[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-581-40":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":601},{"id":5,"name":6,"category":7,"favorite":8},581,"建设工程造价管理基础知识","建筑工程",0,40,50,2873,[13,34,46,58,70,82,93,105,117,129,138,150,159,168,177,185,197,209,221,233,245,257,269,281,293,305,317,329,341,353,365,377,389,401,413,425,437,449,461,473,485,497,509,520,532,544,556,565,577,589],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":30,"analysis":33},896827,1,"单选题","根据《建设工程工程量清单计价规范》（GB50500-2013），在招标文件未另有要求的情况下，投标报价的综合单价一般要考虑的风险因素是（ ）。",[19,23,26,29],{"key":20,"text":21,"correct":22},"A","政策法规的变化",false,{"key":24,"text":25,"correct":22},"B","人工单价的市场变化",{"key":27,"text":28,"correct":22},"C","政府定价材料的价格变化",{"key":30,"text":31,"correct":32},"D","管理费、利润的风险",true,"",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":30,"analysis":33},896828,"施工投标报价的主要工作有：①复核工程量，②研究招标文件，③确定基础标价，④编制投标文件，其正确的工作流程是（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":22},"①②③④",{"key":24,"text":41,"correct":22},"②③①④",{"key":27,"text":43,"correct":22},"①②④③",{"key":30,"text":45,"correct":32},"②①③④",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":27,"analysis":33},896829,"（ ）报价技巧，可以迷惑对手，提高中标概率。但对投标单位的分析判断和决策能力要求较高。",[50,52,54,56],{"key":20,"text":51,"correct":22},"不平衡报价法",{"key":24,"text":53,"correct":22},"多方案报价法",{"key":27,"text":55,"correct":32},"突然降价法",{"key":30,"text":57,"correct":22},"无利润报价法",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":24,"analysis":33},896830,"根据《建设工程工程量清单计价规范》（GB50500-2013），关于施工发承包投标报价的编制，下列做法正确的是（ ）。",[62,64,66,68],{"key":20,"text":63,"correct":22},"A.设计图纸与招标工程量清单项目特征描述不同的，以设计图纸特征为准",{"key":24,"text":65,"correct":32},"暂列金额应按照招标工程量清单中列出的金额填写，不得变动以后发生的为准，以招标工程量清单为准",{"key":27,"text":67,"correct":22},"材料、工程设备暂估价应按暂估单价，乘以所需数量后计入其他项目费",{"key":30,"text":69,"correct":22},"总承包服务费应按照投标人提出的协调、配合和服务项目自主报价",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":20,"analysis":33},896832,"下列项目成本分析方法中，（ ）具有通俗易懂、简单易行、便于掌握的特点，因而得到了广泛的应用，但在应用时必须注意各技术经济指标的可比性。",[74,76,78,80],{"key":20,"text":75,"correct":32},"比较法",{"key":24,"text":77,"correct":22},"因素分析法",{"key":27,"text":79,"correct":22},"差额计算法",{"key":30,"text":81,"correct":22},"比率法",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":24,"analysis":33},896833,"成本控制方法中，（ ）是对工程项目成本\u002F进度进行综合控制的一种分析方法。",[86,88,90,92],{"key":20,"text":87,"correct":22},"工期一成本同步分析法",{"key":24,"text":89,"correct":32},"挣值法",{"key":27,"text":91,"correct":22},"项目成本分析表法",{"key":30,"text":81,"correct":22},{"id":94,"libraryId":5,"type":15,"typeLabel":16,"stem":95,"options":96,"answer":24,"analysis":33},896834,"下列选项中，（ ）是指在项目实施过程中，对影响项目成本的各项要素，即施工生产所耗费的人力、物力和各项费用开支，采取一定措施进行监督、调节和控制，及时预防、发现和纠正偏差，保证项目成本目标的实现。",[97,99,101,103],{"key":20,"text":98,"correct":22},"成本核算",{"key":24,"text":100,"correct":32},"成本控制",{"key":27,"text":102,"correct":22},"成本分析",{"key":30,"text":104,"correct":22},"成本测算",{"id":106,"libraryId":5,"type":15,"typeLabel":16,"stem":107,"options":108,"answer":27,"analysis":33},896835,"项目经理部可控责任成本考核指标不包括（ ）。",[109,111,113,115],{"key":20,"text":110,"correct":22},"项目经理责任目标总成本降低额和降低率",{"key":24,"text":112,"correct":22},"施工计划成本实际降低额和降低率",{"key":27,"text":114,"correct":32},"设计成本降低额和降低率",{"key":30,"text":116,"correct":22},"施工责任目标成本实际降低额和降低率",{"id":118,"libraryId":5,"type":15,"typeLabel":16,"stem":119,"options":120,"answer":24,"analysis":33},896836,"项目成本控制的主要环节不包括（ ）。",[121,123,125,127],{"key":20,"text":122,"correct":22},"计划预控",{"key":24,"text":124,"correct":32},"费用控制",{"key":27,"text":126,"correct":22},"过程控制",{"key":30,"text":128,"correct":22},"纠偏控制",{"id":130,"libraryId":5,"type":15,"typeLabel":16,"stem":131,"options":132,"answer":24,"analysis":33},896837,"建设工程成本管理内容中，（ ）是目标成本的一种表达形式，是建立项目成本管理责任制、开展成本控制和核算的基础，是进行成本费用控制的主要依据。",[133,134,136,137],{"key":20,"text":102,"correct":22},{"key":24,"text":135,"correct":32},"成本计划",{"key":27,"text":100,"correct":22},{"key":30,"text":98,"correct":22},{"id":139,"libraryId":5,"type":15,"typeLabel":16,"stem":140,"options":141,"answer":20,"analysis":33},896838,"项目成本计划的编制方法中，当项目非常庞大和复杂而需要分为几个部分时，可采用（ ）。",[142,144,146,148],{"key":20,"text":143,"correct":32},"定率估算法",{"key":24,"text":145,"correct":22},"技术进步法",{"key":27,"text":147,"correct":22},"按实计算法",{"key":30,"text":149,"correct":22},"目标利润法",{"id":151,"libraryId":5,"type":15,"typeLabel":16,"stem":152,"options":153,"answer":20,"analysis":33},896839,"项目（ ）是以货币形式编制的项目在计划期内的生产费用、成本水平及为降低成本采取的主要措施和规划的具体方案。",[154,155,157,158],{"key":20,"text":135,"correct":32},{"key":24,"text":156,"correct":22},"成本预测",{"key":27,"text":100,"correct":22},{"key":30,"text":98,"correct":22},{"id":160,"libraryId":5,"type":15,"typeLabel":16,"stem":161,"options":162,"answer":20,"analysis":33},896840,"实现成本目标责任制的保证和手段是（ ）。",[163,165,166,167],{"key":20,"text":164,"correct":32},"成本考核",{"key":24,"text":102,"correct":22},{"key":27,"text":100,"correct":22},{"key":30,"text":135,"correct":22},{"id":169,"libraryId":5,"type":15,"typeLabel":16,"stem":170,"options":171,"answer":30,"analysis":33},896841,"项目成本计划的编制基础是项目（ ）。",[172,173,174,176],{"key":20,"text":164,"correct":22},{"key":24,"text":102,"correct":22},{"key":27,"text":175,"correct":22},"成本结算",{"key":30,"text":104,"correct":32},{"id":178,"libraryId":5,"type":15,"typeLabel":16,"stem":179,"options":180,"answer":27,"analysis":33},896842,"先将对比分析的数值变成相对数，再观察其相互之间关系的项目成本分析方法是（ ）。",[181,182,183,184],{"key":20,"text":75,"correct":22},{"key":24,"text":79,"correct":22},{"key":27,"text":81,"correct":32},{"key":30,"text":77,"correct":22},{"id":186,"libraryId":5,"type":15,"typeLabel":16,"stem":187,"options":188,"answer":24,"analysis":33},896843,"根据《建设工程施工合同示范文本》中的合同条款，关于合理补偿承包人索赔的说法，正确的是（ ）。",[189,191,193,195],{"key":20,"text":190,"correct":22},"承包人遇到不利物质条件可进行利润索赔",{"key":24,"text":192,"correct":32},"发生不可抗力只能进行工期索赔",{"key":27,"text":194,"correct":22},"异常恶劣天气导致的停工通常可以进行费用索赔",{"key":30,"text":196,"correct":22},"发包人原因引起的暂停施工只能进行工期索赔",{"id":198,"libraryId":5,"type":15,"typeLabel":16,"stem":199,"options":200,"answer":30,"analysis":33},896844,"下列索赔费用中，不属于材料费的索赔的是（ ）。",[201,203,205,207],{"key":20,"text":202,"correct":22},"由于索赔事件的发生造成材料实际用量超过计划用量而增加的材料费",{"key":24,"text":204,"correct":22},"由于发包人原因导致工程延期期间的材料价格上涨和超期储存费用",{"key":27,"text":206,"correct":22},"运输费，仓储费，以及合理的损耗费用",{"key":30,"text":208,"correct":32},"由于承包商管理不善，造成材料损坏失效",{"id":210,"libraryId":5,"type":15,"typeLabel":16,"stem":211,"options":212,"answer":20,"analysis":33},896845,"下列情形中，只可以进行工期索赔的是（ ）。",[213,215,217,219],{"key":20,"text":214,"correct":32},"异常恶劣的气候条件导致工期延误",{"key":24,"text":216,"correct":22},"施工中遇到不利物质条件",{"key":27,"text":218,"correct":22},"工程移交后因发包人的原因出现新的缺陷或损坏的修复",{"key":30,"text":220,"correct":22},"承包人提前竣工",{"id":222,"libraryId":5,"type":15,"typeLabel":16,"stem":223,"options":224,"answer":24,"analysis":33},896846,"就施工索赔的目的而言，施工索赔包括（ ）。",[225,227,229,231],{"key":20,"text":226,"correct":22},"物价上涨索赔和业主违约索赔",{"key":24,"text":228,"correct":32},"工期索赔和费用索赔",{"key":27,"text":230,"correct":22},"拖延付款索赔和不可抗拒因素索赔",{"key":30,"text":232,"correct":22},"特殊风险索赔和业主风险索赔",{"id":234,"libraryId":5,"type":15,"typeLabel":16,"stem":235,"options":236,"answer":30,"analysis":33},896847,"如果初始延误者是客观原因，则在客观因素发生影响的延误期内，承包人（ ）。",[237,239,241,243],{"key":20,"text":238,"correct":22},"不可以得到工期延长，也很难得到费用补偿",{"key":24,"text":240,"correct":22},"不可以得到工期延长，可以得到费用补偿",{"key":27,"text":242,"correct":22},"可以得到工期延长，也可以得到费用补偿",{"key":30,"text":244,"correct":32},"可以得到工期延长，但很难得到费用补偿",{"id":246,"libraryId":5,"type":15,"typeLabel":16,"stem":247,"options":248,"answer":20,"analysis":33},896848,"工程索赔中最关键和最主要的依据是（ ）。",[249,251,253,255],{"key":20,"text":250,"correct":32},"工程施工合同文件",{"key":24,"text":252,"correct":22},"国家、部门和地方有关的标准、规范和定额",{"key":27,"text":254,"correct":22},"工程施工合同履行过程中与索赔事件有关的各种凭证",{"key":30,"text":256,"correct":22},"国家法律、行政法规",{"id":258,"libraryId":5,"type":15,"typeLabel":16,"stem":259,"options":260,"answer":24,"analysis":33},896849,"关于工期索赔，下列说法不正确的是（ ）。",[261,263,265,267],{"key":20,"text":262,"correct":22},"因承包人的原因造成施工进度滞后，属于不可原谅的延期",{"key":24,"text":264,"correct":32},"只有发包人不应承担任何责任的延误，才是可原谅的延期",{"key":27,"text":266,"correct":22},"只有位于关键线路上工作内容的滞后，才会影响到竣工日期",{"key":30,"text":268,"correct":22},"只有可原谅延期部分才能批准顺延合同工期",{"id":270,"libraryId":5,"type":15,"typeLabel":16,"stem":271,"options":272,"answer":27,"analysis":33},896850,"施工单位在施工中发生如下事项：完成业主要求的合同外用工花费3万元；由于设计图纸延误造成工人窝工损失1万元；施工电梯机械故障造成工人窝工损失2万元。施工单位可向业主索赔的人工费为（ ）万元。",[273,275,277,279],{"key":20,"text":274,"correct":22},"3",{"key":24,"text":276,"correct":22},"5",{"key":27,"text":278,"correct":32},"4",{"key":30,"text":280,"correct":22},"6",{"id":282,"libraryId":5,"type":15,"typeLabel":16,"stem":283,"options":284,"answer":27,"analysis":33},896851,"某工程合同价格为5000万元，计划工期是200天，施工期间因非承包人原因导致工期延误10天，若同期该公司承揽的所有工程合同总价为2．5亿元，计划总部管理费为1250万元，则承包人可以索赔的总部管理费为（ ）万元。",[285,287,289,291],{"key":20,"text":286,"correct":22},"7．5",{"key":24,"text":288,"correct":22},"10",{"key":27,"text":290,"correct":32},"12．5",{"key":30,"text":292,"correct":22},"15",{"id":294,"libraryId":5,"type":15,"typeLabel":16,"stem":295,"options":296,"answer":24,"analysis":33},896852,"根据《建设工程价款结算暂行办法》，原则上预付比例不低于合同金额的（ ）。",[297,299,301,303],{"key":20,"text":298,"correct":22},"5%",{"key":24,"text":300,"correct":32},"10%",{"key":27,"text":302,"correct":22},"15%",{"key":30,"text":304,"correct":22},"20%",{"id":306,"libraryId":5,"type":15,"typeLabel":16,"stem":307,"options":308,"answer":30,"analysis":33},896853,"已知某工程承包合同价款总额是3000万元，其主要材料及构件所占比重为60%，预付款总金额为工程价款总额的20%，则预付款起扣点是（ ）万元。",[309,311,313,315],{"key":20,"text":310,"correct":22},"1000",{"key":24,"text":312,"correct":22},"1400",{"key":27,"text":314,"correct":22},"1500",{"key":30,"text":316,"correct":32},"2000",{"id":318,"libraryId":5,"type":15,"typeLabel":16,"stem":319,"options":320,"answer":30,"analysis":33},896854,"下列属于本周期合计应扣减的金额的是（ ）。",[321,323,325,327],{"key":20,"text":322,"correct":22},"本周期已完成单价项目的金额",{"key":24,"text":324,"correct":22},"周期应支付的总价项目的金额",{"key":27,"text":326,"correct":22},"本周期已完成的计日工价款",{"key":30,"text":328,"correct":32},"本周期应扣回的预付款",{"id":330,"libraryId":5,"type":15,"typeLabel":16,"stem":331,"options":332,"answer":27,"analysis":33},896855,"根据我国现行的关于工程预付款的相关规定，下列说法中正确的是（ ）。",[333,335,337,339],{"key":20,"text":334,"correct":22},"当约定需提交预付款保函时则保函的担保金额必须大于预付款金额",{"key":24,"text":336,"correct":22},"预付款是发包人为解决承包人在施工过程中的资金周转问题而提供的协助",{"key":27,"text":338,"correct":32},"预付款担保的担保金额通常与发包人的预付款是等值的",{"key":30,"text":340,"correct":22},"预付款担保的主要形式为现金",{"id":342,"libraryId":5,"type":15,"typeLabel":16,"stem":343,"options":344,"answer":24,"analysis":33},896856,"关于合同价款的期中支付，下列说法不正确的是（ ）。",[345,347,349,351],{"key":20,"text":346,"correct":22},"合同价款的期中支付是指发包人在合同工程施工过程中，按照合同约定对付款周期内承包人完成的合同价款给予支付的款项",{"key":24,"text":348,"correct":32},"合同价款的期中支付是工程进度款的预付",{"key":27,"text":350,"correct":22},"发承包双方应按照合同约定的时间、程序和方法，根据工程计量结果，办理期中价款结算，支付进度款",{"key":30,"text":352,"correct":22},"进度款支付周期，应与合同约定的工程计量周期一致",{"id":354,"libraryId":5,"type":15,"typeLabel":16,"stem":355,"options":356,"answer":24,"analysis":33},896857,"按合同约定扣回预付款，下列说法不正确的是（ ）。",[357,359,361,363],{"key":20,"text":358,"correct":22},"付款的扣款方法由发包人和承包人通过洽商后在合同中予以确定",{"key":24,"text":360,"correct":32},"一般是在承包人完成金额累计达到合同总价的一定比例后，由发包人开始向承包人还款",{"key":27,"text":362,"correct":22},"发包方从每次应付给承包人的金额中扣回工程预付款",{"key":30,"text":364,"correct":22},"发包人至少在合同规定的完工期前将工程预付款的总金额逐次扣回",{"id":366,"libraryId":5,"type":15,"typeLabel":16,"stem":367,"options":368,"answer":24,"analysis":33},896858,"政府投资项目的竣工总结算由（ ）审查。",[369,371,373,375],{"key":20,"text":370,"correct":22},"主管部门",{"key":24,"text":372,"correct":32},"同级财政部门",{"key":27,"text":374,"correct":22},"所在地财政监察专员办事机构",{"key":30,"text":376,"correct":22},"财政部",{"id":378,"libraryId":5,"type":15,"typeLabel":16,"stem":379,"options":380,"answer":20,"analysis":33},896859,"由于不可抗力解除合同的，发包人应向承包人支付（ ）。",[381,383,385,387],{"key":20,"text":382,"correct":32},"合同解除之日前已完成工程但尚未支付的合同价款",{"key":24,"text":384,"correct":22},"合同解除之后完成工程但尚未支付的合同价款",{"key":27,"text":386,"correct":22},"合同解除之后完成工程的合同价款",{"key":30,"text":388,"correct":22},"合同解除之日前未完成工程但尚未支付的合同价款",{"id":390,"libraryId":5,"type":15,"typeLabel":16,"stem":391,"options":392,"answer":20,"analysis":33},896860,"承包人在合同内享有的索赔权利也自行终止是在（ ）。",[393,395,397,399],{"key":20,"text":394,"correct":32},"最终结清付款后",{"key":24,"text":396,"correct":22},"缺陷责任期终止后",{"key":27,"text":398,"correct":22},"最终结清申请单进行审核后",{"key":30,"text":400,"correct":22},"签发最终支付证书后",{"id":402,"libraryId":5,"type":15,"typeLabel":16,"stem":403,"options":404,"answer":24,"analysis":33},896861,"根据《建设工程价款结算暂行办法》的规定，在竣工结算编审过程中，单位工程竣工结算的编制人是（ ）。",[405,407,409,411],{"key":20,"text":406,"correct":22},"业主",{"key":24,"text":408,"correct":32},"承包商",{"key":27,"text":410,"correct":22},"总承包商",{"key":30,"text":412,"correct":22},"监理咨询机构",{"id":414,"libraryId":5,"type":15,"typeLabel":16,"stem":415,"options":416,"answer":24,"analysis":33},896862,"关于办理有质量争议工程的竣工结算，下列说法中错误的是（ ）。",[417,419,421,423],{"key":20,"text":418,"correct":22},"已实际投入使用工程的质量争议按工程保修合同执行，竣工结算按合同约定办理",{"key":24,"text":420,"correct":32},"已竣工未投入使用的质量争议按工程保修合同执行，竣工结算按合同约定办理",{"key":27,"text":422,"correct":22},"停工、停建工程的质量争议可在执行工程质量监督机构处理决定后办理竣工结算",{"key":30,"text":424,"correct":22},"已竣工未验收并且未实际投入使用，其无质量争议部分的工程，竣工结算按合同约定办理",{"id":426,"libraryId":5,"type":15,"typeLabel":16,"stem":427,"options":428,"answer":20,"analysis":33},896863,"由建设单位编制，反映建设项目实际造价和投资效果的文件是（ ）。",[429,431,433,435],{"key":20,"text":430,"correct":32},"竣工决算",{"key":24,"text":432,"correct":22},"竣工验收",{"key":27,"text":434,"correct":22},"竣工整理",{"key":30,"text":436,"correct":22},"竣工核实",{"id":438,"libraryId":5,"type":15,"typeLabel":16,"stem":439,"options":440,"answer":20,"analysis":33},896864,"完整的竣工决算书包含的内容是（ ）。",[441,443,445,447],{"key":20,"text":442,"correct":32},"竣工财务决算说明书、竣工财务决算报表、工程竣工图、工程竣工造价对比分析",{"key":24,"text":444,"correct":22},"竣工财务决算报表、竣工决算、工程竣工图、工程造价对比分析",{"key":27,"text":446,"correct":22},"竣工财务决算说明书、竣工决算、竣工验收报告、工程造价对比分析",{"key":30,"text":448,"correct":22},"竣工财务决算报表、工程竣工图、工程造价对比分析",{"id":450,"libraryId":5,"type":15,"typeLabel":16,"stem":451,"options":452,"answer":24,"analysis":33},896865,"基本建设项目竣工决算报表不包括（ ）。",[453,455,457,459],{"key":20,"text":454,"correct":22},"建设项目概况表",{"key":24,"text":456,"correct":32},"资金平衡表",{"key":27,"text":458,"correct":22},"基本建设项目竣工财务决算表",{"key":30,"text":460,"correct":22},"基本建设项目交付使用资产明细表",{"id":462,"libraryId":5,"type":15,"typeLabel":16,"stem":463,"options":464,"answer":20,"analysis":33},896866,"股票和债券根据是否可以上市流通分别采用（ ）确定其价值。",[465,467,469,471],{"key":20,"text":466,"correct":32},"市场法和收益法",{"key":24,"text":468,"correct":22},"政府定价法和市场法",{"key":27,"text":470,"correct":22},"市场法和政府定价法",{"key":30,"text":472,"correct":22},"收益法和计划法",{"id":474,"libraryId":5,"type":15,"typeLabel":16,"stem":475,"options":476,"answer":27,"analysis":33},896867,"新增固定资产价值的计算对象是（ ）。",[477,479,481,483],{"key":20,"text":478,"correct":22},"独立专业的单位工程",{"key":24,"text":480,"correct":22},"独立施工的单位工程",{"key":27,"text":482,"correct":32},"独立发挥生产能力的单项工程",{"key":30,"text":484,"correct":22},"独立设计的单位工程",{"id":486,"libraryId":5,"type":15,"typeLabel":16,"stem":487,"options":488,"answer":30,"analysis":33},896868,"关于缺陷责任与保修责任的说法，正确的是（ ）。",[489,491,493,495],{"key":20,"text":490,"correct":22},"缺陷责任期自合同竣工日期起计算",{"key":24,"text":492,"correct":22},"发包人在使用过程中发现已接收的工程存在新的缺陷的，由发包人自行修复",{"key":27,"text":494,"correct":22},"缺陷责任期最长不超过3年",{"key":30,"text":496,"correct":32},"保修期自实际竣工日期起计算",{"id":498,"libraryId":5,"type":15,"typeLabel":16,"stem":499,"options":500,"answer":20,"analysis":33},896869,"关于建设工程项目竣工决算，下列说法不正确的是（ ）。",[501,503,505,507],{"key":20,"text":502,"correct":32},"竣工决算是以工程量和技术指标为计量单位的",{"key":24,"text":504,"correct":22},"竣工决算是竣工验收报告的重要组成部分",{"key":27,"text":506,"correct":22},"竣工决算是反映建设项目实际造价和投资效果的文件",{"key":30,"text":508,"correct":22},"竣工决算是综合反映竣工建设项目全部建设费用、建设成果和财务情况的总结性文件",{"id":510,"libraryId":5,"type":15,"typeLabel":16,"stem":511,"options":512,"answer":24,"analysis":33},896870,"竣工财务决算报表中，（ ）是办理资产交接和接收单位登记资产账目的依据，是使用单位建立资产明细账和登记新增资产价值的依据。",[513,515,517,518],{"key":20,"text":514,"correct":22},"建设项目竣工财务决算审批表",{"key":24,"text":516,"correct":32},"建设项目交付使用资产明细表",{"key":27,"text":454,"correct":22},{"key":30,"text":519,"correct":22},"建设项目交付使用资产总表",{"id":521,"libraryId":5,"type":15,"typeLabel":16,"stem":522,"options":523,"answer":20,"analysis":33},896871,"关于竣工决算，说法正确的是（ ）。",[524,526,528,530],{"key":20,"text":525,"correct":32},"建筑项目竣工决算应包括从筹建到竣工验收的全部实际费用",{"key":24,"text":527,"correct":22},"建筑项目竣工决算应包括从动工到竣工投产全过程的全部费用",{"key":27,"text":529,"correct":22},"新增固定资产价值的计算应以建设项目为对象",{"key":30,"text":531,"correct":22},"已具备竣工验收条件的项目",{"id":533,"libraryId":5,"type":15,"typeLabel":16,"stem":534,"options":535,"answer":30,"analysis":33},896872,"新增固定资产价值是建设项目竣工投产后所增加的固定资产的价值，它是以（ ）形态表示的固定资产投资最终成果的综合性指标。",[536,538,540,542],{"key":20,"text":537,"correct":22},"时间",{"key":24,"text":539,"correct":22},"期货",{"key":27,"text":541,"correct":22},"货币",{"key":30,"text":543,"correct":32},"价值",{"id":545,"libraryId":5,"type":15,"typeLabel":16,"stem":546,"options":547,"answer":24,"analysis":33},896873,"建设项目竣工决算应包括（ ）的全部实际费用。",[548,550,552,554],{"key":20,"text":549,"correct":22},"从实际到竣工投产",{"key":24,"text":551,"correct":32},"从筹建到竣工验收",{"key":27,"text":553,"correct":22},"从立项到竣工验收",{"key":30,"text":555,"correct":22},"从开工到竣工验收",{"id":557,"libraryId":5,"type":15,"typeLabel":16,"stem":558,"options":559,"answer":27,"analysis":33},896874,"用来反映建设项目的全部资金来源和资金占用情况，并且是考核和分析投资效果依据的表是（ ）。",[560,561,563,564],{"key":20,"text":516,"correct":22},{"key":24,"text":562,"correct":22},"基本建设项目概况表",{"key":27,"text":458,"correct":32},{"key":30,"text":514,"correct":22},{"id":566,"libraryId":5,"type":15,"typeLabel":16,"stem":567,"options":568,"answer":24,"analysis":33},896875,"建设工程竣工决算的文件，由（ ）负责组织人员编写。",[569,571,573,575],{"key":20,"text":570,"correct":22},"施工单位",{"key":24,"text":572,"correct":32},"建设单位",{"key":27,"text":574,"correct":22},"设计单位",{"key":30,"text":576,"correct":22},"监理单位",{"id":578,"libraryId":5,"type":15,"typeLabel":16,"stem":579,"options":580,"answer":30,"analysis":33},896876,"间接成本是指与研制开发有关的费用，其中不包括（ ）。",[581,583,585,587],{"key":20,"text":582,"correct":22},"非专用设备折旧费",{"key":24,"text":584,"correct":22},"管理费",{"key":27,"text":586,"correct":22},"应分摊的公共费用及能源费用",{"key":30,"text":588,"correct":32},"咨询鉴定费",{"id":590,"libraryId":5,"type":15,"typeLabel":16,"stem":591,"options":592,"answer":27,"analysis":33},896877,"关于新增无形资产价值的确定与计价，下列说法中正确的是（ ）。",[593,595,597,599],{"key":20,"text":594,"correct":22},"企业接受捐赠的无形资产，按开发中的实际支出计价",{"key":24,"text":596,"correct":22},"专利权转让价格按成本估价进行",{"key":27,"text":598,"correct":32},"自创专有技术在自创中发生的费用按当期费用处理",{"key":30,"text":600,"correct":22},"行政划拨的土地使用权作为无形资产核算",[602,605,608,611,614,617],{"id":15,"name":603,"category":7,"favorite":604},"领导干部任职前廉政法规知识测试题",92,{"id":606,"name":607,"category":7,"favorite":15},595,"建筑结构与设备",{"id":609,"name":610,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":612,"name":613,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":615,"name":616,"category":7,"favorite":8},534,"BIM工程师",{"id":618,"name":616,"category":7,"favorite":8},535]