[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-581-45":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":608},{"id":5,"name":6,"category":7,"favorite":8},581,"建设工程造价管理基础知识","建筑工程",0,45,50,2873,[13,34,46,58,70,82,94,106,117,129,141,153,165,177,189,197,209,221,233,245,257,269,281,293,305,317,329,341,353,365,377,389,401,413,425,437,449,461,473,485,497,509,521,533,545,557,564,576,584,596],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":20,"analysis":33},897080,1,"单选题","柱网布置是否合理，对工程造价和面积的利用效率都有较大影响。建筑设计中对柱网布置应注意（ ）。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","适当扩大柱距和跨度能使厂房有更大的灵活性",true,{"key":24,"text":25,"correct":26},"B","单跨厂房跨度不变时，层数越多越经济",false,{"key":28,"text":29,"correct":26},"C","多跨厂房柱间距不变时，跨度越大造价越低",{"key":31,"text":32,"correct":26},"D","柱网布置与厂房的高度无关","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":24,"analysis":33},897081,"关于住宅建筑设计中的结构面积系数，下列说法中正确的是（ ）",[38,40,42,44],{"key":20,"text":39,"correct":26},"结构面积系数越大，设计方案越经济",{"key":24,"text":41,"correct":22},"房间平均面积越大，结构面积系数越小",{"key":28,"text":43,"correct":26},"结构面积系数与房间户型组成有关，与房屋长度、宽度无关",{"key":31,"text":45,"correct":26},"结构面积系数与房屋结构有关，与房屋外形无关",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":24,"analysis":33},897083,"单位工程概算按其工作性质可分为单位建设工程概算和单位设备及安装工程概算两类，下列属于单位设备及安装工程概算的是（ ）。",[50,52,54,56],{"key":20,"text":51,"correct":26},"通风、空调工程概算",{"key":24,"text":53,"correct":22},"工(器)具及生产家具购置费概算",{"key":28,"text":55,"correct":26},"电气、照明工程概算",{"key":31,"text":57,"correct":26},"弱电工程概算",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":24,"analysis":33},897084,"下列原因中，不能据以调整设计概算的是（ ）。",[62,64,66,68],{"key":20,"text":63,"correct":26},"超出原设计范围的重大变更",{"key":24,"text":65,"correct":22},"超出承包人预期的货币贬值和汇率变化",{"key":28,"text":67,"correct":26},"超出基本预备费规定范围的不可抗拒重大自然灾害引起的工程变动和费用增加",{"key":31,"text":69,"correct":26},"超出预备费的国家重大政策性调整",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":24,"analysis":33},897085,"按照国家有关规定，作为年度固定资产投资计划、计划投资总额及构成数额的编制和确定依据的是（ ）",[74,76,78,80],{"key":20,"text":75,"correct":26},"经批准的投资估算",{"key":24,"text":77,"correct":22},"经批准的设计概算",{"key":28,"text":79,"correct":26},"经批准的施工图预算",{"key":31,"text":81,"correct":26},"经批准的工程决算",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":20,"analysis":33},897086,"某建设项目由若干单项工程构成，应包含在其中某单项工程综合概算中的费用项目是（ ）。",[86,88,90,92],{"key":20,"text":87,"correct":22},"工器具及生产家具购置费",{"key":24,"text":89,"correct":26},"办公和生活用品购置费",{"key":28,"text":91,"correct":26},"研究试验费",{"key":31,"text":93,"correct":26},"基本预备费",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":28,"analysis":33},897087,"某拟建工程初步设计已达到必要的深度，能够据此计算出扩大分项工程的工程量，则能较为准确地编制拟建工程概算的方法是（ ）。",[98,100,102,104],{"key":20,"text":99,"correct":26},"概算指标法",{"key":24,"text":101,"correct":26},"类似工程预算法",{"key":28,"text":103,"correct":22},"概算定额法",{"key":31,"text":105,"correct":26},"综合吨位指标法",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":20,"analysis":33},897088,"当初步设计深度较深、有详细的设备清单时，最能精确地编制设备安装工程费概算的方法是（ ）。",[110,112,114,116],{"key":20,"text":111,"correct":22},"预算单价法",{"key":24,"text":113,"correct":26},"扩大单价法",{"key":28,"text":115,"correct":26},"设备价值百分比法",{"key":31,"text":105,"correct":26},{"id":118,"libraryId":5,"type":15,"typeLabel":16,"stem":119,"options":120,"answer":20,"analysis":33},897089,"某地2016年拟建一年产50万吨产品的工业项目，预计建设期为3年。该地区2013年已建年产40万吨的类似项目投资为2亿元。已知生产能力指数为0.9，该地区2013、2016年同类工程造价指数分别为108、112，预计拟建项目建设期内工程造价年上涨率为5%。用生产能力指数法估算的拟建项目静态投资为（ ）亿元。",[121,123,125,127],{"key":20,"text":122,"correct":22},"2.54",{"key":24,"text":124,"correct":26},"2.74",{"key":28,"text":126,"correct":26},"2.75",{"key":31,"text":128,"correct":26},"2.94",{"id":130,"libraryId":5,"type":15,"typeLabel":16,"stem":131,"options":132,"answer":28,"analysis":33},897090,"2006年已建成年产20万吨的某化工厂，2010年拟建年产100万吨相同产品的新项目，并采用增加相同规格设备数量的技术方案。若应用生产能力指数法估算拟建项目投资额，则生产能力指数取值的适宜范围是（ ）。",[133,135,137,139],{"key":20,"text":134,"correct":26},"0.4～0.5",{"key":24,"text":136,"correct":26},"0.6～0.7",{"key":28,"text":138,"correct":22},"0.8～0.9",{"key":31,"text":140,"correct":26},"0.9～1",{"id":142,"libraryId":5,"type":15,"typeLabel":16,"stem":143,"options":144,"answer":28,"analysis":33},897091,"下列建筑设计影响工程造价的选项中，属于影响工业建筑但一般不影响民用建筑的因素是（ ）。",[145,147,149,151],{"key":20,"text":146,"correct":26},"建筑物平面形状",{"key":24,"text":148,"correct":26},"项目利益相关者",{"key":28,"text":150,"correct":22},"柱网布置",{"key":31,"text":152,"correct":26},"风险因素",{"id":154,"libraryId":5,"type":15,"typeLabel":16,"stem":155,"options":156,"answer":28,"analysis":33},897092,"设计概算一经批准一般不得进行调整，其总投资反映（ ）时的价格水平。",[157,159,161,163],{"key":20,"text":158,"correct":26},"项目立项",{"key":24,"text":160,"correct":26},"可行性研究",{"key":28,"text":162,"correct":22},"概算编制",{"key":31,"text":164,"correct":26},"项目施工",{"id":166,"libraryId":5,"type":15,"typeLabel":16,"stem":167,"options":168,"answer":20,"analysis":33},897093,"某地拟建一幢建筑面积为2500m2办公楼。已知建筑面积为2700m2的类似工程预算成本为216万元，其人、材、机、企业管理费占预算成本的比重分别为20%、50%、10%、15%。拟建工程和类似工程地区的人工费、材料费、施工机具使用费、企业管理费之间的差异系数分别是1.1、1.2、1.3、1.15，综合费率为4%，则利用类似工程预算法编制该拟建工程概算造价为（ ）万元。",[169,171,173,175],{"key":20,"text":170,"correct":22},"233.48",{"key":24,"text":172,"correct":26},"252.2",{"key":28,"text":174,"correct":26},"287.4",{"key":31,"text":176,"correct":26},"302.8",{"id":178,"libraryId":5,"type":15,"typeLabel":16,"stem":179,"options":180,"answer":24,"analysis":33},897094,"某项目建设期为2年，第一年贷款3000万元，第二年贷款2000万元，贷款年内均衡发放，年利率为8%，建设期内只计息不付息。该项目建设期利息为（ ）。",[181,183,185,187],{"key":20,"text":182,"correct":26},"366.4",{"key":24,"text":184,"correct":22},"449.6",{"key":28,"text":186,"correct":26},"572.8",{"key":31,"text":188,"correct":26},"659.2",{"id":190,"libraryId":5,"type":15,"typeLabel":16,"stem":191,"options":192,"answer":24,"analysis":33},897095,"在建筑工程初步设计文件深度不够、不能准确计算出工程量的情况下，可采用的设计概算编制方法是（ ）。",[193,194,195,196],{"key":20,"text":103,"correct":26},{"key":24,"text":99,"correct":22},{"key":28,"text":111,"correct":26},{"key":31,"text":105,"correct":26},{"id":198,"libraryId":5,"type":15,"typeLabel":16,"stem":199,"options":200,"answer":28,"analysis":33},897096,"2009年在某地兴建一座55万吨合成氨的化肥厂，总投资为453000万元，假如2012年在该地开工兴建65万吨合成氨的工厂，合成氨的生产能力指数为0．81，则所需静态投资为（ ）万元(假定从2009--2012年每年平均指数为1．05)。",[201,203,205,207],{"key":20,"text":202,"correct":26},"612345．21",{"key":24,"text":204,"correct":26},"613482．65",{"key":28,"text":206,"correct":22},"600388．19",{"key":31,"text":208,"correct":26},"643259．13",{"id":210,"libraryId":5,"type":15,"typeLabel":16,"stem":211,"options":212,"answer":28,"analysis":33},897097,"关于工程量清单的编制，下列说法中正确的是（ ）。",[213,215,217,219],{"key":20,"text":214,"correct":26},"项目编码以五级全国统一编码设置，用十二位阿拉伯数字表示",{"key":24,"text":216,"correct":26},"编制分部分项工程量清单时，必须对工作内容进行描述",{"key":28,"text":218,"correct":22},"补充项目的编码由计算规范的代码与B和三位阿拉伯数字组成",{"key":31,"text":220,"correct":26},"按施工方案计算的措施费，必须写明“计算基础”、“费率”的数值",{"id":222,"libraryId":5,"type":15,"typeLabel":16,"stem":223,"options":224,"answer":31,"analysis":33},897098,"招标人对已发出的招标文件进行的必要修改，应当在投标截止时间（ ）天前发出。",[225,227,229,231],{"key":20,"text":226,"correct":26},"7",{"key":24,"text":228,"correct":26},"10",{"key":28,"text":230,"correct":26},"14",{"key":31,"text":232,"correct":22},"15",{"id":234,"libraryId":5,"type":15,"typeLabel":16,"stem":235,"options":236,"answer":31,"analysis":33},897099,"关于招标控制价及其编制，下列说法中正确的是（ ）。",[237,239,241,243],{"key":20,"text":238,"correct":26},"招标人不得拒绝高于招标控制价的投标报价",{"key":24,"text":240,"correct":26},"当重新公布招标控制价时，原投标截止期不变",{"key":28,"text":242,"correct":26},"经复核认为招标控制价误差大于±3%时，投标人应责成招标人改正",{"key":31,"text":244,"correct":22},"投标人经复核认为招标控制价未按规定编制的，应在招标控制价公布后5日内提出投诉",{"id":246,"libraryId":5,"type":15,"typeLabel":16,"stem":247,"options":248,"answer":20,"analysis":33},897100,"招标人要求总承包人对专业工程进行统一管理和协调的，总承包人可计取总承包服务费，其取费基数为（ ）。",[249,251,253,255],{"key":20,"text":250,"correct":22},"专业工程估算造价",{"key":24,"text":252,"correct":26},"投标报价总额",{"key":28,"text":254,"correct":26},"分部分项工程费用",{"key":31,"text":256,"correct":26},"分部分项工程费与措施费之和",{"id":258,"libraryId":5,"type":15,"typeLabel":16,"stem":259,"options":260,"answer":28,"analysis":33},897101,"关于招标控制价及其编制的说法，正确的是（ ）。",[261,263,265,267],{"key":20,"text":262,"correct":26},"综合单价中包括应由招标人承担的风险费用",{"key":24,"text":264,"correct":26},"招标人供应的材料，总承包服务费应按材料价值的1.5%计算",{"key":28,"text":266,"correct":22},"措施项目费应按招标文件中提供的措施项目清单确定",{"key":31,"text":268,"correct":26},"招标文件提供暂估价的主要材料，其主材费用应计入其他项目清单费用",{"id":270,"libraryId":5,"type":15,"typeLabel":16,"stem":271,"options":272,"answer":24,"analysis":33},897102,"投标人为使报价具有竞争力，下列有关生产要素询价的做法中，正确的是（ ）。",[273,275,277,279],{"key":20,"text":274,"correct":26},"在通过资格预审前进行询价",{"key":24,"text":276,"correct":22},"尽量向咨询公司进行询价",{"key":28,"text":278,"correct":26},"不论何时何地尽量使用自有机械",{"key":31,"text":280,"correct":26},"劳务市场招募零散工有利于管理",{"id":282,"libraryId":5,"type":15,"typeLabel":16,"stem":283,"options":284,"answer":28,"analysis":33},897103,"投标人针对工程量清单中工程量的遗漏或错误，可以采取的正确做法是（ ）。",[285,287,289,291],{"key":20,"text":286,"correct":26},"即向招标人提出异议，要求招标人修改",{"key":24,"text":288,"correct":26},"不向招标人提出异议，风险自留",{"key":28,"text":290,"correct":22},"是否向招标人提出修改意见取决于投标策略",{"key":31,"text":292,"correct":26},"等中标后，要求招标人按实调整",{"id":294,"libraryId":5,"type":15,"typeLabel":16,"stem":295,"options":296,"answer":20,"analysis":33},897104,"投标人在投标报价时，应优先被采用为综合单价编制依据的是（ ）。",[297,299,301,303],{"key":20,"text":298,"correct":22},"企业定额",{"key":24,"text":300,"correct":26},"地区定额",{"key":28,"text":302,"correct":26},"行业定额",{"key":31,"text":304,"correct":26},"国家定额",{"id":306,"libraryId":5,"type":15,"typeLabel":16,"stem":307,"options":308,"answer":20,"analysis":33},897105,"关于工程量清单方式招标工程合同价格风险及风险分担，下列说法中正确的是（ ）。",[309,311,313,315],{"key":20,"text":310,"correct":22},"当出现的风险内容及幅度在招标文件规定的范围内时，综合单价不变",{"key":24,"text":312,"correct":26},"市场价格波动导致施工机具使用费发生变化时，承包人只承担5%以内的价格风险",{"key":28,"text":314,"correct":26},"人工费变化发生的风险全部由发包人承担",{"key":31,"text":316,"correct":26},"承包人管理费的风险一般由发承包双方共同承担",{"id":318,"libraryId":5,"type":15,"typeLabel":16,"stem":319,"options":320,"answer":31,"analysis":33},897106,"下列情形中，属于投标人相互串通投标的是（ ）。",[321,323,325,327],{"key":20,"text":322,"correct":26},"不同投标人的投标报价呈现规律性差异",{"key":24,"text":324,"correct":26},"不同投标人的投标文件由同一单位或个人编制",{"key":28,"text":326,"correct":26},"不同投标人委托了同一单位或个人办理某项投标事宜",{"key":31,"text":328,"correct":22},"投标人之间约定中标人",{"id":330,"libraryId":5,"type":15,"typeLabel":16,"stem":331,"options":332,"answer":31,"analysis":33},897107,"关于缺陷责任与保修责任的说法，正确的是（ ）。",[333,335,337,339],{"key":20,"text":334,"correct":26},"缺陷责任期自合同竣工日起计算",{"key":24,"text":336,"correct":26},"发包人在使用过程中发现已接收的工程存在新的缺陷的，由发包人自行修复",{"key":28,"text":338,"correct":26},"缺陷责任期最长不超过3年",{"key":31,"text":340,"correct":22},"保修期自实际竣工日起计算",{"id":342,"libraryId":5,"type":15,"typeLabel":16,"stem":343,"options":344,"answer":31,"analysis":33},897108,"关于缺陷责任期内的工程维修及费用承担，下列说法中正确的是（ ）。",[345,347,349,351],{"key":20,"text":346,"correct":26},"不可抗力造成的缺陷，发包人负责维修，从质量保证金中扣除费用",{"key":24,"text":348,"correct":26},"承包人造成的缺陷，承包人负责维修并承担费用后，可免除其对工程的一般损失赔偿责任",{"key":28,"text":350,"correct":26},"发承包双方对缺陷责任有争议的，按质量鉴定机构的鉴定结论，由责任方承担维修费，另一方承担鉴定费",{"key":31,"text":352,"correct":22},"承包人造成工程无法使用而需再次检验、修复的，发包人有权要求承包人延长缺陷责任期",{"id":354,"libraryId":5,"type":15,"typeLabel":16,"stem":355,"options":356,"answer":24,"analysis":33},897109,"招标人在工程量清单中提供的用于支付必然发生但暂不能确定价格的材料、工程设备单价及专业工程金额是（ ）。",[357,359,361,363],{"key":20,"text":358,"correct":26},"暂列金额",{"key":24,"text":360,"correct":22},"暂估价",{"key":28,"text":362,"correct":26},"总承包服务费",{"key":31,"text":364,"correct":26},"价差预备费",{"id":366,"libraryId":5,"type":15,"typeLabel":16,"stem":367,"options":368,"answer":31,"analysis":33},897110,"关于投标保证金，下列说法中正确的是（ ）。",[369,371,373,375],{"key":20,"text":370,"correct":26},"投标保证金的数额不得少于投标总价的2%",{"key":24,"text":372,"correct":26},"招标人应当在签订合同后的30日内退还未中标人的投标保证金",{"key":28,"text":374,"correct":26},"投标人拒绝延长投标有效期的，投标人无权收回其投标保证金",{"key":31,"text":376,"correct":22},"投标保证金的有效期应与投标有效期相同",{"id":378,"libraryId":5,"type":15,"typeLabel":16,"stem":379,"options":380,"answer":31,"analysis":33},897111,"根据《标准施工合同》，当中标通知书、图纸和专用合同条款出现含义或内容矛盾时，合同文件优先解释的顺序是（ ）。",[381,383,385,387],{"key":20,"text":382,"correct":26},"图纸→专用合同条款→中标通知书",{"key":24,"text":384,"correct":26},"图纸→中标通知书→专用合同条款",{"key":28,"text":386,"correct":26},"中标通知书→图纸→专用合同条款",{"key":31,"text":388,"correct":22},"中标通知书→专用合同条款→图纸",{"id":390,"libraryId":5,"type":15,"typeLabel":16,"stem":391,"options":392,"answer":31,"analysis":33},897112,"根据《标准施工合同》，就图纸、通用合同条款和已标价的工程量清单而言，优先解释的顺序是（ ）。",[393,395,397,399],{"key":20,"text":394,"correct":26},"已标价的工程量清单—通用合同条款—图纸",{"key":24,"text":396,"correct":26},"已标价的工程量清单—图纸—通用合同条款",{"key":28,"text":398,"correct":26},"通用合同条款—已标价的工程量清单—图纸",{"key":31,"text":400,"correct":22},"通用合同条款—图纸—已标价的工程量清单",{"id":402,"libraryId":5,"type":15,"typeLabel":16,"stem":403,"options":404,"answer":24,"analysis":33},897113,"根据《标准施工合同》，施工合同文件包括（ ）。",[405,407,409,411],{"key":20,"text":406,"correct":26},"招标文件",{"key":24,"text":408,"correct":22},"投标函及投标函附录",{"key":28,"text":410,"correct":26},"委托监理协议书",{"key":31,"text":412,"correct":26},"投标企业定额标准",{"id":414,"libraryId":5,"type":15,"typeLabel":16,"stem":415,"options":416,"answer":24,"analysis":33},897114,"根据《建设工程量清单计价规范》（GB 50500－2013），下列关于工程量清单项目编码的说法中，正确的是（ ）。",[417,419,421,423],{"key":20,"text":418,"correct":26},"第三级编码为分部工程顺序码，由三位数字表示",{"key":24,"text":420,"correct":22},"第五级编码应根据拟建工程的工程量清单项目名称设置，不得重码",{"key":28,"text":422,"correct":26},"同一标段含有多个单位工程，不同单位工程中项目特征相同的工程应采用相同编码",{"key":31,"text":424,"correct":26},"补充项目编码以“B”加上计算规范代码后跟三位数字表示，并应从001起顺序编制。",{"id":426,"libraryId":5,"type":15,"typeLabel":16,"stem":427,"options":428,"answer":28,"analysis":33},897115,"对于不能计算工程量的措施项目，当按施工方案计算措施费时，若无“计算基础”和“费率”数值，则（ ）。",[429,431,433,435],{"key":20,"text":430,"correct":26},"以定额基价为计算基础，以国家、行业、地区定额中相应的费率计算金额",{"key":24,"text":432,"correct":26},"以“定额人工费＋定额机械费”为计算基础，以国家、行业、地区定额中相应费率计算金额",{"key":28,"text":434,"correct":22},"只填写“金额”数值，在备注中说明施工方案出处或计算方法",{"key":31,"text":436,"correct":26},"以备注中说明的计算方法，补充填写“计算基础”和“费率”",{"id":438,"libraryId":5,"type":15,"typeLabel":16,"stem":439,"options":440,"answer":24,"analysis":33},897116,"关于工程量清单编制中的项目特征描述，下列说法中正确的是（ ）。",[441,443,445,447],{"key":20,"text":442,"correct":26},"措施项目无需描述项目特征",{"key":24,"text":444,"correct":22},"应按计算规范附录中规定的项目特征，结合技术规范、标准图集加以描述",{"key":28,"text":446,"correct":26},"对完成清单项目可能发生的具体工作和操作程序仍需加以描述",{"key":31,"text":448,"correct":26},"图纸中已有的工程规格、型号、材质等可不描述",{"id":450,"libraryId":5,"type":15,"typeLabel":16,"stem":451,"options":452,"answer":31,"analysis":33},897117,"关于工程量清单中的计日工，下列说法中正确的是（ ）。",[453,455,457,459],{"key":20,"text":454,"correct":26},"即指零星工作所消耗的人工工时",{"key":24,"text":456,"correct":26},"在投标时计入总价，其数量和单价由投标人填报",{"key":28,"text":458,"correct":26},"应按投标文件载明的数量和单价进行结算",{"key":31,"text":460,"correct":22},"在编制招标工程量清单时，暂定数量由招标人填写",{"id":462,"libraryId":5,"type":15,"typeLabel":16,"stem":463,"options":464,"answer":24,"analysis":33},897118,"关于招标文件的澄清，下列说法中错误的是（ ）。",[465,467,469,471],{"key":20,"text":466,"correct":26},"投标人应以信函、电报等可以有形地表现所载内容的形式向招标人提出疑问",{"key":24,"text":468,"correct":22},"招标文件的澄清应发给所有投标人并指明澄清问题的来源",{"key":28,"text":470,"correct":26},"澄清发出的时间距投标截止日不足15天的应推迟投标截止时间",{"key":31,"text":472,"correct":26},"投标人收到澄清的确认时间可以是相对时间，也可以是绝对时间",{"id":474,"libraryId":5,"type":15,"typeLabel":16,"stem":475,"options":476,"answer":31,"analysis":33},897119,"关于暂列金额，下列说法中正确的是（ ）。",[477,479,481,483],{"key":20,"text":478,"correct":26},"用于必须要发生但暂时不能确定价格的项目",{"key":24,"text":480,"correct":26},"由承包人支配，按签证价格结算",{"key":28,"text":482,"correct":26},"不能用于因工程变更而发生的索赔支付",{"key":31,"text":484,"correct":22},"不同专业预留的暂列金额应分别列项",{"id":486,"libraryId":5,"type":15,"typeLabel":16,"stem":487,"options":488,"answer":20,"analysis":33},897120,"关于招标控制价的相关规定，下列说法中正确的是（ ）。",[489,491,493,495],{"key":20,"text":490,"correct":22},"国有资金投资的工程建设项目，应编制招标控制价",{"key":24,"text":492,"correct":26},"招标控制价应在招标文件中公布，仅需公布总价",{"key":28,"text":494,"correct":26},"招标控制价超过批准概算3%以内时，招标人不必将其报原概算审批部门审核",{"key":31,"text":496,"correct":26},"当招标控制价复查结论超过原公布的招标控制价3%以内时，应责成招标人改正",{"id":498,"libraryId":5,"type":15,"typeLabel":16,"stem":499,"options":500,"answer":24,"analysis":33},897121,"关于依法必须招标的工程，下列说法中正确的是（ ）。",[501,503,505,507],{"key":20,"text":502,"correct":26},"国有资金投资的建设工程招标可不设招标控制价",{"key":24,"text":504,"correct":22},"招标人可以自行决定是否编制标底，标底必须保密",{"key":28,"text":506,"correct":26},"招标人设有最高投标限价的，应当在开标时公布",{"key":31,"text":508,"correct":26},"招标人也可以根据需要，规定最低投标限价",{"id":510,"libraryId":5,"type":15,"typeLabel":16,"stem":511,"options":512,"answer":24,"analysis":33},897122,"投标人在投标前期研究招标文件时，对合同形式进行分析的主要内容为（ ）。",[513,515,517,519],{"key":20,"text":514,"correct":26},"承包商任务",{"key":24,"text":516,"correct":22},"计价方式",{"key":28,"text":518,"correct":26},"付款办法",{"key":31,"text":520,"correct":26},"合同价款调整",{"id":522,"libraryId":5,"type":15,"typeLabel":16,"stem":523,"options":524,"answer":28,"analysis":33},897123,"关于联合体投标的说法，正确的是（ ）。",[525,527,529,531],{"key":20,"text":526,"correct":26},"联合体投标是指投标人相互约定在招标项目中分别以高、中、低价位报价的投标",{"key":24,"text":528,"correct":26},"由同一专业的单位组成的联合体，按照资质等级较高的单位确定资质等级",{"key":28,"text":530,"correct":22},"通过资格预审的联合体，各方组成结构、职责及财务能力等条件不得改变",{"key":31,"text":532,"correct":26},"联合体中牵头人提交的投标保证金对其他成员不具有约束力",{"id":534,"libraryId":5,"type":15,"typeLabel":16,"stem":535,"options":536,"answer":31,"analysis":33},897124,"建设工程在缺陷责任期内，由第三方原因造成的缺陷（ ）。",[537,539,541,543],{"key":20,"text":538,"correct":26},"应由承包人负责维修，费用从质量保证金中扣除",{"key":24,"text":540,"correct":26},"应由承包人负责维修，费用由发包人承担",{"key":28,"text":542,"correct":26},"发包人委托承包人维修的，费用由第三方支付",{"key":31,"text":544,"correct":22},"发包人委托承包人维修的，费用由发包人支付",{"id":546,"libraryId":5,"type":15,"typeLabel":16,"stem":547,"options":548,"answer":20,"analysis":33},897125,"根据《建设工程施工合同（示范文本）》，下列选项正确的有（ ）。",[549,551,553,555],{"key":20,"text":550,"correct":22},"签约合同价包括安全文明施工费，包括暂估价及暂列金额",{"key":24,"text":552,"correct":26},"费用指为履行合同所发生的或将要发生的所有必需的开支，也包括利润",{"key":28,"text":554,"correct":26},"承包人经发包人同意采取合同约定以外的安全措施所产生的费用，由承包人承担",{"key":31,"text":556,"correct":26},"质量保证金是指按照合同约定承包人用于保证其在保修期期内履行缺陷修补义务的担保",{"id":558,"libraryId":5,"type":15,"typeLabel":16,"stem":235,"options":559,"answer":31,"analysis":33},897126,[560,561,562,563],{"key":20,"text":238,"correct":26},{"key":24,"text":240,"correct":26},{"key":28,"text":242,"correct":26},{"key":31,"text":244,"correct":22},{"id":565,"libraryId":5,"type":15,"typeLabel":16,"stem":566,"options":567,"answer":28,"analysis":33},897127,"《建设工程工程量清单计价规范》规定，分部分项工程量清单项目编码的第三级为表示（ ）的顺序码。",[568,570,572,574],{"key":20,"text":569,"correct":26},"分项工程",{"key":24,"text":571,"correct":26},"扩大分项工程",{"key":28,"text":573,"correct":22},"分部工程",{"key":31,"text":575,"correct":26},"专业工程",{"id":577,"libraryId":5,"type":15,"typeLabel":16,"stem":578,"options":579,"answer":24,"analysis":33},897128,"招标人在工程量清单中提供的用于支付必然发生但暂不能确定价格的材料、工程设备的单价及专业工程的金额是（ ）。",[580,581,582,583],{"key":20,"text":358,"correct":26},{"key":24,"text":360,"correct":22},{"key":28,"text":362,"correct":26},{"key":31,"text":364,"correct":26},{"id":585,"libraryId":5,"type":15,"typeLabel":16,"stem":586,"options":587,"answer":24,"analysis":33},897129,"关于缺陷责任期与保修期，下列说法中正确的是（ ）。",[588,590,592,594],{"key":20,"text":589,"correct":26},"缺陷责任期就是保修期",{"key":24,"text":591,"correct":22},"屋面防水工程的保修期为5年",{"key":28,"text":593,"correct":26},"结构工程的保修期为10年",{"key":31,"text":595,"correct":26},"给排水管道的保修期为5年",{"id":597,"libraryId":5,"type":15,"typeLabel":16,"stem":598,"options":599,"answer":28,"analysis":33},897130,"施工合同约定，承包人承担的钢筋价格风险幅度为±5%，超过部分依据《建设工程工程量清单规范》（GB 50500—2013）造价信息法调差。已知承包人投标价格、基准期发布价格分别为2400元\u002Ft、2200元\u002Ft，2015年12月、2016年7月的造价信息发布价为2000元\u002Ft、2600元\u002Ft。则该两月钢筋的实际结算价格应分别为（ ）元\u002Ft。",[600,602,604,606],{"key":20,"text":601,"correct":26},"2280，2520",{"key":24,"text":603,"correct":26},"2310，2690",{"key":28,"text":605,"correct":22},"2310，2480",{"key":31,"text":607,"correct":26},"2280，2480",[609,612,615,618,621,624],{"id":15,"name":610,"category":7,"favorite":611},"领导干部任职前廉政法规知识测试题",92,{"id":613,"name":614,"category":7,"favorite":15},595,"建筑结构与设备",{"id":616,"name":617,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":619,"name":620,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":622,"name":623,"category":7,"favorite":8},534,"BIM工程师",{"id":625,"name":623,"category":7,"favorite":8},535]