[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-581-31":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":585},{"id":5,"name":6,"category":7,"favorite":8},581,"建设工程造价管理基础知识","建筑工程",0,31,50,2873,[13,34,46,58,70,82,94,106,114,126,138,150,162,174,186,198,210,222,234,246,258,270,281,289,298,306,318,330,340,352,364,376,384,396,408,416,428,440,452,461,473,483,495,507,519,528,540,552,564,573],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":20,"analysis":33},896339,1,"单选题","根据《合同法》，合同生效后，当事人就价款约定不明确又未能补充协议的，合同价款应按（ ）执行。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","订立合同时履行地市场价格",true,{"key":24,"text":25,"correct":26},"B","订立合同时付款方所在地市场价格",false,{"key":28,"text":29,"correct":26},"C","标的物交付时市场价格",{"key":31,"text":32,"correct":26},"D","标的物交付时政府指导价","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":28,"analysis":33},896340,"关于合同争议仲裁的说法，正确的是（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":26},"仲裁是诉讼的前置程序",{"key":24,"text":41,"correct":26},"仲裁裁决在当事人认可后具有法律约束力",{"key":28,"text":43,"correct":22},"仲裁裁决的强制执行须向人民法院申请",{"key":31,"text":45,"correct":26},"仲裁协议的效力须由人民法院裁定",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":28,"analysis":33},896341,"根据《建筑法》， 获取施工许可证后因故不能按期开工的， 建设单位应当申请延期， 延期的规定是（）。",[50,52,54,56],{"key":20,"text":51,"correct":26},"以两次为限，每次不超过2个月",{"key":24,"text":53,"correct":26},"以三次为限，每次不超过2个月",{"key":28,"text":55,"correct":22},"以两次为限，每次不超过3个月",{"key":31,"text":57,"correct":26},"以三次为限，每次不超过3个月",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":20,"analysis":33},896342,"根据《建筑法》 的规定， 下列关于建筑工程施工许可制度的表述中， 建设单位的正确做法是（ ）。",[62,64,66,68],{"key":20,"text":63,"correct":22},"在建工程因故中止施工之日起1个月内向施工许可证颁发机关报告",{"key":24,"text":65,"correct":26},"在建工程因故中止施工之日起3个月内向施工许可证颁发机关报告",{"key":28,"text":67,"correct":26},"对中止施工满6个月的工程，恢复施工前应当报发证机关核验施工许可证",{"key":31,"text":69,"correct":26},"对中止施工满1年的工程，恢复施工前应当重新申请办理施工许可证",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":24,"analysis":33},896343,"根据《建设工程质量管理条例》， 在正常使用条件下， 供热与供冷系统的最低保修期限是（ ） 个采暖期、 供冷期。",[74,76,78,80],{"key":20,"text":75,"correct":26},"1",{"key":24,"text":77,"correct":22},"2",{"key":28,"text":79,"correct":26},"3",{"key":31,"text":81,"correct":26},"4",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":31,"analysis":33},896344,"根据《招标投标法》， 下列关于招标投标的说法， 正确的是（ ）。",[86,88,90,92],{"key":20,"text":87,"correct":26},"招标分为公开招标、邀请招标和议标三种方式",{"key":24,"text":89,"correct":26},"联合体中标后，联合体各方应分别与招标人签订合同",{"key":28,"text":91,"correct":26},"招标人不得修改已发出的招标文件",{"key":31,"text":93,"correct":22},"投标文件应当对招标文件提出的实质性要求和条件作出响应",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":28,"analysis":33},896345,"下列情形中， 可构成缔约过失责任的是（ ）。",[98,100,102,104],{"key":20,"text":99,"correct":26},"因自然灾害，当事人无法执行签订合同的计划，造成对方的损失",{"key":24,"text":101,"correct":26},"当事人双方串通牟利签订合同，造成第三方损失",{"key":28,"text":103,"correct":22},"当事人因合同谈判破裂，泄露对方商业机密，造成对方损失",{"key":31,"text":105,"correct":26},"合同签订后，当事人拒付合同规定的预付款，使合同无法履行，造成对方损失",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":28,"analysis":33},896346,"根据《建筑法》 ， 获取施工许可证后因故不能按期开工的， 建设单位应当申请延期， 延期的规定是（ ） 。",[110,111,112,113],{"key":20,"text":51,"correct":26},{"key":24,"text":53,"correct":26},{"key":28,"text":55,"correct":22},{"key":31,"text":57,"correct":26},{"id":115,"libraryId":5,"type":15,"typeLabel":16,"stem":116,"options":117,"answer":31,"analysis":33},896347,"按照建筑法规定， 以下正确的说法是（ ） 。",[118,120,122,124],{"key":20,"text":119,"correct":26},"建筑企业集团公司可以允许所属法人公司以其名义承揽工程",{"key":24,"text":121,"correct":26},"建筑企业可以在其资质等级之上承揽工程",{"key":28,"text":123,"correct":26},"联合体共同承包的，按照资质等级高的单位的业务许可范围承揽工程",{"key":31,"text":125,"correct":22},"施工企业不允许将承包的全部建筑工程转包给他人",{"id":127,"libraryId":5,"type":15,"typeLabel":16,"stem":128,"options":129,"answer":28,"analysis":33},896348,"关于限制民事行为能力人订立的合同，叙述错误的是（ ）。",[130,132,134,136],{"key":20,"text":131,"correct":26},"限制民事行为能力人订立的合同，经法定代理人追认后，该合同有效，但纯获利益的合同或者与其年龄、智力、精神健康状况相适应而订立的合同，不必经法定代理人追认",{"key":24,"text":133,"correct":26},"与限制民事行为能力人的年龄、智力、精神健康状况相适应而订立的合同，不必经其法定代理人追认，即为有效合同",{"key":28,"text":135,"correct":22},"根据我国《民法通则》，限制民事行为能力人是指12周岁以上不满16周岁的未成年人，以及不能完全辨认自己行为的精神病人",{"key":31,"text":137,"correct":26},"经过其法定代理人追认的合同，即为有效合同",{"id":139,"libraryId":5,"type":15,"typeLabel":16,"stem":140,"options":141,"answer":28,"analysis":33},896350,"根据《工程造价咨询企业管理办法》，属于甲级工程造价咨询企业资质标准的是（）。",[142,144,146,148],{"key":20,"text":143,"correct":26},"专职专业人员中取得造价工程师注册证书的人员不少于6人",{"key":24,"text":145,"correct":26},"企业注册资本不少于50万元",{"key":28,"text":147,"correct":22},"企业近3年工程造价咨询营业收入累计不低于500万元",{"key":31,"text":149,"correct":26},"人均办公建筑面积不少于6m",{"id":151,"libraryId":5,"type":15,"typeLabel":16,"stem":152,"options":153,"answer":31,"analysis":33},896352,"工程造价咨询企业跨省、自治区、直辖市承接工程造价咨询业务的，应当自承接业务之日起（）日内到建设工程所在地省、自治区、直辖市人民政府建设主管部门备案。",[154,156,158,160],{"key":20,"text":155,"correct":26},"5",{"key":24,"text":157,"correct":26},"10",{"key":28,"text":159,"correct":26},"20",{"key":31,"text":161,"correct":22},"30",{"id":163,"libraryId":5,"type":15,"typeLabel":16,"stem":164,"options":165,"answer":28,"analysis":33},896355,"下列工程中，属于分部工程的是（）。",[166,168,170,172],{"key":20,"text":167,"correct":26},"既有工厂的车间扩建工程",{"key":24,"text":169,"correct":26},"工业车间的设备安装工程",{"key":28,"text":171,"correct":22},"房屋建筑的装饰装修工程",{"key":31,"text":173,"correct":26},"基础工程中的土方开挖工程",{"id":175,"libraryId":5,"type":15,"typeLabel":16,"stem":176,"options":177,"answer":24,"analysis":33},896356,"一座大型食品加工厂属于（）。",[178,180,182,184],{"key":20,"text":179,"correct":26},"分部工程",{"key":24,"text":181,"correct":22},"单项工程",{"key":28,"text":183,"correct":26},"分项工程",{"key":31,"text":185,"correct":26},"单位工程",{"id":187,"libraryId":5,"type":15,"typeLabel":16,"stem":188,"options":189,"answer":24,"analysis":33},896357,"以下关于项目建议书的说法，不正确的是（）。",[190,192,194,196],{"key":20,"text":191,"correct":26},"项目建议书批准后，可以进行可行性研究工作，但并不表明项目已经立项",{"key":24,"text":193,"correct":22},"经过批准的项目建议书是工程项目的最终决策",{"key":28,"text":195,"correct":26},"项目建议书是对工程项目的轮廓设想",{"key":31,"text":197,"correct":26},"项目建议书的主要作用是推荐一个拟建项目，供政府部门选择并确定是否进行下一步工作",{"id":199,"libraryId":5,"type":15,"typeLabel":16,"stem":200,"options":201,"answer":31,"analysis":33},896362,"根据《国务院关于投资体制改革的决定》，对于采用贷款贴息方式的政府投资项目，政府需要审批（）。",[202,204,206,208],{"key":20,"text":203,"correct":26},"项目建议书",{"key":24,"text":205,"correct":26},"可行性研究报告",{"key":28,"text":207,"correct":26},"工程概算",{"key":31,"text":209,"correct":22},"资金申请报告",{"id":211,"libraryId":5,"type":15,"typeLabel":16,"stem":212,"options":213,"answer":24,"analysis":33},896363,"根据《国务院关于投资体系改革的决定》，政府投资项目实行（）。",[214,216,218,220],{"key":20,"text":215,"correct":26},"备案制",{"key":24,"text":217,"correct":22},"审批制",{"key":28,"text":219,"correct":26},"核准制",{"key":31,"text":221,"correct":26},"报告制",{"id":223,"libraryId":5,"type":15,"typeLabel":16,"stem":224,"options":225,"answer":24,"analysis":33},896364,"根据《工程造价咨询企业管理办法》，工程造价咨询企业出资人中，注册造价工程师人数不应低于出资人总数的（）。",[226,228,230,232],{"key":20,"text":227,"correct":26},"50%",{"key":24,"text":229,"correct":22},"60%",{"key":28,"text":231,"correct":26},"70%",{"key":31,"text":233,"correct":26},"80%",{"id":235,"libraryId":5,"type":15,"typeLabel":16,"stem":236,"options":237,"answer":28,"analysis":33},896365,"根据《工程造价咨询单位管理办法》的规定，乙级工程造价咨询单位的资质标准之一是：具有专业技术职称且从事工程造价专业工作的专职人员和取得造价程师注册证书的专业人员分别不少于（ ）。",[238,240,242,244],{"key":20,"text":239,"correct":26},"20人和10人",{"key":24,"text":241,"correct":26},"20人和8人",{"key":28,"text":243,"correct":22},"12人和6人",{"key":31,"text":245,"correct":26},"12人和4人",{"id":247,"libraryId":5,"type":15,"typeLabel":16,"stem":248,"options":249,"answer":31,"analysis":33},896366,"关于工程造价咨询企业乙级资质标准的表述正确的是（ ）。",[250,252,254,256],{"key":20,"text":251,"correct":26},"专职专业人员不少于20人",{"key":24,"text":253,"correct":26},"企业注册资本不少于人民币100万元",{"key":28,"text":255,"correct":26},"具有工程或者工程经济类中级以上专业技术职称的人员不少于10人",{"key":31,"text":257,"correct":22},"暂定期内工程造价咨询营业收入累计不低于人民币50万元",{"id":259,"libraryId":5,"type":15,"typeLabel":16,"stem":260,"options":261,"answer":20,"analysis":33},896367,"属于建设项目合同价款确定内容的是（ ）。",[262,264,266,268],{"key":20,"text":263,"correct":22},"招标工程工程量清单的编制和审核",{"key":24,"text":265,"correct":26},"索赔费用的计算",{"key":28,"text":267,"correct":26},"工程洽商",{"key":31,"text":269,"correct":26},"工程变更",{"id":271,"libraryId":5,"type":15,"typeLabel":16,"stem":272,"options":273,"answer":28,"analysis":33},896368,"根据《工程造价咨询企业管理办法》，乙级工程造价咨询企业中专职从事工程造价专业工作的人员不得少于（）人。",[274,276,277,279],{"key":20,"text":275,"correct":26},"8",{"key":24,"text":157,"correct":26},{"key":28,"text":278,"correct":22},"12",{"key":31,"text":280,"correct":26},"16",{"id":282,"libraryId":5,"type":15,"typeLabel":16,"stem":283,"options":284,"answer":24,"analysis":33},896370,"具有独立施工条件并能形成独立使用功能的建筑物及构筑物是（）。",[285,286,287,288],{"key":20,"text":181,"correct":26},{"key":24,"text":185,"correct":22},{"key":28,"text":179,"correct":26},{"key":31,"text":183,"correct":26},{"id":290,"libraryId":5,"type":15,"typeLabel":16,"stem":291,"options":292,"answer":20,"analysis":33},896372,"根据《工程造价咨询企业管理办法》，工程造价咨询企业设立分支机构的，在分支机构中执业的注册造价工程师人数应不少于（）人。",[293,294,295,296],{"key":20,"text":79,"correct":22},{"key":24,"text":81,"correct":26},{"key":28,"text":155,"correct":26},{"key":31,"text":297,"correct":26},"6",{"id":299,"libraryId":5,"type":15,"typeLabel":16,"stem":300,"options":301,"answer":20,"analysis":33},896373,"根据《工程造价咨询企业管理办法》，已取得乙级工程造价咨询企业资质证书满（ ）年的企业，方可申请甲级资质。",[302,303,304,305],{"key":20,"text":79,"correct":22},{"key":24,"text":81,"correct":26},{"key":28,"text":155,"correct":26},{"key":31,"text":297,"correct":26},{"id":307,"libraryId":5,"type":15,"typeLabel":16,"stem":308,"options":309,"answer":20,"analysis":33},896374,"未取得工程造价咨询企业资质从事工程造价咨询活动或者超越资质等级承接工程造价咨询业务的，（ ）。",[310,312,314,316],{"key":20,"text":311,"correct":22},"出具的工程造价成果文件无效，由有关部门给予处罚",{"key":24,"text":313,"correct":26},"出具的工程造价成果文件无效，但不给予处罚",{"key":28,"text":315,"correct":26},"出具的工程造价成果文件有效，由有关部门给予处罚",{"key":31,"text":317,"correct":26},"出具的工程造价成果文件有效，但不给予处罚",{"id":319,"libraryId":5,"type":15,"typeLabel":16,"stem":320,"options":321,"answer":20,"analysis":33},896375,"乙级工程造价咨询企业可以从事工程造价（ ）万元人民币以下的各类建设项目的工程造价咨询业务。",[322,324,326,328],{"key":20,"text":323,"correct":22},"5000",{"key":24,"text":325,"correct":26},"10000",{"key":28,"text":327,"correct":26},"20000",{"key":31,"text":329,"correct":26},"25000",{"id":331,"libraryId":5,"type":15,"typeLabel":16,"stem":332,"options":333,"answer":31,"analysis":33},896376,"在设立甲级工程造价咨询企业时，企业出资人中，注册造价工程师人数不低于出资人总人数的（ ）%，且其出资额不低于企业注册资本总额的60%。",[334,335,337,338],{"key":20,"text":161,"correct":26},{"key":24,"text":336,"correct":26},"40",{"key":28,"text":159,"correct":26},{"key":31,"text":339,"correct":22},"60",{"id":341,"libraryId":5,"type":15,"typeLabel":16,"stem":342,"options":343,"answer":31,"analysis":33},896377,"工程造价咨询企业的工程造价咨询业务范围不包括（ ）。",[344,346,348,350],{"key":20,"text":345,"correct":26},"建设项目建议书及可行性研究投资估算、项目经济评价报告的审核",{"key":24,"text":347,"correct":26},"配合设计方案比选、优化设计、限额设计等工作进行工程造价分析与控制",{"key":28,"text":349,"correct":26},"工程竣工决算报告的审核",{"key":31,"text":351,"correct":22},"工程造价经济纠纷的仲裁",{"id":353,"libraryId":5,"type":15,"typeLabel":16,"stem":354,"options":355,"answer":24,"analysis":33},896378,"根据《工程造价咨询企业管理办法》，工程造价咨询企业应办理而未及时办理资质证书变更手续的，由资质许可机关责令限期办理，逾期不办理的，可处以（ ）以下的罚款。",[356,358,360,362],{"key":20,"text":357,"correct":26},"5000元",{"key":24,"text":359,"correct":22},"1万元",{"key":28,"text":361,"correct":26},"2万元",{"key":31,"text":363,"correct":26},"3万元",{"id":365,"libraryId":5,"type":15,"typeLabel":16,"stem":366,"options":367,"answer":24,"analysis":33},896379,"根据《工程造价咨询企业管理办法》，工程造价咨询企业可被处 1 万元以上 3 万元以下罚款的情形是（ ）。",[368,370,372,374],{"key":20,"text":369,"correct":26},"跨地区承接业务不备案的",{"key":24,"text":371,"correct":22},"出租、出借资质证书的",{"key":28,"text":373,"correct":26},"设立分支机构未备案的",{"key":31,"text":375,"correct":26},"提供虚假材料申请资质的",{"id":377,"libraryId":5,"type":15,"typeLabel":16,"stem":378,"options":379,"answer":24,"analysis":33},896380,"根据《工程造价咨询企业管理办法》 ， 工程造价咨询企业可被处1万元以上3万元以下罚款的情形是（ ） 。",[380,381,382,383],{"key":20,"text":369,"correct":26},{"key":24,"text":371,"correct":22},{"key":28,"text":373,"correct":26},{"key":31,"text":375,"correct":26},{"id":385,"libraryId":5,"type":15,"typeLabel":16,"stem":386,"options":387,"answer":28,"analysis":33},896381,"关于甲级工程造价咨询企业的资质标准，叙述错误的是（ ）。",[388,390,392,394],{"key":20,"text":389,"correct":26},"企业与专职专业人员签订劳动合同，且专职专业人员符合国家规定的职业年龄",{"key":24,"text":391,"correct":26},"专职专业人员人事档案关系由国家认可的人事代理机构代为管理",{"key":28,"text":393,"correct":22},"企业注册资本不少于人民币80万元",{"key":31,"text":395,"correct":26},"已取得乙级工程造价咨询企业资质证书满3年",{"id":397,"libraryId":5,"type":15,"typeLabel":16,"stem":398,"options":399,"answer":24,"analysis":33},896382,"根据《注册造价工程师管理办法》，属于一级造价工程师业务范围的是（）。",[400,402,404,406],{"key":20,"text":401,"correct":26},"建设项目投资估算与批准",{"key":24,"text":403,"correct":22},"施工预算编制与审核",{"key":28,"text":405,"correct":26},"建设工程保险中的造价裁定",{"key":31,"text":407,"correct":26},"工程造价纠纷的裁决",{"id":409,"libraryId":5,"type":15,"typeLabel":16,"stem":410,"options":411,"answer":20,"analysis":33},896383,"根据《注册工程造价咨询企业管理办法》，提供虚假材料申请工程造价咨询企业资质的，在（）年内不得再次申请工程造价咨询企业资质。",[412,413,414,415],{"key":20,"text":75,"correct":22},{"key":24,"text":77,"correct":26},{"key":28,"text":79,"correct":26},{"key":31,"text":81,"correct":26},{"id":417,"libraryId":5,"type":15,"typeLabel":16,"stem":418,"options":419,"answer":20,"analysis":33},896384,"工程设计阶段，（ ）的目的是为了阐明在指定的地点、时间和投资控制数额内，拟建项目在技术上的可行性和经济上的合理性。",[420,422,424,426],{"key":20,"text":421,"correct":22},"初步设计",{"key":24,"text":423,"correct":26},"技术设计",{"key":28,"text":425,"correct":26},"施工图设计",{"key":31,"text":427,"correct":26},"施工图设计文件的审查",{"id":429,"libraryId":5,"type":15,"typeLabel":16,"stem":430,"options":431,"answer":28,"analysis":33},896385,"建设工程项目管理的任务中，（ ）的主要任务是采用规划、组织、协调等手段，采取组织、技术、经济、合同等措施，确保项目总目标的实现。",[432,434,436,438],{"key":20,"text":433,"correct":26},"风险管理",{"key":24,"text":435,"correct":26},"信息管理",{"key":28,"text":437,"correct":22},"目标控制",{"key":31,"text":439,"correct":26},"合同管理",{"id":441,"libraryId":5,"type":15,"typeLabel":16,"stem":442,"options":443,"answer":28,"analysis":33},896386,"工程设计工作一般划分为两个阶段，即（ ）。",[444,446,448,450],{"key":20,"text":445,"correct":26},"初步设计和技术设计",{"key":24,"text":447,"correct":26},"技术设计和施工图设计",{"key":28,"text":449,"correct":22},"初步设计和施工图设计",{"key":31,"text":451,"correct":26},"组织设计和技术设计",{"id":453,"libraryId":5,"type":15,"typeLabel":16,"stem":454,"options":455,"answer":28,"analysis":33},896387,"根据《国务院关于投资体制改革的决定》 ， 对于采用投资补助方式的政府投资项目， 政府需要审批的文件是（ ） 。",[456,457,458,459],{"key":20,"text":203,"correct":26},{"key":24,"text":205,"correct":26},{"key":28,"text":209,"correct":22},{"key":31,"text":460,"correct":26},"初步设计和概算",{"id":462,"libraryId":5,"type":15,"typeLabel":16,"stem":463,"options":464,"answer":31,"analysis":33},896388,"竣工验收的准备工作不包括（ ） 。",[465,467,469,471],{"key":20,"text":466,"correct":26},"整理技术资料",{"key":24,"text":468,"correct":26},"绘制竣工图",{"key":28,"text":470,"correct":26},"编制竣工决算",{"key":31,"text":472,"correct":22},"组织验收委员会",{"id":474,"libraryId":5,"type":15,"typeLabel":16,"stem":475,"options":476,"answer":28,"analysis":33},896389,"工程设计工作一般划分为两个阶段，即（）和施工图设计。",[477,479,480,481],{"key":20,"text":478,"correct":26},"规划设计",{"key":24,"text":423,"correct":26},{"key":28,"text":421,"correct":22},{"key":31,"text":482,"correct":26},"工艺设计",{"id":484,"libraryId":5,"type":15,"typeLabel":16,"stem":485,"options":486,"answer":20,"analysis":33},896390,"建设项目在开工建设之前要切实做好各项准备工作，其主要内容不包括（）。",[487,489,491,493],{"key":20,"text":488,"correct":22},"征地、拆迁、场地平整以及基坑开挖工作",{"key":24,"text":490,"correct":26},"完成施工用水、电、通信、道路等接通工作",{"key":28,"text":492,"correct":26},"组织招标选择施工单位及设备、材料供应商",{"key":31,"text":494,"correct":26},"准备必要的施工图纸",{"id":496,"libraryId":5,"type":15,"typeLabel":16,"stem":497,"options":498,"answer":24,"analysis":33},896391,"过程后评价是指对工程项目立项决策、设计施工、竣工投产、生产运营等全过程进行系统分析，找出项目后评价与（）之间的差异及其产生原因，使后评价结论有根有据，同时针对问题提出解决办法。",[499,501,503,505],{"key":20,"text":500,"correct":26},"投资总额",{"key":24,"text":502,"correct":22},"原预期效益",{"key":28,"text":504,"correct":26},"实际收益",{"key":31,"text":506,"correct":26},"效益后评价",{"id":508,"libraryId":5,"type":15,"typeLabel":16,"stem":509,"options":510,"answer":28,"analysis":33},896392,"（）的项目管理是全过程的项目管理，包括项目决策与实施阶段的各个环节。",[511,513,515,517],{"key":20,"text":512,"correct":26},"总承包方",{"key":24,"text":514,"correct":26},"设计方",{"key":28,"text":516,"correct":22},"业主方",{"key":31,"text":518,"correct":26},"施工方",{"id":520,"libraryId":5,"type":15,"typeLabel":16,"stem":521,"options":522,"answer":24,"analysis":33},896393,"项目管理的内容不包括（）。",[523,524,526,527],{"key":20,"text":439,"correct":26},{"key":24,"text":525,"correct":22},"地质勘测",{"key":28,"text":435,"correct":26},{"key":31,"text":437,"correct":26},{"id":529,"libraryId":5,"type":15,"typeLabel":16,"stem":530,"options":531,"answer":28,"analysis":33},896395,"生产准备工作一般应包括的主要内容有（ ）等。",[532,534,536,538],{"key":20,"text":533,"correct":26},"组织准备、资金准备、物资准备",{"key":24,"text":535,"correct":26},"组织准备、技术准备、管理准备",{"key":28,"text":537,"correct":22},"组织准备、技术准备、物资准备",{"key":31,"text":539,"correct":26},"管理准备、技术准备、资金准备",{"id":541,"libraryId":5,"type":15,"typeLabel":16,"stem":542,"options":543,"answer":31,"analysis":33},896396,"施工安装活动应按照工程设计要求、施工合同条款、有关工程建设法律法规规范标准及施工组织设计，在保证工程质量、工期、成本及安全、环保等目标的前提下进行，达到竣工验收标准后，由（ ）移交给建设单位。",[544,546,548,550],{"key":20,"text":545,"correct":26},"监理单位",{"key":24,"text":547,"correct":26},"分包单位",{"key":28,"text":549,"correct":26},"设计单位",{"key":31,"text":551,"correct":22},"施工单位",{"id":553,"libraryId":5,"type":15,"typeLabel":16,"stem":554,"options":555,"answer":24,"analysis":33},896397,"工程项目的种类繁多，为了适应科学管理的需要，可以从不同的角度进行分类，建设工程项目按项目的（ ）划分，可分为政府投资项目和非政府投资项目。",[556,558,560,562],{"key":20,"text":557,"correct":26},"建设性质",{"key":24,"text":559,"correct":22},"投资来源",{"key":28,"text":561,"correct":26},"项目规模",{"key":31,"text":563,"correct":26},"投资作用",{"id":565,"libraryId":5,"type":15,"typeLabel":16,"stem":566,"options":567,"answer":28,"analysis":33},896398,"根据《房屋建筑和市政基础设施工程施工图设计文件审查暂行办法》规定，（ ）应当将施工图送施工图审查机构审查。",[568,569,570,572],{"key":20,"text":551,"correct":26},{"key":24,"text":545,"correct":26},{"key":28,"text":571,"correct":22},"建设单位",{"key":31,"text":549,"correct":26},{"id":574,"libraryId":5,"type":15,"typeLabel":16,"stem":575,"options":576,"answer":28,"analysis":33},896399,"项目管理知识体系中，（ ）是指为满足项目利益相关者目标而开展的计划、管理和控制活动。",[577,579,581,583],{"key":20,"text":578,"correct":26},"项目范围管理",{"key":24,"text":580,"correct":26},"项目时间管理",{"key":28,"text":582,"correct":22},"项目质量管理",{"key":31,"text":584,"correct":26},"项目人力资源管理",[586,589,592,595,598,601],{"id":15,"name":587,"category":7,"favorite":588},"领导干部任职前廉政法规知识测试题",92,{"id":590,"name":591,"category":7,"favorite":15},595,"建筑结构与设备",{"id":593,"name":594,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":596,"name":597,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":599,"name":600,"category":7,"favorite":8},534,"BIM工程师",{"id":602,"name":600,"category":7,"favorite":8},535]