[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-581-5":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":610},{"id":5,"name":6,"category":7,"favorite":8},581,"建设工程造价管理基础知识","建筑工程",0,5,50,2873,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,189,201,213,225,237,249,261,272,284,296,308,318,330,342,353,365,377,389,400,412,424,436,448,460,472,484,493,505,517,529,540,552,564,574,586,598],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":20,"analysis":33},894986,1,"单选题","根据我国现行建筑安装工程费项目组成的规定，下列费用应列入暂列金额的是（）。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","施工过程中可能发生的工程变更及索赔、现场签证等费用",true,{"key":24,"text":25,"correct":26},"B","应建设单位要求，完成建设项目之外的零星项目费用",false,{"key":28,"text":29,"correct":26},"C","对建设单位自行采购的材料进行保管所发生的费用",{"key":31,"text":32,"correct":26},"D","施工用电、用水的开办费","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":20,"analysis":33},894987,"根据我国现行建筑安装工程费用项目组成的规定，下列关于措施项目费用的说法中正确的是（）。",[38,40,42,44],{"key":20,"text":39,"correct":22},"冬雨季施工费是冬、雨季施工增加的临时设施，防滑处理，雨雪排除等费用",{"key":24,"text":41,"correct":26},"施工排水、降水费由排水和降水两个独立的费用项目组成",{"key":28,"text":43,"correct":26},"当单层建筑物檐口高度超过15m时，可计算超高施工增加费",{"key":31,"text":45,"correct":26},"已完工程及设备保护费是指分部工程或结构部位验收前，对已完工程及设备采取必要保护措施所发生的费用",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":31,"analysis":33},894988,"在国外建筑安装工程费用中，属于开办费的项目是()。",[50,52,54,56],{"key":20,"text":51,"correct":26},"业务所需手续费",{"key":24,"text":53,"correct":26},"业务资料费",{"key":28,"text":55,"correct":26},"代理人的费用与佣金",{"key":31,"text":57,"correct":22},"恶劣气候条件下的工程防护措施费",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":28,"analysis":33},894989,"在国外建筑安装工程费用中，工作人员劳动保护费应列入()。",[62,64,66,68],{"key":20,"text":63,"correct":26},"人工费",{"key":24,"text":65,"correct":26},"材料费",{"key":28,"text":67,"correct":22},"管理费",{"key":31,"text":69,"correct":26},"暂定金额",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":28,"analysis":33},894990,"根据《房屋建筑与装饰工程计量规范》的规定，垂直运输费中包括行走式垂直运输机械的是( )。",[74,76,78,80],{"key":20,"text":75,"correct":26},"固定装置费",{"key":24,"text":77,"correct":26},"基础制作费",{"key":28,"text":79,"correct":22},"轨道铺设费",{"key":31,"text":81,"correct":26},"安装费",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":20,"analysis":33},894991,"下列关于费用的构成和计算的说法中，表述不正确的有（）。",[86,88,90,92],{"key":20,"text":87,"correct":22},"建筑安装工程费按照费用构成要素划分:由人工费、材料费（包含工程设备）、施工机具使用费、企业管理费构成",{"key":24,"text":89,"correct":26},"材料费的基本要素包括材料消耗量和材料单价",{"key":28,"text":91,"correct":26},"建筑安装工程费中的施工机具使用费，是指施工作业所发生的施工机械、仪器仪表使用费或其租赁费",{"key":31,"text":93,"correct":26},"施工机械使用费=Σ（施工机械台班消耗量×机械台班单价）",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":20,"analysis":33},894992,"下列设施的费用应计入安全文明施工措施费的是（）。",[98,100,102,104],{"key":20,"text":99,"correct":22},"安全施工标志的购置及安全宣传费用",{"key":24,"text":101,"correct":26},"工程排污费",{"key":28,"text":103,"correct":26},"财产保险费",{"key":31,"text":105,"correct":26},"工伤保险费",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":24,"analysis":33},894993,"下列费用属于安装工程费的是（）。",[110,112,114,116],{"key":20,"text":111,"correct":26},"设备基础的砌筑费用",{"key":24,"text":113,"correct":22},"与设备相连的工作台的工程费用",{"key":28,"text":115,"correct":26},"管道敷设工程的费用",{"key":31,"text":117,"correct":26},"电缆导线敷设工程的费用",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":31,"analysis":33},894994,"施工安全用电的费用属于（）。",[122,124,126,128],{"key":20,"text":123,"correct":26},"环境保护",{"key":24,"text":125,"correct":26},"文明施工",{"key":28,"text":127,"correct":26},"临时设施",{"key":31,"text":129,"correct":22},"安全施工",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":24,"analysis":33},894995,"根据我国现行建筑安装工程费用项目构成的规定，下列费用中属于安全文明施工费的（）。",[134,136,138,140],{"key":20,"text":135,"correct":26},"夜间施工时，临时可移动照明灯具的设置、拆除费用",{"key":24,"text":137,"correct":22},"工人安全防护用品的购置费用",{"key":28,"text":139,"correct":26},"地下室施工时采用的照明设施拆除费",{"key":31,"text":141,"correct":26},"建筑物的临时保护设施费",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":20,"analysis":33},894996,"下列费用中，属于建筑工程费用的是（）",[146,148,150,152],{"key":20,"text":147,"correct":22},"建筑工程以及各种炉窑的砌筑工程和金属结构工程的费用",{"key":24,"text":149,"correct":26},"生产、动力、起重、运输、传动和医疗、实验等各种需要安装的机械设备的装配费用",{"key":28,"text":151,"correct":26},"对单台设备进行单机试运转的费用",{"key":31,"text":153,"correct":26},"对系统设备进行系统联动无负荷试运转工作的调试费",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":31,"analysis":33},894997,"下列费用项目中，不属于按造价形成划分建筑工程费用项目构成的是（）。",[158,160,162,164],{"key":20,"text":159,"correct":26},"分部分项工程费",{"key":24,"text":161,"correct":26},"临时设施费",{"key":28,"text":163,"correct":26},"二次搬运费",{"key":31,"text":165,"correct":22},"施工机具使用费",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":20,"analysis":33},894998,"国外建筑安装工程费用中，单项工程费用由()构成。",[170,172,174,176],{"key":20,"text":171,"correct":22},"各分部分项工程费、单项工程开办费",{"key":24,"text":173,"correct":26},"直接工程费、管理费、利润及税金",{"key":28,"text":175,"correct":26},"直接工程费、开办费、利润及税金",{"key":31,"text":177,"correct":26},"各分部分项工程费、单项工程开办费、措施费",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":24,"analysis":33},894999,"因施工场地狭小等特殊情况而发生的二次搬运费用应属于( )。",[182,183,185,187],{"key":20,"text":159,"correct":26},{"key":24,"text":184,"correct":22},"措施费",{"key":28,"text":186,"correct":26},"规费",{"key":31,"text":188,"correct":26},"企业管理费",{"id":190,"libraryId":5,"type":15,"typeLabel":16,"stem":191,"options":192,"answer":24,"analysis":33},895000,"根据《建设项目工程总承包合同示范文本（试行）》GF-2011-2016，下列变更事项，属于采购变更的是（）。",[193,195,197,199],{"key":20,"text":194,"correct":26},"对设备规格和数量的调整",{"key":24,"text":196,"correct":22},"改变检查、检验、检测、试验地点",{"key":28,"text":198,"correct":26},"重新进行竣工试验",{"key":31,"text":200,"correct":26},"对配套工程系统的工艺调整",{"id":202,"libraryId":5,"type":15,"typeLabel":16,"stem":203,"options":204,"answer":31,"analysis":33},895001,"下列关于费用计算的说法，不正确的是（）。",[205,207,209,211],{"key":20,"text":206,"correct":26},"应予计量的措施项目：措施项目费=Σ（措施项目工程量×综合单价）",{"key":24,"text":208,"correct":26},"不宜计量的措施项目：安全文明施工费=计算基数×安全文明施工费费率（％）",{"key":28,"text":210,"correct":26},"其余不宜计量的措施项目：措施项目费=计算基数×措施项目费费率（％）",{"key":31,"text":212,"correct":22},"分部分项工程费=Σ[分部分项工程量×费率（％）]",{"id":214,"libraryId":5,"type":15,"typeLabel":16,"stem":215,"options":216,"answer":28,"analysis":33},895002,"国产非标准设备原价，其说法正确的是（）。",[217,219,221,223],{"key":20,"text":218,"correct":26},"一般采用国家定型标准",{"key":24,"text":220,"correct":26},"设备厂采用批量生产",{"key":28,"text":222,"correct":22},"按照成本构成进行估价",{"key":31,"text":224,"correct":26},"一般有完善的设备交易市场",{"id":226,"libraryId":5,"type":15,"typeLabel":16,"stem":227,"options":228,"answer":31,"analysis":33},895003,"采用成本计算估价法计算非标准设备原价时，下列表述正确的是（）。",[229,231,233,235],{"key":20,"text":230,"correct":26},"专用工具费＝（材料费＋加工费）×专用工具费率",{"key":24,"text":232,"correct":26},"加工费＝设备总重量×（1＋加工耗损系数）×设备每吨加工费",{"key":28,"text":234,"correct":26},"包装费的计算基数中不应包含废品损失费",{"key":31,"text":236,"correct":22},"利润的计算基数中不应包含外购配套件费",{"id":238,"libraryId":5,"type":15,"typeLabel":16,"stem":239,"options":240,"answer":31,"analysis":33},895004,"下列关于工具、器具及生产家具购置费的表述中，正确的是（）。",[241,243,245,247],{"key":20,"text":242,"correct":26},"该项费用属于设备费",{"key":24,"text":244,"correct":26},"该项费用属于工程建设其他费用",{"key":28,"text":246,"correct":26},"该项费用是为了保证项目生产运营期的需要而支付的相关购置费用",{"key":31,"text":248,"correct":22},"该项费用一般以需要安装的设备购置费为基数乘以一定费率计算",{"id":250,"libraryId":5,"type":15,"typeLabel":16,"stem":251,"options":252,"answer":20,"analysis":33},895005,"对外贸易运输保险费的计算公式为（）",[253,255,257,259],{"key":20,"text":254,"correct":22},"运输保险费=（FOB＋国际运输费）／（1－保险费率）×保险费率",{"key":24,"text":256,"correct":26},"运输保险费=（CIF＋国际运输费）／（1－保险费率）×保险费率",{"key":28,"text":258,"correct":26},"运输保险费=（FOB＋国际运输费）／（1＋保险费率）×保险费率",{"key":31,"text":260,"correct":26},"运输保险费=（CFR＋国际运输费）／（1－保险费率）×保险费率",{"id":262,"libraryId":5,"type":15,"typeLabel":16,"stem":263,"options":264,"answer":24,"analysis":33},895006,"用成本计算估价法计算国产非标准设备原价时，利润的计算基数中不包括的费用项目是（）。",[265,266,268,270],{"key":20,"text":65,"correct":26},{"key":24,"text":267,"correct":22},"税金",{"key":28,"text":269,"correct":26},"专用工具费",{"key":31,"text":271,"correct":26},"包装费",{"id":273,"libraryId":5,"type":15,"typeLabel":16,"stem":274,"options":275,"answer":31,"analysis":33},895007,"国产非标准设备原价的确定可采用()等方法。",[276,278,280,282],{"key":20,"text":277,"correct":26},"概算指标法和定额估价法",{"key":24,"text":279,"correct":26},"成本计算估价法和概算指标法",{"key":28,"text":281,"correct":26},"分部组合估价法和百分比法",{"key":31,"text":283,"correct":22},"成本计算估价法和分部组合估价法",{"id":285,"libraryId":5,"type":15,"typeLabel":16,"stem":286,"options":287,"answer":28,"analysis":33},895008,"进口设备采用装运港船上交货价(FO B)时，买方需承担的责任不包括()。",[288,290,292,294],{"key":20,"text":289,"correct":26},"租船舱，支付运费",{"key":24,"text":291,"correct":26},"装船后的一切风险和运费",{"key":28,"text":293,"correct":22},"办理出口手续，并将货物装上船",{"key":31,"text":295,"correct":26},"办理海外运输保险并支付保险费",{"id":297,"libraryId":5,"type":15,"typeLabel":16,"stem":298,"options":299,"answer":28,"analysis":33},895009,"采用FOB货价方式进口设备抵岸价构成中，国际运费是指()。",[300,302,304,306],{"key":20,"text":301,"correct":26},"从出口国的生产厂起到我国建设项目工地仓库止的运费",{"key":24,"text":303,"correct":26},"从出口国的生产厂起到我国抵达港（站）止的运费",{"key":28,"text":305,"correct":22},"从装运港（站）起到我国目的港（站）止的运费",{"key":31,"text":307,"correct":26},"从装运港（站）起到我国建设项目工地仓库止的运费",{"id":309,"libraryId":5,"type":15,"typeLabel":16,"stem":310,"options":311,"answer":31,"analysis":33},895010,"计算非标准设备原价时，下列表述中正确的是（）。",[312,314,316,317],{"key":20,"text":313,"correct":26},"专用工具费=（材料费+加工费）×专用工具费率",{"key":24,"text":315,"correct":26},"加工费=设备总重量×（1+加工耗损系数）×设备每吨加工费",{"key":28,"text":234,"correct":26},{"key":31,"text":236,"correct":22},{"id":319,"libraryId":5,"type":15,"typeLabel":16,"stem":320,"options":321,"answer":20,"analysis":33},895011,"对外贸易货物运输保险费的计算公式是()。",[322,324,326,328],{"key":20,"text":323,"correct":22},"运输保险费=（FOB+国外运费）\u002F（1-保险费率）×保险费率",{"key":24,"text":325,"correct":26},"运输保险费=（CIF+国外运费）\u002F（1-保险费率）×保险费率",{"key":28,"text":327,"correct":26},"运输保险费=（FOB+国外运费）\u002F（1+保险费率）×保险费率",{"key":31,"text":329,"correct":26},"运输保险费=（CFR+国外运费）\u002F（1-保险费率）×保险费率",{"id":331,"libraryId":5,"type":15,"typeLabel":16,"stem":332,"options":333,"answer":31,"analysis":33},895012,"在进口设备原价的组成中，属于进口从属费用的是()。",[334,336,338,340],{"key":20,"text":335,"correct":26},"货价",{"key":24,"text":337,"correct":26},"国际运费",{"key":28,"text":339,"correct":26},"运输保险费",{"key":31,"text":341,"correct":22},"外贸手续费",{"id":343,"libraryId":5,"type":15,"typeLabel":16,"stem":344,"options":345,"answer":31,"analysis":33},895013,"采用成本计算估价法计算国产非标准设备原价时，包装费的计取基数不包括该设备的()。",[346,347,349,351],{"key":20,"text":65,"correct":26},{"key":24,"text":348,"correct":26},"加工费",{"key":28,"text":350,"correct":26},"外购配套件费",{"key":31,"text":352,"correct":22},"设计费",{"id":354,"libraryId":5,"type":15,"typeLabel":16,"stem":355,"options":356,"answer":20,"analysis":33},895014,"下列项目中属于设备运杂费中运费和装卸费的是()。",[357,359,361,363],{"key":20,"text":358,"correct":22},"国产设备由设备制造厂交货地点起至工地仓库止所发生的运费",{"key":24,"text":360,"correct":26},"进口设备由设备制造厂交货地点起至工地仓库止所发生的运费",{"key":28,"text":362,"correct":26},"为运输而进行的包装支出的各种费用",{"key":31,"text":364,"correct":26},"进口设备由设备制造厂交货地点起至施工组织设计指定的设备堆放地点止所发生的运费",{"id":366,"libraryId":5,"type":15,"typeLabel":16,"stem":367,"options":368,"answer":20,"analysis":33},895015,"下列费用项目中，属于工器具及生产家具购置费计算内容的是()。",[369,371,373,375],{"key":20,"text":370,"correct":22},"未达到固定资产标准的设备购置费",{"key":24,"text":372,"correct":26},"达到固定资产标准的设备购置费",{"key":28,"text":374,"correct":26},"引进设备时备品备件的测绘费",{"key":31,"text":376,"correct":26},"引进设备的专利使用费",{"id":378,"libraryId":5,"type":15,"typeLabel":16,"stem":379,"options":380,"answer":20,"analysis":33},895016,"某进口设备的人民币货价为50万元，国际运费费率为10%，运输保险费费率为3%，进口关税税率为20%，则该设备应支付关税税额是()万元。",[381,383,385,387],{"key":20,"text":382,"correct":22},"11.34",{"key":24,"text":384,"correct":26},"11.43",{"key":28,"text":386,"correct":26},"11.30",{"key":31,"text":388,"correct":26},"10.00",{"id":390,"libraryId":5,"type":15,"typeLabel":16,"stem":391,"options":392,"answer":31,"analysis":33},895017,"用成本计算估价法计算国产非标准设备原价时，需要考虑的费用项目是()。",[393,395,397,399],{"key":20,"text":394,"correct":26},"特殊设备安全监督检查费",{"key":24,"text":396,"correct":26},"供销部门手续费",{"key":28,"text":398,"correct":26},"成品损失费及运输包装费",{"key":31,"text":350,"correct":22},{"id":401,"libraryId":5,"type":15,"typeLabel":16,"stem":402,"options":403,"answer":24,"analysis":33},895018,"已知国内制造厂生产某非标准设备所用材料费、加工费、辅助材料费、专用工具费、废品损失费共20万元，外购配套件费3万元，非标准设备设计费1万元，包装费率1%，利润率为8%，若其他费用不考虑，则该设备的原价为( )。",[404,406,408,410],{"key":20,"text":405,"correct":26},"25. 82万元",{"key":24,"text":407,"correct":22},"25. 85万元",{"key":28,"text":409,"correct":26},"26. 09万元",{"key":31,"text":411,"correct":26},"29. 09万元",{"id":413,"libraryId":5,"type":15,"typeLabel":16,"stem":414,"options":415,"answer":31,"analysis":33},895019,"某批进口设备离岸价格为1000万元，国际运费为100万元，运输保险费率为1%。则该批设备关税完税价格应为（）万元。",[416,418,420,422],{"key":20,"text":417,"correct":26},"1100",{"key":24,"text":419,"correct":26},"1110",{"key":28,"text":421,"correct":26},"1111",{"key":31,"text":423,"correct":22},"1111.11",{"id":425,"libraryId":5,"type":15,"typeLabel":16,"stem":426,"options":427,"answer":20,"analysis":33},895020,"就国际贸易的各种交易价格而言，以下各种价格中费用划分与风险转移分界点相一致的是（）。",[428,430,432,434],{"key":20,"text":429,"correct":22},"离岸价格",{"key":24,"text":431,"correct":26},"运费在内价",{"key":28,"text":433,"correct":26},"到岸价格",{"key":31,"text":435,"correct":26},"抵岸价格",{"id":437,"libraryId":5,"type":15,"typeLabel":16,"stem":438,"options":439,"answer":24,"analysis":33},895022,"下列属于工程建设其他费用中与未来生产经营有关的其他费用的是()。",[440,442,444,446],{"key":20,"text":441,"correct":26},"引进技术和引进设备其他费",{"key":24,"text":443,"correct":22},"人员培训及提前进场费",{"key":28,"text":445,"correct":26},"建设管理费",{"key":31,"text":447,"correct":26},"工程监理费",{"id":449,"libraryId":5,"type":15,"typeLabel":16,"stem":450,"options":451,"answer":20,"analysis":33},895023,"下列费用中，属于与项目建设有关的其他费用中研究试验费的是()。",[452,454,456,458],{"key":20,"text":453,"correct":22},"按施工验收规定在施工中必须进行试验所需费用",{"key":24,"text":455,"correct":26},"应在建筑安装费用中列支的施工企业对建筑材料、构件和建筑物进行一般鉴定、检查所发生的费用及技术革新的研究试验费",{"key":28,"text":457,"correct":26},"应由科技三项费用（即新产品试制费、中间试验费和重要科学研究补助费）开支的项",{"key":31,"text":459,"correct":26},"应由勘察设计费或工程费用中开支的项目",{"id":461,"libraryId":5,"type":15,"typeLabel":16,"stem":462,"options":463,"answer":28,"analysis":33},895024,"土地补偿费为该耕地被征用前三年平均年产值的()倍。",[464,466,468,470],{"key":20,"text":465,"correct":26},"2～3",{"key":24,"text":467,"correct":26},"3～5",{"key":28,"text":469,"correct":22},"6～10",{"key":31,"text":471,"correct":26},"8～12",{"id":473,"libraryId":5,"type":15,"typeLabel":16,"stem":474,"options":475,"answer":20,"analysis":33},895025,"根据设计要求，在施工过程中对某屋架结构进行破坏性试验，以提供和验证设计数据，则该项费用应在()中支出。",[476,478,480,482],{"key":20,"text":477,"correct":22},"研究试验费",{"key":24,"text":479,"correct":26},"施工方的检验试验费",{"key":28,"text":481,"correct":26},"建设单位管理费",{"key":31,"text":483,"correct":26},"勘察设计费",{"id":485,"libraryId":5,"type":15,"typeLabel":16,"stem":486,"options":487,"answer":31,"analysis":33},895026,"按我国现行投资构成，下列费用中不属于与项目建设有关的其他费用的是()。",[488,489,490,491],{"key":20,"text":483,"correct":26},{"key":24,"text":477,"correct":26},{"key":28,"text":447,"correct":26},{"key":31,"text":492,"correct":22},"联合试运转费",{"id":494,"libraryId":5,"type":15,"typeLabel":16,"stem":495,"options":496,"answer":20,"analysis":33},895027,"在征地补偿费和拆迁补偿费中都可能包含的费用是( )。",[497,499,501,503],{"key":20,"text":498,"correct":22},"安置补助费",{"key":24,"text":500,"correct":26},"土地补偿费",{"key":28,"text":502,"correct":26},"青苗补偿费",{"key":31,"text":504,"correct":26},"地上附着物补偿费",{"id":506,"libraryId":5,"type":15,"typeLabel":16,"stem":507,"options":508,"answer":31,"analysis":33},895028,"下列费用项目中，计入工程建设其他费中专利及专有技术使用费的是( )。",[509,511,513,515],{"key":20,"text":510,"correct":26},"专利及专有技术在项目全寿命期的使用费",{"key":24,"text":512,"correct":26},"在生产期支付的商标权费",{"key":28,"text":514,"correct":26},"国内设计资料费",{"key":31,"text":516,"correct":22},"国外设计资料费",{"id":518,"libraryId":5,"type":15,"typeLabel":16,"stem":519,"options":520,"answer":20,"analysis":33},895029,"关于建设用地的取得及使用年限，下列说法中正确的是（）。",[521,523,525,527],{"key":20,"text":522,"correct":22},"获取建设用地使用权的方式可以是租赁或转让",{"key":24,"text":524,"correct":26},"通过协议出让获取土地使用权的方式分为投标、竞拍、挂牌三种",{"key":28,"text":526,"correct":26},"城市公益事业用地不得以划拨方式取得",{"key":31,"text":528,"correct":26},"将土地使用权无偿交付给使用者的，其土地使用年限最高为70年",{"id":530,"libraryId":5,"type":15,"typeLabel":16,"stem":531,"options":532,"answer":20,"analysis":33},895030,"下列费用中，属于生产准备费的是（）。",[533,535,537,538],{"key":20,"text":534,"correct":22},"人员培训费",{"key":24,"text":536,"correct":26},"竣工验收费",{"key":28,"text":492,"correct":26},{"key":31,"text":539,"correct":26},"完工清理费",{"id":541,"libraryId":5,"type":15,"typeLabel":16,"stem":542,"options":543,"answer":20,"analysis":33},895031,"关于征地补偿费用，下列表述正确的是（）。",[544,546,548,550],{"key":20,"text":545,"correct":22},"地上附着物补偿应根据协调征地方案前地上附着物的实际情况确定",{"key":24,"text":547,"correct":26},"土地补偿费和安置补助费的总和不得超过土地被征用前三年平均年产值的15倍",{"key":28,"text":549,"correct":26},"征用未开发的规划菜地按一年只种一茬的标准缴纳新菜地开发建设基金",{"key":31,"text":551,"correct":26},"征收耕地占用税时，对于占用前三年曾用于种植农作物的土地不得视为耕地",{"id":553,"libraryId":5,"type":15,"typeLabel":16,"stem":554,"options":555,"answer":24,"analysis":33},895033,"关于土地征用及迁移补偿费的说法中，正确的是()。",[556,558,560,562],{"key":20,"text":557,"correct":26},"征用耕地的土地补偿费标准为该地被征用前三年，平均年产值的4～6倍",{"key":24,"text":559,"correct":22},"拆迁补偿的方式可以实行货币补偿",{"key":28,"text":561,"correct":26},"青苗补偿费归农村集体所有",{"key":31,"text":563,"correct":26},"被征用耕地的安置补助费最高不超过被征用前三年平均年产值的30倍",{"id":565,"libraryId":5,"type":15,"typeLabel":16,"stem":566,"options":567,"answer":28,"analysis":33},895034,"工程监理费属于()。",[568,569,571,572],{"key":20,"text":477,"correct":26},{"key":24,"text":570,"correct":26},"其他直接费",{"key":28,"text":445,"correct":22},{"key":31,"text":573,"correct":26},"无形资产费用",{"id":575,"libraryId":5,"type":15,"typeLabel":16,"stem":576,"options":577,"answer":31,"analysis":33},895035,"下列费用项目中，属于工程建设其他费中研究试验费的是（）。",[578,580,582,584],{"key":20,"text":579,"correct":26},"新产品试制费",{"key":24,"text":581,"correct":26},"水文地质勘查费",{"key":28,"text":583,"correct":26},"特殊设备安全监督检验费",{"key":31,"text":585,"correct":22},"委托专业机构验证设计参数而发生的验证费",{"id":587,"libraryId":5,"type":15,"typeLabel":16,"stem":588,"options":589,"answer":31,"analysis":33},895036,"某工业项目及其总装车间的各项费用如下表所示（单位：万元），则总装车间分摊的建设单位管理费为()万元。",[590,592,594,596],{"key":20,"text":591,"correct":26},"18.67",{"key":24,"text":593,"correct":26},"18.29",{"key":28,"text":595,"correct":26},"17.14",{"key":31,"text":597,"correct":22},"17.21",{"id":599,"libraryId":5,"type":15,"typeLabel":16,"stem":600,"options":601,"answer":24,"analysis":33},895037,"根据《中华人民共和国城镇国有土地使用权出让和转让暂行条例》土地使用权出让最高年限按土地用途确定，工业用地的最高年限为（）年。",[602,604,606,608],{"key":20,"text":603,"correct":26},"40",{"key":24,"text":605,"correct":22},"50",{"key":28,"text":607,"correct":26},"60",{"key":31,"text":609,"correct":26},"70",[611,614,617,620,623,626],{"id":15,"name":612,"category":7,"favorite":613},"领导干部任职前廉政法规知识测试题",92,{"id":615,"name":616,"category":7,"favorite":15},595,"建筑结构与设备",{"id":618,"name":619,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":621,"name":622,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":624,"name":625,"category":7,"favorite":8},534,"BIM工程师",{"id":627,"name":625,"category":7,"favorite":8},535]