[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-581-49":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":705},{"id":5,"name":6,"category":7,"favorite":8},581,"建设工程造价管理基础知识","建筑工程",0,49,50,2873,[13,38,53,68,83,98,113,128,142,156,171,182,196,210,225,239,253,265,280,293,308,323,338,351,362,376,391,401,415,425,438,453,467,480,494,509,523,538,552,566,579,588,597,610,624,638,652,665,679,692],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},897284,2,"多选题","关于预算定额的性质与特点的描述，正确的是()。",[19,23,26,30,33],{"key":20,"text":21,"correct":22},"A","一种计价性定额",true,{"key":24,"text":25,"correct":22},"B","以分项工程和结构构件为对象编制",{"key":27,"text":28,"correct":29},"C","反映平均先进水平",false,{"key":31,"text":32,"correct":22},"D","以施工定额为基础编制",{"key":34,"text":35,"correct":29},"E","编制施工预算的基础","ABD","",{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":52,"analysis":37},897285,"关于投资估算指标，下列说法中正确的有（）。",[42,44,46,48,50],{"key":20,"text":43,"correct":29},"应以单项工程为编制对象",{"key":24,"text":45,"correct":22},"是反映建设总投资的经济指标",{"key":27,"text":47,"correct":22},"概略程度与可行性研究工作阶段相适应",{"key":31,"text":49,"correct":29},"编制基础包括概算定额，不包括预算定额",{"key":34,"text":51,"correct":22},"可根据历史预算资料和价格变动资料等编制","BCE",{"id":54,"libraryId":5,"type":15,"typeLabel":16,"stem":55,"options":56,"answer":67,"analysis":37},897286,"下列表述中属于施工定额特性的是()。",[57,59,61,63,65],{"key":20,"text":58,"correct":29},"计价性定额",{"key":24,"text":60,"correct":22},"企业定额性质",{"key":27,"text":62,"correct":22},"分项最细",{"key":31,"text":64,"correct":22},"基础性定额",{"key":34,"text":66,"correct":22},"以工序为研究对象","BCDE",{"id":69,"libraryId":5,"type":15,"typeLabel":16,"stem":70,"options":71,"answer":82,"analysis":37},897287,"下列工程造价管理活动中，属于工程量清单计价活动的是()。",[72,74,76,78,80],{"key":20,"text":73,"correct":22},"工程支付",{"key":24,"text":75,"correct":22},"合同价款调整",{"key":27,"text":77,"correct":22},"工程计价争议处理",{"key":31,"text":79,"correct":29},"竣工决算",{"key":34,"text":81,"correct":22},"投标报价","ABCE",{"id":84,"libraryId":5,"type":15,"typeLabel":16,"stem":85,"options":86,"answer":97,"analysis":37},897288,"关于工程定额的说法中，正确的有()。",[87,89,91,93,95],{"key":20,"text":88,"correct":22},"人工定额与机械消耗定额的主要表现形式是时间定额",{"key":24,"text":90,"correct":29},"预算定额为工程定额中的基础性定额",{"key":27,"text":92,"correct":22},"概算定额的每一综合分项都包含了数个预算定额分项工程项目",{"key":31,"text":94,"correct":22},"概算指标能够反映以单位工程为对象的人工、材料、机械台班消耗量",{"key":34,"text":96,"correct":29},"已完工程竣工决算是一种典型的投资估算指标","ACD",{"id":99,"libraryId":5,"type":15,"typeLabel":16,"stem":100,"options":101,"answer":112,"analysis":37},897289,"根据分部组合计价原理，单位工程可依据（）等的不同分解为分部工程。",[102,104,106,108,110],{"key":20,"text":103,"correct":22},"结构部位",{"key":24,"text":105,"correct":22},"路段长度",{"key":27,"text":107,"correct":22},"施工特点",{"key":31,"text":109,"correct":29},"材料",{"key":34,"text":111,"correct":29},"工序","ABC",{"id":114,"libraryId":5,"type":15,"typeLabel":16,"stem":115,"options":116,"answer":127,"analysis":37},897290,"编制工程量清单时，可以依据施工组织设计、施工规范、验收规范确定的要素有()。",[117,119,121,123,125],{"key":20,"text":118,"correct":22},"项目名称",{"key":24,"text":120,"correct":29},"项目编码",{"key":27,"text":122,"correct":22},"项目特征",{"key":31,"text":124,"correct":29},"计量单位",{"key":34,"text":126,"correct":22},"工程量","ACE",{"id":129,"libraryId":5,"type":15,"typeLabel":16,"stem":130,"options":131,"answer":67,"analysis":37},897291,"下列各种定额中，定额水平为社会平均水平的有()。",[132,134,136,138,140],{"key":20,"text":133,"correct":29},"施工定额",{"key":24,"text":135,"correct":22},"预算定额",{"key":27,"text":137,"correct":22},"概算定额",{"key":31,"text":139,"correct":22},"概算指标",{"key":34,"text":141,"correct":22},"投资估算指标",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":36,"analysis":37},897292,"工程量清单计价中，分部分项工程的综合单价由完成规定计量单位工程量清单项目所需()等费用组成。",[146,148,150,152,154],{"key":20,"text":147,"correct":22},"人工费、材料费、机械使用费",{"key":24,"text":149,"correct":22},"管理费",{"key":27,"text":151,"correct":29},"临时设施费",{"key":31,"text":153,"correct":22},"利润",{"key":34,"text":155,"correct":29},"税金",{"id":157,"libraryId":5,"type":15,"typeLabel":16,"stem":158,"options":159,"answer":170,"analysis":37},897293,"下列关于工程量清单计价程序和方法的说法中，正确的是( )。",[160,162,164,166,168],{"key":20,"text":161,"correct":29},"编制建设工程造价的基本过程只有工程量计算",{"key":24,"text":163,"correct":22},"工程量清单计价要历经工程量清单编制和工程量清单应用两个阶段",{"key":27,"text":165,"correct":29},"工程量清单在发承包阶段的应用主要是用来编制招标控制价、投标报价和工程计量、工程结算和工程计价纠纷的解决",{"key":31,"text":167,"correct":29},"招标控制价和投标报价的编制依据相同",{"key":34,"text":169,"correct":22},"综合单价由人工费、材料和工程设备费、施工机具使用费、企业管理费、利润及一， 定范围内的风险费用组成","BE",{"id":172,"libraryId":5,"type":15,"typeLabel":16,"stem":173,"options":174,"answer":127,"analysis":37},897294,"按定额的编制程序和用途，建设工程定额可划分为（）。",[175,176,178,179,181],{"key":20,"text":133,"correct":22},{"key":24,"text":177,"correct":29},"企业定额",{"key":27,"text":135,"correct":22},{"key":31,"text":180,"correct":29},"补充定额",{"key":34,"text":141,"correct":22},{"id":183,"libraryId":5,"type":15,"typeLabel":16,"stem":184,"options":185,"answer":97,"analysis":37},897296,"关于措施项目清单编制依据，正确的是()。",[186,188,190,192,194],{"key":20,"text":187,"correct":22},"拟定的招标文件",{"key":24,"text":189,"correct":29},"其他项目清单",{"key":27,"text":191,"correct":22},"常规施工方案",{"key":31,"text":193,"correct":22},"与建设工程有关的标准、规范",{"key":34,"text":195,"correct":29},"相关法律法规",{"id":197,"libraryId":5,"type":15,"typeLabel":16,"stem":198,"options":199,"answer":127,"analysis":37},897297,"下列措施项目中，应按分部分项工程量清单编制方式编制的有( )。",[200,202,204,206,208],{"key":20,"text":201,"correct":22},"超高施工增加",{"key":24,"text":203,"correct":29},"建筑物的临时保护设施",{"key":27,"text":205,"correct":22},"大型机械设备进出场及安拆",{"key":31,"text":207,"correct":29},"已完工程及设备保护",{"key":34,"text":209,"correct":22},"施工排水、降水",{"id":211,"libraryId":5,"type":15,"typeLabel":16,"stem":212,"options":213,"answer":224,"analysis":37},897299,"根据《建设工程工程量清单计价规范》（GB 10500——2013），在其他项目清单中，应由投标人自主确定价格的有（）。",[214,216,218,220,222],{"key":20,"text":215,"correct":29},"暂列金额",{"key":24,"text":217,"correct":29},"专业工程暂估价",{"key":27,"text":219,"correct":29},"材料暂估价单价",{"key":31,"text":221,"correct":22},"计日工单价",{"key":34,"text":223,"correct":22},"总承包服务费","DE",{"id":226,"libraryId":5,"type":15,"typeLabel":16,"stem":227,"options":228,"answer":112,"analysis":37},897300,"安全文明施工费的计算基数可以是下列()。",[229,231,233,235,237],{"key":20,"text":230,"correct":22},"定额基价",{"key":24,"text":232,"correct":22},"定额人工费",{"key":27,"text":234,"correct":22},"定额人工费+定额机械费",{"key":31,"text":236,"correct":29},"定额材料费+定额机械费",{"key":34,"text":238,"correct":29},"定额人工费+定额材料费",{"id":240,"libraryId":5,"type":15,"typeLabel":16,"stem":241,"options":242,"answer":252,"analysis":37},897301,"措施项目清单的编制依据有()。",[243,245,247,249,250],{"key":20,"text":244,"correct":22},"施工现场情况",{"key":24,"text":246,"correct":22},"工程特点",{"key":27,"text":248,"correct":29},"施工承包合同",{"key":31,"text":191,"correct":22},{"key":34,"text":251,"correct":22},"建设工程设计文件","ABDE",{"id":254,"libraryId":5,"type":15,"typeLabel":16,"stem":255,"options":256,"answer":264,"analysis":37},897303,"下列措施项目中，适宜于采用综合单价方式计价的是()。",[257,258,259,261,263],{"key":20,"text":207,"correct":29},{"key":24,"text":205,"correct":22},{"key":27,"text":260,"correct":29},"安全文明施工",{"key":31,"text":262,"correct":22},"混凝土、钢筋混凝土模板",{"key":34,"text":209,"correct":22},"BDE",{"id":266,"libraryId":5,"type":15,"typeLabel":16,"stem":267,"options":268,"answer":279,"analysis":37},897304,"分部分项工程量清单的项目特征应按“清单计价规范”附录中规定的项目特征，结合( )予以详细而准确的表述和说明。",[269,271,273,275,277],{"key":20,"text":270,"correct":22},"技术规范",{"key":24,"text":272,"correct":29},"工程内容",{"key":27,"text":274,"correct":22},"标准图集",{"key":31,"text":276,"correct":22},"施工图纸",{"key":34,"text":278,"correct":22},"安装位置","ACDE",{"id":281,"libraryId":5,"type":15,"typeLabel":16,"stem":282,"options":283,"answer":292,"analysis":37},897305,"根据《房屋建筑与装饰工程工程量计算规范》GB50584的规定，下列属于可以精确计算工程量的措施项目有( )。",[284,286,288,290,291],{"key":20,"text":285,"correct":22},"施工排水、施工降水",{"key":24,"text":287,"correct":22},"垂直运输",{"key":27,"text":289,"correct":29},"冬雨季施工",{"key":31,"text":260,"correct":29},{"key":34,"text":205,"correct":22},"ABE",{"id":294,"libraryId":5,"type":15,"typeLabel":16,"stem":295,"options":296,"answer":307,"analysis":37},897306,"下列各项关于其他项目清单的编制，说法正确的有( )。",[297,299,301,303,305],{"key":20,"text":298,"correct":29},"暂列金额是预见肯定要发生而暂时无法明确数额的费用项目",{"key":24,"text":300,"correct":29},"专业工程暂估价应包括除规费以外的所有综合单价构成内容",{"key":27,"text":302,"correct":22},"需要纳入分部分项工程量清单项目综合单价中的暂估价只是材料费和工程设备费",{"key":31,"text":304,"correct":29},"总承包服务费包括总承包人为分包工程及自行采购材料、设备发生的管理费用",{"key":34,"text":306,"correct":22},"招标人应预计总承包服务费并按投标人的投标报价向投标人支付该项费用","CE",{"id":309,"libraryId":5,"type":15,"typeLabel":16,"stem":310,"options":311,"answer":322,"analysis":37},897307,"下列工程项目中，必须采用工程量清单计价的有()。",[312,314,316,318,320],{"key":20,"text":313,"correct":22},"使用各级财政预算资金的项目",{"key":24,"text":315,"correct":22},"使用国家发行债券所筹资金的项目",{"key":27,"text":317,"correct":22},"国有资金投资总额占50%以上的项目",{"key":31,"text":319,"correct":22},"使用国家政策性贷款的项目",{"key":34,"text":321,"correct":29},"使用国际金融机构货款的项目","ABCD",{"id":324,"libraryId":5,"type":15,"typeLabel":16,"stem":325,"options":326,"answer":337,"analysis":37},897308,"关于措施项目工程量清单编制与计价，下列说法中正确的是( )。",[327,329,331,333,335],{"key":20,"text":328,"correct":29},"不能计算工程量的措施项目也可以采用分部分项工程量清单方式编制",{"key":24,"text":330,"correct":22},"安全文明施工费按总价方式编制，其计算基础可为“定额基价”、“定额人工费”",{"key":27,"text":332,"correct":29},"总价措施项目清单表应列明计量单位、费率、金额等内容",{"key":31,"text":334,"correct":22},"安全文明施工费计算基础可为“定额人工费”",{"key":34,"text":336,"correct":29},"按施工方案计算的总价措施项目可以只需填“金额”数值","BD",{"id":339,"libraryId":5,"type":15,"typeLabel":16,"stem":340,"options":341,"answer":127,"analysis":37},897309,"根据《建设工程工程量清单计价规范》的规定，其他项目清单的暂列金额部分包括()。",[342,344,345,347,349],{"key":20,"text":343,"correct":22},"施工合同签订时不可预见的所需材料采购费用",{"key":24,"text":223,"correct":29},{"key":27,"text":346,"correct":22},"尚未确定的所需服务的采购费用",{"key":31,"text":348,"correct":29},"材料的暂估单价",{"key":34,"text":350,"correct":22},"合同约定的可能发生的工程价款调整费用",{"id":352,"libraryId":5,"type":15,"typeLabel":16,"stem":353,"options":354,"answer":252,"analysis":37},897310,"分部分项工程项目清单的组成部分是()。",[355,356,357,359,360],{"key":20,"text":120,"correct":22},{"key":24,"text":118,"correct":22},{"key":27,"text":358,"correct":29},"项目内容",{"key":31,"text":122,"correct":22},{"key":34,"text":361,"correct":22},"工程数量",{"id":363,"libraryId":5,"type":15,"typeLabel":16,"stem":364,"options":365,"answer":170,"analysis":37},897311,"关于工程量清单编制中的项目特征描述，下列说法中正确的是( )。",[366,368,370,372,374],{"key":20,"text":367,"correct":29},"措施项目无需描述项目特征",{"key":24,"text":369,"correct":22},"应按计量规范附录中规定的项目特征，结合技术规范、标准图集加以描述",{"key":27,"text":371,"correct":29},"对完成清单项目可能发生的具体工作和操作程序仍需加以描述",{"key":31,"text":373,"correct":29},"图纸中已有的工程规格、型号、材质等可不描述",{"key":34,"text":375,"correct":22},"项目独有的特征，清单编制人视项目具体情况确定",{"id":377,"libraryId":5,"type":15,"typeLabel":16,"stem":378,"options":379,"answer":390,"analysis":37},897312,"根据《建设工程工程量清单计价规范》GB 50500-2013，关于工程量清单计价的有关要求，下列说法中正确的有（）。",[380,382,384,386,388],{"key":20,"text":381,"correct":29},"事业单位自有资金投资的建设工程发承包，可以不采用工程量清单计价",{"key":24,"text":383,"correct":22},"使用国有资金投资的建设工程发承包，必须采用工程量清单计价",{"key":27,"text":385,"correct":22},"招标工程量清单应以单位工程为单位编制",{"key":31,"text":387,"correct":29},"工程量清单计价方式下，必须采用单价合同",{"key":34,"text":389,"correct":29},"招标工程量清单的准确性和完整性由清单编制人负责","BC",{"id":392,"libraryId":5,"type":15,"typeLabel":16,"stem":393,"options":394,"answer":82,"analysis":37},897314,"分部分项工程项目清单必须根据专业工程计量规范规定的（）进行编制。",[395,396,397,398,400],{"key":20,"text":120,"correct":22},{"key":24,"text":118,"correct":22},{"key":27,"text":122,"correct":22},{"key":31,"text":399,"correct":29},"计算费率",{"key":34,"text":124,"correct":22},{"id":402,"libraryId":5,"type":15,"typeLabel":16,"stem":403,"options":404,"answer":112,"analysis":37},897315,"下列有关暂列金额的表述,正确的是（）。",[405,407,409,411,413],{"key":20,"text":406,"correct":22},"用于施工合同签订时尚未确定或者不可预见的所需材料、设备、服务的采购",{"key":24,"text":408,"correct":22},"用于施工中可能发生的工程变更、合同约定调整因素出现时的工程价款调整",{"key":27,"text":410,"correct":22},"用于发生的索赔、现场签证确认等的费用",{"key":31,"text":412,"correct":29},"用于支付必然发生但暂时不能确定价格的材料的单价",{"key":34,"text":414,"correct":29},"指招标人在工程量清单中暂定但未包括在合同价款中的一笔款项",{"id":416,"libraryId":5,"type":15,"typeLabel":16,"stem":417,"options":418,"answer":224,"analysis":37},897316,"根据《建设工程工程量清单计价规范》（GB50500-2013），在其他项目清单中，应由投标人自主确定价格的有（）。",[419,420,421,423,424],{"key":20,"text":215,"correct":29},{"key":24,"text":217,"correct":29},{"key":27,"text":422,"correct":29},"材料暂估单价",{"key":31,"text":221,"correct":22},{"key":34,"text":223,"correct":22},{"id":426,"libraryId":5,"type":15,"typeLabel":16,"stem":427,"options":428,"answer":292,"analysis":37},897317,"为了便于措施项目费的确定和调整，通常采用分部分项工程量清单方式编制的措施项目有（）。",[429,431,433,435,436],{"key":20,"text":430,"correct":22},"脚手架工程",{"key":24,"text":432,"correct":22},"垂直运输工程",{"key":27,"text":434,"correct":29},"二次搬运工程",{"key":31,"text":207,"correct":29},{"key":34,"text":437,"correct":22},"施工排水降水",{"id":439,"libraryId":5,"type":15,"typeLabel":16,"stem":440,"options":441,"answer":452,"analysis":37},897318,"关于其他项目清单编制的说法，正确的有()。",[442,444,446,448,450],{"key":20,"text":443,"correct":29},"需要纳入分部分项工程量清单项目综合单价中的暂估价只是材料费",{"key":24,"text":445,"correct":29},"暂估价用于支付可能发生也可能不发生的材料及专业工程",{"key":27,"text":447,"correct":22},"专业工程的暂估价一般应是综合暂估价，应当包括除规费和税金以外的管理费、利润等取费",{"key":31,"text":449,"correct":22},"暂列金额是招标人考虑工程建设工程中不可预见、不能确定的因素而暂定的一笔费用",{"key":34,"text":451,"correct":29},"计日工清单中由招标人列项，投标人填写数量与单价","CD",{"id":454,"libraryId":5,"type":15,"typeLabel":16,"stem":455,"options":456,"answer":170,"analysis":37},897319,"关于编制预算定额应遵循的原则,下列说法中正确的有（）。",[457,459,461,463,465],{"key":20,"text":458,"correct":29},"反映社会先进平均水平",{"key":24,"text":460,"correct":22},"坚持统一性和差别性相结合",{"key":27,"text":462,"correct":29},"价格的灵活可协调性",{"key":31,"text":464,"correct":29},"综合、简化",{"key":34,"text":466,"correct":22},"简明适用",{"id":468,"libraryId":5,"type":15,"typeLabel":16,"stem":469,"options":470,"answer":52,"analysis":37},897320,"投资估算指标包括()。",[471,472,474,476,478],{"key":20,"text":139,"correct":29},{"key":24,"text":473,"correct":22},"建设项目综合指标",{"key":27,"text":475,"correct":22},"单项工程指标",{"key":31,"text":477,"correct":29},"工程单价指标",{"key":34,"text":479,"correct":22},"单位工程指标",{"id":481,"libraryId":5,"type":15,"typeLabel":16,"stem":482,"options":483,"answer":170,"analysis":37},897321,"单位工程投资估算指标的表示方式中，管道以“元\u002Fm”并区分( )表示。",[484,486,488,490,492],{"key":20,"text":485,"correct":29},"结构形式",{"key":24,"text":487,"correct":22},"材质",{"key":27,"text":489,"correct":29},"容积",{"key":31,"text":491,"correct":29},"面层",{"key":34,"text":493,"correct":22},"管径",{"id":495,"libraryId":5,"type":15,"typeLabel":16,"stem":496,"options":497,"answer":508,"analysis":37},897322,"建筑安装工程概算指标通常是()和造价指标。",[498,500,502,504,506],{"key":20,"text":499,"correct":29},"以整个建筑物和构筑物为对象",{"key":24,"text":501,"correct":22},"以建筑面积、体积为单位",{"key":27,"text":503,"correct":22},"以成套设备装置的台或组为计量单位",{"key":31,"text":505,"correct":22},"人工、材料和机械台班的消耗量标准",{"key":34,"text":507,"correct":29},"以部分建筑物或构筑物为对象","BCD",{"id":510,"libraryId":5,"type":15,"typeLabel":16,"stem":511,"options":512,"answer":264,"analysis":37},897323,"下列有关概算定额与概算指标关系的表述中，正确的是（）。",[513,515,517,519,521],{"key":20,"text":514,"correct":29},"概算定额以单位工程为对象，概算指标以单项工程为对象",{"key":24,"text":516,"correct":22},"概算定额以预算定额为基础，概算指标主要来自各种预算和结算资料",{"key":27,"text":518,"correct":29},"概算定额适用于初步设计阶段，概算指标不适用于初步设计阶段",{"key":31,"text":520,"correct":22},"概算指标比概算定额更加综合与扩大",{"key":34,"text":522,"correct":22},"概算定额是编制概算指标的依据",{"id":524,"libraryId":5,"type":15,"typeLabel":16,"stem":525,"options":526,"answer":537,"analysis":37},897324,"预算定额中人工、材料、机械台班消耗量的确定方法包括（）。",[527,529,531,533,535],{"key":20,"text":528,"correct":22},"以施工定额为基础确定",{"key":24,"text":530,"correct":22},"以现场观察测定资料为基础计算",{"key":27,"text":532,"correct":29},"以工程量计算规则为依据计算",{"key":31,"text":534,"correct":29},"以各类费用定额为基础确定",{"key":34,"text":536,"correct":29},"以工程结算资料为依据计算","AB",{"id":539,"libraryId":5,"type":15,"typeLabel":16,"stem":540,"options":541,"answer":508,"analysis":37},897325,"下列用工项目中，构成预算定额人工工日消耗量但并不包括在施工定额中的有（）。",[542,544,546,548,550],{"key":20,"text":543,"correct":29},"材料水平搬运用工",{"key":24,"text":545,"correct":22},"材料加工用工和电焊点火用工",{"key":27,"text":547,"correct":22},"工序交接时对前一工序修整用工",{"key":31,"text":549,"correct":22},"在施工定额基础上应增加计算的用工",{"key":34,"text":551,"correct":29},"完成施工任务必须消耗的技术工程用工",{"id":553,"libraryId":5,"type":15,"typeLabel":16,"stem":554,"options":555,"answer":112,"analysis":37},897326,"编制预算定额时，机械台班消耗量中机械幅度差的内容包括（）。",[556,558,560,562,564],{"key":20,"text":557,"correct":22},"机械维修引起的停歇时间",{"key":24,"text":559,"correct":22},"停电引起的机械停歇时间",{"key":27,"text":561,"correct":22},"机械在施工中不可避免的工序间歇",{"key":31,"text":563,"correct":29},"机械工作量不饱满增加的时间",{"key":34,"text":565,"correct":29},"机械低负荷下增加的工作时间",{"id":567,"libraryId":5,"type":15,"typeLabel":16,"stem":568,"options":569,"answer":508,"analysis":37},897327,"下列与施工机械工作相关的时间中，应包括在预算定额机械台班消耗量中，但不包括在施工定额中的有（）。",[570,572,574,575,577],{"key":20,"text":571,"correct":29},"低负荷下工作时间",{"key":24,"text":573,"correct":22},"正常施工时 机械施工不可避免的工序间歇",{"key":27,"text":557,"correct":22},{"key":31,"text":576,"correct":22},"开工时工作量不饱满所损失的时间",{"key":34,"text":578,"correct":29},"不可避免的中断时间",{"id":580,"libraryId":5,"type":15,"typeLabel":16,"stem":581,"options":582,"answer":52,"analysis":37},897328,"投资估算指标包括（）。",[583,584,585,586,587],{"key":20,"text":139,"correct":29},{"key":24,"text":473,"correct":22},{"key":27,"text":475,"correct":22},{"key":31,"text":477,"correct":29},{"key":34,"text":479,"correct":22},{"id":589,"libraryId":5,"type":15,"typeLabel":16,"stem":590,"options":591,"answer":36,"analysis":37},897329,"关于预算定额的性质与特点的描述，正确的有（）。",[592,593,594,595,596],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":22},{"key":27,"text":28,"correct":29},{"key":31,"text":32,"correct":22},{"key":34,"text":35,"correct":29},{"id":598,"libraryId":5,"type":15,"typeLabel":16,"stem":599,"options":600,"answer":170,"analysis":37},897330,"下列工人工作时间中，虽属于损失时间，但在拟定定额时又要适度考虑它的影响的是()。",[601,603,605,606,608],{"key":20,"text":602,"correct":29},"施工本身导致的停工时间",{"key":24,"text":604,"correct":22},"非施工本身导致的停工时间",{"key":27,"text":578,"correct":29},{"key":31,"text":607,"correct":29},"多余工作时",{"key":34,"text":609,"correct":22},"偶然工作时间",{"id":611,"libraryId":5,"type":15,"typeLabel":16,"stem":612,"options":613,"answer":52,"analysis":37},897331,"关于测定时间消耗的工作日写实法的特点的说法中，正确的有()。",[614,616,618,620,622],{"key":20,"text":615,"correct":29},"工作日写实法用于检查定额执行情况时，需要测定3～4次",{"key":24,"text":617,"correct":22},"能够获得整个工作班内各种工时的消耗量",{"key":27,"text":619,"correct":22},"工作日写实法用于编制定额时，需要记录产品数量和影响工时消耗的各种因素",{"key":31,"text":621,"correct":29},"记录时间需要将有效工作时间分成不同组成部分",{"key":34,"text":623,"correct":22},"应按工时消耗性质分类记录各类工时消耗量",{"id":625,"libraryId":5,"type":15,"typeLabel":16,"stem":626,"options":627,"answer":112,"analysis":37},897332,"挂贴墙面花岗岩板材的施工中，所用下列材料属于形成工程实体材料的有()。",[628,630,632,634,636],{"key":20,"text":629,"correct":22},"花岗石板材",{"key":24,"text":631,"correct":22},"水泥砂浆",{"key":27,"text":633,"correct":22},"钢龙骨",{"key":31,"text":635,"correct":29},"脚手架",{"key":34,"text":637,"correct":29},"安全网",{"id":639,"libraryId":5,"type":15,"typeLabel":16,"stem":640,"options":641,"answer":170,"analysis":37},897333,"在定额的测定中，写实记录法是测定时间定额的常用方法，其特点包括()。",[642,644,646,648,650],{"key":20,"text":643,"correct":29},"主要适用于测定定时重复的循环工作",{"key":24,"text":645,"correct":22},"能够获得分析工作时间消耗和制定定额必需的全部资料",{"key":27,"text":647,"correct":29},"能够通过测定检查定额的执行情况",{"key":31,"text":649,"correct":29},"能反映工人或机器工作日工时消耗的全部情况",{"key":34,"text":651,"correct":22},"观测对象可以是一个工人，也可以是一个工人小组",{"id":653,"libraryId":5,"type":15,"typeLabel":16,"stem":654,"options":655,"answer":52,"analysis":37},897334,"工人工作时间中的损失时间包括()。",[656,658,660,662,664],{"key":20,"text":657,"correct":29},"准备与结束工作时间",{"key":24,"text":659,"correct":22},"施工本身造成的停工时间",{"key":27,"text":661,"correct":22},"非施工本身造成的停工时间",{"key":31,"text":663,"correct":29},"休息时间",{"key":34,"text":609,"correct":22},{"id":666,"libraryId":5,"type":15,"typeLabel":16,"stem":667,"options":668,"answer":127,"analysis":37},897335,"施工中材料的消耗分为必需消耗的材料和损失的材料，在确定材料定额消耗量时，必需消耗的材料包括()。",[669,671,673,675,677],{"key":20,"text":670,"correct":22},"直接用于建筑和安装工程的材料",{"key":24,"text":672,"correct":29},"不可避免的场外运输损耗材料",{"key":27,"text":674,"correct":22},"不可避免的场内运输损耗材料",{"key":31,"text":676,"correct":29},"不可避免的现场仓储损耗材料",{"key":34,"text":678,"correct":22},"不可避免的施工过程中损耗材料",{"id":680,"libraryId":5,"type":15,"typeLabel":16,"stem":681,"options":682,"answer":508,"analysis":37},897336,"确定施工时间定额时，下列工人工作时间可以计入定额时间的有()。",[683,685,687,689,691],{"key":20,"text":684,"correct":29},"机手并动下的辅助工作时间",{"key":24,"text":686,"correct":22},"准备与结束工作的时间",{"key":27,"text":688,"correct":22},"与施工过程工艺特点有关的工作中断时间",{"key":31,"text":690,"correct":22},"必需的休息时间",{"key":34,"text":659,"correct":29},{"id":693,"libraryId":5,"type":15,"typeLabel":16,"stem":694,"options":695,"answer":704,"analysis":37},897337,"在确定人工定额消耗量时，规范时间包括()。",[696,698,700,702,703],{"key":20,"text":697,"correct":29},"基本工作时间",{"key":24,"text":699,"correct":29},"辅助工作时间",{"key":27,"text":701,"correct":22},"准备与结束时间",{"key":31,"text":578,"correct":22},{"key":34,"text":663,"correct":22},"CDE",[706,710,713,716,719,722],{"id":707,"name":708,"category":7,"favorite":709},1,"领导干部任职前廉政法规知识测试题",92,{"id":711,"name":712,"category":7,"favorite":707},595,"建筑结构与设备",{"id":714,"name":715,"category":7,"favorite":707},715,"招标采购专业知识与法律法规",{"id":717,"name":718,"category":7,"favorite":707},848,"市政方向-通用基础",{"id":720,"name":721,"category":7,"favorite":8},534,"BIM工程师",{"id":723,"name":721,"category":7,"favorite":8},535]