[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-581-35":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":589},{"id":5,"name":6,"category":7,"favorite":8},581,"建设工程造价管理基础知识","建筑工程",0,35,50,2873,[13,34,46,58,70,82,94,106,118,130,142,152,164,176,188,200,212,224,236,248,260,272,284,294,306,318,330,342,353,363,375,386,395,403,415,424,433,445,453,465,477,485,497,509,520,532,544,556,568,577],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":24,"analysis":33},896566,1,"单选题","建设单位通过市场机制取得建设用地，不仅应承担征地补偿费用、拆迁补偿费用，还须向土地所有者支付（）。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","安置补助费",false,{"key":24,"text":25,"correct":26},"B","土地出让金",true,{"key":28,"text":29,"correct":22},"C","青苗补偿费",{"key":31,"text":32,"correct":22},"D","土地管理费","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":31,"analysis":33},896569,"下列费用项目中，计入工程建设其他费中专利及专有技术使用费的是（）。",[38,40,42,44],{"key":20,"text":39,"correct":22},"专利及专有技术在项目全寿命期的使用费",{"key":24,"text":41,"correct":22},"在生产期支付的商标权费",{"key":28,"text":43,"correct":22},"国内设计资料费",{"key":31,"text":45,"correct":26},"国外设计资料费",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":20,"analysis":33},896571,"建设单位管理费是指建设单位发生的（ ）的开支。",[50,52,54,56],{"key":20,"text":51,"correct":26},"管理性质",{"key":24,"text":53,"correct":22},"职工福利费",{"key":28,"text":55,"correct":22},"基本医疗保险费",{"key":31,"text":57,"correct":22},"办公费",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":28,"analysis":33},896573,"在建设工程项目总投资组成中的基本预备费主要是为（）。",[62,64,66,68],{"key":20,"text":63,"correct":22},"建设期内材料价格上涨增加的费用",{"key":24,"text":65,"correct":22},"因施工质量不合格返工增加的费用",{"key":28,"text":67,"correct":26},"设计变更增加工程量的费用",{"key":31,"text":69,"correct":22},"因业主方拖欠工程款增加的承包商贷款利息",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":20,"analysis":33},896574,"基本预备费是指在投资估算或设计概算内难以预料的工程费用，下列关于其费用内容叙述错误的是（ ）。",[74,76,78,80],{"key":20,"text":75,"correct":26},"实行工程保险的工程项目费用应适当提高",{"key":24,"text":77,"correct":22},"竣工验收时为鉴定工程质量，对隐蔽工程进行必要的挖掘和修复的费用",{"key":28,"text":79,"correct":22},"超规超限设备运输过程中可能增加的费用",{"key":31,"text":81,"correct":22},"在批准的基础设计和概算范围内增加的设计变更、局部地基处理等费用",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":28,"analysis":33},896576,"根据我国现行建设项目投资构成，下列费用项目中属于建设期利息包含内容的是（ ）。",[86,88,90,92],{"key":20,"text":87,"correct":22},"建设单位建设期后发生的利息",{"key":24,"text":89,"correct":22},"施工单位建设期长期贷款利息",{"key":28,"text":91,"correct":26},"国内代理机构收取的贷款管理费",{"key":31,"text":93,"correct":22},"国外贷款机构收取的转贷费",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":31,"analysis":33},896577,"基本预备费的计费基数是（ ）。",[98,100,102,104],{"key":20,"text":99,"correct":22},"设备及工(器)具购置费",{"key":24,"text":101,"correct":22},"建筑安装工程费",{"key":28,"text":103,"correct":22},"设备及工(器)具购置费+建筑安装工程费",{"key":31,"text":105,"correct":26},"设备及工(器)具购置费+建筑安装工程费+工程建设其他费用",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":20,"analysis":33},896578,"关于建设期利息的说法，正确的是（）。",[110,112,114,116],{"key":20,"text":111,"correct":26},"建设期利息包括国际商业银行贷款在建设期间应计的借款利息",{"key":24,"text":113,"correct":22},"建设期利息包括在境内发行的债券在建设期后支付的借款利息",{"key":28,"text":115,"correct":22},"建设期利息不包括国外贷款银行以年利率方式收取的各种管理费",{"key":31,"text":117,"correct":22},"建设期利息不包括国内代理机构以年利率方式收取的转贷费和担保费",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":31,"analysis":33},896579,"预备费包括基本预备费和价差预备费，其中价差预备费的计算应是（ ）。",[122,124,126,128],{"key":20,"text":123,"correct":22},"以编制年份的静态投资额为基数，采用单利方法",{"key":24,"text":125,"correct":22},"以编制年份的静态投资额为基数，采用复利方法",{"key":28,"text":127,"correct":22},"以估算年份价格水平的投资额为基数，采用单利方法",{"key":31,"text":129,"correct":26},"以估算年份价格水平的投资额为基数，采用复利方法",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":28,"analysis":33},896581,"某建设工程项目的设备及工器具购置费为 2500 万元，建筑安装工程费为 2000 万元，工程建设其他费为 1500 万元，基本预备费率为 10%，则该项目的基本预备费为（ ）万元。",[134,136,138,140],{"key":20,"text":135,"correct":22},"200",{"key":24,"text":137,"correct":22},"400",{"key":28,"text":139,"correct":26},"600",{"key":31,"text":141,"correct":22},"450",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":31,"analysis":33},896582,"建设工程价差预备费的计算应是（ ）。",[146,148,150,151],{"key":20,"text":147,"correct":22},"以编制年费的静态投资额为基数，采用单利方法",{"key":24,"text":149,"correct":22},"以编制年费的静态投资额为基数，采用复利方法",{"key":28,"text":127,"correct":22},{"key":31,"text":129,"correct":26},{"id":153,"libraryId":5,"type":15,"typeLabel":16,"stem":154,"options":155,"answer":20,"analysis":33},896583,"影响工程造价计价的两个主要因素是（）。",[156,158,160,162],{"key":20,"text":157,"correct":26},"单位价格和实物工程量",{"key":24,"text":159,"correct":22},"单位价格和单位消耗量",{"key":28,"text":161,"correct":22},"资源市场单价和单位消耗量",{"key":31,"text":163,"correct":22},"资源市场单价和措施项目工程量",{"id":165,"libraryId":5,"type":15,"typeLabel":16,"stem":166,"options":167,"answer":24,"analysis":33},896584,"在下列各种定额中，以工序为研究对象的是（）。",[168,170,172,174],{"key":20,"text":169,"correct":22},"概算定额",{"key":24,"text":171,"correct":26},"施工定额",{"key":28,"text":173,"correct":22},"预算定额",{"key":31,"text":175,"correct":22},"投资估算指标",{"id":177,"libraryId":5,"type":15,"typeLabel":16,"stem":178,"options":179,"answer":24,"analysis":33},896585,"工程造价计价的顺序是（ ）。",[180,182,184,186],{"key":20,"text":181,"correct":22},"工程项目单价→单项工程造价→单位工程造价→建设项目总造价",{"key":24,"text":183,"correct":26},"分部分项工程造价→单位工程造价→单项工程造价→建设项目总造价",{"key":28,"text":185,"correct":22},"单项工程造价→单位工程造价→工程项目单价→建设项目总造价",{"key":31,"text":187,"correct":22},"单位工程造价→单项工程造价→工程项目单价→建设项目总造价",{"id":189,"libraryId":5,"type":15,"typeLabel":16,"stem":190,"options":191,"answer":24,"analysis":33},896586,"作为工程定额体系的重要组成部分，预算定额是（ ）。",[192,194,196,198],{"key":20,"text":193,"correct":22},"完成一定计价单位的某一施工过程所需要消耗的人工、材料和机械台班数量标准",{"key":24,"text":195,"correct":26},"完成一定计量单位合格分项工程和结构构件所需消耗的人工、材料、施工机械台班数量及其费用标准",{"key":28,"text":197,"correct":22},"完成单位合格扩大分项工程所需消耗的人工、材料和施工机械台班数量及费用标准",{"key":31,"text":199,"correct":22},"完成一个规定计量单位建筑安装产品的费用消耗标准",{"id":201,"libraryId":5,"type":15,"typeLabel":16,"stem":202,"options":203,"answer":20,"analysis":33},896587,"工程定额计价法的第二阶段的工作内容是（ ）。",[204,206,208,210],{"key":20,"text":205,"correct":26},"熟悉图纸和现场",{"key":24,"text":207,"correct":22},"套定额单价",{"key":28,"text":209,"correct":22},"计算工程量",{"key":31,"text":211,"correct":22},"收集资料",{"id":213,"libraryId":5,"type":15,"typeLabel":16,"stem":214,"options":215,"answer":24,"analysis":33},896588,"概算定额是确定完成合格的（ ）所需消耗的人工、材料和机械台班的数量标准。",[216,218,220,222],{"key":20,"text":217,"correct":22},"分部(分项)工程",{"key":24,"text":219,"correct":26},"单位扩大分项工程",{"key":28,"text":221,"correct":22},"单位工程",{"key":31,"text":223,"correct":22},"单项工程",{"id":225,"libraryId":5,"type":15,"typeLabel":16,"stem":226,"options":227,"answer":20,"analysis":33},896589,"下列各项定额中，不属于按投用途分类的是（ ）定额。",[228,230,232,234],{"key":20,"text":229,"correct":26},"企业",{"key":24,"text":231,"correct":22},"施工",{"key":28,"text":233,"correct":22},"预算",{"key":31,"text":235,"correct":22},"概算",{"id":237,"libraryId":5,"type":15,"typeLabel":16,"stem":238,"options":239,"answer":31,"analysis":33},896590,"影响工程造价的主要因素是（ ）。",[240,242,244,246],{"key":20,"text":241,"correct":22},"工程方案和环境保护措施",{"key":24,"text":243,"correct":22},"建筑设计和工艺设计",{"key":28,"text":245,"correct":22},"项目建设规模和设备方案",{"key":31,"text":247,"correct":26},"单位价格和实物工程数量",{"id":249,"libraryId":5,"type":15,"typeLabel":16,"stem":250,"options":251,"answer":31,"analysis":33},896591,"关于工程造价的分布组合计价原理，下列说法正确的是（）。",[252,254,256,258],{"key":20,"text":253,"correct":22},"分部分项工程费=基本构造单元工程量×工料单价",{"key":24,"text":255,"correct":22},"工料单价指人工、材料和施工机械台班单价",{"key":28,"text":257,"correct":22},"基本构造单元是由分部工程适当组合形成",{"key":31,"text":259,"correct":26},"工程总价是按规定程序和方法逐级汇总形成的工程造价",{"id":261,"libraryId":5,"type":15,"typeLabel":16,"stem":262,"options":263,"answer":31,"analysis":33},896592,"分部分项工程项目综合单价组成不包括（）。",[264,266,268,270],{"key":20,"text":265,"correct":22},"人工费",{"key":24,"text":267,"correct":22},"材料费",{"key":28,"text":269,"correct":22},"管理费",{"key":31,"text":271,"correct":26},"税金",{"id":273,"libraryId":5,"type":15,"typeLabel":16,"stem":274,"options":275,"answer":31,"analysis":33},896593,"工程定额计价的主要程序有：①计算工程量；②套用定额单价；③费用计算；④复核⑤熟悉施工图纸和现场，正确的步骤是（）。",[276,278,280,282],{"key":20,"text":277,"correct":22},"④-⑤-①-②-③",{"key":24,"text":279,"correct":22},"⑤-①-④-②-③",{"key":28,"text":281,"correct":22},"⑤-②-①-④-③",{"key":31,"text":283,"correct":26},"⑤-①-②-③-④",{"id":285,"libraryId":5,"type":15,"typeLabel":16,"stem":286,"options":287,"answer":28,"analysis":33},896594,"下列定额中，项目划分最细的计价定额是（ ）。",[288,290,292,293],{"key":20,"text":289,"correct":22},"材料消耗定额",{"key":24,"text":291,"correct":22},"劳动定额",{"key":28,"text":173,"correct":26},{"key":31,"text":169,"correct":22},{"id":295,"libraryId":5,"type":15,"typeLabel":16,"stem":296,"options":297,"answer":31,"analysis":33},896595,"根据我国建设市场发展现状，工程量清单计价和计量规范主要适用于（ ）",[298,300,302,304],{"key":20,"text":299,"correct":22},"项目建设前期各阶段工程造价的估计",{"key":24,"text":301,"correct":22},"项目初步设计阶段概算的预测",{"key":28,"text":303,"correct":22},"项目施工图设计阶段预算的预测",{"key":31,"text":305,"correct":26},"项目合同价格的形成和后续合同价格的管理",{"id":307,"libraryId":5,"type":15,"typeLabel":16,"stem":308,"options":309,"answer":20,"analysis":33},896596,"施工组织设计是由（ ）根据施工特点、现场情况、施工工期等有关条件编制的，用来确定施工方案，布置现场，安排进度计价时应注意施工组织设计中影响工程费用的因素。",[310,312,314,316],{"key":20,"text":311,"correct":26},"施工单位",{"key":24,"text":313,"correct":22},"监理单位",{"key":28,"text":315,"correct":22},"分包单位",{"key":31,"text":317,"correct":22},"设计单位",{"id":319,"libraryId":5,"type":15,"typeLabel":16,"stem":320,"options":321,"answer":20,"analysis":33},896597,"根据《建设工程工程量清单计价规范》（GB50500-2013），下列费用项目中需纳入分部分项工程项目综合单价的是（ ）。",[322,324,326,328],{"key":20,"text":323,"correct":26},"工程设备估价",{"key":24,"text":325,"correct":22},"专业工程暂估价",{"key":28,"text":327,"correct":22},"暂列金额",{"key":31,"text":329,"correct":22},"计日工费",{"id":331,"libraryId":5,"type":15,"typeLabel":16,"stem":332,"options":333,"answer":24,"analysis":33},896598,"工程造价的计价依据按用途分类可以分为7大类，其中计算设备费依据的是（）。",[334,336,338,340],{"key":20,"text":335,"correct":22},"各项工程建设其他费用定额",{"key":24,"text":337,"correct":26},"设备价格、运杂费率等",{"key":28,"text":339,"correct":22},"间接费定额",{"key":31,"text":341,"correct":22},"概算指标、概算定额、预算定额",{"id":343,"libraryId":5,"type":15,"typeLabel":16,"stem":344,"options":345,"answer":20,"analysis":33},896599,"以下属于计算分部分项工程人工、材料、机械台班消耗量及费用依据的是（）。",[346,348,350,351],{"key":20,"text":347,"correct":26},"工程造价信息",{"key":24,"text":349,"correct":22},"工程建设其他费定额",{"key":28,"text":339,"correct":22},{"key":31,"text":352,"correct":22},"运杂费率",{"id":354,"libraryId":5,"type":15,"typeLabel":16,"stem":355,"options":356,"answer":28,"analysis":33},896600,"以下属于计算建筑安装工程费用依据的是（）。",[357,359,360,362],{"key":20,"text":358,"correct":22},"用地指标",{"key":24,"text":349,"correct":22},{"key":28,"text":361,"correct":26},"费用定额",{"key":31,"text":352,"correct":22},{"id":364,"libraryId":5,"type":15,"typeLabel":16,"stem":365,"options":366,"answer":31,"analysis":33},896601,"完成某单位分部(分项)工程需要基本用工4．2工日，超运距用工0．3工日，辅助用工1工日，人工幅度系数为10%，则该单位分部(分项)工作预算定额人工消耗量为（ ）工日。",[367,369,371,373],{"key":20,"text":368,"correct":22},"5．92",{"key":24,"text":370,"correct":22},"5．95",{"key":28,"text":372,"correct":22},"6．02",{"key":31,"text":374,"correct":26},"6．05",{"id":376,"libraryId":5,"type":15,"typeLabel":16,"stem":377,"options":378,"answer":28,"analysis":33},896602,"概算指标是以( )为对象的消耗指标。",[379,380,382,384],{"key":20,"text":221,"correct":22},{"key":24,"text":381,"correct":22},"分部工程",{"key":28,"text":383,"correct":26},"整个建筑物或构筑物",{"key":31,"text":385,"correct":22},"分项工程",{"id":387,"libraryId":5,"type":15,"typeLabel":16,"stem":388,"options":389,"answer":20,"analysis":33},896603,"工程建设( )是编制建设项目建议书、可行性研究报告等前期工作阶段投资估算的依据。",[390,391,392,393],{"key":20,"text":175,"correct":26},{"key":24,"text":169,"correct":22},{"key":28,"text":173,"correct":22},{"key":31,"text":394,"correct":22},"概算指标",{"id":396,"libraryId":5,"type":15,"typeLabel":16,"stem":397,"options":398,"answer":20,"analysis":33},896604,"既是企业施工成本管理，也是企业编制工料计划的依据的定额是（ ）。",[399,400,401,402],{"key":20,"text":171,"correct":26},{"key":24,"text":394,"correct":22},{"key":28,"text":173,"correct":22},{"key":31,"text":169,"correct":22},{"id":404,"libraryId":5,"type":15,"typeLabel":16,"stem":405,"options":406,"answer":31,"analysis":33},896605,"下列不属于预算定额的确定编制细则工作的是（ ）。",[407,409,411,413],{"key":20,"text":408,"correct":22},"统一计算口径、计量单位和小数点位数的要求",{"key":24,"text":410,"correct":22},"统一的名称、用字、专业用语",{"key":28,"text":412,"correct":22},"统一编制表格及编制方法",{"key":31,"text":414,"correct":26},"统一的工程量计算规则",{"id":416,"libraryId":5,"type":15,"typeLabel":16,"stem":417,"options":418,"answer":20,"analysis":33},896606,"既是编制项目建议书、可行性研究报告等前期工作阶段投资估算的依据，也可以作为编制固定资产长远规划投资额的参考的是（ ）。",[419,421,422,423],{"key":20,"text":420,"correct":26},"工程建设投资估算指标",{"key":24,"text":394,"correct":22},{"key":28,"text":173,"correct":22},{"key":31,"text":169,"correct":22},{"id":425,"libraryId":5,"type":15,"typeLabel":16,"stem":426,"options":427,"answer":24,"analysis":33},896607,"编制建设项目主要材料计划的参考依据的是（ ）。",[428,429,430,431],{"key":20,"text":394,"correct":22},{"key":24,"text":169,"correct":26},{"key":28,"text":173,"correct":22},{"key":31,"text":432,"correct":22},"预算指标",{"id":434,"libraryId":5,"type":15,"typeLabel":16,"stem":435,"options":436,"answer":31,"analysis":33},896608,"预算定额的作用不包括（ ）。",[437,439,441,443],{"key":20,"text":438,"correct":22},"是编制施工图预算、确定建筑安装工程造价的基础",{"key":24,"text":440,"correct":22},"是编制施工组织设计的依据",{"key":28,"text":442,"correct":22},"是施工单位进行经济活动分析的依据",{"key":31,"text":444,"correct":26},"是编制建设项目主要材料计划的参考依据",{"id":446,"libraryId":5,"type":15,"typeLabel":16,"stem":447,"options":448,"answer":28,"analysis":33},896609,"编制概算定额的基础是（ ）。",[449,450,451,452],{"key":20,"text":171,"correct":22},{"key":24,"text":291,"correct":22},{"key":28,"text":173,"correct":26},{"key":31,"text":394,"correct":22},{"id":454,"libraryId":5,"type":15,"typeLabel":16,"stem":455,"options":456,"answer":20,"analysis":33},896610,"建设项目综合指标一般以项目的（ ）表示。",[457,459,461,463],{"key":20,"text":458,"correct":26},"综合生产能力单位投资",{"key":24,"text":460,"correct":22},"单项工程生产能力单位投资",{"key":28,"text":462,"correct":22},"建筑安装工程费用",{"key":31,"text":464,"correct":22},"投资估算指标的编制",{"id":466,"libraryId":5,"type":15,"typeLabel":16,"stem":467,"options":468,"answer":28,"analysis":33},896611,"概算指标的主要内容不包括（ ）。",[469,471,473,475],{"key":20,"text":470,"correct":22},"工程概况",{"key":24,"text":472,"correct":22},"工程造价及费用组成",{"key":28,"text":474,"correct":26},"每平方米建筑面积的质量指标",{"key":31,"text":476,"correct":22},"每平方米建筑面积的工料消耗指标",{"id":478,"libraryId":5,"type":15,"typeLabel":16,"stem":479,"options":480,"answer":20,"analysis":33},896612,"基本建设管理部门编制投资估算、编制基本建设计划、估算主要材料用量计划的依据是（ ）。",[481,482,483,484],{"key":20,"text":394,"correct":26},{"key":24,"text":171,"correct":22},{"key":28,"text":173,"correct":22},{"key":31,"text":169,"correct":22},{"id":486,"libraryId":5,"type":15,"typeLabel":16,"stem":487,"options":488,"answer":28,"analysis":33},896613,"投资估算指标的编制阶段不包括（ ）。",[489,491,493,495],{"key":20,"text":490,"correct":22},"收集整理资料阶段",{"key":24,"text":492,"correct":22},"平衡调整阶段",{"key":28,"text":494,"correct":26},"决策阶段",{"key":31,"text":496,"correct":22},"测算审查阶段",{"id":498,"libraryId":5,"type":15,"typeLabel":16,"stem":499,"options":500,"answer":20,"analysis":33},896614,"预算定额是按照（ ）编制的。",[501,503,505,507],{"key":20,"text":502,"correct":26},"社会平均水平",{"key":24,"text":504,"correct":22},"社会先进水平",{"key":28,"text":506,"correct":22},"行业平均水平",{"key":31,"text":508,"correct":22},"社会平均先进水平",{"id":510,"libraryId":5,"type":15,"typeLabel":16,"stem":511,"options":512,"answer":24,"analysis":33},896615,"关于概算定额的主要作用，下列说法不正确的是（ ）。",[513,515,517,518],{"key":20,"text":514,"correct":22},"编制最高投标限价的依据",{"key":24,"text":516,"correct":26},"是编制预算定额的依据",{"key":28,"text":444,"correct":22},{"key":31,"text":519,"correct":22},"对设计项目进行技术经济分析和比较的基础资料之一",{"id":521,"libraryId":5,"type":15,"typeLabel":16,"stem":522,"options":523,"answer":28,"analysis":33},896616,"预算定额的施工机械台班消耗指标的计量单位是台班，按现行规定，每个工作台班按机械工作（ ）小时计算。",[524,526,528,530],{"key":20,"text":525,"correct":22},"5",{"key":24,"text":527,"correct":22},"6",{"key":28,"text":529,"correct":26},"8",{"key":31,"text":531,"correct":22},"12",{"id":533,"libraryId":5,"type":15,"typeLabel":16,"stem":534,"options":535,"answer":28,"analysis":33},896617,"下列用时中，同时包含在劳动定额和预算定额人工消耗量中的是（ ）。",[536,538,540,542],{"key":20,"text":537,"correct":22},"隐蔽工程验收的影响时间",{"key":24,"text":539,"correct":22},"工序搭接发生的停歇时间",{"key":28,"text":541,"correct":26},"不可避免的中断时间",{"key":31,"text":543,"correct":22},"加工材料所需的时间",{"id":545,"libraryId":5,"type":15,"typeLabel":16,"stem":546,"options":547,"answer":31,"analysis":33},896618,"下列材料损耗，应计入预算定额材料损耗量的是（ ）。",[548,550,552,554],{"key":20,"text":549,"correct":22},"场外运输损耗",{"key":24,"text":551,"correct":22},"工地仓储损耗",{"key":28,"text":553,"correct":22},"一般性检验鉴定损耗",{"key":31,"text":555,"correct":26},"施工加工损耗",{"id":557,"libraryId":5,"type":15,"typeLabel":16,"stem":558,"options":559,"answer":20,"analysis":33},896619,"概算定额与预算定额的差异主要表现在（ ）的不同。",[560,562,564,566],{"key":20,"text":561,"correct":26},"项目划分",{"key":24,"text":563,"correct":22},"主要工程内容",{"key":28,"text":565,"correct":22},"主要表达方式",{"key":31,"text":567,"correct":22},"基本使用方法",{"id":569,"libraryId":5,"type":15,"typeLabel":16,"stem":570,"options":571,"answer":31,"analysis":33},896620,"下列工程中，属于概算指标编制对象的是（ ）。",[572,573,574,575],{"key":20,"text":385,"correct":22},{"key":24,"text":223,"correct":22},{"key":28,"text":381,"correct":22},{"key":31,"text":576,"correct":26},"整个建筑物",{"id":578,"libraryId":5,"type":15,"typeLabel":16,"stem":579,"options":580,"answer":31,"analysis":33},896621,"在计算预算定额人工工日消耗量时，包含在人工幅度差内的用工是（ ）。",[581,583,585,587],{"key":20,"text":582,"correct":22},"超运距用工",{"key":24,"text":584,"correct":22},"材料加工用工",{"key":28,"text":586,"correct":22},"机械土方工程的配合用工",{"key":31,"text":588,"correct":26},"工种交叉作业相互影响的停歇用工",[590,593,596,599,602,605],{"id":15,"name":591,"category":7,"favorite":592},"领导干部任职前廉政法规知识测试题",92,{"id":594,"name":595,"category":7,"favorite":15},595,"建筑结构与设备",{"id":597,"name":598,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":600,"name":601,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":603,"name":604,"category":7,"favorite":8},534,"BIM工程师",{"id":606,"name":604,"category":7,"favorite":8},535]