[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-581-47":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":707},{"id":5,"name":6,"category":7,"favorite":8},581,"建设工程造价管理基础知识","建筑工程",0,47,50,2873,[13,38,53,67,82,97,112,126,140,155,169,183,197,210,224,239,253,262,277,291,305,320,334,343,357,371,380,395,409,424,439,454,465,480,495,508,522,537,550,565,578,591,604,618,629,639,654,668,682,696],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},897183,2,"多选题","实行法人责任制的建设项目，项目总经理的职责有（）。",[19,23,26,30,33],{"key":20,"text":21,"correct":22},"A","负责筹措建设资金",false,{"key":24,"text":25,"correct":22},"B","负责提出项目竣工验收申请报告",{"key":27,"text":28,"correct":29},"C","组织编制项目初步设计文件",true,{"key":31,"text":32,"correct":29},"D","组织工程设计招标工作",{"key":34,"text":35,"correct":29},"E","负责生产准备工作和培训有关人员","CDE","",{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":52,"analysis":37},897184,"建设单位在办理工程质量监督注册手续时需提供的资料有（）。",[42,44,46,48,50],{"key":20,"text":43,"correct":29},"中标通知书",{"key":24,"text":45,"correct":22},"施工进度计划",{"key":27,"text":47,"correct":22},"施工方案",{"key":31,"text":49,"correct":29},"施工组织设计",{"key":34,"text":51,"correct":29},"监理规划","ADE",{"id":54,"libraryId":5,"type":15,"typeLabel":16,"stem":55,"options":56,"answer":66,"analysis":37},897185,"在办理建设工程质量监督注册手续时需提供的材料有（）。",[57,59,60,62,64],{"key":20,"text":58,"correct":29},"监理合同",{"key":24,"text":43,"correct":29},{"key":27,"text":61,"correct":22},"施工图",{"key":31,"text":63,"correct":29},"施工合同",{"key":34,"text":65,"correct":29},"施工图设计文件审查报告和批准书","ABDE",{"id":68,"libraryId":5,"type":15,"typeLabel":16,"stem":69,"options":70,"answer":81,"analysis":37},897186,"建设工程项目建议书的内容应包括（）。",[71,73,75,77,79],{"key":20,"text":72,"correct":29},"产品方案的初步设想",{"key":24,"text":74,"correct":29},"建设条件的初步分析",{"key":27,"text":76,"correct":29},"投资估算",{"key":31,"text":78,"correct":29},"项目进度安排",{"key":34,"text":80,"correct":22},"项目合同文件草案","ABCD",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":96,"analysis":37},897187,"根据《建设工程监理范围和规模标准规定》必须实行监理制的为（）。",[86,88,90,92,94],{"key":20,"text":87,"correct":22},"大中型工程项目",{"key":24,"text":89,"correct":29},"利用外国政府或者国际组织贷款、援助资金的工程",{"key":27,"text":91,"correct":29},"国家重点建设工程",{"key":31,"text":93,"correct":22},"某住宅小区工程",{"key":34,"text":95,"correct":22},"某公司自用的办公楼","BC",{"id":98,"libraryId":5,"type":15,"typeLabel":16,"stem":99,"options":100,"answer":111,"analysis":37},897188,"建设工程项目采用Partnering模式的特点有()。",[101,103,105,107,109],{"key":20,"text":102,"correct":29},"Partnering协议是工程建设参与各方共同签署的协议",{"key":24,"text":104,"correct":22},"Partnering协议是工程合同文件的组成部分",{"key":27,"text":106,"correct":29},"Partnering模式需要工程建设参与各方高层管理者的参与",{"key":31,"text":108,"correct":29},"Partnering模式强调资源共享和风险分担",{"key":34,"text":110,"correct":22},"Partnering模式可以独立于其他承包模式而存在","ACD",{"id":113,"libraryId":5,"type":15,"typeLabel":16,"stem":114,"options":115,"answer":52,"analysis":37},897189,"对业主而言，建设工程采用平行承包模式的特点有()。",[116,118,120,122,124],{"key":20,"text":117,"correct":29},"选择承包商的范围大",{"key":24,"text":119,"correct":22},"组织协调工作量小",{"key":27,"text":121,"correct":22},"合同结构简单",{"key":31,"text":123,"correct":29},"工程招标任务量大",{"key":34,"text":125,"correct":29},"工程造价控制难度大",{"id":127,"libraryId":5,"type":15,"typeLabel":16,"stem":128,"options":129,"answer":111,"analysis":37},897190,"建设工程设计与施工采用总分包模式的特点有()。",[130,132,134,136,138],{"key":20,"text":131,"correct":29},"对总承包商要求高，业主选择范围小",{"key":24,"text":133,"correct":22},"总包合同价格可较早确定，合同金额较低",{"key":27,"text":135,"correct":29},"业主的合同结构简单，组织协调工作量小",{"key":31,"text":137,"correct":29},"工程设计与施工有机融合，有利于缩短建设工期",{"key":34,"text":139,"correct":22},"分包单位多，弱化了工程质量控制工作",{"id":141,"libraryId":5,"type":15,"typeLabel":16,"stem":142,"options":143,"answer":154,"analysis":37},897191,"下列关于CM承包模式的说法，正确的有（）。",[144,146,148,150,152],{"key":20,"text":145,"correct":29},"CM承包模式下采用快速路径法施工",{"key":24,"text":147,"correct":22},"CM单位直接与分包单位签订分包合同",{"key":27,"text":149,"correct":29},"CM合同采用成本加酬金的计价方式",{"key":31,"text":151,"correct":22},"CM单位与分包单位之间的合同价是保密的",{"key":34,"text":153,"correct":29},"CM单位不赚取总包与分包之间的差价","ACE",{"id":156,"libraryId":5,"type":15,"typeLabel":16,"stem":157,"options":158,"answer":66,"analysis":37},897192,"根据《关于实行建设项目法人责任制的暂行规定》，建设项目总经理的职权有()。",[159,161,163,165,167],{"key":20,"text":160,"correct":29},"组织编制初步设计文件",{"key":24,"text":162,"correct":29},"组织工程设计招标",{"key":27,"text":164,"correct":22},"审批项目财务预算",{"key":31,"text":166,"correct":29},"组织单项工程预验收",{"key":34,"text":168,"correct":29},"编制项目财务决算",{"id":170,"libraryId":5,"type":15,"typeLabel":16,"stem":171,"options":172,"answer":96,"analysis":37},897193,"根据《国务院关于投资体制改革的决定》，对于企业不使用政府资金投资建设的项目，应区别不同情况实行()。",[173,175,177,179,181],{"key":20,"text":174,"correct":22},"审批制",{"key":24,"text":176,"correct":29},"核准制",{"key":27,"text":178,"correct":29},"备案制",{"key":31,"text":180,"correct":22},"报建制",{"key":34,"text":182,"correct":22},"核查制",{"id":184,"libraryId":5,"type":15,"typeLabel":16,"stem":185,"options":186,"answer":81,"analysis":37},897194,"根据《建筑工程施工质量验收统一标准》 GB 50300-2013，建筑工程包括()等分部工程。",[187,189,191,193,195],{"key":20,"text":188,"correct":29},"地基与基础",{"key":24,"text":190,"correct":29},"主体结构",{"key":27,"text":192,"correct":29},"建筑装饰装修",{"key":31,"text":194,"correct":29},"屋面",{"key":34,"text":196,"correct":22},"土建工程",{"id":198,"libraryId":5,"type":15,"typeLabel":16,"stem":199,"options":200,"answer":209,"analysis":37},897195,"根据《关于实行建设项目法人责任制的暂行规定》，建设项目董事会的职权有()。",[201,202,204,206,207],{"key":20,"text":21,"correct":29},{"key":24,"text":203,"correct":29},"审核、上报项目初步设计和概算文件",{"key":27,"text":205,"correct":29},"研究解决建设过程中出现的重大问题",{"key":31,"text":28,"correct":22},{"key":34,"text":208,"correct":22},"组织工程设计、施工监理、施工队伍和设备材料采购的招标工作","ABC",{"id":211,"libraryId":5,"type":15,"typeLabel":16,"stem":212,"options":213,"answer":81,"analysis":37},897196,"项目法人责任制由项目法人对()等实行全过程负责。",[214,216,218,220,222],{"key":20,"text":215,"correct":29},"项目策划",{"key":24,"text":217,"correct":29},"资金筹措",{"key":27,"text":219,"correct":29},"建设实施",{"key":31,"text":221,"correct":29},"生产经营",{"key":34,"text":223,"correct":22},"资产核算",{"id":225,"libraryId":5,"type":15,"typeLabel":16,"stem":226,"options":227,"answer":238,"analysis":37},897197,"根据《房屋建筑和市政基础设施工程施工图设计文件审查管理办法》，施工图审查机构对施工图设计文件审查的内容有()。",[228,230,232,234,236],{"key":20,"text":229,"correct":22},"是否按限额设计标准进行施工图设计",{"key":24,"text":231,"correct":29},"是否符合工程建设强制性标准",{"key":27,"text":233,"correct":22},"施工图预算是否超过批准的工程概算",{"key":31,"text":235,"correct":29},"地基基础和主体结构的安全性",{"key":34,"text":237,"correct":22},"危险性较大的工程是否有专项施工方案","BD",{"id":240,"libraryId":5,"type":15,"typeLabel":16,"stem":241,"options":242,"answer":81,"analysis":37},897198,"BIM技术值得关注和推广的方面包括()。",[243,245,247,249,251],{"key":20,"text":244,"correct":29},"构建可视化模型",{"key":24,"text":246,"correct":29},"优化工程设计方案",{"key":27,"text":248,"correct":29},"模拟施工",{"key":31,"text":250,"correct":29},"强化造价管理",{"key":34,"text":252,"correct":22},"强化施工管理",{"id":254,"libraryId":5,"type":15,"typeLabel":16,"stem":255,"options":256,"answer":36,"analysis":37},897199,"实行法人责任制的建设项目，项目总经理的职责有()。",[257,258,259,260,261],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":22},{"key":27,"text":28,"correct":29},{"key":31,"text":32,"correct":29},{"key":34,"text":35,"correct":29},{"id":263,"libraryId":5,"type":15,"typeLabel":16,"stem":264,"options":265,"answer":276,"analysis":37},897201,"根据《国务院关于投资体制改革的决定》（国发 [2004] 20号），关于政府投资项目，下列说法错误的是（）。",[266,268,270,272,274],{"key":20,"text":267,"correct":29},"对于采用直接投资的政府投资项目，政府只需审批开工报告",{"key":24,"text":269,"correct":22},"对于采用投资补助、转贷和贷款贴息方式的政府投资项目，则只审批资金申请报告",{"key":27,"text":271,"correct":22},"政府投资项目一般都要经过符合资质要求的咨询中介机构的评估论证，特别重大的项目还应实行专家评议制度",{"key":31,"text":273,"correct":29},"对于采用资本金注入方式的政府投资项目，政府需要从投资决策的角度审批项目建议书和可行性研究报告，所有情况均不再审批开工报告",{"key":34,"text":275,"correct":22},"政府投资项目只实行审批制","AD",{"id":278,"libraryId":5,"type":15,"typeLabel":16,"stem":279,"options":280,"answer":36,"analysis":37},897202,"根据《国务院关于投资体制改革的决定》，只需审批资金申请报告的政府投资项目是指采用()方式的项目。",[281,283,285,287,289],{"key":20,"text":282,"correct":22},"直接投资",{"key":24,"text":284,"correct":22},"资本金注入",{"key":27,"text":286,"correct":29},"投资补助",{"key":31,"text":288,"correct":29},"转贷",{"key":34,"text":290,"correct":29},"贷款贴息",{"id":292,"libraryId":5,"type":15,"typeLabel":16,"stem":293,"options":294,"answer":238,"analysis":37},897203,"关于工程项目后评价的说法，正确的有()。",[295,297,299,301,303],{"key":20,"text":296,"correct":22},"项目后评价应在竣工验收阶段进行",{"key":24,"text":298,"correct":29},"项目后评价的基本方法是对比法",{"key":27,"text":300,"correct":22},"项目效益后评价主要是经济效益后评价",{"key":31,"text":302,"correct":29},"项目效益后评价是项目后评价的重要组成部分",{"key":34,"text":304,"correct":22},"项目后评价全部采用实际运营数据",{"id":306,"libraryId":5,"type":15,"typeLabel":16,"stem":307,"options":308,"answer":319,"analysis":37},897204,"工程项目管理的发展趋势包括()。",[309,311,313,315,317],{"key":20,"text":310,"correct":29},"国际化趋势",{"key":24,"text":312,"correct":29},"集成化趋势",{"key":27,"text":314,"correct":22},"专业化趋势",{"key":31,"text":316,"correct":22},"市场化趋势",{"key":34,"text":318,"correct":29},"信息化趋势","ABE",{"id":321,"libraryId":5,"type":15,"typeLabel":16,"stem":322,"options":323,"answer":66,"analysis":37},897205,"BIM技术在工程造价管理信息化方面的意义包括()。",[324,326,328,330,332],{"key":20,"text":325,"correct":29},"提高工程量计算的准确性",{"key":24,"text":327,"correct":29},"合理安排资源计划",{"key":27,"text":329,"correct":22},"控制工程造价",{"key":31,"text":331,"correct":29},"有效支持多算对比",{"key":34,"text":333,"correct":29},"积累和共享历史数据",{"id":335,"libraryId":5,"type":15,"typeLabel":16,"stem":336,"options":337,"answer":111,"analysis":37},897206,"建设工程设计与施工采用总分包模式的特点有（）。",[338,339,340,341,342],{"key":20,"text":131,"correct":29},{"key":24,"text":133,"correct":22},{"key":27,"text":135,"correct":29},{"key":31,"text":137,"correct":29},{"key":34,"text":139,"correct":22},{"id":344,"libraryId":5,"type":15,"typeLabel":16,"stem":345,"options":346,"answer":111,"analysis":37},897207,"建设工程项目采用Partnering 模式的特点有（）。",[347,349,351,353,355],{"key":20,"text":348,"correct":29},"Partnering 协议是工程建设参与各方共同签署的协议",{"key":24,"text":350,"correct":22},"Partnering 协议是工程合同文件的组成部分",{"key":27,"text":352,"correct":29},"Partnering 模式需要工程建设参与各方高层管理者的参与",{"key":31,"text":354,"correct":29},"Partnering 模式强调资源共享和风险分担",{"key":34,"text":356,"correct":22},"Partnering 模式可以独立于其他承包模式而存在",{"id":358,"libraryId":5,"type":15,"typeLabel":16,"stem":359,"options":360,"answer":370,"analysis":37},897208,"建设工程施工联合体承包模式的特点有（）。",[361,362,364,366,368],{"key":20,"text":135,"correct":29},{"key":24,"text":363,"correct":22},"通过联合体内部合同约束，增加了工程质量监控环节",{"key":27,"text":365,"correct":22},"施工合同总价可以较早确定，业主可承担较少风险",{"key":31,"text":367,"correct":22},"施工合同风险大，要求各承包商有较高的综合管理水平",{"key":34,"text":369,"correct":29},"能够集中联合体成员单位优势，增强抗风险能力","AE",{"id":372,"libraryId":5,"type":15,"typeLabel":16,"stem":373,"options":374,"answer":52,"analysis":37},897209,"对业主而言，建设工程采用平行承包模式的特点有（）。",[375,376,377,378,379],{"key":20,"text":117,"correct":29},{"key":24,"text":119,"correct":22},{"key":27,"text":121,"correct":22},{"key":31,"text":123,"correct":29},{"key":34,"text":125,"correct":29},{"id":381,"libraryId":5,"type":15,"typeLabel":16,"stem":382,"options":383,"answer":394,"analysis":37},897210,"关于强矩阵制组织形式的说法，正确的有（）。",[384,386,388,390,392],{"key":20,"text":385,"correct":29},"项目经理具有较大权限",{"key":24,"text":387,"correct":22},"需要配备训练有素的协调人员",{"key":27,"text":389,"correct":29},"项目组织成员绩效完全由项目经理考核",{"key":31,"text":391,"correct":29},"适用于技术复杂且对时间紧迫的项目",{"key":34,"text":393,"correct":29},"项目经理直接向最高领导负责","ACDE",{"id":396,"libraryId":5,"type":15,"typeLabel":16,"stem":397,"options":398,"answer":154,"analysis":37},897211,"下列关于CM 承包模式的说法，正确的有（）。",[399,401,403,405,407],{"key":20,"text":400,"correct":29},"CM 承包模式下采用快速路径法施工",{"key":24,"text":402,"correct":22},"CM 单位直接与分包单位签订分包合同",{"key":27,"text":404,"correct":29},"CM 合同采用成本加酬金的计价方式",{"key":31,"text":406,"correct":22},"CM 单位与分包单位之间的合同价是保密的",{"key":34,"text":408,"correct":29},"CM 单位不赚取总包与分包之间的差价",{"id":410,"libraryId":5,"type":15,"typeLabel":16,"stem":411,"options":412,"answer":423,"analysis":37},897212,"建设工程采用平行承包模式时，建设单位控制工程造价难度大的原因有（）。",[413,415,417,419,421],{"key":20,"text":414,"correct":22},"合同价值小，建设单位选择承包单位的范围小",{"key":24,"text":416,"correct":22},"合同数量多，组织协调工作量大",{"key":27,"text":418,"correct":29},"总合同价不易在短期内确定，影响造价控制的实施",{"key":31,"text":420,"correct":22},"建设周期长，增加时间成本",{"key":34,"text":422,"correct":29},"工程招标任务量大，需控制多项合同价格","CE",{"id":425,"libraryId":5,"type":15,"typeLabel":16,"stem":426,"options":427,"answer":438,"analysis":37},897213,"采用控制图法控制生产过程质量时，说明点子在控制界限内排列有缺陷的情形有（）。",[428,430,432,434,436],{"key":20,"text":429,"correct":29},"点子连续在中心线一侧出现7 个以上",{"key":24,"text":431,"correct":29},"连续7 个以上的点子上升或下降",{"key":27,"text":433,"correct":22},"连续11 个点子落在一倍标准偏差控制界限之外",{"key":31,"text":435,"correct":29},"点子落在两倍标准偏差控制界限之外",{"key":34,"text":437,"correct":22},"点子落在三倍标准偏差控制界限附近","ABD",{"id":440,"libraryId":5,"type":15,"typeLabel":16,"stem":441,"options":442,"answer":453,"analysis":37},897214,"与S 曲线法相同，香蕉曲线同样可用来控制工程造价和工程进度。下列项目目标控制方法中，可用于控制工程质量的有（）。",[443,445,447,449,451],{"key":20,"text":444,"correct":22},"S 曲线法",{"key":24,"text":446,"correct":29},"控制图法",{"key":27,"text":448,"correct":29},"排列图法",{"key":31,"text":450,"correct":29},"直方图法",{"key":34,"text":452,"correct":22},"横道图法","BCD",{"id":455,"libraryId":5,"type":15,"typeLabel":16,"stem":456,"options":457,"answer":453,"analysis":37},897215,"下列建设工程项目目标控制方法中，可用来判断工程进度偏差的有（）。",[458,459,461,462,464],{"key":20,"text":450,"correct":22},{"key":24,"text":460,"correct":29},"网络计划法",{"key":27,"text":444,"correct":29},{"key":31,"text":463,"correct":29},"香蕉曲线法",{"key":34,"text":446,"correct":22},{"id":466,"libraryId":5,"type":15,"typeLabel":16,"stem":467,"options":468,"answer":479,"analysis":37},897216,"建设单位编制的工程项目建设总进度计划包括的内容有（）。",[469,471,473,475,477],{"key":20,"text":470,"correct":22},"竣工投产交付使用计划表",{"key":24,"text":472,"correct":29},"工程项目一览表",{"key":27,"text":474,"correct":22},"年度建设资金平衡表",{"key":31,"text":476,"correct":29},"工程项目进度平衡表",{"key":34,"text":478,"correct":29},"投资计划年度分配表","BDE",{"id":481,"libraryId":5,"type":15,"typeLabel":16,"stem":482,"options":483,"answer":494,"analysis":37},897217,"世界银行工程造价构成中，应急费包括()。",[484,486,488,490,492],{"key":20,"text":485,"correct":22},"建设成本上升费",{"key":24,"text":487,"correct":29},"未明确项目的准备金",{"key":27,"text":489,"correct":22},"各种酬金",{"key":31,"text":491,"correct":22},"运费和保险费",{"key":34,"text":493,"correct":29},"不可预见准备金","BE",{"id":496,"libraryId":5,"type":15,"typeLabel":16,"stem":497,"options":498,"answer":66,"analysis":37},897218,"世界银行、国际咨询工程师联合会规定工程项目总建设成本包括()。",[499,501,503,505,507],{"key":20,"text":500,"correct":29},"项目直接建设成本",{"key":24,"text":502,"correct":29},"项目间接建设成本",{"key":27,"text":504,"correct":22},"预备费",{"key":31,"text":506,"correct":29},"应急费",{"key":34,"text":485,"correct":29},{"id":509,"libraryId":5,"type":15,"typeLabel":16,"stem":510,"options":511,"answer":438,"analysis":37},897219,"根据我国现行建筑安装工程费用组成，下列各费用项目中属于措施费的是()。",[512,514,516,518,520],{"key":20,"text":513,"correct":29},"安全施工费",{"key":24,"text":515,"correct":29},"超高施工增加费",{"key":27,"text":517,"correct":22},"建设单位临时设施费",{"key":31,"text":519,"correct":29},"已完工程及设备保护费",{"key":34,"text":521,"correct":22},"工程排污费",{"id":523,"libraryId":5,"type":15,"typeLabel":16,"stem":524,"options":525,"answer":536,"analysis":37},897220,"下列有关安全文明费的说法中，正确的有( )。",[526,528,530,532,534],{"key":20,"text":527,"correct":29},"安全文明施工费包括临时设施费",{"key":24,"text":529,"correct":22},"现场生活用洁净燃料费属于环境保护费",{"key":27,"text":531,"correct":29},"“三宝”、“四口”、“五临边”等防护费用属于安全施工费",{"key":31,"text":533,"correct":22},"消防设施与消防器材的配置费用属于文明施工费",{"key":34,"text":535,"correct":22},"施工现场搭设的临时文化福利用房的费用属于文明施工费","AC",{"id":538,"libraryId":5,"type":15,"typeLabel":16,"stem":539,"options":540,"answer":479,"analysis":37},897221,"根据现行建筑安装工程费用的规定，规费应包括()。",[541,543,544,546,548],{"key":20,"text":542,"correct":22},"施工排水费",{"key":24,"text":521,"correct":29},{"key":27,"text":545,"correct":22},"冬雨季施工增加费",{"key":31,"text":547,"correct":29},"住房公积金",{"key":34,"text":549,"correct":29},"社会保险费",{"id":551,"libraryId":5,"type":15,"typeLabel":16,"stem":552,"options":553,"answer":564,"analysis":37},897222,"下列工程中，其工程费用列入建筑工程费用的是()。",[554,556,558,560,562],{"key":20,"text":555,"correct":29},"设备基础工程",{"key":24,"text":557,"correct":29},"供水、供暖、通风工程",{"key":27,"text":559,"correct":29},"电缆导线敷设工程",{"key":31,"text":561,"correct":22},"附属于被安装设备的管线敷设工程",{"key":34,"text":563,"correct":29},"各种炉窑的砌筑工程","ABCE",{"id":566,"libraryId":5,"type":15,"typeLabel":16,"stem":567,"options":568,"answer":81,"analysis":37},897223,"下列措施项目其计量单位可以用“m2”计量的是()。",[569,571,573,575,576],{"key":20,"text":570,"correct":29},"脚手架费",{"key":24,"text":572,"correct":29},"混凝土模板及支架（撑）费",{"key":27,"text":574,"correct":29},"垂直运输费",{"key":31,"text":515,"correct":29},{"key":34,"text":577,"correct":22},"施工排水、降水费",{"id":579,"libraryId":5,"type":15,"typeLabel":16,"stem":580,"options":581,"answer":238,"analysis":37},897224,"下列各费用项目中属于措施费的是()。",[582,584,586,588,589],{"key":20,"text":583,"correct":22},"财务费",{"key":24,"text":585,"correct":29},"施工降水费",{"key":27,"text":587,"correct":22},"管理人员工资",{"key":31,"text":519,"correct":29},{"key":34,"text":590,"correct":22},"广告费",{"id":592,"libraryId":5,"type":15,"typeLabel":16,"stem":593,"options":594,"answer":111,"analysis":37},897225,"下列属于社会保险费的是()。",[595,597,598,600,602],{"key":20,"text":596,"correct":29},"养老保险费",{"key":24,"text":547,"correct":22},{"key":27,"text":599,"correct":29},"失业保险费",{"key":31,"text":601,"correct":29},"医疗保险费",{"key":34,"text":603,"correct":22},"危险作业意外伤害保险费",{"id":605,"libraryId":5,"type":15,"typeLabel":16,"stem":606,"options":607,"answer":319,"analysis":37},897226,"下列各项费用中，构成大型施工机械台班单价的是()。",[608,610,612,614,616],{"key":20,"text":609,"correct":29},"折旧费",{"key":24,"text":611,"correct":29},"检修费",{"key":27,"text":613,"correct":22},"大型机械设备进出场及安拆费",{"key":31,"text":615,"correct":22},"材料费",{"key":34,"text":617,"correct":29},"维护费",{"id":619,"libraryId":5,"type":15,"typeLabel":16,"stem":620,"options":621,"answer":628,"analysis":37},897227,"根据我国现行建筑安装工程费用项目组成，下列属于社会保险费的是()",[622,623,624,625,626],{"key":20,"text":547,"correct":22},{"key":24,"text":596,"correct":29},{"key":27,"text":599,"correct":29},{"key":31,"text":601,"correct":29},{"key":34,"text":627,"correct":29},"工伤保险费","BCDE",{"id":630,"libraryId":5,"type":15,"typeLabel":16,"stem":631,"options":632,"answer":536,"analysis":37},897228,"能够用㎡作为计算单位的措施项目包括( )。",[633,634,635,636,638],{"key":20,"text":574,"correct":29},{"key":24,"text":577,"correct":22},{"key":27,"text":515,"correct":29},{"key":31,"text":637,"correct":22},"场地平整费",{"key":34,"text":519,"correct":22},{"id":640,"libraryId":5,"type":15,"typeLabel":16,"stem":641,"options":642,"answer":653,"analysis":37},897229,"关于措施费中超高施工增加费，下列说法正确的有（）。",[643,645,647,649,651],{"key":20,"text":644,"correct":22},"单层建筑费檐口高度超过30m时计费",{"key":24,"text":646,"correct":29},"多层建筑超过6层时计算",{"key":27,"text":648,"correct":29},"包括建筑超高引起的人工工效降低费",{"key":31,"text":650,"correct":22},"不包括通信联络设备的使用费",{"key":34,"text":652,"correct":29},"按建筑物超过部分建筑面积以“㎡”为单位计算","BCE",{"id":655,"libraryId":5,"type":15,"typeLabel":16,"stem":656,"options":657,"answer":479,"analysis":37},897230,"根据现行建筑安装工程费项目组成规定，下列费用项目中，属于建筑安装工程企业管理费的有（）。",[658,660,662,664,666],{"key":20,"text":659,"correct":22},"仪器仪表使用费",{"key":24,"text":661,"correct":29},"工具用具使用费",{"key":27,"text":663,"correct":22},"建筑安装工程一切险",{"key":31,"text":665,"correct":29},"地方教育附加费",{"key":34,"text":667,"correct":29},"劳动保险费",{"id":669,"libraryId":5,"type":15,"typeLabel":16,"stem":670,"options":671,"answer":52,"analysis":37},897231,"按我国现行建筑安装工程费用项目组成的规定，下列属于企业管理费内容的有（）。",[672,674,676,678,680],{"key":20,"text":673,"correct":29},"企业管理人员办公用的文具、纸张等费用",{"key":24,"text":675,"correct":22},"企业施工生产和管理使用的属于固定资产的交通工具的购置、维修费",{"key":27,"text":677,"correct":22},"对建筑以及材料、构件和建筑安装进行特殊鉴定检查所发生的检验试验费",{"key":31,"text":679,"correct":29},"按全部职工工资总额比例计提的工会经费",{"key":34,"text":681,"correct":29},"为施工生产筹集资金、履约担保所发生的财务费用",{"id":683,"libraryId":5,"type":15,"typeLabel":16,"stem":684,"options":685,"answer":453,"analysis":37},897232,"固定资产投资中的积极部分包括了()。",[686,688,690,692,694],{"key":20,"text":687,"correct":22},"建安工程费用",{"key":24,"text":689,"correct":29},"工艺设备购置费",{"key":27,"text":691,"correct":29},"工具、器具购置费",{"key":31,"text":693,"correct":29},"生产家具购置费",{"key":34,"text":695,"correct":22},"固定资产折旧费",{"id":697,"libraryId":5,"type":15,"typeLabel":16,"stem":698,"options":699,"answer":209,"analysis":37},897233,"规费包括()。",[700,701,702,703,705],{"key":20,"text":521,"correct":29},{"key":24,"text":549,"correct":29},{"key":27,"text":547,"correct":29},{"key":31,"text":704,"correct":22},"二次搬运费",{"key":34,"text":706,"correct":22},"危险作业意外伤害保险",[708,712,715,718,721,724],{"id":709,"name":710,"category":7,"favorite":711},1,"领导干部任职前廉政法规知识测试题",92,{"id":713,"name":714,"category":7,"favorite":709},595,"建筑结构与设备",{"id":716,"name":717,"category":7,"favorite":709},715,"招标采购专业知识与法律法规",{"id":719,"name":720,"category":7,"favorite":709},848,"市政方向-通用基础",{"id":722,"name":723,"category":7,"favorite":8},534,"BIM工程师",{"id":725,"name":723,"category":7,"favorite":8},535]