[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-581-36":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":581},{"id":5,"name":6,"category":7,"favorite":8},581,"建设工程造价管理基础知识","建筑工程",0,36,50,2873,[13,34,46,58,70,82,94,106,118,130,138,146,158,170,180,192,204,216,228,240,252,264,276,288,296,308,316,324,332,340,352,363,371,379,391,403,415,427,439,451,461,473,485,497,509,521,533,545,557,569],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":27,"analysis":33},896622,1,"单选题","概算定额的编制步骤不包括的是（ ）。",[19,23,26,30],{"key":20,"text":21,"correct":22},"A","准备工作阶段",false,{"key":24,"text":25,"correct":22},"B","编制初稿阶段",{"key":27,"text":28,"correct":29},"C","编制定额项目表",true,{"key":31,"text":32,"correct":22},"D","审查定稿阶段","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":20,"analysis":33},896623,"编制人工定额时，工人定额工作时间中应予以合理考虑的情况是（）。",[38,40,42,44],{"key":20,"text":39,"correct":29},"由于水源或电源终端引起的停工时间",{"key":24,"text":41,"correct":22},"由于工程技术人员和工人差错引起的工时损失",{"key":27,"text":43,"correct":22},"由于劳动组织不合理导致工作中断所占用的时间",{"key":31,"text":45,"correct":22},"由于材料供应不及时引起的停工时间",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":20,"analysis":33},896624,"运输汽车装载保温泡沫板， 因体积大但重量不足而引起的汽车在降低负荷的情况下工作的时间属于机器工作时间消耗中的（ ）。",[50,52,54,56],{"key":20,"text":51,"correct":29},"有效工作时间",{"key":24,"text":53,"correct":22},"不可避免的无负荷工作时间",{"key":27,"text":55,"correct":22},"多余工作时间",{"key":31,"text":57,"correct":22},"低负荷下的工作时间",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":24,"analysis":33},896625,"正常施工条件下，完成单位合格建筑产品所需某材料的不可避免损耗量为0．90kg，已知该材料的损耗率为7．20%，则其总消耗量为（ ）kg。",[62,64,66,68],{"key":20,"text":63,"correct":22},"13．50",{"key":24,"text":65,"correct":29},"13．40",{"key":27,"text":67,"correct":22},"12．50",{"key":31,"text":69,"correct":22},"11．60",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":31,"analysis":33},896626,"已知产量定额为10单位，则时间定额为（ ）。",[74,76,78,80],{"key":20,"text":75,"correct":22},"10单位",{"key":24,"text":77,"correct":22},"1单位",{"key":27,"text":79,"correct":22},"0．5单位",{"key":31,"text":81,"correct":29},"0．1单位",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":20,"analysis":33},896627,"在正常施工条件和合理使用材料的情况下，生产质量合格的单位产品所必须消耗的建筑安装材料的数量标准属于（ ）。",[86,88,90,92],{"key":20,"text":87,"correct":29},"材料消耗定额",{"key":24,"text":89,"correct":22},"机械台班消耗定额",{"key":27,"text":91,"correct":22},"施工定额",{"key":31,"text":93,"correct":22},"概算定额",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":31,"analysis":33},896628,"在编制材料消耗定额的基本方法中，（ ）比较适合计算块状、板状、卷状等材料的消耗量。",[98,100,102,104],{"key":20,"text":99,"correct":22},"现场技术测定法",{"key":24,"text":101,"correct":22},"试验法",{"key":27,"text":103,"correct":22},"统计法",{"key":31,"text":105,"correct":29},"理论计算法",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":31,"analysis":33},896629,"若完成某分项工程需要某种材料的净耗量为0．95t，损耗率为5%，那么，必需消耗量为（ ）t。",[110,112,114,116],{"key":20,"text":111,"correct":22},"0．8",{"key":24,"text":113,"correct":22},"0．95",{"key":27,"text":115,"correct":22},"1．05",{"key":31,"text":117,"correct":29},"0．9975",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":27,"analysis":33},896630,"工程计价最基础的定额，可分为（ ）。",[122,124,126,128],{"key":20,"text":123,"correct":22},"施工定额、预算定额、概算定额",{"key":24,"text":125,"correct":22},"建筑工程定额、设备安装工程定额、建筑安装工程费用定额",{"key":27,"text":127,"correct":29},"劳动定额、机械台班消耗量定额、材料消耗量定额",{"key":31,"text":129,"correct":22},"概算指标、投资估算指标、概算定额",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":27,"analysis":33},896631,"编制材料消耗定额的基本方法中，用（ ）主要是为了取得编制材料损耗定额的资料。",[134,135,136,137],{"key":20,"text":103,"correct":22},{"key":24,"text":101,"correct":22},{"key":27,"text":99,"correct":29},{"key":31,"text":105,"correct":22},{"id":139,"libraryId":5,"type":15,"typeLabel":16,"stem":140,"options":141,"answer":24,"analysis":33},896632,"编制材料消耗定额的基本方法中，（ ）可获得材料消耗的各项数据，用以编制材料消耗定额。",[142,143,144,145],{"key":20,"text":105,"correct":22},{"key":24,"text":103,"correct":29},{"key":27,"text":101,"correct":22},{"key":31,"text":99,"correct":22},{"id":147,"libraryId":5,"type":15,"typeLabel":16,"stem":148,"options":149,"answer":27,"analysis":33},896633,"下列关于时间定额的表述，错误的是（ ）。",[150,152,154,156],{"key":20,"text":151,"correct":22},"时间定额是劳动定额的类型之一",{"key":24,"text":153,"correct":22},"时间定额与产量定额是互为倒数的关系",{"key":27,"text":155,"correct":29},"时间定额与产量定额是互为补充说明的关系",{"key":31,"text":157,"correct":22},"时间定额是指某工种某一等级的工人或工人小组在合理的劳动组织等施工条件下，完成单位合格产品所必须消耗的工作时间",{"id":159,"libraryId":5,"type":15,"typeLabel":16,"stem":160,"options":161,"answer":20,"analysis":33},896634,"修磨校验工具、移动工作梯、工人转移工作地点等所需时间属于（ ）。",[162,164,166,168],{"key":20,"text":163,"correct":29},"辅助工作时间",{"key":24,"text":165,"correct":22},"由于施工工艺特点引起的工作中断时间",{"key":27,"text":167,"correct":22},"施工本身造成的停工时间",{"key":31,"text":169,"correct":22},"准备与结束工作时间",{"id":171,"libraryId":5,"type":15,"typeLabel":16,"stem":172,"options":173,"answer":31,"analysis":33},896635,"施工机械工作时间中的不可避免的中断时间应属于（ ）。",[174,175,177,178],{"key":20,"text":51,"correct":22},{"key":24,"text":176,"correct":22},"停工时间",{"key":27,"text":53,"correct":22},{"key":31,"text":179,"correct":29},"定额时间",{"id":181,"libraryId":5,"type":15,"typeLabel":16,"stem":182,"options":183,"answer":20,"analysis":33},896636,"材料损耗计算公式，可以表示为（ ）×100%。",[184,186,188,190],{"key":20,"text":185,"correct":29},"材料损耗量／材料净用量",{"key":24,"text":187,"correct":22},"材料净用量／材料损耗量",{"key":27,"text":189,"correct":22},"材料损耗量／材料总用量",{"key":31,"text":191,"correct":22},"材料净用量／材料总用量",{"id":193,"libraryId":5,"type":15,"typeLabel":16,"stem":194,"options":195,"answer":24,"analysis":33},896637,"下列机械工作时间中，属于有效工作时间的是（ ）。",[196,198,200,202],{"key":20,"text":197,"correct":22},"筑路机在工作区末端的调头时间",{"key":24,"text":199,"correct":29},"体积达标而未达到载重吨位的货物汽车运输时间",{"key":27,"text":201,"correct":22},"机械在工作地点之间的转移时间",{"key":31,"text":203,"correct":22},"装车数量不足而在低负荷下工作的时间",{"id":205,"libraryId":5,"type":15,"typeLabel":16,"stem":206,"options":207,"answer":31,"analysis":33},896638,"1m31 砖厚砖墙中若材料为标准砖， 灰缝厚度为 10mm， 砖损耗率为 2%， 砂浆损耗率为 1%， 则砂浆消耗量为（ ） m3。",[208,210,212,214],{"key":20,"text":209,"correct":22},"0.062",{"key":24,"text":211,"correct":22},"0.081",{"key":27,"text":213,"correct":22},"0.205",{"key":31,"text":215,"correct":29},"0.228",{"id":217,"libraryId":5,"type":15,"typeLabel":16,"stem":218,"options":219,"answer":20,"analysis":33},896639,"已知砌筑1m3砖墙中砖净量和损耗分别为529块、6块，百块砖体积按0.146m3计算，砂浆损耗率为10%。则砌筑1m3砖墙的砂浆用量为（ ）m3。",[220,222,224,226],{"key":20,"text":221,"correct":29},"0.250",{"key":24,"text":223,"correct":22},"0.253",{"key":27,"text":225,"correct":22},"0.241",{"key":31,"text":227,"correct":22},"0.243",{"id":229,"libraryId":5,"type":15,"typeLabel":16,"stem":230,"options":231,"answer":24,"analysis":33},896640,"（ ），重视现场调查研究和技术分析，有一定的科学技术依据，制定定额的准确性较好。",[232,234,236,238],{"key":20,"text":233,"correct":22},"经验估计法",{"key":24,"text":235,"correct":29},"技术测定法",{"key":27,"text":237,"correct":22},"统计分析法",{"key":31,"text":239,"correct":22},"比较类推法",{"id":241,"libraryId":5,"type":15,"typeLabel":16,"stem":242,"options":243,"answer":31,"analysis":33},896641,"下列施工机械消耗时间中，属于机械必须消耗时间的是（ ）。",[244,246,248,250],{"key":20,"text":245,"correct":22},"未及时供料引起的机械停工时间",{"key":24,"text":247,"correct":22},"由于气候条件引起的机械停工时间",{"key":27,"text":249,"correct":22},"装料不足时的机械运转时间",{"key":31,"text":251,"correct":29},"因机械保养而中断使用的时间",{"id":253,"libraryId":5,"type":15,"typeLabel":16,"stem":254,"options":255,"answer":31,"analysis":33},896642,"下列工人工作时间消耗中，属于有效工作时间的是（ ）。",[256,258,260,262],{"key":20,"text":257,"correct":22},"因混凝土养护引起的停工时间",{"key":24,"text":259,"correct":22},"偶然停工（停水、停电）增加的时间",{"key":27,"text":261,"correct":22},"产品质量不合格返工的工作时间",{"key":31,"text":263,"correct":29},"准备施工工具花费的时间",{"id":265,"libraryId":5,"type":15,"typeLabel":16,"stem":266,"options":267,"answer":24,"analysis":33},896643,"某混凝土构件采用木模板施工，木模板一次净用量为 200 ㎡，现场制作安装不可避免的损耗率为 2％，木模板可周转使用 5 次，每次补损率为 5％，则木模板的周转使用量为（）㎡。",[268,270,272,274],{"key":20,"text":269,"correct":22},"48.00",{"key":24,"text":271,"correct":29},"48.96",{"key":27,"text":273,"correct":22},"49.44",{"key":31,"text":275,"correct":22},"51.00",{"id":277,"libraryId":5,"type":15,"typeLabel":16,"stem":278,"options":279,"answer":27,"analysis":33},896644,"确定施工机械台班定额消耗量前需计算机械时间利用系数，其计算公式正确的是（ ）。",[280,282,284,286],{"key":20,"text":281,"correct":22},"机械时间利用系数=机械纯工作1h正常生产率×工作班纯工作时间",{"key":24,"text":283,"correct":22},"机械时间利用系数=1\u002F机械台班产量定额",{"key":27,"text":285,"correct":29},"机械时间利用系数=机械在一个工作班内纯工作时间\u002F一个工作班延续时间（8h）",{"key":31,"text":287,"correct":22},"机械时间利用系数=一个工作班延续时间（8h）\u002F机械在一个工作班内纯工作时间",{"id":289,"libraryId":5,"type":15,"typeLabel":16,"stem":290,"options":291,"answer":24,"analysis":33},896645,"某混凝土构件采用木模板施工， 木模板一次使用量为 204 ㎡， 木模板可周转使用 5 次， 每次补损率为 5％，则木模板的周转使用量为（ ） ㎡。",[292,293,294,295],{"key":20,"text":269,"correct":22},{"key":24,"text":271,"correct":29},{"key":27,"text":273,"correct":22},{"key":31,"text":275,"correct":22},{"id":297,"libraryId":5,"type":15,"typeLabel":16,"stem":298,"options":299,"answer":27,"analysis":33},896646,"砌筑一砖厚砖墙，灰缝厚度为10mm，砖的施工损耗率为1．5%，场外运输损耗率为1%。砖的规格为240mm×115mm×53mm，每立方米砖墙工程中砖的定额消耗量为（ ）块。",[300,302,304,306],{"key":20,"text":301,"correct":22},"515．56",{"key":24,"text":303,"correct":22},"520．64",{"key":27,"text":305,"correct":29},"537．04",{"key":31,"text":307,"correct":22},"542．33",{"id":309,"libraryId":5,"type":15,"typeLabel":16,"stem":310,"options":311,"answer":20,"analysis":33},896647,"已知砌筑 1m3 砖墙中砖净用量和损耗量分别为 529 块、6 块，百块砖体积按 0.146m3 计算，砂浆损耗率为 10%。则砌筑 1m3 砖墙的砂浆用量是（ ）m3。",[312,313,314,315],{"key":20,"text":221,"correct":29},{"key":24,"text":223,"correct":22},{"key":27,"text":225,"correct":22},{"key":31,"text":227,"correct":22},{"id":317,"libraryId":5,"type":15,"typeLabel":16,"stem":318,"options":319,"answer":27,"analysis":33},896648,"通过对施工过程的具体活动进行实地观察，详细记录工人和机械的工作时间消耗、完成产品数量及有关影响因素,再对所获得的资料进行分析，制定出人工定额的方法是（）。",[320,321,322,323],{"key":20,"text":237,"correct":22},{"key":24,"text":239,"correct":22},{"key":27,"text":235,"correct":29},{"key":31,"text":233,"correct":22},{"id":325,"libraryId":5,"type":15,"typeLabel":16,"stem":326,"options":327,"answer":27,"analysis":33},896649,"某施工企业编制砌砖墙人工定额，该企业有近5年同类工程的施工工时消耗资料，则制定人工定额适合选用的方法是（）。",[328,329,330,331],{"key":20,"text":235,"correct":22},{"key":24,"text":239,"correct":22},{"key":27,"text":237,"correct":29},{"key":31,"text":233,"correct":22},{"id":333,"libraryId":5,"type":15,"typeLabel":16,"stem":334,"options":335,"answer":20,"analysis":33},896650,"对于结构上相似、工艺上的同类、条件上具有可比性及变化规律性的产品，施 工人工定额的制定适宜采用的方法是（）。",[336,337,338,339],{"key":20,"text":239,"correct":29},{"key":24,"text":235,"correct":22},{"key":27,"text":237,"correct":22},{"key":31,"text":233,"correct":22},{"id":341,"libraryId":5,"type":15,"typeLabel":16,"stem":342,"options":343,"answer":24,"analysis":33},896651,"编制压路机台班使用定额时，属于必须消耗的时间的是（）。",[344,346,348,350],{"key":20,"text":345,"correct":22},"施工组织不好引起的停工时间",{"key":24,"text":347,"correct":29},"压路机在工作区末端调头时间",{"key":27,"text":349,"correct":22},"压路机操作人员擅离岗位引起的停工时间",{"key":31,"text":351,"correct":22},"暴雨时压路机的停工时间",{"id":353,"libraryId":5,"type":15,"typeLabel":16,"stem":354,"options":355,"answer":27,"analysis":33},896652,"编制人工定额时，基本工作结束后整理劳动工具时间应计入（）。",[356,358,360,361],{"key":20,"text":357,"correct":22},"休息时间",{"key":24,"text":359,"correct":22},"不可避免的中断时间",{"key":27,"text":51,"correct":29},{"key":31,"text":362,"correct":22},"损失时间",{"id":364,"libraryId":5,"type":15,"typeLabel":16,"stem":365,"options":366,"answer":24,"analysis":33},896653,"在人工定额的损失时间里，工人在工作班内消耗的工作时间属于人工损失时间的是（ ）。",[367,368,369,370],{"key":20,"text":357,"correct":22},{"key":24,"text":176,"correct":29},{"key":27,"text":359,"correct":22},{"key":31,"text":169,"correct":22},{"id":372,"libraryId":5,"type":15,"typeLabel":16,"stem":373,"options":374,"answer":27,"analysis":33},896654,"在相同类型的项目中，选择有代表性的典型项目，然后根据测定的定额用比较类推的方法编制其他相关定额的一种方法是（ ）。",[375,376,377,378],{"key":20,"text":233,"correct":22},{"key":24,"text":237,"correct":22},{"key":27,"text":239,"correct":29},{"key":31,"text":235,"correct":22},{"id":380,"libraryId":5,"type":15,"typeLabel":16,"stem":381,"options":382,"answer":20,"analysis":33},896656,"不用计入人工日工资单价的费用是（ ）。",[383,385,387,389],{"key":20,"text":384,"correct":29},"劳动保险费",{"key":24,"text":386,"correct":22},"津贴补贴",{"key":27,"text":388,"correct":22},"劳动竞赛奖",{"key":31,"text":390,"correct":22},"特殊情况下支付的工资",{"id":392,"libraryId":5,"type":15,"typeLabel":16,"stem":393,"options":394,"answer":27,"analysis":33},896657,"在计算施工机械的台班单价时，不需要考虑（ ）。",[395,397,399,401],{"key":20,"text":396,"correct":22},"台班折旧费",{"key":24,"text":398,"correct":22},"车船税",{"key":27,"text":400,"correct":29},"原材料费",{"key":31,"text":402,"correct":22},"台班人工费",{"id":404,"libraryId":5,"type":15,"typeLabel":16,"stem":405,"options":406,"answer":24,"analysis":33},896658,"某吊装设备配驾驶员1人，当年制度工作日为250天，年工作台班为220台班，人工日工资单价为80元。该吊装设备的台班人工费为（ ）元。",[407,409,411,413],{"key":20,"text":408,"correct":22},"80．57",{"key":24,"text":410,"correct":29},"90．91",{"key":27,"text":412,"correct":22},"76．33",{"key":31,"text":414,"correct":22},"85．20",{"id":416,"libraryId":5,"type":15,"typeLabel":16,"stem":417,"options":418,"answer":20,"analysis":33},896659,"某大型施工机械预算价格为5万元，机械耐用总台班为1250台班，检修周期数为4，一次检修费为2000元，维护费系数为60%，机上人工费和燃料动力费为60元\u002F台班。不考虑残值和其他有关费用，则该机械台班单价为（ ）元\u002F台班。",[419,421,423,425],{"key":20,"text":420,"correct":29},"107.68",{"key":24,"text":422,"correct":22},"110.24",{"key":27,"text":424,"correct":22},"112.80",{"key":31,"text":426,"correct":22},"52.80",{"id":428,"libraryId":5,"type":15,"typeLabel":16,"stem":429,"options":430,"answer":24,"analysis":33},896660,"从甲、乙两地采购某工程材料，采购量及有关费用如下表所示。该工程材料的材料单价为（ ）元\u002Ft。 （表中原价、运杂费均为不含税价格）",[431,433,435,437],{"key":20,"text":432,"correct":22},"262.08",{"key":24,"text":434,"correct":29},"262.16",{"key":27,"text":436,"correct":22},"262.42",{"key":31,"text":438,"correct":22},"262.50",{"id":440,"libraryId":5,"type":15,"typeLabel":16,"stem":441,"options":442,"answer":31,"analysis":33},896661,"某工程采购的一批钢材的出厂价为3980元\u002F吨，运费为50元\u002F吨，运输损耗率为0.5%，采购保管费率为2%，则该批钢材的材料单价为（ ）元\u002F吨。",[443,445,447,449],{"key":20,"text":444,"correct":22},"4129.90",{"key":24,"text":446,"correct":22},"4079.90",{"key":27,"text":448,"correct":22},"4050.15",{"key":31,"text":450,"correct":29},"4131.15",{"id":452,"libraryId":5,"type":15,"typeLabel":16,"stem":453,"options":454,"answer":31,"analysis":33},896662,"根据国家相关法律、法规和政策规定，因停工学习、执行国家或社会义务等原因，按计时工资标准支付的工资属于人工日工资单价中的（ ）。",[455,457,459,460],{"key":20,"text":456,"correct":22},"基本工资",{"key":24,"text":458,"correct":22},"奖金",{"key":27,"text":386,"correct":22},{"key":31,"text":390,"correct":29},{"id":462,"libraryId":5,"type":15,"typeLabel":16,"stem":463,"options":464,"answer":31,"analysis":33},896663,"某施工机械设备司机2人，若年制度工作日为254天，年工作台班为250台班，人工日工资单价为80元，则该施工机械的台班人工费为（ ）元\u002F台班。",[465,467,469,471],{"key":20,"text":466,"correct":22},"78．72",{"key":24,"text":468,"correct":22},"81．28",{"key":27,"text":470,"correct":22},"157．44",{"key":31,"text":472,"correct":29},"162．56",{"id":474,"libraryId":5,"type":15,"typeLabel":16,"stem":475,"options":476,"answer":24,"analysis":33},896664,"某装修公司采购一批花岗石，运至施工现场，已知该花岗石出厂价为1000元／m2，运杂费30元／m2，当地造价管理部门规定材料采购及保管费率为1%，该花岗石的预算价格为（ ）元／m2。",[477,479,481,483],{"key":20,"text":478,"correct":22},"1034",{"key":24,"text":480,"correct":29},"1040．3",{"key":27,"text":482,"correct":22},"1044．34",{"key":31,"text":484,"correct":22},"1054．68",{"id":486,"libraryId":5,"type":15,"typeLabel":16,"stem":487,"options":488,"answer":20,"analysis":33},896665,"某施工机械预计使用15年，耐用总台班数为2100台班，使用期内检修次数是4次，一次检修费为5000元，则台班检修费为（ ）元。",[489,491,493,495],{"key":20,"text":490,"correct":29},"9．52",{"key":24,"text":492,"correct":22},"10．23",{"key":27,"text":494,"correct":22},"8．65",{"key":31,"text":496,"correct":22},"9．68",{"id":498,"libraryId":5,"type":15,"typeLabel":16,"stem":499,"options":500,"answer":24,"analysis":33},896666,"关于施工机械安拆费和场外运费的说法，正确的是（ ）。",[501,503,505,507],{"key":20,"text":502,"correct":22},"安拆费指安拆一次所需的人工、材料和机械使用费之和",{"key":24,"text":504,"correct":29},"安拆费中包括机械辅助设施的折旧费",{"key":27,"text":506,"correct":22},"能自行开动机械的安拆费不予计算",{"key":31,"text":508,"correct":22},"塔式起重机安拆费的超高增加费应计入机械台班单价",{"id":510,"libraryId":5,"type":15,"typeLabel":16,"stem":511,"options":512,"answer":27,"analysis":33},896667,"某材料原价为300元\u002Ft，运杂费及运输损耗费合计为50元\u002Ft,采购及保管费费率为3%,则该材料预算单价为（）元\u002Ft。",[513,515,517,519],{"key":20,"text":514,"correct":22},"350.0",{"key":24,"text":516,"correct":22},"359.0",{"key":27,"text":518,"correct":29},"360.5",{"key":31,"text":520,"correct":22},"360.8",{"id":522,"libraryId":5,"type":15,"typeLabel":16,"stem":523,"options":524,"answer":27,"analysis":33},896668,"某挖掘机配司机1人，若年制度工作日为245天，年工作台班为220台班，人工工日单价为90元，则该挖掘机的人工费为（）元\u002F台班。",[525,527,529,531],{"key":20,"text":526,"correct":22},"90.0",{"key":24,"text":528,"correct":22},"99.1",{"key":27,"text":530,"correct":29},"100.2",{"key":31,"text":532,"correct":22},"132.7",{"id":534,"libraryId":5,"type":15,"typeLabel":16,"stem":535,"options":536,"answer":20,"analysis":33},896669,"某施工机械原值为50000元，耐用总台班为2000台班，一次大修费为3000元，大修周期为4，台班经常修理费系数为20%，每台班发生的其他费用合计为30元\u002F台班，忽略残值和资金时间价值，则该机械的台班单价为（ ）元\u002F台班。",[537,539,541,543],{"key":20,"text":538,"correct":29},"60．40",{"key":24,"text":540,"correct":22},"62．20",{"key":27,"text":542,"correct":22},"65．40",{"key":31,"text":544,"correct":22},"67．20",{"id":546,"libraryId":5,"type":15,"typeLabel":16,"stem":547,"options":548,"answer":31,"analysis":33},896670,"关于建筑安装工程费用中建筑业增值税的计算，下列说法中正确的是（ ）。",[549,551,553,555],{"key":20,"text":550,"correct":22},"当事人可以自主选择一般计税法或简易计税法计税",{"key":24,"text":552,"correct":22},"一般计税法、简易计税法中的建筑业增值税税率均为11%",{"key":27,"text":554,"correct":22},"采用简易计税法时，税前造价不包含增值税的进项税额",{"key":31,"text":556,"correct":29},"采用一般计税法时，税前造价不包含增值税的进项税额",{"id":558,"libraryId":5,"type":15,"typeLabel":16,"stem":559,"options":560,"answer":24,"analysis":33},896671,"下列不属于企业管理费费率计算基础的是( )。",[561,563,565,567],{"key":20,"text":562,"correct":22},"以人、材、机费为计算基础",{"key":24,"text":564,"correct":29},"以人工费和材料费合计为计算基础",{"key":27,"text":566,"correct":22},"以人工费和机械费合计为计算基础",{"key":31,"text":568,"correct":22},"以人工费为计算基础",{"id":570,"libraryId":5,"type":15,"typeLabel":16,"stem":571,"options":572,"answer":27,"analysis":33},896672,"分别反映各类工程的人工、材料、施工机械及主要设备报告期价格对基期价格的变化程度指标的是（ ）。",[573,575,577,579],{"key":20,"text":574,"correct":22},"月指数",{"key":24,"text":576,"correct":22},"综合造价指数",{"key":27,"text":578,"correct":29},"单项价格指数",{"key":31,"text":580,"correct":22},"时点造价指数",[582,585,588,591,594,597],{"id":15,"name":583,"category":7,"favorite":584},"领导干部任职前廉政法规知识测试题",92,{"id":586,"name":587,"category":7,"favorite":15},595,"建筑结构与设备",{"id":589,"name":590,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":592,"name":593,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":595,"name":596,"category":7,"favorite":8},534,"BIM工程师",{"id":598,"name":596,"category":7,"favorite":8},535]