[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-581-3":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":594},{"id":5,"name":6,"category":7,"favorite":8},581,"建设工程造价管理基础知识","建筑工程",0,3,50,2873,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,190,202,214,226,238,249,261,273,285,295,303,315,327,335,347,359,371,382,394,406,418,427,436,444,456,468,480,492,504,516,528,540,549,559,571,583],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":27,"analysis":33},894885,1,"单选题","世界银行贷款项目的建设周期中各工作阶段的正确顺序是()。",[19,23,26,30],{"key":20,"text":21,"correct":22},"A","项目选定、项目评估、项目准备、项目谈判、项目实施、项目总结评价",false,{"key":24,"text":25,"correct":22},"B","项目评估、项目选定、项目谈判、项目准备、项目实施、项目总结评价",{"key":27,"text":28,"correct":29},"C","项目选定、项目准备、项目评估、项目谈判、项目实施、项目总结评价",true,{"key":31,"text":32,"correct":22},"D","项目评估、项目选定、项目准备、项目谈判、项目实施、项目总结评价","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":20,"analysis":33},894886,"根据《国务院关于投资体制改革的决定》，企业不使用政府资金投资建设《政府核准的投资项目目录》中的项目时，企业仅需向政府提交()。",[38,40,42,44],{"key":20,"text":39,"correct":29},"项目申请报告",{"key":24,"text":41,"correct":22},"项目可行性研究报告",{"key":27,"text":43,"correct":22},"项目开工报告",{"key":31,"text":45,"correct":22},"项目初步设计文件",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":31,"analysis":33},894887,"对于一般工业与民用建筑工程而言，下列工程中，属于分部工程的是()。",[50,52,54,56],{"key":20,"text":51,"correct":22},"砌体工程",{"key":24,"text":53,"correct":22},"幕墙工程",{"key":27,"text":55,"correct":22},"钢筋工程",{"key":31,"text":57,"correct":29},"电梯工程",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":24,"analysis":33},894888,"按照工程建设项目发展的内在规律，投资建设一个工程项目都要经过投资决策和建设实施两个发展时期。这两个发展时期又可分为若干个阶段，它们之间()。",[62,64,66,68],{"key":20,"text":63,"correct":22},"次序可以颠倒，但不能交叉",{"key":24,"text":65,"correct":29},"次序不能颠倒，但可以合理交叉",{"key":27,"text":67,"correct":22},"次序不能颠倒，也不能交叉",{"key":31,"text":69,"correct":22},"次序可以颠倒，也可以交叉",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":31,"analysis":33},894889,"根据《国务院关于投资体制改革的决定》，企业投资建设《政府核准的投资项目目录》以外的项目实行()。",[74,76,78,80],{"key":20,"text":75,"correct":22},"审批制",{"key":24,"text":77,"correct":22},"核准制",{"key":27,"text":79,"correct":22},"登记制",{"key":31,"text":81,"correct":29},"备案制",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":27,"analysis":33},894890,"工程项目的项目后评价是固定资产投资管理的最后一个环节，项目后评价的基本方法是()。",[86,88,90,92],{"key":20,"text":87,"correct":22},"效益评价法",{"key":24,"text":89,"correct":22},"影响评价法",{"key":27,"text":91,"correct":29},"对比法",{"key":31,"text":93,"correct":22},"过程评价法",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":27,"analysis":33},894891,"工程项目可根据投资作用划分为生产性工程项目和非生产性工程项目两类，下列项目中属于生产性工程项目的是()。",[98,100,102,104],{"key":20,"text":99,"correct":22},"企业管理机关的办公楼建设项目",{"key":24,"text":101,"correct":22},"宗教建设项目",{"key":27,"text":103,"correct":29},"基础设施建设项目",{"key":31,"text":105,"correct":22},"公共事业建设项目",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":27,"analysis":33},894892,"根据我国现行规定，不同类别的建设工程项目应采用不同的组织实施方式，下列组合中正确的是()。",[110,112,114,116],{"key":20,"text":111,"correct":22},"竞争性项目—代建制",{"key":24,"text":113,"correct":22},"公益性项目—项目法人责任制",{"key":27,"text":115,"correct":29},"非经营性政府投资项目—代建制",{"key":31,"text":117,"correct":22},"基础性项目—代建制",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":24,"analysis":33},894893,"根据我国《关于实行建设项目法人责任制的暂行规定》的要求，项目总经理的职权包括()。",[122,124,126,128],{"key":20,"text":123,"correct":22},"聘任或解聘项目高级管理人员",{"key":24,"text":125,"correct":29},"组织单项工程预验收",{"key":27,"text":127,"correct":22},"提出项目竣工验收申请报告",{"key":31,"text":129,"correct":22},"提出项目开工报告",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":20,"analysis":33},894894,"根据《建筑工程质量管理条例》，应当按照国家有关规定办理质量监督手续的单位（）。",[134,136,138,140],{"key":20,"text":135,"correct":29},"建设单位",{"key":24,"text":137,"correct":22},"设计单位",{"key":27,"text":139,"correct":22},"监理单位",{"key":31,"text":141,"correct":22},"施工单位",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":31,"analysis":33},894895,"在工程项目分类过程中，如果是生产单一产品的项目，一般以（）划分项目等级。",[146,148,150,152],{"key":20,"text":147,"correct":22},"项目的规模",{"key":24,"text":149,"correct":22},"项目的总设计能力",{"key":27,"text":151,"correct":22},"项目的总投资额",{"key":31,"text":153,"correct":29},"产品的设计生产能力",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":31,"analysis":33},894896,"根据《关于实行建设项目法人责任制的暂行规定》，项目法人应在( )正式成立。",[158,160,162,164],{"key":20,"text":159,"correct":22},"申报项目建议书之前",{"key":24,"text":161,"correct":22},"项目建议书被批准后",{"key":27,"text":163,"correct":22},"申报项目可行性研究报告之前",{"key":31,"text":165,"correct":29},"项目可行性研究报告被批准后",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":27,"analysis":33},894897,"根据国家现行规定，下列关于建设项目竣工验收的表述正确的是()。",[170,172,174,176],{"key":20,"text":171,"correct":22},"无论规模大小，建设项目完工后均应进行初验，然后进行正式验收",{"key":24,"text":173,"correct":22},"建设项目竣工图应由施工单位绘制并加盖“竣工图”标志",{"key":27,"text":175,"correct":29},"由项目主管部门或建设单位向负责验收的单位提出竣工验收申请报告",{"key":31,"text":177,"correct":22},"施工单位必须及时编制竣工决算，分析投资计划执行情况",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":20,"analysis":33},894898,"在实际工作中，往往从效益后评价、过程后评价两个方面对工程项目进行后评价。下面属于效益后评价的是()。",[182,184,186,188],{"key":20,"text":183,"correct":29},"项目可持续性后评价",{"key":24,"text":185,"correct":22},"立项决策系统分析",{"key":27,"text":187,"correct":22},"设计施工系统分析",{"key":31,"text":189,"correct":22},"生产运营系统分析",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":27,"analysis":33},894899,"下列工程中，属于分部工程的是()。",[194,196,198,200],{"key":20,"text":195,"correct":22},"既有工厂的车间扩建工程",{"key":24,"text":197,"correct":22},"工业车间的设备安装工程",{"key":27,"text":199,"correct":29},"房屋建筑的装饰装修工程",{"key":31,"text":201,"correct":22},"基础工程中的土方开挖工程",{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":27,"analysis":33},894900,"根据《建筑工程施工质量验收统一标准》GB 50300-2013，下列工程中，属于分项工程的是()。",[206,208,210,212],{"key":20,"text":207,"correct":22},"计算机机房工程",{"key":24,"text":209,"correct":22},"轻钢结构工程",{"key":27,"text":211,"correct":29},"土方开挖工程",{"key":31,"text":213,"correct":22},"外墙防水工程",{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":20,"analysis":33},894901,"国有大中型项目在建设阶段就按现代企业制度组建项目法人，实行全过程负责的是()。",[218,220,222,224],{"key":20,"text":219,"correct":29},"项目法人责任制",{"key":24,"text":221,"correct":22},"工程监理制",{"key":27,"text":223,"correct":22},"工程招标投标制",{"key":31,"text":225,"correct":22},"合同管理制",{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":20,"analysis":33},894902,"实行建设项目法人责任制的项目，项目董事会需要负责的工作是()。",[230,232,234,236],{"key":20,"text":231,"correct":29},"筹措建设资金并按时偿还债务",{"key":24,"text":233,"correct":22},"组织编制并上报项目初步设计文件",{"key":27,"text":235,"correct":22},"编制和确定工程招标方案",{"key":31,"text":237,"correct":22},"组织工程建设实施并控制项目目标",{"id":239,"libraryId":5,"type":15,"typeLabel":16,"stem":240,"options":241,"answer":24,"analysis":33},894903,"根据《建筑工程施工质量验收统一验收标准》GB50300，下列工程中，属于分项工程的是()。",[242,244,245,247],{"key":20,"text":243,"correct":22},"电气工程",{"key":24,"text":55,"correct":29},{"key":27,"text":246,"correct":22},"屋面工程",{"key":31,"text":248,"correct":22},"桩基工程",{"id":250,"libraryId":5,"type":15,"typeLabel":16,"stem":251,"options":252,"answer":31,"analysis":33},894904,"城镇市政基础设施工程的建设单位应在开工前向()申请领取施工许可证。",[253,255,257,259],{"key":20,"text":254,"correct":22},"国务院建设主管部门",{"key":24,"text":256,"correct":22},"工程所在地省级以上人民政府建设主管部门",{"key":27,"text":258,"correct":22},"工程所在地地市级以上人民政府建设主管部门",{"key":31,"text":260,"correct":29},"工程所在地县级以上人民政府建设主管部门",{"id":262,"libraryId":5,"type":15,"typeLabel":16,"stem":263,"options":264,"answer":27,"analysis":33},894905,"建设单位在办理工程质量监督注册手续时，需提供()。",[265,267,269,271],{"key":20,"text":266,"correct":22},"投标文件",{"key":24,"text":268,"correct":22},"专项施工方案",{"key":27,"text":270,"correct":29},"施工组织设计",{"key":31,"text":272,"correct":22},"施工图设计文件",{"id":274,"libraryId":5,"type":15,"typeLabel":16,"stem":275,"options":276,"answer":20,"analysis":33},894906,"下列项目开工建设准备工作中，在办理工程质量监督手续之后才能进行的工作是()。",[277,279,281,283],{"key":20,"text":278,"correct":29},"办理施工许可证",{"key":24,"text":280,"correct":22},"编制施工组织设计",{"key":27,"text":282,"correct":22},"编制监理规划",{"key":31,"text":284,"correct":22},"审查施工图设计文件",{"id":286,"libraryId":5,"type":15,"typeLabel":16,"stem":287,"options":288,"answer":27,"analysis":33},894907,"根据《关于实行建设项目法人责任制的暂行规定》，项目法人应在()正式成立。",[289,290,292,293],{"key":20,"text":161,"correct":22},{"key":24,"text":291,"correct":22},"项目施工图设计文件审查通过后",{"key":27,"text":165,"correct":29},{"key":31,"text":294,"correct":22},"项目初步设计文件被批准后",{"id":296,"libraryId":5,"type":15,"typeLabel":16,"stem":297,"options":298,"answer":24,"analysis":33},894908,"根据《建筑工程施工质量验收统一验收标准》，下列工程中，属于分项工程的是()。",[299,300,301,302],{"key":20,"text":243,"correct":22},{"key":24,"text":55,"correct":29},{"key":27,"text":246,"correct":22},{"key":31,"text":248,"correct":22},{"id":304,"libraryId":5,"type":15,"typeLabel":16,"stem":305,"options":306,"answer":31,"analysis":33},894909,"下列关于竣工图的说明，正确的是()。",[307,309,311,313],{"key":20,"text":308,"correct":22},"竣工图必须由施工单位绘制",{"key":24,"text":310,"correct":22},"竣工图必须由设计单位绘制",{"key":27,"text":312,"correct":22},"竣工图由业主负责绘制",{"key":31,"text":314,"correct":29},"竣工图必须由施工单位加盖竣工图标志",{"id":316,"libraryId":5,"type":15,"typeLabel":16,"stem":317,"options":318,"answer":31,"analysis":33},894910,"根据《国务院关于投资体制改革的决定》，下列关于项目投资决策审批制度的说明，正确的是()。",[319,321,323,325],{"key":20,"text":320,"correct":22},"政府投资项目实行审批制和核准制",{"key":24,"text":322,"correct":22},"采用资本金注入方式的政府投资项目，需要审批项目建议书、可行性研究报告和开工报告",{"key":27,"text":324,"correct":22},"对于企业不使用政府资金投资建设的项目，一律实行备案制",{"key":31,"text":326,"correct":29},"按规定应实行备案的项目由企业按照属地原则向地方政府投资主管部门备案",{"id":328,"libraryId":5,"type":15,"typeLabel":16,"stem":329,"options":330,"answer":20,"analysis":33},894911,"根据《建设工程质量管理条例》，应当按照国家有关规定办理工程质量监督手续的单位是( )。",[331,332,333,334],{"key":20,"text":135,"correct":29},{"key":24,"text":137,"correct":22},{"key":27,"text":139,"correct":22},{"key":31,"text":141,"correct":22},{"id":336,"libraryId":5,"type":15,"typeLabel":16,"stem":337,"options":338,"answer":24,"analysis":33},894912,"根据《国务院关于投资体制改革的决定》，实施核准制的项目，企业不再经过批准()的程序。",[339,341,343,345],{"key":20,"text":340,"correct":22},"项目申请报告、可行性研究报告和开工报告",{"key":24,"text":342,"correct":29},"项目建议书、可行性研究报告和开工报告",{"key":27,"text":344,"correct":22},"项目申请报告、项目建议书和可行性研究报告",{"key":31,"text":346,"correct":22},"项目申请报告、项目建议书和开工报告",{"id":348,"libraryId":5,"type":15,"typeLabel":16,"stem":349,"options":350,"answer":24,"analysis":33},894913,"为了实现工程造价的模拟计算和动态控制，可应用建筑信息建模（BIM）技术，在包含进度数据的建筑模型上加载费用数据而形成（）模型。",[351,353,355,357],{"key":20,"text":352,"correct":22},"6D",{"key":24,"text":354,"correct":29},"5D",{"key":27,"text":356,"correct":22},"4D",{"key":31,"text":358,"correct":22},"3D",{"id":360,"libraryId":5,"type":15,"typeLabel":16,"stem":361,"options":362,"answer":24,"analysis":33},894914,"下列项目管理组织机构形式中，未明确项目经理角色的是（）组织机构。",[363,365,367,369],{"key":20,"text":364,"correct":22},"职能制",{"key":24,"text":366,"correct":29},"弱矩阵制",{"key":27,"text":368,"correct":22},"平衡矩阵制",{"key":31,"text":370,"correct":22},"强矩阵制",{"id":372,"libraryId":5,"type":15,"typeLabel":16,"stem":373,"options":374,"answer":20,"analysis":33},894915,"下列工程项目管理组织机构形式中，具有较大的机动性和灵活性，能够实现集权与分权的最优结合，但因有双重领导，容易产生扯皮现象的（）。",[375,377,379,381],{"key":20,"text":376,"correct":29},"矩阵制",{"key":24,"text":378,"correct":22},"直线职能制",{"key":27,"text":380,"correct":22},"直线制",{"key":31,"text":364,"correct":22},{"id":383,"libraryId":5,"type":15,"typeLabel":16,"stem":384,"options":385,"answer":20,"analysis":33},894916,"关于CM 承包模式的说法，正确的是（）。",[386,388,390,392],{"key":20,"text":387,"correct":29},"CM 合同采用成本加酬金的计价方式",{"key":24,"text":389,"correct":22},"分包合同由CM 单位与分包单位签订",{"key":27,"text":391,"correct":22},"总包与分包之间的差价归CM 单位",{"key":31,"text":393,"correct":22},"订立CM 合同时需要一次确定施工合同总价",{"id":395,"libraryId":5,"type":15,"typeLabel":16,"stem":396,"options":397,"answer":20,"analysis":33},894917,"建设工程采用CM 承包模式时，CM 单位有代理型和非代理型两种。工程分包商的签约对象是（）。",[398,400,402,404],{"key":20,"text":399,"correct":29},"代理型为业主，非代理型为CM 单位",{"key":24,"text":401,"correct":22},"代理型为CM 单位，非代理型为业主",{"key":27,"text":403,"correct":22},"无论代理型或非代理型，均为业主",{"key":31,"text":405,"correct":22},"无论代理型或非代理型，均为CM 单位",{"id":407,"libraryId":5,"type":15,"typeLabel":16,"stem":408,"options":409,"answer":24,"analysis":33},894918,"工程项目承包模式中，建设单位组织协调工作量小，但风险较大的是（）。",[410,412,414,416],{"key":20,"text":411,"correct":22},"总分包模式",{"key":24,"text":413,"correct":29},"合作体承包模式",{"key":27,"text":415,"correct":22},"平行承包模式",{"key":31,"text":417,"correct":22},"联合体承包模式",{"id":419,"libraryId":5,"type":15,"typeLabel":16,"stem":420,"options":421,"answer":31,"analysis":33},894919,"在可以采用的几种组织形式中，实行没有职能机构的“个人管理”的组织形式是（）。",[422,423,425,426],{"key":20,"text":378,"correct":22},{"key":24,"text":424,"correct":22},"矩阵式",{"key":27,"text":364,"correct":22},{"key":31,"text":380,"correct":29},{"id":428,"libraryId":5,"type":15,"typeLabel":16,"stem":429,"options":430,"answer":24,"analysis":33},894920,"下列工程项目管理组织机构形式中易形成多头领导的是（）。",[431,432,433,434],{"key":20,"text":380,"correct":22},{"key":24,"text":364,"correct":29},{"key":27,"text":378,"correct":22},{"key":31,"text":435,"correct":22},"职能制和直线职能制",{"id":437,"libraryId":5,"type":15,"typeLabel":16,"stem":438,"options":439,"answer":27,"analysis":33},894921,"在下列组织机构形式中，具有集中领导、职责清晰，但各职能部门之间的横向联系差、信息传递路线长等特点的是（）组织机构形式。",[440,441,442,443],{"key":20,"text":380,"correct":22},{"key":24,"text":364,"correct":22},{"key":27,"text":378,"correct":29},{"key":31,"text":376,"correct":22},{"id":445,"libraryId":5,"type":15,"typeLabel":16,"stem":446,"options":447,"answer":31,"analysis":33},894922,"下列关于总分包模式特点的表述错误的是（）。",[448,450,452,454],{"key":20,"text":449,"correct":22},"有利于项目组织管理",{"key":24,"text":451,"correct":22},"有利于控制工程造价",{"key":27,"text":453,"correct":22},"有利于控制工程质量",{"key":31,"text":455,"correct":29},"业主的风险较大",{"id":457,"libraryId":5,"type":15,"typeLabel":16,"stem":458,"options":459,"answer":20,"analysis":33},894923,"下列工程项目目标控制方法中，可用来掌握产品质量波动情况及质量特征的分布规律，以便对质量状况进行分析判断的是（）。",[460,462,464,466],{"key":20,"text":461,"correct":29},"直方图法",{"key":24,"text":463,"correct":22},"鱼刺图法",{"key":27,"text":465,"correct":22},"控制图法",{"key":31,"text":467,"correct":22},"S 曲线法",{"id":469,"libraryId":5,"type":15,"typeLabel":16,"stem":470,"options":471,"answer":27,"analysis":33},894924,"香蕉曲线法和S 曲线法均可用来控制工程造价和工程进度。二者的主要区别是：香蕉曲线以（）为基础绘制。",[472,474,476,478],{"key":20,"text":473,"correct":22},"施工横道计划",{"key":24,"text":475,"correct":22},"流水施工计划",{"key":27,"text":477,"correct":29},"工程网络计划",{"key":31,"text":479,"correct":22},"挣值分析计划",{"id":481,"libraryId":5,"type":15,"typeLabel":16,"stem":482,"options":483,"answer":20,"analysis":33},894925,"下列方法中，可用来综合控制工程进度和工程造价的是（）。",[484,486,488,490],{"key":20,"text":485,"correct":29},"香蕉曲线法和S 曲线法",{"key":24,"text":487,"correct":22},"网络计划法和控制图法",{"key":27,"text":489,"correct":22},"因果分析图法和排列图法",{"key":31,"text":491,"correct":22},"价值工程法和直方图法",{"id":493,"libraryId":5,"type":15,"typeLabel":16,"stem":494,"options":495,"answer":20,"analysis":33},894926,"为了有效地控制建设工程项目目标，可采取的组织措施之一是（）。",[496,498,500,502],{"key":20,"text":497,"correct":29},"定制工作考核标准",{"key":24,"text":499,"correct":22},"论证技术方案",{"key":27,"text":501,"correct":22},"审查工程付款",{"key":31,"text":503,"correct":22},"选择合同计价方式",{"id":505,"libraryId":5,"type":15,"typeLabel":16,"stem":506,"options":507,"answer":24,"analysis":33},894927,"根据《建筑施工组织设计规范》，按编制对象不同，施工组织设计的三个层次是指（）。",[508,510,512,514],{"key":20,"text":509,"correct":22},"施工总平面图、施工总进度计划和资源需求计划",{"key":24,"text":511,"correct":29},"施工组织总设计、单位工程施工组织设计和施工方案",{"key":27,"text":513,"correct":22},"施工总平面图、施工总进度计划和专项施工方案",{"key":31,"text":515,"correct":22},"施工组织总设计、单位工程施工进度计划和施工作业计划",{"id":517,"libraryId":5,"type":15,"typeLabel":16,"stem":518,"options":519,"answer":24,"analysis":33},894928,"根据《建筑施工组织设计规范》，单位工程施工组织设计应由（）主持编制。",[520,522,524,526],{"key":20,"text":521,"correct":22},"建设单位项目负责人",{"key":24,"text":523,"correct":29},"施工项目负责人",{"key":27,"text":525,"correct":22},"施工单位技术负责人",{"key":31,"text":527,"correct":22},"施工项目技术负责人",{"id":529,"libraryId":5,"type":15,"typeLabel":16,"stem":530,"options":531,"answer":27,"analysis":33},894929,"下列进度计划表中，用来确定年度施工项目的投资额和年末形象进度，并阐明建设条件落实情况的是（）。",[532,534,536,538],{"key":20,"text":533,"correct":22},"投资计划年度分配表",{"key":24,"text":535,"correct":22},"年度建设资金平衡表",{"key":27,"text":537,"correct":29},"年度计划项目表",{"key":31,"text":539,"correct":22},"工程项目进度平衡表",{"id":541,"libraryId":5,"type":15,"typeLabel":16,"stem":542,"options":543,"answer":31,"analysis":33},894930,"下列表格中，不属于工程项目年度计划的是（）。",[544,545,546,548],{"key":20,"text":537,"correct":22},{"key":24,"text":535,"correct":22},{"key":27,"text":547,"correct":22},"年度设备平衡表",{"key":31,"text":533,"correct":29},{"id":550,"libraryId":5,"type":15,"typeLabel":16,"stem":551,"options":552,"answer":20,"analysis":33},894931,"用来分析工程质量主要影响因素的方法是（)。",[553,555,557,558],{"key":20,"text":554,"correct":29},"排列图法",{"key":24,"text":556,"correct":22},"责任图法",{"key":27,"text":461,"correct":22},{"key":31,"text":465,"correct":22},{"id":560,"libraryId":5,"type":15,"typeLabel":16,"stem":561,"options":562,"answer":31,"analysis":33},894932,"用于控制建设工程质量的静态分析方法是（）。",[563,565,567,569],{"key":20,"text":564,"correct":22},"香蕉图法和鱼刺图法",{"key":24,"text":566,"correct":22},"排列图法和控制图法",{"key":27,"text":568,"correct":22},"控制图法和责任图法",{"key":31,"text":570,"correct":29},"直方图法和排列图法",{"id":572,"libraryId":5,"type":15,"typeLabel":16,"stem":573,"options":574,"answer":24,"analysis":33},894933,"下列建设工程项目目标控制方法中，可用来综合控制工程进度和工程造价的方法是（）。",[575,577,579,581],{"key":20,"text":576,"correct":22},"决策树法和流程图法",{"key":24,"text":578,"correct":29},"S 曲线法和香蕉曲线法",{"key":27,"text":580,"correct":22},"横道图法和树枝图法",{"key":31,"text":582,"correct":22},"网络图法和横道图法",{"id":584,"libraryId":5,"type":15,"typeLabel":16,"stem":585,"options":586,"answer":24,"analysis":33},894934,"下列进度计划表中，用来明确各种设计文件交付日期，主要设备交货日期，施工单位进场日期，水、电及道路接通日期等的是（）。",[587,589,590,592],{"key":20,"text":588,"correct":22},"工程项目总进度计划表",{"key":24,"text":539,"correct":29},{"key":27,"text":591,"correct":22},"工程项目施工总进度表",{"key":31,"text":593,"correct":22},"单位工程总进度计划表",[595,598,601,604,607,610],{"id":15,"name":596,"category":7,"favorite":597},"领导干部任职前廉政法规知识测试题",92,{"id":599,"name":600,"category":7,"favorite":15},595,"建筑结构与设备",{"id":602,"name":603,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":605,"name":606,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":608,"name":609,"category":7,"favorite":8},534,"BIM工程师",{"id":611,"name":609,"category":7,"favorite":8},535]