[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-581-4":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":574},{"id":5,"name":6,"category":7,"favorite":8},581,"建设工程造价管理基础知识","建筑工程",0,4,50,2873,[13,34,46,58,70,82,94,106,118,129,141,153,164,174,184,193,204,214,226,238,246,254,265,277,286,295,305,317,329,341,353,365,377,389,398,410,422,434,446,458,468,480,491,499,508,519,530,542,552,564],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":27,"analysis":33},894935,1,"单选题","下列工程项目目标控制方法中，可用来找出工程质量主要影响因素的是（）。",[19,23,26,30],{"key":20,"text":21,"correct":22},"A","直方图法",false,{"key":24,"text":25,"correct":22},"B","鱼刺图法",{"key":27,"text":28,"correct":29},"C","排列图法",true,{"key":31,"text":32,"correct":22},"D","S 曲线法","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":27,"analysis":33},894936,"下列关于工程项目目标控制方法的表述中正确的是（）。",[38,40,42,44],{"key":20,"text":39,"correct":22},"直方图是一种用来寻找影响工程质量主要因素的有效工具",{"key":24,"text":41,"correct":22},"通过因果分析图，可以发现工程项目中主要的质量问题",{"key":27,"text":43,"correct":29},"香蕉曲线与S 曲线都可以用来控制工程造价和工程进度",{"key":31,"text":45,"correct":22},"控制图法和直方图法分别属于质量控制的静态和动态分析方法",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":20,"analysis":33},894937,"建设工程项目实施CM 承包模式时，代理型合同由（）的计价方式签订。",[50,52,54,56],{"key":20,"text":51,"correct":29},"业主与分包商以简单的成本加酬金",{"key":24,"text":53,"correct":22},"业主与分包商以保证最大工程费用加酬金",{"key":27,"text":55,"correct":22},"CM 单位与分包商以简单的成本加酬金",{"key":31,"text":57,"correct":22},"CM 单位与分包商以保证最大工程费用加酬金",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":31,"analysis":33},894938,"下列控制措施中，属于工程项目目标被动控制措施的是（）。",[62,64,66,68],{"key":20,"text":63,"correct":22},"制定实施计划时，考虑影响目标实现和计划实施的不利因素",{"key":24,"text":65,"correct":22},"说明和揭示影响目标实现和计划实施的潜在风险因素",{"key":27,"text":67,"correct":22},"制定必要的备用方案，以应对可能出现的影响目标实现的情况",{"key":31,"text":69,"correct":29},"跟踪目标实施情况，发现目标偏离时及时采取纠偏措施",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":20,"analysis":33},894939,"下列工程项目计划表中，用来阐明各单位工程的建筑面积、投资额、新增固定资产、新增生产能力等建筑总规模及本年计划完成情况的是（）。",[74,76,78,80],{"key":20,"text":75,"correct":29},"年度竣工投产交付实用计划表",{"key":24,"text":77,"correct":22},"年度计划项目表",{"key":27,"text":79,"correct":22},"年度建设资金平衡表",{"key":31,"text":81,"correct":22},"按资计划年度分配表",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":24,"analysis":33},894940,"根据《建筑施工组织设计规范》，施工组织总设计应由（）主持编制。",[86,88,90,92],{"key":20,"text":87,"correct":22},"总承包单位技术负责人",{"key":24,"text":89,"correct":29},"施工项目负责人",{"key":27,"text":91,"correct":22},"总承包单位法定代表人",{"key":31,"text":93,"correct":22},"施工项目技术负责人",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":27,"analysis":33},894941,"根据《建设项目经济评价方法与参数（第三版）》，建设投资由（）三项费用构成。",[98,100,102,104],{"key":20,"text":99,"correct":22},"工程费用、建设期利息、预备费",{"key":24,"text":101,"correct":22},"建设费用、建设期利息、流动资金",{"key":27,"text":103,"correct":29},"工程费用、工程建设其他费用、预备费",{"key":31,"text":105,"correct":22},"建筑安装工程费、设备及工器具购置费、工程建设其他费用",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":27,"analysis":33},894942,"国外建筑工程造价构成中，反映工程造价中因缺乏资料不能完全预见和注明的项目是（）。",[110,112,114,116],{"key":20,"text":111,"correct":22},"项目直接建设成本",{"key":24,"text":113,"correct":22},"项目简介建设成本",{"key":27,"text":115,"correct":29},"应急费",{"key":31,"text":117,"correct":22},"建设成本上升费用",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":27,"analysis":33},894944,"根据世界银行对建设工程造价构成的规定，只能作为一种储备可能不动用的费用是（）。",[122,124,126,128],{"key":20,"text":123,"correct":22},"未明确项目准备金",{"key":24,"text":125,"correct":22},"基本预备费",{"key":27,"text":127,"correct":29},"不可预见准备金",{"key":31,"text":117,"correct":22},{"id":130,"libraryId":5,"type":15,"typeLabel":16,"stem":131,"options":132,"answer":27,"analysis":33},894945,"已知某世行项目各项数据如下：项目管理费500 万元，开工试车费300 万元，业主的行政性费用100 万元，生产前费用600 万元，运费和保险费150 万元，地方税100 万元，建设成本上升费用120 万元，则该项目间接建设成本为（）万元。",[133,135,137,139],{"key":20,"text":134,"correct":22},"1000",{"key":24,"text":136,"correct":22},"1500",{"key":27,"text":138,"correct":29},"1750",{"key":31,"text":140,"correct":22},"1870",{"id":142,"libraryId":5,"type":15,"typeLabel":16,"stem":143,"options":144,"answer":20,"analysis":33},894946,"在世界银行规定的项目总建设成本中，未明确项目的准备金的目的是为了（）。",[145,147,149,151],{"key":20,"text":146,"correct":29},"支付那些估算时不可能明确的潜在项目",{"key":24,"text":148,"correct":22},"支付工作范围以外可能增加的项目",{"key":27,"text":150,"correct":22},"应付天灾、非正常经济情况及罢工等情况",{"key":31,"text":152,"correct":22},"用来补偿估算的误差",{"id":154,"libraryId":5,"type":15,"typeLabel":16,"stem":155,"options":156,"answer":27,"analysis":33},894947,"下列项目中属于世界银行工程造价构成中间接成本的是（）。",[157,159,161,163],{"key":20,"text":158,"correct":22},"建筑保险和债券",{"key":24,"text":160,"correct":22},"仪器仪表费",{"key":27,"text":162,"correct":29},"开工试车费",{"key":31,"text":127,"correct":22},{"id":165,"libraryId":5,"type":15,"typeLabel":16,"stem":166,"options":167,"answer":24,"analysis":33},894948,"国外建设工程造价构成中，有一部分费用的目的是补偿直至工程结束时的未知价格增长，此费用是（）。",[168,169,171,172],{"key":20,"text":123,"correct":22},{"key":24,"text":170,"correct":29},"建设成本上升费",{"key":27,"text":127,"correct":22},{"key":31,"text":173,"correct":22},"生产前费用",{"id":175,"libraryId":5,"type":15,"typeLabel":16,"stem":176,"options":177,"answer":31,"analysis":33},894949,"下列各项中属于世界银行工程造价构成中项目直接建设成本的是（）。",[178,179,180,182],{"key":20,"text":162,"correct":22},{"key":24,"text":173,"correct":22},{"key":27,"text":181,"correct":22},"业主的行政性费用",{"key":31,"text":183,"correct":29},"土地征购费",{"id":185,"libraryId":5,"type":15,"typeLabel":16,"stem":186,"options":187,"answer":31,"analysis":33},894950,"在世界银行工程造价的构成中，有一项费用有可能发生，有可能不发生,在正常建设条件下可能不动用，只是一种贮备。此项费用是（)。",[188,189,191,192],{"key":20,"text":117,"correct":22},{"key":24,"text":190,"correct":22},"项目间接建设成本",{"key":27,"text":123,"correct":22},{"key":31,"text":127,"correct":29},{"id":194,"libraryId":5,"type":15,"typeLabel":16,"stem":195,"options":196,"answer":20,"analysis":33},894951,"在世界银行规定的项目总建设成本中，属于项目直接建设成本的是（）。",[197,199,200,202],{"key":20,"text":198,"correct":29},"临时公共设施的维持费",{"key":24,"text":162,"correct":22},{"key":27,"text":201,"correct":22},"施工管理现场人员的薪金",{"key":31,"text":203,"correct":22},"生产前的勘测费用",{"id":205,"libraryId":5,"type":15,"typeLabel":16,"stem":206,"options":207,"answer":24,"analysis":33},894952,"按照国外建设工程造价的构成，下列费用中，属于应急费的是（）。",[208,209,210,212],{"key":20,"text":162,"correct":22},{"key":24,"text":123,"correct":29},{"key":27,"text":211,"correct":22},"保险费",{"key":31,"text":213,"correct":22},"运费",{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":31,"analysis":33},894953,"对于非生产性建设项目，项目总投资不包括的内容为（）。",[218,220,222,224],{"key":20,"text":219,"correct":22},"建设投资",{"key":24,"text":221,"correct":22},"建设期利息",{"key":27,"text":223,"correct":22},"预备费",{"key":31,"text":225,"correct":29},"铺底流动资金",{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":31,"analysis":33},894954,"根据现行建设项目工程造价构成的相关规定，工程造价是指（）。",[230,232,234,236],{"key":20,"text":231,"correct":22},"为完成工程项目建造，生产性设备及配合工程安装设备的费用",{"key":24,"text":233,"correct":22},"建设期内直接用于工程建造、设备购置及其安装的建设投资",{"key":27,"text":235,"correct":22},"为完成工程项目建设，在建设期内投入且形成现金流出的全部费用",{"key":31,"text":237,"correct":29},"在建设期内预计或实际支出的建设费用",{"id":239,"libraryId":5,"type":15,"typeLabel":16,"stem":240,"options":241,"answer":27,"analysis":33},894955,"在国外的项目总建设成本中，未明确项目的准备金的目的是为了()。",[242,243,244,245],{"key":20,"text":152,"correct":22},{"key":24,"text":148,"correct":22},{"key":27,"text":146,"correct":29},{"key":31,"text":150,"correct":22},{"id":247,"libraryId":5,"type":15,"typeLabel":16,"stem":248,"options":249,"answer":27,"analysis":33},894956,"据《建设项目经济评价方法与参数（第三版）》，建设投资由()三项费用构成。",[250,251,252,253],{"key":20,"text":99,"correct":22},{"key":24,"text":101,"correct":22},{"key":27,"text":103,"correct":29},{"key":31,"text":105,"correct":22},{"id":255,"libraryId":5,"type":15,"typeLabel":16,"stem":256,"options":257,"answer":27,"analysis":33},894957,"在建设项目总投资中，为完成工程项目建设，在建设期内投入且形成现金流出的全部费用是（）。",[258,260,262,263],{"key":20,"text":259,"correct":22},"工程造价",{"key":24,"text":261,"correct":22},"建设项目总投资",{"key":27,"text":219,"correct":29},{"key":31,"text":264,"correct":22},"工程费用",{"id":266,"libraryId":5,"type":15,"typeLabel":16,"stem":267,"options":268,"answer":27,"analysis":33},894958,"下列费用中，不属于工程造价构成的是()。",[269,271,273,275],{"key":20,"text":270,"correct":22},"用于支付项目所需土地而发生的费用",{"key":24,"text":272,"correct":22},"用于建设单位自身进行项目管理所支出的费用",{"key":27,"text":274,"correct":29},"流动资金",{"key":31,"text":276,"correct":22},"用于委托工程勘察设计所支付的费用",{"id":278,"libraryId":5,"type":15,"typeLabel":16,"stem":279,"options":280,"answer":27,"analysis":33},894959,"为保证工程项目顺利实施，避免在难以预料的情况下造成投资不足而预先安排的费用是()。",[281,282,283,284],{"key":20,"text":274,"correct":22},{"key":24,"text":221,"correct":22},{"key":27,"text":223,"correct":29},{"key":31,"text":285,"correct":22},"其他资产费用",{"id":287,"libraryId":5,"type":15,"typeLabel":16,"stem":288,"options":289,"answer":24,"analysis":33},894960,"反映工程造价估算日期至工程竣工日期之前，工程各个主要组成部分的人工、材料和设备等未知价格增长部分的是()。",[290,292,293,294],{"key":20,"text":291,"correct":22},"直接建设成本",{"key":24,"text":170,"correct":29},{"key":27,"text":127,"correct":22},{"key":31,"text":123,"correct":22},{"id":296,"libraryId":5,"type":15,"typeLabel":16,"stem":297,"options":298,"answer":27,"analysis":33},894961,"根据世界银行对工程项目总建设成本的规定，下列费用应计入项目间接建设成本的是（）。",[299,301,303,304],{"key":20,"text":300,"correct":22},"临时公共设施及场地的维持费",{"key":24,"text":302,"correct":22},"建筑保险和债券费",{"key":27,"text":162,"correct":29},{"key":31,"text":183,"correct":22},{"id":306,"libraryId":5,"type":15,"typeLabel":16,"stem":307,"options":308,"answer":31,"analysis":33},894962,"以直接费为取费基数时，下列企业管理费费率计算公式中，正确的是()。",[309,311,313,315],{"key":20,"text":310,"correct":22},"企业管理费费率=年管理费总额\u002F（全年建安产值×人工费占分部分项工程费比例）×100%",{"key":24,"text":312,"correct":22},"企业管理费费率=生产工人年平均管理费\u002F（年有效施工天数×人工单价）×100%",{"key":27,"text":314,"correct":22},"企业管理费费率=生产工人年平均管理费\u002F[年有效施工天数×（人工单价+每一工日机械使用费）]×100%",{"key":31,"text":316,"correct":29},"企业管理费费率（%）=[生产工人年平均管理费\u002F（年有效施工天数×人工单价）]×人工费占直接费比例（%）",{"id":318,"libraryId":5,"type":15,"typeLabel":16,"stem":319,"options":320,"answer":24,"analysis":33},894963,"根据我国现行建筑安装工程费用的组成，下列属于规费的是()。",[321,323,325,327],{"key":20,"text":322,"correct":22},"环境保护费",{"key":24,"text":324,"correct":29},"生育保险费",{"key":27,"text":326,"correct":22},"财务保险费",{"key":31,"text":328,"correct":22},"文明施工费",{"id":330,"libraryId":5,"type":15,"typeLabel":16,"stem":331,"options":332,"answer":24,"analysis":33},894964,"在规费计算中，社会保险费和住房公积金的计算基数通常是()。",[333,335,337,339],{"key":20,"text":334,"correct":22},"工程定额人工费与机械费之和",{"key":24,"text":336,"correct":29},"工程定额人工费",{"key":27,"text":338,"correct":22},"工程定额人工费、材料费与机械费之和",{"key":31,"text":340,"correct":22},"分部分项工程费",{"id":342,"libraryId":5,"type":15,"typeLabel":16,"stem":343,"options":344,"answer":20,"analysis":33},894965,"按照国外建筑安装工程费用的构成，下列费用中，不属于单项工程开办费的是()。",[345,347,349,351],{"key":20,"text":346,"correct":29},"工人招聘解雇费",{"key":24,"text":348,"correct":22},"施工用水、用电费",{"key":27,"text":350,"correct":22},"临时设施费",{"key":31,"text":352,"correct":22},"驻工地工程师现场办公室及所需设备费用",{"id":354,"libraryId":5,"type":15,"typeLabel":16,"stem":355,"options":356,"answer":27,"analysis":33},894966,"根据我国现行建筑安装工程费用构成的相关规定，下列费用中，属于安装工程费用的是()。",[357,359,361,363],{"key":20,"text":358,"correct":22},"房屋建筑工程供水、供暖等设备费用",{"key":24,"text":360,"correct":22},"设备基础、工作台的砌筑工程费或金属结构工程费用",{"key":27,"text":362,"correct":29},"对系统设备进行系统联动无负荷运转工作的调试费",{"key":31,"text":364,"correct":22},"对整个生产线负荷联合试运转所发生的费用",{"id":366,"libraryId":5,"type":15,"typeLabel":16,"stem":367,"options":368,"answer":20,"analysis":33},894967,"关于建筑安装工程费中材料费的说法，正确的是()。",[369,371,373,375],{"key":20,"text":370,"correct":29},"材料单价是指建筑材料从其来源地运到施工工地仓库直至出库形成的综合平均单价",{"key":24,"text":372,"correct":22},"材料消耗量是指形成工程实体的净用量",{"key":27,"text":374,"correct":22},"材料检验试验费包括对构件做破坏性试验的费用",{"key":31,"text":376,"correct":22},"材料费等于材料消耗量与材料基价的乘积加检验试验费",{"id":378,"libraryId":5,"type":15,"typeLabel":16,"stem":379,"options":380,"answer":20,"analysis":33},894968,"下列措施项目中，属于环境保护项目的是()。",[381,383,385,387],{"key":20,"text":382,"correct":29},"工程防扬尘洒水费用",{"key":24,"text":384,"correct":22},"现场围挡的墙面美化",{"key":27,"text":386,"correct":22},"生活用洁净燃料费用",{"key":31,"text":388,"correct":22},"现场绿化费用",{"id":390,"libraryId":5,"type":15,"typeLabel":16,"stem":391,"options":392,"answer":24,"analysis":33},894969,"施工现场生活卫生设施费用属于()。",[393,394,395,397],{"key":20,"text":322,"correct":22},{"key":24,"text":328,"correct":29},{"key":27,"text":396,"correct":22},"安全施工费",{"key":31,"text":350,"correct":22},{"id":399,"libraryId":5,"type":15,"typeLabel":16,"stem":400,"options":401,"answer":20,"analysis":33},894970,"下列费用项目中，不属于企业管理费的是()。",[402,404,406,408],{"key":20,"text":403,"correct":29},"社会保险费",{"key":24,"text":405,"correct":22},"劳动保护费",{"key":27,"text":407,"correct":22},"检验试验费",{"key":31,"text":409,"correct":22},"劳动保险和职工福利费",{"id":411,"libraryId":5,"type":15,"typeLabel":16,"stem":412,"options":413,"answer":24,"analysis":33},894971,"劳动保护费属于()。",[414,416,418,420],{"key":20,"text":415,"correct":22},"规费",{"key":24,"text":417,"correct":29},"企业管理费",{"key":27,"text":419,"correct":22},"措施费",{"key":31,"text":421,"correct":22},"直接费",{"id":423,"libraryId":5,"type":15,"typeLabel":16,"stem":424,"options":425,"answer":24,"analysis":33},894972,"关于建筑安装工程费用中的规费，下列说法中正确的是( )。",[426,428,430,432],{"key":20,"text":427,"correct":22},"规费是指由县级及以上有关权力部门规定必须缴纳或计取的费用",{"key":24,"text":429,"correct":29},"规费包括工程排污费和住房公积金",{"key":27,"text":431,"correct":22},"投标人在投标报价时填写的规费可高于规定的标准",{"key":31,"text":433,"correct":22},"社会保险费中包括建筑安装工程一切险的投保费用",{"id":435,"libraryId":5,"type":15,"typeLabel":16,"stem":436,"options":437,"answer":24,"analysis":33},894973,"下列费用项目中，包含在国外建筑安装工程材料费中的是（）。",[438,440,442,444],{"key":20,"text":439,"correct":22},"单独列项的是增值税",{"key":24,"text":441,"correct":29},"材料价格预涨费",{"key":27,"text":443,"correct":22},"周转材料摊销费",{"key":31,"text":445,"correct":22},"各种现场用水、用电费",{"id":447,"libraryId":5,"type":15,"typeLabel":16,"stem":448,"options":449,"answer":24,"analysis":33},894974,"根据《房屋建筑与装饰工程计量规范》GB50854—2013，下列措施项目中，应列入安全施工项目的是()。",[450,452,454,456],{"key":20,"text":451,"correct":22},"现场施工机械设备防扰民措施费用",{"key":24,"text":453,"correct":29},"建筑工地起重机械的检验检测费用",{"key":27,"text":455,"correct":22},"“五牌一图”的费用",{"key":31,"text":457,"correct":22},"防煤气中毒等措施费用",{"id":459,"libraryId":5,"type":15,"typeLabel":16,"stem":460,"options":461,"answer":27,"analysis":33},894975,"根据我国现行建筑安装工程费用项目组成的规定，检验试验费应计入()。",[462,464,466,467],{"key":20,"text":463,"correct":22},"人工费",{"key":24,"text":465,"correct":22},"材料费",{"key":27,"text":417,"correct":29},{"key":31,"text":419,"correct":22},{"id":469,"libraryId":5,"type":15,"typeLabel":16,"stem":470,"options":471,"answer":31,"analysis":33},894976,"下列各项中按照费用构成要素划分，不属于材料费的是()。",[472,474,476,478],{"key":20,"text":473,"correct":22},"施工过程中耗费的原材料",{"key":24,"text":475,"correct":22},"施工过程中耗费的辅助材料",{"key":27,"text":477,"correct":22},"施工过程中耗费的半成品",{"key":31,"text":479,"correct":29},"施工过程中耗费的专用工具",{"id":481,"libraryId":5,"type":15,"typeLabel":16,"stem":482,"options":483,"answer":27,"analysis":33},894977,"下列()不属于安全施工措施费。",[484,486,488,490],{"key":20,"text":485,"correct":22},"外电防护措施费用",{"key":24,"text":487,"correct":22},"安全照明设施费",{"key":27,"text":489,"correct":29},"治安综合治理费用",{"key":31,"text":453,"correct":22},{"id":492,"libraryId":5,"type":15,"typeLabel":16,"stem":493,"options":494,"answer":31,"analysis":33},894978,"夏季防暑降温费属于()。",[495,496,497,498],{"key":20,"text":463,"correct":22},{"key":24,"text":419,"correct":22},{"key":27,"text":415,"correct":22},{"key":31,"text":417,"correct":29},{"id":500,"libraryId":5,"type":15,"typeLabel":16,"stem":501,"options":502,"answer":20,"analysis":33},894979,"工程排污费属于()。",[503,504,505,507],{"key":20,"text":415,"correct":29},{"key":24,"text":322,"correct":22},{"key":27,"text":506,"correct":22},"安全文明施工费",{"key":31,"text":417,"correct":22},{"id":509,"libraryId":5,"type":15,"typeLabel":16,"stem":510,"options":511,"answer":27,"analysis":33},894980,"施工管理用财产、车辆保险费用应计入()。",[512,514,516,517],{"key":20,"text":513,"correct":22},"现场经费",{"key":24,"text":515,"correct":22},"其他直接费",{"key":27,"text":417,"correct":29},{"key":31,"text":518,"correct":22},"固定资产其他费用",{"id":520,"libraryId":5,"type":15,"typeLabel":16,"stem":521,"options":522,"answer":31,"analysis":33},894981,"根据国外建筑安装工程费用构成，施工用水、用电费应计入()。",[523,524,526,528],{"key":20,"text":465,"correct":22},{"key":24,"text":525,"correct":22},"施工机械费",{"key":27,"text":527,"correct":22},"管理费",{"key":31,"text":529,"correct":29},"开办费",{"id":531,"libraryId":5,"type":15,"typeLabel":16,"stem":532,"options":533,"answer":20,"analysis":33},894982,"国外建筑安装工程费用中的暂定金额()。",[534,536,538,540],{"key":20,"text":535,"correct":29},"包括在合同价中，但只有工程师批准后才能动用",{"key":24,"text":537,"correct":22},"不包括在合同价中，只有工程师批准后才能动用",{"key":27,"text":539,"correct":22},"不包括在合同价中，只有业主批准后才能动用",{"key":31,"text":541,"correct":22},"包括在合同价中，由承包商自主使用",{"id":543,"libraryId":5,"type":15,"typeLabel":16,"stem":544,"options":545,"answer":27,"analysis":33},894983,"施工企业按规定缴纳的车船使用税应计入建安工程造价的()。",[546,548,550,551],{"key":20,"text":547,"correct":22},"税金",{"key":24,"text":549,"correct":22},"利润",{"key":27,"text":417,"correct":29},{"key":31,"text":415,"correct":22},{"id":553,"libraryId":5,"type":15,"typeLabel":16,"stem":554,"options":555,"answer":24,"analysis":33},894984,"关于工程建设其他费用中场地准备及临时设施费的内容，下列说法中正确的是()。",[556,558,560,562],{"key":20,"text":557,"correct":22},"施工现场临时供水管道的费用计入建设单位临时设施费",{"key":24,"text":559,"correct":29},"建设单位临时设施费不包括已列入建筑安装工程费用中的施工单位临时设施费用",{"key":27,"text":561,"correct":22},"新建和改扩建项目的场地准备和临时没施费可按工程费用的比例计算",{"key":31,"text":563,"correct":22},"建设场地的大型土石方工程计入场地准备费",{"id":565,"libraryId":5,"type":15,"typeLabel":16,"stem":566,"options":567,"answer":27,"analysis":33},894985,"以下各项中不能作为企业管理费计算基数的是()。",[568,569,571,573],{"key":20,"text":463,"correct":22},{"key":24,"text":570,"correct":22},"人工费和机械费的合计",{"key":27,"text":572,"correct":29},"人工费、材料费和机械费的合计",{"key":31,"text":421,"correct":22},[575,578,581,584,587,590],{"id":15,"name":576,"category":7,"favorite":577},"领导干部任职前廉政法规知识测试题",92,{"id":579,"name":580,"category":7,"favorite":15},595,"建筑结构与设备",{"id":582,"name":583,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":585,"name":586,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":588,"name":589,"category":7,"favorite":8},534,"BIM工程师",{"id":591,"name":589,"category":7,"favorite":8},535]