[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-581-32":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":596},{"id":5,"name":6,"category":7,"favorite":8},581,"建设工程造价管理基础知识","建筑工程",0,32,50,2873,[13,34,46,58,70,78,90,102,114,126,137,149,160,172,184,196,208,219,228,240,252,264,273,285,297,306,318,328,340,351,362,374,386,398,410,422,434,446,458,470,482,494,504,516,528,540,552,564,576,584],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":24,"analysis":33},896400,1,"单选题","竣工决算文件中，真实记录各种地下、地上建筑物等详细情况的技术文件是（ ）。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","总平面图",false,{"key":24,"text":25,"correct":26},"B","竣工图",true,{"key":28,"text":29,"correct":22},"C","施工图",{"key":31,"text":32,"correct":22},"D","交付使用资产明细表","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":28,"analysis":33},896401,"在一个建设工程项目中，具有独立的设计文件，竣工后可以独立发挥生产能力或效益的一组配套齐全的工程项目属于（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":22},"分部工程",{"key":24,"text":41,"correct":22},"单位工程",{"key":28,"text":43,"correct":26},"单项工程",{"key":31,"text":45,"correct":22},"分项工程",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":31,"analysis":33},896402,"对于采用（ ）的政府投资项目，政府需要从投资决策的角度审批项目建议书和可行性研究报告，除特殊情况外不再审批开工报告，同时还要严格审批其初步设计和概算。",[50,52,54,56],{"key":20,"text":51,"correct":22},"投资补助、转贷和资本金注入方式",{"key":24,"text":53,"correct":22},"直接投资和贷款贴息方式",{"key":28,"text":55,"correct":22},"投资补助、转贷和贷款贴息方式",{"key":31,"text":57,"correct":26},"直接投资和资本金注入方式",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":28,"analysis":33},896403,"项目在开工建设之前要切实做好各项准备工作，其主要内容不包括（ ）。",[62,64,66,68],{"key":20,"text":63,"correct":22},"征地、拆迁和场地平整",{"key":24,"text":65,"correct":22},"完成施工用水、电、通信、道路等接通工作",{"key":28,"text":67,"correct":26},"设计施工图样",{"key":31,"text":69,"correct":22},"组织招标选择工程监理单位、承包单位及设备、材料供应商",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":20,"analysis":33},896404,"具备独立施工条件并能形成独立使用功能的建筑物及构筑物为（ ）。",[74,75,76,77],{"key":20,"text":41,"correct":26},{"key":24,"text":39,"correct":22},{"key":28,"text":45,"correct":22},{"key":31,"text":43,"correct":22},{"id":79,"libraryId":5,"type":15,"typeLabel":16,"stem":80,"options":81,"answer":31,"analysis":33},896405,"对于《政府核准的投资项目目录》以外的企业投资项目，实行（ ）。",[82,84,86,88],{"key":20,"text":83,"correct":22},"核准制",{"key":24,"text":85,"correct":22},"责任制",{"key":28,"text":87,"correct":22},"审批制",{"key":31,"text":89,"correct":26},"备案制",{"id":91,"libraryId":5,"type":15,"typeLabel":16,"stem":92,"options":93,"answer":28,"analysis":33},896406,"根据《建筑工程施工质量验收统一标准》 ， 下列工程中， 属于分项工程的是（ ） 。",[94,96,98,100],{"key":20,"text":95,"correct":22},"计算机机房工程",{"key":24,"text":97,"correct":22},"轻钢结构工程",{"key":28,"text":99,"correct":26},"土方开挖工程",{"key":31,"text":101,"correct":22},"外墙防水工程",{"id":103,"libraryId":5,"type":15,"typeLabel":16,"stem":104,"options":105,"answer":28,"analysis":33},896407,"关于《国务院关于投资体制改革的决定》，特别重大的政府投资项目应实行（）制度。",[106,108,110,112],{"key":20,"text":107,"correct":22},"网上公示",{"key":24,"text":109,"correct":22},"咨询论证",{"key":28,"text":111,"correct":26},"专家评议",{"key":31,"text":113,"correct":22},"民众听证",{"id":115,"libraryId":5,"type":15,"typeLabel":16,"stem":116,"options":117,"answer":28,"analysis":33},896408,"根据《国务院关于投资体制改革的决定》，对于采用投资补助方式的政府投资项目政府需要审批的文件是（）。",[118,120,122,124],{"key":20,"text":119,"correct":22},"项目建议书",{"key":24,"text":121,"correct":22},"可行性研究报告",{"key":28,"text":123,"correct":26},"资金申请报告",{"key":31,"text":125,"correct":22},"初步设计和概算",{"id":127,"libraryId":5,"type":15,"typeLabel":16,"stem":128,"options":129,"answer":20,"analysis":33},896409,"根据《国务院关于投资体制改革的决定》，对于采用直接投资和资本金注入方式的政府投资项目，除特殊情况外，政府部门不再审批（）。",[130,132,134,136],{"key":20,"text":131,"correct":26},"开工报告",{"key":24,"text":133,"correct":22},"初步设计",{"key":28,"text":135,"correct":22},"工程概算",{"key":31,"text":121,"correct":22},{"id":138,"libraryId":5,"type":15,"typeLabel":16,"stem":139,"options":140,"answer":28,"analysis":33},896410,"根据《国务院关于投资体制改革的决定》实行备案制的项目是（）。",[141,143,145,147],{"key":20,"text":142,"correct":22},"政府直接投资的项目",{"key":24,"text":144,"correct":22},"采用资金注入方式的政府投资项目",{"key":28,"text":146,"correct":26},"政府核准的投资项目目录外的企业投资项目",{"key":31,"text":148,"correct":22},"政府核准的投资项目目录内的企业投资项目",{"id":150,"libraryId":5,"type":15,"typeLabel":16,"stem":151,"options":152,"answer":20,"analysis":33},896413,"对一般工业与民用建筑工程而言，下列工程中属于分部工程的是（ ）。",[153,155,156,158],{"key":20,"text":154,"correct":26},"电梯工程",{"key":24,"text":7,"correct":22},{"key":28,"text":157,"correct":22},"设备安装工程",{"key":31,"text":159,"correct":22},"工业管道工程",{"id":161,"libraryId":5,"type":15,"typeLabel":16,"stem":162,"options":163,"answer":24,"analysis":33},896414,"根据《房屋建筑和市政基础设施工程施工图设计文件审查管理办法》，施工图审查机构需要对施工图涉及公共利益、公众安全和（ ）的内容进行审查。",[164,166,168,170],{"key":20,"text":165,"correct":22},"施工组织方案",{"key":24,"text":167,"correct":26},"工程建设强制性标准",{"key":28,"text":169,"correct":22},"施工技术方案",{"key":31,"text":171,"correct":22},"施工图预算",{"id":173,"libraryId":5,"type":15,"typeLabel":16,"stem":174,"options":175,"answer":20,"analysis":33},896415,"建设工程项目管理工作的核心任务是（ ）。",[176,178,180,182],{"key":20,"text":177,"correct":26},"项目的目标控制",{"key":24,"text":179,"correct":22},"为项目建设的决策和实施增值",{"key":28,"text":181,"correct":22},"实现工程项目实施阶段的建设目标",{"key":31,"text":183,"correct":22},"为工程建设和使用增值",{"id":185,"libraryId":5,"type":15,"typeLabel":16,"stem":186,"options":187,"answer":24,"analysis":33},896416,"将工程项目按照投资效益和市场需求划分， 投资主要由政府用财政资金安排的项目是（ ）",[188,190,192,194],{"key":20,"text":189,"correct":22},"基础性项目",{"key":24,"text":191,"correct":26},"公益性项目",{"key":28,"text":193,"correct":22},"竞争性项目",{"key":31,"text":195,"correct":22},"改建项目",{"id":197,"libraryId":5,"type":15,"typeLabel":16,"stem":198,"options":199,"answer":28,"analysis":33},896417,"下列关于建设项目竣工验收表述正确的是（ ） 。",[200,202,204,206],{"key":20,"text":201,"correct":22},"无论规模大小，建设项目完工后均应进行初验，然后进行正式验收",{"key":24,"text":203,"correct":22},"建设项目竣工图应由施工单位绘制并加盖“竣工图”标志",{"key":28,"text":205,"correct":26},"具备竣工验收条件的工程，应在3个月内办理验收投产和移交规定资产手续",{"key":31,"text":207,"correct":22},"施工单位必须及时编制竣工决算，分析投资计划执行情况",{"id":209,"libraryId":5,"type":15,"typeLabel":16,"stem":210,"options":211,"answer":28,"analysis":33},896418,"根据《国务院关于投资体制改革的决定》，实行核准制的项目，企业仅需向政府提交（ ）。",[212,213,215,217],{"key":20,"text":119,"correct":22},{"key":24,"text":214,"correct":22},"项目可行性研究报告",{"key":28,"text":216,"correct":26},"项目申请报告",{"key":31,"text":218,"correct":22},"项目开工报告",{"id":220,"libraryId":5,"type":15,"typeLabel":16,"stem":221,"options":222,"answer":28,"analysis":33},896419,"根据《国务院关于投资体制改革的决定》，对于采用投资补助、转贷和贷款贴息方式的政府投资项目，政府投资主管部门需要审批（ ）。",[223,225,226,227],{"key":20,"text":224,"correct":22},"初步设计概算",{"key":24,"text":216,"correct":22},{"key":28,"text":123,"correct":26},{"key":31,"text":218,"correct":22},{"id":229,"libraryId":5,"type":15,"typeLabel":16,"stem":230,"options":231,"answer":28,"analysis":33},896420,"建设单位在办理工程质量监督注册手续时，需提供（ ）。",[232,234,236,238],{"key":20,"text":233,"correct":22},"投标文件",{"key":24,"text":235,"correct":22},"专项施工方案",{"key":28,"text":237,"correct":26},"施工组织设计",{"key":31,"text":239,"correct":22},"施工图设计文件",{"id":241,"libraryId":5,"type":15,"typeLabel":16,"stem":242,"options":243,"answer":28,"analysis":33},896421,"根据《建筑工程施工图设计文件审查暂行办法》，施工图设计文件应当由（ ）委托有关审查机构进行审查。",[244,246,248,250],{"key":20,"text":245,"correct":22},"工程监理单位",{"key":24,"text":247,"correct":22},"工程质量监督单位",{"key":28,"text":249,"correct":26},"建设单位",{"key":31,"text":251,"correct":22},"建设行政主管部门",{"id":253,"libraryId":5,"type":15,"typeLabel":16,"stem":254,"options":255,"answer":31,"analysis":33},896422,"关于建设工程竣工图的绘制和形成，下列说法中正确的是（ ）。",[256,258,260,262],{"key":20,"text":257,"correct":22},"凡按图竣工没有变动的，由发包人在原施工图上加盖“竣工图”标志",{"key":24,"text":259,"correct":22},"凡在施工过程中发生设计变更的，一律重新绘制竣工图",{"key":28,"text":261,"correct":22},"平面布置发生重大改变的，一律由设计单位负责重新绘制竣工图",{"key":31,"text":263,"correct":26},"重新绘制的新图，应加盖“竣工图”标志",{"id":265,"libraryId":5,"type":15,"typeLabel":16,"stem":266,"options":267,"answer":28,"analysis":33},896423,"根据《建筑工程施工质量验收统一标准》，在下列工程中，属于分项工程的是（ ）。",[268,270,271,272],{"key":20,"text":269,"correct":22},"计算机房工程",{"key":24,"text":97,"correct":22},{"key":28,"text":99,"correct":26},{"key":31,"text":101,"correct":22},{"id":274,"libraryId":5,"type":15,"typeLabel":16,"stem":275,"options":276,"answer":28,"analysis":33},896424,"下列工程中，属于分部工程的是（ ）。",[277,279,281,283],{"key":20,"text":278,"correct":22},"既有工厂的车间扩建工程",{"key":24,"text":280,"correct":22},"工业车间的设备安装工程",{"key":28,"text":282,"correct":26},"房屋建筑的装饰装修工程",{"key":31,"text":284,"correct":22},"基础工程中的土方开挖工程",{"id":286,"libraryId":5,"type":15,"typeLabel":16,"stem":287,"options":288,"answer":24,"analysis":33},896425,"根据《国务院关于投资体制改革的决定》， 为了广泛听取社会各方对政府投资项目的意见和建议， 国家将逐步实行政府投资项目（ ） 制度。",[289,291,293,295],{"key":20,"text":290,"correct":22},"专家评审",{"key":24,"text":292,"correct":26},"公示",{"key":28,"text":294,"correct":22},"咨询评估",{"key":31,"text":296,"correct":22},"听证",{"id":298,"libraryId":5,"type":15,"typeLabel":16,"stem":299,"options":300,"answer":28,"analysis":33},896426,"根据《国务院关于投资体制改革的决定》， 特别重大的政府投资项目应实行（ ）。",[301,302,304,305],{"key":20,"text":107,"correct":22},{"key":24,"text":303,"correct":22},"咨询论证制度",{"key":28,"text":111,"correct":26},{"key":31,"text":113,"correct":22},{"id":307,"libraryId":5,"type":15,"typeLabel":16,"stem":308,"options":309,"answer":28,"analysis":33},896427,"为了保护环境， 在项目实施阶段应做到“三同时” 。 这里的“三同时” 是指主体工程与环保措施工程要（ ） 。",[310,312,314,316],{"key":20,"text":311,"correct":22},"同时施工、同时验收、同时投入运行",{"key":24,"text":313,"correct":22},"同时审批、同时设计、同时施工",{"key":28,"text":315,"correct":26},"同时设计、同时施工、同时投入运行",{"key":31,"text":317,"correct":22},"同时施工、同时移交、同时使用",{"id":319,"libraryId":5,"type":15,"typeLabel":16,"stem":320,"options":321,"answer":24,"analysis":33},896428,"对于一般工业与民用建筑工程而言，下列工程中，属于分部工程的是（ ）。",[322,324,326,327],{"key":20,"text":323,"correct":22},"玻璃幕墙安装工程",{"key":24,"text":325,"correct":26},"装饰装修工程",{"key":28,"text":159,"correct":22},{"key":31,"text":99,"correct":22},{"id":329,"libraryId":5,"type":15,"typeLabel":16,"stem":330,"options":331,"answer":31,"analysis":33},896429,"项目后评价是工程项目实施阶段管理的延伸，它的基本方法是（ ）",[332,334,336,338],{"key":20,"text":333,"correct":22},"统计法",{"key":24,"text":335,"correct":22},"比例法",{"key":28,"text":337,"correct":22},"理论计算法",{"key":31,"text":339,"correct":26},"对比法",{"id":341,"libraryId":5,"type":15,"typeLabel":16,"stem":342,"options":343,"answer":20,"analysis":33},896430,"根据《建设工程质量管理条例》 ， 应当按照国家有关规定办理工程质量监督手续的单位是（ ） 。",[344,345,347,349],{"key":20,"text":249,"correct":26},{"key":24,"text":346,"correct":22},"设计单位",{"key":28,"text":348,"correct":22},"监理单位",{"key":31,"text":350,"correct":22},"施工单位",{"id":352,"libraryId":5,"type":15,"typeLabel":16,"stem":353,"options":354,"answer":24,"analysis":33},896431,"根据《国务院关于投资体制改革的决定》，对于采用资本金注入方式的政府投资工程项目，政府投资主管部门需要严格审批的内容是（ ）。",[355,357,358,360],{"key":20,"text":356,"correct":22},"资金申请报告和施工方案",{"key":24,"text":125,"correct":26},{"key":28,"text":359,"correct":22},"施工组织设计和预算",{"key":31,"text":361,"correct":22},"预算和开工报告",{"id":363,"libraryId":5,"type":15,"typeLabel":16,"stem":364,"options":365,"answer":20,"analysis":33},896432,"项目融资主要是以（）来安排融资。",[366,368,370,372],{"key":20,"text":367,"correct":26},"项目资产和预期收益",{"key":24,"text":369,"correct":22},"项目投资者的资信水平",{"key":28,"text":371,"correct":22},"项目第三方担保",{"key":31,"text":373,"correct":22},"项目管理的能力和水平",{"id":375,"libraryId":5,"type":15,"typeLabel":16,"stem":376,"options":377,"answer":24,"analysis":33},896433,"工程项目代建合同生效后，为了保证政府投资的合理使用，代建单位须提交工程概算投资（）左右的履约保函。",[378,380,382,384],{"key":20,"text":379,"correct":22},"5％",{"key":24,"text":381,"correct":26},"10％",{"key":28,"text":383,"correct":22},"15％",{"key":31,"text":385,"correct":22},"20％",{"id":387,"libraryId":5,"type":15,"typeLabel":16,"stem":388,"options":389,"answer":31,"analysis":33},896435,"CM承包模式的特点是（）。",[390,392,394,396],{"key":20,"text":391,"correct":22},"CM单位是以发包人的身份进行施工管理",{"key":24,"text":393,"correct":22},"采用流水施工法施工",{"key":28,"text":395,"correct":22},"CM单位不会影响工程设计活动",{"key":31,"text":397,"correct":26},"采用快速路径法施工",{"id":399,"libraryId":5,"type":15,"typeLabel":16,"stem":400,"options":401,"answer":24,"analysis":33},896436,"工程项目实现有条件的“边设计、边施工”的承包模式是（）。",[402,404,406,408],{"key":20,"text":403,"correct":22},"总分包模式",{"key":24,"text":405,"correct":26},"CM承包模式",{"key":28,"text":407,"correct":22},"Partnering模式",{"key":31,"text":409,"correct":22},"合作体承包模式",{"id":411,"libraryId":5,"type":15,"typeLabel":16,"stem":412,"options":413,"answer":28,"analysis":33},896438,"业主将建设工程项目的设计、设备与材料采购、施工任务全部发包给一个承包商的合同属于（ ）。",[414,416,418,420],{"key":20,"text":415,"correct":22},"单项工程或者特殊专业工程承包合同",{"key":24,"text":417,"correct":22},"施工总承包合同",{"key":28,"text":419,"correct":26},"EPC承包合同",{"key":31,"text":421,"correct":22},"工程施工合同",{"id":423,"libraryId":5,"type":15,"typeLabel":16,"stem":424,"options":425,"answer":20,"analysis":33},896439,"采用ABS方式融资， 组建SPC作用是（ ） 。",[426,428,430,432],{"key":20,"text":427,"correct":26},"由SPC公司直接在资金市场上发行债券",{"key":24,"text":429,"correct":22},"由SPC公司与商业银行签订贷款协议",{"key":28,"text":431,"correct":22},"SPC公司作为项目法人",{"key":31,"text":433,"correct":22},"由SPC公司运营项目",{"id":435,"libraryId":5,"type":15,"typeLabel":16,"stem":436,"options":437,"answer":28,"analysis":33},896440,"债权人在项目融资过程中，关注的重点是（）。",[438,440,442,444],{"key":20,"text":439,"correct":22},"抵押人所提供的抵押物的价值",{"key":24,"text":441,"correct":22},"项目公司的资信等级",{"key":28,"text":443,"correct":26},"项目贷款期内可用于还款的现金流量",{"key":31,"text":445,"correct":22},"项目投资人的实力和信用等级",{"id":447,"libraryId":5,"type":15,"typeLabel":16,"stem":448,"options":449,"answer":31,"analysis":33},896441,"以下（）PPP模式社会资本方承担的风险相对较小。",[450,452,454,456],{"key":20,"text":451,"correct":22},"私有化类",{"key":24,"text":453,"correct":22},"民营化类",{"key":28,"text":455,"correct":22},"特许经营类",{"key":31,"text":457,"correct":26},"外包类",{"id":459,"libraryId":5,"type":15,"typeLabel":16,"stem":460,"options":461,"answer":24,"analysis":33},896444,"下列关于项目管理承包(PM C)说法正确的是（）。",[462,464,466,468],{"key":20,"text":463,"correct":22},"A.项目管理承包商代表业主进行项目管理，同时还承担部分工程的设计、采购、施工(EP工作。这对项目管理承包商而言，风险低，相应的利润、回报较高",{"key":24,"text":465,"correct":26},"项目管理承包商作为业主顾问，对项目进行监督和检查，并及时向业主报告工程进展情况。这对项目管理承包商而言，风险最低，接近于零，但回报也低",{"key":28,"text":467,"correct":22},"项目管理承包商作为业主项目管理的延伸，只是管理EPC承包商而不承担任何EPC工作。这对项目管理承包商而言，风险较高，回报较低",{"key":31,"text":469,"correct":22},"以上说法均不正确",{"id":471,"libraryId":5,"type":15,"typeLabel":16,"stem":472,"options":473,"answer":31,"analysis":33},896445,"下列关于工程代建制的说法中，正确的是（）。",[474,476,478,480],{"key":20,"text":475,"correct":22},"工程代建制是一种针对经营性政府投资项目的建设实施组织方式",{"key":24,"text":477,"correct":22},"工程代建单位参与工程项目前期的策划决策和建成后的经营管理",{"key":28,"text":479,"correct":22},"在项目建设期间，工程代建单位存在经营性亏损或盈利",{"key":31,"text":481,"correct":26},"工程代建制由专业化的工程项目管理单位作为代建单位",{"id":483,"libraryId":5,"type":15,"typeLabel":16,"stem":484,"options":485,"answer":24,"analysis":33},896446,"在工程代建制模式中，工程代建单位不参与工程项目的策划决策和经营管理，不对投资收益负责。一般需要提交工程概算投资（ ）左右的履约保函。",[486,488,490,492],{"key":20,"text":487,"correct":22},"5%",{"key":24,"text":489,"correct":26},"10%",{"key":28,"text":491,"correct":22},"15%",{"key":31,"text":493,"correct":22},"20%",{"id":495,"libraryId":5,"type":15,"typeLabel":16,"stem":496,"options":497,"answer":31,"analysis":33},896447,"CM（ConstructionManagement）承包模式的特点是（ ）。",[498,500,501,503],{"key":20,"text":499,"correct":22},"建设单位与分包单位直接签订合同",{"key":24,"text":393,"correct":22},{"key":28,"text":502,"correct":22},"CM单位可赚取总分包之间的差价",{"key":31,"text":397,"correct":26},{"id":505,"libraryId":5,"type":15,"typeLabel":16,"stem":506,"options":507,"answer":28,"analysis":33},896448,"下列关于PMC的说法正确的是（） 。",[508,510,512,514],{"key":20,"text":509,"correct":22},"PMC是项目管理咨询公司代理业主或承包商进行项目管理",{"key":24,"text":511,"correct":22},"PMC模式中项目管理承包商参与项目全寿命周期管理",{"key":28,"text":513,"correct":26},"采用PMC管理模式时，绝大部分项目管理工作均由项目管理承包商承担",{"key":31,"text":515,"correct":22},"采用PMC管理模式时，项目管理承包商承担了业主的大部分风险",{"id":517,"libraryId":5,"type":15,"typeLabel":16,"stem":518,"options":519,"answer":28,"analysis":33},896449,"PMC模式下， 项目管理承包商在项目前期阶段工作内容是指（） 。",[520,522,524,526],{"key":20,"text":521,"correct":22},"进行设计管理，协调有关技术条件",{"key":24,"text":523,"correct":22},"完成项目总体中某些部分的详细设计",{"key":28,"text":525,"correct":26},"组织项目风险识别和分析，并制定项目风险应对策略",{"key":31,"text":527,"correct":22},"实施采购管理，并为业主负责的采购提供服务",{"id":529,"libraryId":5,"type":15,"typeLabel":16,"stem":530,"options":531,"answer":31,"analysis":33},896450,"下列关于CM(Construction Management)模式的说法中，错误的是（）。",[532,534,536,538],{"key":20,"text":533,"correct":22},"CM模式特别适用于实施周期长、工期要求紧迫的大型复杂工程项目",{"key":24,"text":535,"correct":22},"CM模式有利于控制工程质量和造价",{"key":28,"text":537,"correct":22},"CM承包模式使工程项目实现有条件的“边设计、边施工”",{"key":31,"text":539,"correct":26},"快速路径法施工并不适合CM承包模式",{"id":541,"libraryId":5,"type":15,"typeLabel":16,"stem":542,"options":543,"answer":31,"analysis":33},896451,"从投资者角度看，既能回避建设过程风险，又能尽快取得收益的项目融资方式是（ ）。",[544,546,548,550],{"key":20,"text":545,"correct":22},"BT",{"key":24,"text":547,"correct":22},"BOO",{"key":28,"text":549,"correct":22},"BOOT",{"key":31,"text":551,"correct":26},"TOT",{"id":553,"libraryId":5,"type":15,"typeLabel":16,"stem":554,"options":555,"answer":24,"analysis":33},896452,"以下关于工程代建制下代建单位责任的说法中，错误的表述是（ ）。",[556,558,560,562],{"key":20,"text":557,"correct":22},"不参与项目前期决策",{"key":24,"text":559,"correct":26},"在项目建设过程中不承担管理咨询风险",{"key":28,"text":561,"correct":22},"不对项目运营期间资产保值增值负责",{"key":31,"text":563,"correct":22},"不对项目的投资收益负责",{"id":565,"libraryId":5,"type":15,"typeLabel":16,"stem":566,"options":567,"answer":31,"analysis":33},896453,"采用 BOOT 模式的合同期限一般为（ ） 年。",[568,570,572,574],{"key":20,"text":569,"correct":22},"8~15",{"key":24,"text":571,"correct":22},"15~20",{"key":28,"text":573,"correct":22},"20~25",{"key":31,"text":575,"correct":26},"25~30",{"id":577,"libraryId":5,"type":15,"typeLabel":16,"stem":578,"options":579,"answer":24,"analysis":33},896454,"程项目代建合同生效后， 为了保证政府投资的合理使用， 代建单位须提交工程概算投资（ ） 左右的履约保函。",[580,581,582,583],{"key":20,"text":487,"correct":22},{"key":24,"text":489,"correct":26},{"key":28,"text":491,"correct":22},{"key":31,"text":493,"correct":22},{"id":585,"libraryId":5,"type":15,"typeLabel":16,"stem":586,"options":587,"answer":31,"analysis":33},896455,"采用ABS融资方式进行项目融资的物质基础是（ ）。",[588,590,592,594],{"key":20,"text":589,"correct":22},"债权发行机构的注册资金",{"key":24,"text":591,"correct":22},"项目原始权益人的全部资产",{"key":28,"text":593,"correct":22},"债权承销机构的担保资产",{"key":31,"text":595,"correct":26},"具有可靠未来现金流量的项目资产",[597,600,603,606,609,612],{"id":15,"name":598,"category":7,"favorite":599},"领导干部任职前廉政法规知识测试题",92,{"id":601,"name":602,"category":7,"favorite":15},595,"建筑结构与设备",{"id":604,"name":605,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":607,"name":608,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":610,"name":611,"category":7,"favorite":8},534,"BIM工程师",{"id":613,"name":611,"category":7,"favorite":8},535]