct":21},"养老保险费",{"key":23,"text":128,"correct":25},"奖金",{"key":27,"text":130,"correct":21},"劳动保护费",{"key":30,"text":132,"correct":25},"加班加点工资",{"key":33,"text":134,"correct":21},"职工福利费",{"id":136,"libraryId":5,"type":14,"typeLabel":15,"stem":137,"options":138,"answer":149,"analysis":36},897346,"下列费用项目中，计算施工机械台班单价时应考虑的有()。",[139,141,143,145,147],{"key":19,"text":140,"correct":21},"购置机械的资金成本",{"key":23,"text":142,"correct":25},"检修费",{"key":27,"text":144,"correct":25},"维护费",{"key":30,"text":146,"correct":21},"机械设备的财产损失保险费",{"key":33,"text":148,"correct":21},"大型机械安拆费","BC",{"id":151,"libraryId":5,"type":14,"typeLabel":15,"stem":152,"options":153,"answer":96,"analysis":36},897348,"影响建筑材料预算价格变动的因素包括()。",[154,155,156,157,158],{"key":19,"text":87,"correct":21},{"key":23,"text":89,"correct":25},{"key":27,"text":91,"correct":25},{"key":30,"text":93,"correct":25},{"key":33,"text":95,"correct":25},{"id":160,"libraryId":5,"type":14,"typeLabel":15,"stem":161,"options":162,"answer":173,"analysis":36},897349,"下列各项费用可以计入材料单价的是( )。",[163,165,167,169,171],{"key":19,"text":164,"correct":25},"材料的供应价格",{"key":23,"text":166,"correct":21},"材料的检验试验费",{"key":27,"text":168,"correct":21},"新材料、新结构试验费",{"key":30,"text":170,"correct":25},"材料的工地管理费",{"key":33,"text":172,"correct":25},"材料的仓储损耗","ADE",{"id":175,"libraryId":5,"type":14,"typeLabel":15,"stem":176,"options":177,"answer":81,"analysis":36},897350,"下列费用项目中，构成施工仪器仪表台班单价的有（）。",[178,180,181,182,184],{"key":19,"text":179,"correct":25},"折旧费",{"key":23,"text":142,"correct":21},{"key":27,"text":144,"correct":25},{"key":30,"text":183,"correct":21},"人工费",{"key":33,"text":185,"correct":25},"校验费",{"id":187,"libraryId":5,"type":14,"typeLabel":15,"stem":188,"options":189,"answer":120,"analysis":36},897351,"下列材料单价的构成费用，包含在采购及保管费中进行计算的有()。",[190,192,194,196,198],{"key":19,"text":191,"correct":21},"运杂费",{"key":23,"text":193,"correct":25},"仓储费",{"key":27,"text":195,"correct":25},"工地保管费",{"key":30,"text":197,"correct":21},"运输损耗",{"key":33,"text":199,"correct":25},"仓储损耗",{"id":201,"libraryId":5,"type":14,"typeLabel":15,"stem":202,"options":203,"answer":81,"analysis":36},897352,"影响定额动态人工日工资单价的因素包括( )。",[204,206,208,210,212],{"key":19,"text":205,"correct":25},"人工日工资单价的组成内容",{"key":23,"text":207,"correct":21},"社会工资差额",{"key":27,"text":209,"correct":25},"劳动力市场供需变化",{"key":30,"text":211,"correct":21},"社会最低工资水平",{"key":33,"text":213,"correct":25},"政府推行的社会保障与福利政策",{"id":215,"libraryId":5,"type":14,"typeLabel":15,"stem":216,"options":217,"answer":227,"analysis":36},897353,"下列费用包含或可能包含在材料价格中材料运杂费的是()。",[218,220,222,223,225],{"key":19,"text":219,"correct":25},"附加工作费",{"key":23,"text":221,"correct":25},"装卸费",{"key":27,"text":197,"correct":21},{"key":30,"text":224,"correct":25},"调车费",{"key":33,"text":226,"correct":25},"运输费","ABDE",{"id":229,"libraryId":5,"type":14,"typeLabel":15,"stem":230,"options":231,"answer":120,"analysis":36},897354,"下列费用中属于人工单价组成内容的有()。",[232,233,235,237,238],{"key":19,"text":134,"correct":21},{"key":23,"text":234,"correct":25},"计时工资或计件工资",{"key":27,"text":236,"correct":25},"津贴补贴",{"key":30,"text":130,"correct":21},{"key":33,"text":128,"correct":25},{"id":240,"libraryId":5,"type":14,"typeLabel":15,"stem":241,"options":242,"answer":120,"analysis":36},897355,"下列材料单价的构成费用，包含在采购及保管费中进行计算的有（）。",[243,244,245,247,248],{"key":19,"text":191,"correct":21},{"key":23,"text":193,"correct":25},{"key":27,"text":246,"correct":25},"工地管理费",{"key":30,"text":197,"correct":21},{"key":33,"text":199,"correct":25},{"id":250,"libraryId":5,"type":14,"typeLabel":15,"stem":251,"options":252,"answer":260,"analysis":36},897356,"下列费用项目中，属于人工单价的有（）。",[253,255,257,258,259],{"key":19,"text":254,"correct":25},"计时工资",{"key":23,"text":256,"correct":25},"计件工资",{"key":27,"text":128,"correct":25},{"key":30,"text":126,"correct":21},{"key":33,"text":132,"correct":25},"ABCE",{"id":262,"libraryId":5,"type":14,"typeLabel":15,"stem":263,"options":264,"answer":272,"analysis":36},897357,"下列费用项目中，应计入人工日工资单价的有（）。",[265,266,268,269,271],{"key":19,"text":256,"correct":25},{"key":23,"text":267,"correct":25},"劳动竞赛奖金",{"key":27,"text":130,"correct":21},{"key":30,"text":270,"correct":25},"流动施工津贴",{"key":33,"text":134,"correct":21},"ABD",{"id":274,"libraryId":5,"type":14,"typeLabel":15,"stem":275,"options":276,"answer":81,"analysis":36},897358,"影响定额动态人工日工资单价的因素包括（）。",[277,278,279,280,281],{"key":19,"text":205,"correct":25},{"key":23,"text":207,"correct":21},{"key":27,"text":209,"correct":25},{"key":30,"text":211,"correct":21},{"key":33,"text":213,"correct":25},{"id":283,"libraryId":5,"type":14,"typeLabel":15,"stem":284,"options":285,"answer":296,"analysis":36},897359,"关于预算定额编制的说法，正确的有（）。",[286,288,290,292,294],{"key":19,"text":287,"correct":21},"预算定额的计量单位一般按工序或施工工程确定",{"key":23,"text":289,"correct":25},"在综合施工定额的过程中要增加两种定额间的水平差",{"key":27,"text":291,"correct":21},"人工工日消耗量等于基本用工、辅助用工和人工幅度差之和",{"key":30,"text":293,"correct":25},"材料消耗量包含净用量和以净用量为基数计算的损耗量",{"key":33,"text":295,"correct":25},"以小组产量计算机械台班产量的，不再计算机械幅度差","BDE",{"id":298,"libraryId":5,"type":14,"typeLabel":15,"stem":299,"options":300,"answer":311,"analysis":36},897360,"编制预算定额应依据()。",[301,303,305,307,309],{"key":19,"text":302,"correct":25},"现行施工定额",{"key":23,"text":304,"correct":25},"典型施工图纸",{"key":27,"text":306,"correct":25},"现行施工及验收规范",{"key":30,"text":308,"correct":25},"成熟推广的新结构、新材料和先进施工方法",{"key":33,"text":310,"correct":21},"现行的概算定额","ABCD",{"id":313,"libraryId":5,"type":14,"typeLabel":15,"stem":314,"options":315,"answer":311,"analysis":36},897361,"下列属于预算定额机械台班消耗量中机械幅度差的是()。",[316,318,320,322,324],{"key":19,"text":317,"correct":25},"施工机械转移工作面及配套机械相互影响损失的时间",{"key":23,"text":319,"correct":25},"机械维修引起的停歇时间",{"key":27,"text":321,"correct":25},"工程收尾时工作量不饱满造成的机械停歇时间",{"key":30,"text":323,"correct":25},"在正常施工条件下，机械在施工中不可避免的工序间歇时间",{"key":33,"text":325,"correct":21},"运输车辆在装货和卸货时的停车时间",{"id":327,"libraryId":5,"type":14,"typeLabel":15,"stem":328,"options":329,"answer":296,"analysis":36},897362,"关于预算定额编制的说法，正确的有()。",[330,331,332,333,334],{"key":19,"text":287,"correct":21},{"key":23,"text":289,"correct":25},{"key":27,"text":291,"correct":21},{"key":30,"text":293,"correct":25},{"key":33,"text":295,"correct":25},{"id":336,"libraryId":5,"type":14,"typeLabel":15,"stem":337,"options":338,"answer":349,"analysis":36},897363,"下列用工项目中，构成预算定额人工工日消耗量，但并不包括在施工定额中的有( )。",[339,341,343,345,347],{"key":19,"text":340,"correct":21},"材料水平搬运用工",{"key":23,"text":342,"correct":25},"材料加工用工和电焊点火用工",{"key":27,"text":344,"correct":25},"工序交接时对前一工序修整用工",{"key":30,"text":346,"correct":25},"在施工定额基础上应增加计算的用工",{"key":33,"text":348,"correct":21},"完成施工任务必需消耗的技术工程用工","BCD",{"id":351,"libraryId":5,"type":14,"typeLabel":15,"stem":352,"options":353,"answer":364,"analysis":36},897364,"下列施工机械的停歇时间，在预算定额机械幅度差中考虑的是（）。",[354,356,358,360,362],{"key":19,"text":355,"correct":25},"机械维修引起的停歇",{"key":23,"text":357,"correct":25},"工程质量检查引起的停歇",{"key":27,"text":359,"correct":25},"机械转移工作面引起的停歇",{"key":30,"text":361,"correct":21},"进行准备与结束工作时间引起的停歇",{"key":33,"text":363,"correct":21},"施工机械在单位工程之间转移引起的停歇","ABC",{"id":366,"libraryId":5,"type":14,"typeLabel":15,"stem":367,"options":368,"answer":379,"analysis":36},897365,"预算定额中人工、材料、机械台班消耗量的确定方法包括()。",[369,371,373,375,377],{"key":19,"text":370,"correct":25},"以劳动定额为基础确定",{"key":23,"text":372,"correct":25},"以现场观察测定资料为基础计算",{"key":27,"text":374,"correct":21},"以工程量清单计算规则为依据计算",{"key":30,"text":376,"correct":21},"以各类费用定额为基础确定",{"key":33,"text":378,"correct":21},"以工程结算资料为依据计算","AB",{"id":381,"libraryId":5,"type":14,"typeLabel":15,"stem":382,"options":383,"answer":364,"analysis":36},897366,"机械台班产量定额应通过()确定。",[384,386,388,390,392],{"key":19,"text":385,"correct":25},"机械1h纯工作正常生产率",{"key":23,"text":387,"correct":25},"工作班延续时间",{"key":27,"text":389,"correct":25},"机械正常利用系数",{"key":30,"text":391,"correct":21},"劳动定额",{"key":33,"text":393,"correct":21},"多余工作时间",{"id":395,"libraryId":5,"type":14,"typeLabel":15,"stem":396,"options":397,"answer":349,"analysis":36},897367,"下列有关定额编制的描述中，符合预算定额简明适用原则的是()。",[398,400,402,404,406],{"key":19,"text":399,"correct":21},"对于主要工种、主要项目、常用项目，定额步距要大些",{"key":23,"text":401,"correct":25},"对于不常用的、价值量小的项目，分项工程划分可以粗些",{"key":27,"text":403,"correct":25},"要注意补充因采用新技术、新材料而出现的新的定额项目",{"key":30,"text":405,"correct":25},"要合理确定预算定额计量单位，避免一量多用",{"key":33,"text":407,"correct":21},"尽可能多留活口，以适应不同条件下，调整使用定额的需要",{"id":409,"libraryId":5,"type":14,"typeLabel":15,"stem":410,"options":411,"answer":364,"analysis":36},897368,"下列关于各类工程计价定额的说法中，正确的有（）。",[412,414,416,418,420],{"key":19,"text":413,"correct":25},"预算定额是在现行施工定额的基础上编制的，",{"key":23,"text":415,"correct":25},"概、预算定额的基价一般由人工、材料和机械台班费用组成",{"key":27,"text":417,"correct":25},"概算指标可分为建筑工程概算指标、设备及安装工程概算指标",{"key":30,"text":419,"correct":21},"投资估算指标主要以概算定额和概算指标为编制基础",{"key":33,"text":421,"correct":21},"单位工程投资估算指标中仅包括建筑安装工程费",{"id":423,"libraryId":5,"type":14,"typeLabel":15,"stem":424,"options":425,"answer":35,"analysis":36},897369,"确定预算定额人工工日消耗量过程中，应计入其他用工的有（）。",[426,428,430,432,434],{"key":19,"text":427,"correct":21},"材料二次搬运用工",{"key":23,"text":429,"correct":25},"点焊点火用工",{"key":27,"text":431,"correct":21},"按劳动定额规定应增（减）计算的用工",{"key":30,"text":433,"correct":25},"临时水电线路移动造成的停工",{"key":33,"text":435,"correct":21},"完成某一分项工程所需消耗的技术工种用工",{"id":437,"libraryId":5,"type":14,"typeLabel":15,"stem":438,"options":439,"answer":379,"analysis":36},897370,"建设工程定额中的周转材料消耗量指标，应该用（）等指标表示。",[440,442,444,446,448],{"key":19,"text":441,"correct":25},"一次使用量",{"key":23,"text":443,"correct":25},"摊销量",{"key":27,"text":445,"correct":21},"周转使用次数",{"key":30,"text":447,"correct":21},"最终回收量",{"key":33,"text":449,"correct":21},"理论净用量",{"id":451,"libraryId":5,"type":14,"typeLabel":15,"stem":452,"options":453,"answer":260,"analysis":36},897371,"制定材料消耗定额时，确定材料净用量的方法有（）",[454,456,458,460,462],{"key":19,"text":455,"correct":25},"理论计算法",{"key":23,"text":457,"correct":25},"测定法",{"key":27,"text":459,"correct":25},"图纸计算法",{"key":30,"text":461,"correct":21},"评估法",{"key":33,"text":463,"correct":25},"经验法",{"id":465,"libraryId":5,"type":14,"typeLabel":15,"stem":466,"options":467,"answer":96,"analysis":36},897372,"施工作业的定额时间，是在拟定基本工作时间和（）的基础上编制的。",[468,470,471,473,474],{"key":19,"text":469,"correct":21},"偶然时间",{"key":23,"text":46,"correct":25},{"key":27,"text":472,"correct":25},"准备与结束时间",{"key":30,"text":50,"correct":25},{"key":33,"text":44,"correct":25},{"id":476,"libraryId":5,"type":14,"typeLabel":15,"stem":477,"options":478,"answer":66,"analysis":36},897373,"关于施工定额的说法，正确的有（）。",[479,481,483,485,487],{"key":19,"text":480,"correct":25},"施工定额以同一性质的施工过程作为研究对象",{"key":23,"text":482,"correct":25},"施工定额属于企业定额的性质",{"key":27,"text":484,"correct":21},"施工定额是确定招标控制价的重要依据",{"key":30,"text":486,"correct":21},"施工定额能够反映行业施工技术和管理的平均水平",{"key":33,"text":488,"correct":25},"施工定额是建设工程定额的基础性定额",{"id":490,"libraryId":5,"type":14,"typeLabel":15,"stem":491,"options":492,"answer":502,"analysis":36},897374,"影响建设工程周转性材料消耗的因素有（）。",[493,495,497,499,500],{"key":19,"text":494,"correct":25},"第一次制造时的材料消耗",{"key":23,"text":496,"correct":21},"施工工艺流程",{"key":27,"text":498,"correct":25},"每周转使用一次时的材料损耗",{"key":30,"text":445,"correct":25},{"key":33,"text":501,"correct":25},"周转材料的最终回收和回收折价","ACDE",{"id":504,"libraryId":5,"type":14,"typeLabel":15,"stem":505,"options":506,"answer":349,"analysis":36},897375,"建设项目或单项工程造价指数的计算式中包含（）。",[507,509,511,513,515],{"key":19,"text":508,"correct":21},"各类单项价格指数",{"key":23,"text":510,"correct":25},"设备、工器具价格指数",{"key":27,"text":512,"correct":25},"建筑安装工程造价指数",{"key":30,"text":514,"correct":25},"工程建设其他费用指数",{"key":33,"text":516,"correct":21},"各类单位工程价格指数",{"id":518,"libraryId":5,"type":14,"typeLabel":15,"stem":519,"options":520,"answer":120,"analysis":36},897376,"最能体现动态性变化特征，并且在工程价格的市场机制中起重要作用的工程造价信息包括（）。",[521,523,525,527,529],{"key":19,"text":522,"correct":21},"消耗量定额",{"key":23,"text":524,"correct":25},"价格信息",{"key":27,"text":526,"correct":25},"工程造价指数",{"key":30,"text":528,"correct":21},"计价文件",{"key":33,"text":530,"correct":25},"已完工程信息",{"id":532,"libraryId":5,"type":14,"typeLabel":15,"stem":533,"options":534,"answer":296,"analysis":36},897377,"下列工程造价指数中，属于总指数的有（）。",[535,537,538,539,541],{"key":19,"text":536,"correct":21},"间接费指数",{"key":23,"text":510,"correct":25},{"key":27,"text":514,"correct":21},{"key":30,"text":540,"correct":25},"单项工程造价指数",{"key":33,"text":542,"correct":25},"建设项目造价指数",{"id":544,"libraryId":5,"type":14,"typeLabel":15,"stem":545,"options":546,"answer":557,"analysis":36},897378,"编制建安工程造价指数所需的数据有（）。",[547,549,551,553,555],{"key":19,"text":548,"correct":25},"报告期人工费",{"key":23,"text":550,"correct":21},"基期材料费",{"key":27,"text":552,"correct":21},"报告期利润指数",{"key":30,"text":554,"correct":21},"基期施工机械使用费",{"key":33,"text":556,"correct":25},"报告期材料费","AE",{"id":559,"libraryId":5,"type":14,"typeLabel":15,"stem":560,"options":561,"answer":572,"analysis":36},897379,"下列关于设备、工器具价格指数的说法正确的有（）。",[562,564,566,568,570],{"key":19,"text":563,"correct":25},"质量指标指数应当以报告期的数量指标作为同度量因素",{"key":23,"text":565,"correct":21},"拉斯贝尔体系以基期价格为同度量",{"key":27,"text":567,"correct":25},"派许体系主张采用报告期指标作为同度量因素",{"key":30,"text":569,"correct":21},"设备、工器具价格指数是平均数指数形式",{"key":33,"text":571,"correct":21},"设备、工器具价格指数同度量的方法有拉斯贝尔体系和派许体系两种形式","AC",{"id":574,"libraryId":5,"type":14,"typeLabel":15,"stem":575,"options":576,"answer":587,"analysis":36},897380,"下列关于工程造价信息的说法中，不正确的有（）。",[577,579,581,583,585],{"key":19,"text":578,"correct":21},"建筑工种人工成本信息是按照建筑工人的工种分类",{"key":23,"text":580,"correct":21},"材料价格信息的发布应披露供货单位",{"key":27,"text":582,"correct":25},"机械价格信息包括设备市场价格信息和设备租赁市场价格信息两部分，前者对于工程计价更重要",{"key":30,"text":584,"correct":25},"指数包括已完成或在建工程的各种造价信息",{"key":33,"text":586,"correct":25},"按组织方式来分，工程造价信息分为宏观和微观工程造价信息","CDE",{"id":589,"libraryId":5,"type":14,"typeLabel":15,"stem":590,"options":591,"answer":587,"analysis":36},897381,"下列工程造价指数中，采用平均数指数形式编制的有（）。",[592,594,595,597,598],{"key":19,"text":593,"correct":21},"各种单项价格指数",{"key":23,"text":510,"correct":21},{"key":27,"text":596,"correct":25},"建筑安装工程价格指数",{"key":30,"text":540,"correct":25},{"key":33,"text":542,"correct":25},{"id":600,"libraryId":5,"type":14,"typeLabel":15,"stem":601,"options":602,"answer":364,"analysis":36},897382,"对工程造价信息分类必须遵循的基本原则有()。",[603,605,607,609,611],{"key":19,"text":604,"correct":25},"稳定性",{"key":23,"text":606,"correct":25},"可扩展性",{"key":27,"text":608,"correct":25},"兼容性",{"key":30,"text":610,"correct":21},"动态性",{"key":33,"text":612,"correct":21},"及时性",{"id":614,"libraryId":5,"type":14,"typeLabel":15,"stem":615,"options":616,"answer":557,"analysis":36},897383,"编制建安工程造价指数所需的数据有()。",[617,618,620,621,623],{"key":19,"text":548,"correct":25},{"key":23,"text":619,"correct":21},"基期设备工器具单价",{"key":27,"text":552,"correct":21},{"key":30,"text":622,"correct":21},"基期设备工器具购置数量",{"key":33,"text":624,"correct":25},"报告期企业管理费",{"id":626,"libraryId":5,"type":14,"typeLabel":15,"stem":627,"options":628,"answer":81,"analysis":36},897384,"建设项目工程造价指数是由( )指数综合得到的。",[629,630,632,633,635],{"key":19,"text":510,"correct":25},{"key":23,"text":631,"correct":21},"人工费价格指数",{"key":27,"text":512,"correct":25},{"key":30,"text":634,"correct":21},"材料价格指数",{"key":33,"text":514,"correct":25},{"id":637,"libraryId":5,"type":14,"typeLabel":15,"stem":638,"options":639,"answer":66,"analysis":36},897385,"关于工程造价指数，下列说法中正确的有（）。",[640,642,644,646,648],{"key":19,"text":641,"correct":25},"工程造价指数可以反映建筑市场的供求关系",{"key":23,"text":643,"correct":25},"工程造价指数可以反映报告期与基期相比的价格变动趋势",{"key":27,"text":645,"correct":21},"建筑安装工程造价指数是一种单项指数",{"key":30,"text":647,"correct":21},"设备、工器具价格指数是一种数量指标指数",{"key":33,"text":649,"correct":25},"单项工程造价指数一般用平均数指数的形式表示",{"id":651,"libraryId":5,"type":14,"typeLabel":15,"stem":652,"options":653,"answer":364,"analysis":36},897386,"工程造价信息分类必须遵循的基本原则有( )。",[654,655,656,657,658],{"key":19,"text":604,"correct":25},{"key":23,"text":606,"correct":25},{"key":27,"text":608,"correct":25},{"key":30,"text":610,"correct":21},{"key":33,"text":612,"correct":21},{"id":660,"libraryId":5,"type":14,"typeLabel":15,"stem":590,"options":661,"answer":587,"analysis":36},897387,[662,663,664,665,666],{"key":19,"text":593,"correct":21},{"key":23,"text":510,"correct":21},{"key":27,"text":596,"correct":25},{"key":30,"text":540,"correct":25},{"key":33,"text":542,"correct":25},{"id":668,"libraryId":5,"type":14,"typeLabel":15,"stem":669,"options":670,"answer":349,"analysis":36},897388,"建设项目或单项工程造价指数的计算式中包含有()。",[671,672,673,674,675],{"key":19,"text":508,"correct":21},{"key":23,"text":510,"correct":25},{"key":27,"text":512,"correct":25},{"key":30,"text":514,"correct":25},{"key":33,"text":516,"correct":21},[677,681,684,687,690,693],{"id":678,"name":679,"category":7,"favorite":680},1,"领导干部任职前廉政法规知识测试题",92,{"id":682,"name":683,"category":7,"favorite":678},595,"建筑结构与设备",{"id":685,"name":686,"category":7,"favorite":678},715,"招标采购专业知识与法律法规",{"id":688,"name":689,"category":7,"favorite":678},848,"市政方向-通用基础",{"id":691,"name":692,"category":7,"favorite":8},534,"BIM工程师",{"id":694,"name":692,"category":7,"favorite":8},535]