[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-581-27":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":621},{"id":5,"name":6,"category":7,"favorite":8},581,"建设工程造价管理基础知识","建筑工程",0,27,50,2873,[13,34,46,58,70,82,94,106,118,130,142,153,165,177,189,201,213,225,237,249,261,273,285,297,309,321,333,345,357,369,381,393,405,417,429,441,453,465,477,489,501,513,525,537,549,561,573,585,597,609],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":30,"analysis":33},896123,1,"单选题","项目经理部通过在混凝土拌和物中加入添加剂以降低水泥消耗量，属于成本管理措施中（ ）。",[19,23,26,29],{"key":20,"text":21,"correct":22},"A","经济措施",false,{"key":24,"text":25,"correct":22},"B","组织措施",{"key":27,"text":28,"correct":22},"C","合同措施",{"key":30,"text":31,"correct":32},"D","技术措施",true,"",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":20,"analysis":33},896124,"关于用时间—成本累计曲线编制成本计划的说法，正确的是（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":32},"可调整非关键工作的开工时间以控制实际成本支出",{"key":24,"text":41,"correct":22},"全部工作必须按照最早开始时间安排",{"key":27,"text":43,"correct":22},"全部工作必须按照最迟开始时间安排",{"key":30,"text":45,"correct":22},"可缩短关键工作的持续时间以降低成本",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":30,"analysis":33},896125,"某工程的赢得值曲线如下图，关于t1时点成本和进度状态的说法，正确的是（ ）。",[50,52,54,56],{"key":20,"text":51,"correct":22},"费用节约、进度超前",{"key":24,"text":53,"correct":22},"费用超支、进度拖延",{"key":27,"text":55,"correct":22},"费用节约、进度拖延",{"key":30,"text":57,"correct":32},"费用超支、进度超前",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":30,"analysis":33},896126,"对某综合楼项目实施阶段的总进度目标进行控制的主体是（ ）。",[62,64,66,68],{"key":20,"text":63,"correct":22},"设计单位",{"key":24,"text":65,"correct":22},"施工单位",{"key":27,"text":67,"correct":22},"监理单位",{"key":30,"text":69,"correct":32},"建设单位",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":27,"analysis":33},896127,"关于建设工程项目总进度目标的说法，正确的是（ ）。",[74,76,78,80],{"key":20,"text":75,"correct":22},"建设工程项目总进度目标的控制是施工总承包方项目管理的任务",{"key":24,"text":77,"correct":22},"项目实施阶段的总进度指的就是施工进度",{"key":27,"text":79,"correct":32},"在进行项目总进度目标控制前，应分析和论证目标实现的可能性",{"key":30,"text":81,"correct":22},"项目总进度目标论证就是要编制项目的总进度计划",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":20,"analysis":33},896128,"关于施工过程中材料费控制的说法，正确的是（ ）。",[86,88,90,92],{"key":20,"text":87,"correct":32},"有消耗定额的材料采用限额发料",{"key":24,"text":89,"correct":22},"没有消耗定额的材料必须包干使用",{"key":27,"text":91,"correct":22},"零星材料应实施计划管理并按指标控制",{"key":30,"text":93,"correct":22},"有消耗定额的材料均不得超过领料限额",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":27,"analysis":33},896129,"某工程基坑开挖恰逢雨季，造成承包商雨季施工增加费用超支，产生此费用偏差的原因是（ ）。",[98,100,102,104],{"key":20,"text":99,"correct":22},"业主原因",{"key":24,"text":101,"correct":22},"设计原因",{"key":27,"text":103,"correct":32},"客观原因",{"key":30,"text":105,"correct":22},"施工原因",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":27,"analysis":33},896130,"作为施工成本控制的重要依据，工程实际完成量和成本实际支出等信息主要是从（ ）中获取的。",[110,112,114,116],{"key":20,"text":111,"correct":22},"业务核算报告",{"key":24,"text":113,"correct":22},"施工组织设计",{"key":27,"text":115,"correct":32},"工程进度报告",{"key":30,"text":117,"correct":22},"工程变更报告",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":27,"analysis":33},896131,"根据《标准施工招标文件》，关于施工合同索赔程序的规定，正确的是（ ）。",[122,124,126,128],{"key":20,"text":123,"correct":22},"A．设计变更发生后，承包人应在14 天内向发包人提交索赔通知",{"key":24,"text":125,"correct":22},"B．索赔事件持续进行，承包人应在事件终了后立即提交索赔报告",{"key":27,"text":127,"correct":32},"承包人在发出索赔意向通知书后28 天内，向监理人正式递交索赔通知书",{"key":30,"text":129,"correct":22},"索赔意向通知发出后42 天内，承包人应向监理人提交索赔报告及有关资料",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":24,"analysis":33},896132,"某工程项目采用单价合同，在施工过程中进行某分项工程计量时发现因工程变更，承包人实际完成的工程量超过了工程量清单中的工程量，则进行该分项工程计量时（ ）。",[134,136,138,140],{"key":20,"text":135,"correct":22},"A．按照招标工程量清单中的工程量计算",{"key":24,"text":137,"correct":32},"B．按承包人在履行合同义务中完成的工程量计算",{"key":27,"text":139,"correct":22},"按承包人提交的已完工程量计算",{"key":30,"text":141,"correct":22},"按发包人核实后的工程量计算",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":24,"analysis":33},896133,"某工程项目采用经审定批准的施工图纸及其预算方式分包形成的总价合同，在施工过程中进行某分项工程计量时发现，因工程变更，承包人实际完成的工程量超过了合同中的工程量，则进行该分项工程计量时应（ ）。",[146,148,150,151],{"key":20,"text":147,"correct":22},"A．按照合同中的工程量计算",{"key":24,"text":149,"correct":32},"按变更后的工程量计算",{"key":27,"text":139,"correct":22},{"key":30,"text":152,"correct":22},"按发包人核准的工程量计算",{"id":154,"libraryId":5,"type":15,"typeLabel":16,"stem":155,"options":156,"answer":24,"analysis":33},896134,"某混凝土工程招标清单工程量为200m3，综合单价为300 元\u002Fm3。在施工过程中，由于工程变更导致实际完成工程量为250m3。合同约定当实际工程量增加超过15%时可调整单价，调价系数为0.9。该混凝土工程的实际工程费用为（ ）万元。",[157,159,161,163],{"key":20,"text":158,"correct":22},"6.00",{"key":24,"text":160,"correct":32},"7.44",{"key":27,"text":162,"correct":22},"7.50",{"key":30,"text":164,"correct":22},"8.25",{"id":166,"libraryId":5,"type":15,"typeLabel":16,"stem":167,"options":168,"answer":20,"analysis":33},896135,"某住宅小区在施工过程中，开发商突然要求施工承包单位取消建设一处配套设备用房，施工承包单位在规定期限内向开发商提交了索赔报告，开发商未及时支付变更工程款也末提供替代工程，造成施工承包单位费用及利润损失，则费用及利润损失由（ ）承担。",[169,171,173,175],{"key":20,"text":170,"correct":32},"开发商",{"key":24,"text":172,"correct":22},"施工承包单位",{"key":27,"text":174,"correct":22},"双方共同承担",{"key":30,"text":176,"correct":22},"其他方式",{"id":178,"libraryId":5,"type":15,"typeLabel":16,"stem":179,"options":180,"answer":27,"analysis":33},896136,"关于建设工程索赔成立条件的说法，正确的是（ ）。",[181,183,185,187],{"key":20,"text":182,"correct":22},"导致索赔的事情必须是对方的过错，索赔才能成立",{"key":24,"text":184,"correct":22},"只要对方存在过错，不管是否造成损失，索赔都能成立",{"key":27,"text":186,"correct":32},"不按照合同规定的程序提交索赔报告，索赔不能成立",{"key":30,"text":188,"correct":22},"只要索赔事件的事实存在，在合同有效期内任何时候提出索赔都能成立",{"id":190,"libraryId":5,"type":15,"typeLabel":16,"stem":191,"options":192,"answer":30,"analysis":33},896137,"根据《标准施工招标文件》，对于承包人向发包人的索赔请求，其索赔意向书应交由（ ）审核。",[193,195,197,199],{"key":20,"text":194,"correct":22},"业主",{"key":24,"text":196,"correct":22},"设计人",{"key":27,"text":198,"correct":22},"项目经理",{"key":30,"text":200,"correct":32},"监理人",{"id":202,"libraryId":5,"type":15,"typeLabel":16,"stem":203,"options":204,"answer":20,"analysis":33},896138,"工程施工过程中索赔事件发生以后，承包人首先要做的工作是（ ）。",[205,207,209,211],{"key":20,"text":206,"correct":32},"A．向监理工程师提出索赔意向通知",{"key":24,"text":208,"correct":22},"向监理工程师提交索赔依据",{"key":27,"text":210,"correct":22},"向监理工程师提交索赔报告",{"key":30,"text":212,"correct":22},"与业主就索赔事项进行谈判",{"id":214,"libraryId":5,"type":15,"typeLabel":16,"stem":215,"options":216,"answer":24,"analysis":33},896139,"承包商可以向业主提起索赔的情形的是（ ）。",[217,219,221,223],{"key":20,"text":218,"correct":22},"承包商为确保质量而增加的措施费",{"key":24,"text":220,"correct":32},"监理工程师提出的工程变更造成费用的增加",{"key":27,"text":222,"correct":22},"分包商因返工造成费用增加，工期顺延",{"key":30,"text":224,"correct":22},"承包商自行采购材料的质量有问题造成费用增加、工期顺延",{"id":226,"libraryId":5,"type":15,"typeLabel":16,"stem":227,"options":228,"answer":30,"analysis":33},896140,"(2014年)施工合同履行期间，下列不属于工程计量范围的是（）。",[229,231,233,235],{"key":20,"text":230,"correct":22},"工程变更修改的工程量清单内容",{"key":24,"text":232,"correct":22},"合同文件中规定的各种费用支付项目",{"key":27,"text":234,"correct":22},"暂列金额中的专业工程",{"key":30,"text":236,"correct":32},"擅自超出施工图纸施工的工程",{"id":238,"libraryId":5,"type":15,"typeLabel":16,"stem":239,"options":240,"answer":20,"analysis":33},896141,"(2014年)某工程合同总价为5000万元，合同工期180天，材料费占合同总价的60%，材料储备定额天数为25天。材料供应在途天数为5天。用公式计算法来求得该工程的预付款为（）万元。",[241,243,245,247],{"key":20,"text":242,"correct":32},"417",{"key":24,"text":244,"correct":22},"500",{"key":27,"text":246,"correct":22},"694",{"key":30,"text":248,"correct":22},"833",{"id":250,"libraryId":5,"type":15,"typeLabel":16,"stem":251,"options":252,"answer":30,"analysis":33},896142,"(2014年)关于最终结清，下列说法中正确的是（）。",[253,255,257,259],{"key":20,"text":254,"correct":22},"最终结清是在工程保修期满后对剩余质量保证金的最终结清",{"key":24,"text":256,"correct":22},"最终结清支付证书一经签发，承包人对合同内享有的索赔权利即自行终止",{"key":27,"text":258,"correct":22},"质量保证金不足以抵减发包人工程缺陷修复费用的，应按合同约定的争议解决方式处理",{"key":30,"text":260,"correct":32},"最终结清付款涉及政府投资的，应按国家集中支付相关规定和专用合同条款约定办理",{"id":262,"libraryId":5,"type":15,"typeLabel":16,"stem":263,"options":264,"answer":27,"analysis":33},896143,"(2014年)某工程施工合同对于工程款付款时间约定不明、工程尚未交付、工程价款也未结算，现承包人起诉，发包人工程欠款利息应从（）之日计付。",[265,267,269,271],{"key":20,"text":266,"correct":22},"工程计划交付",{"key":24,"text":268,"correct":22},"提交竣工结算文件",{"key":27,"text":270,"correct":32},"当事人起诉",{"key":30,"text":272,"correct":22},"监理工程师暂定付款",{"id":274,"libraryId":5,"type":15,"typeLabel":16,"stem":275,"options":276,"answer":27,"analysis":33},896144,"(2016年)已知某建筑工程施工合同总额为8000万元，工程预付款按合同金额的20%计取，主要材料及构件造价占合同额的50%。预付款起扣点为（ ）万元。",[277,279,281,283],{"key":20,"text":278,"correct":22},"1600",{"key":24,"text":280,"correct":22},"4000",{"key":27,"text":282,"correct":32},"4800",{"key":30,"text":284,"correct":22},"6400",{"id":286,"libraryId":5,"type":15,"typeLabel":16,"stem":287,"options":288,"answer":30,"analysis":33},896145,"(2016年)建设工程已实际交付，但施工合同没有约定付款时间，则拖欠工程款利息的起算日起为()。",[289,291,293,295],{"key":20,"text":290,"correct":22},"提交竣工结算文件之日",{"key":24,"text":292,"correct":22},"确认竣工结算文件之日",{"key":27,"text":294,"correct":22},"竣工验收合格之日",{"key":30,"text":296,"correct":32},"工程实际交付之日",{"id":298,"libraryId":5,"type":15,"typeLabel":16,"stem":299,"options":300,"answer":30,"analysis":33},896146,"(2015年)根据《建设工程工程量清单计价规范》（GB50500-2013），发包人应在工程开工后的28天内预付不低于当年施工进度计划的安全文明施工费总额的( )。",[301,303,305,307],{"key":20,"text":302,"correct":22},"30%",{"key":24,"text":304,"correct":22},"40%",{"key":27,"text":306,"correct":22},"50%",{"key":30,"text":308,"correct":32},"60%",{"id":310,"libraryId":5,"type":15,"typeLabel":16,"stem":311,"options":312,"answer":24,"analysis":33},896147,"(2015年)关于建设工程竣工结算审核，下列说法中正确的是( )。",[313,315,317,319],{"key":20,"text":314,"correct":22},"非国有企业投资的建设工程，不应委托工程造价咨询机构审核",{"key":24,"text":316,"correct":32},"国有资金投资的建设工程，应当委托工程造价咨询机构审核",{"key":27,"text":318,"correct":22},"承包人不同意造价咨询机构的结算审核结论时，造价咨询机构不得出具审核报告",{"key":30,"text":320,"correct":22},"工程造价咨询机构的核对结论与承包人竣工结算文件不一致的，以造价机构核对结论为准",{"id":322,"libraryId":5,"type":15,"typeLabel":16,"stem":323,"options":324,"answer":27,"analysis":33},896148,"(2013年)在用起扣点计算法扣回预付款时，起扣点计算公式为T=P-M\u002FN，则式中N是指()。",[325,327,329,331],{"key":20,"text":326,"correct":22},"工程预付款总额",{"key":24,"text":328,"correct":22},"工程合同总额",{"key":27,"text":330,"correct":32},"主要材料及构件所占比重",{"key":30,"text":332,"correct":22},"累计完成工程金额",{"id":334,"libraryId":5,"type":15,"typeLabel":16,"stem":335,"options":336,"answer":30,"analysis":33},896149,"(2013年)发包人应当开始支付不低于当年施工进度计划的安全文明施工费总额60%的期限是工程开工后的()天内。",[337,339,341,343],{"key":20,"text":338,"correct":22},"7",{"key":24,"text":340,"correct":22},"14",{"key":27,"text":342,"correct":22},"21",{"key":30,"text":344,"correct":32},"28",{"id":346,"libraryId":5,"type":15,"typeLabel":16,"stem":347,"options":348,"answer":24,"analysis":33},896150,"(2013年)关于工程计量的方法，下列说法正确的是()。",[349,351,353,355],{"key":20,"text":350,"correct":22},"按照合同文件中规定的工程量予以计量",{"key":24,"text":352,"correct":32},"不符合合同文件要求的工程不予计量",{"key":27,"text":354,"correct":22},"单价合同工程量必须按现行定额规定的工程量计算规则计量",{"key":30,"text":356,"correct":22},"总价合同各项目的工程量是予以计量的最终工程量",{"id":358,"libraryId":5,"type":15,"typeLabel":16,"stem":359,"options":360,"answer":20,"analysis":33},896151,"(2013年)根据最高人民法院有关司法解释，下列不予支持的诉讼请求是()。",[361,363,365,367],{"key":20,"text":362,"correct":32},"垫资工程款利息没有约定的情况下，承包人请求支付利息",{"key":24,"text":364,"correct":22},"施工合同无效，但工程竣工验收合格，承包人请求合同约定支付工程价款",{"key":27,"text":366,"correct":22},"施工合同无效，已完工程质量合格，承包人请求合同约定支付工程价款",{"key":30,"text":368,"correct":22},"施工合同无效，已完工程质量不合格但修复后工程验收合格，发包人请求承包人承担修复费用",{"id":370,"libraryId":5,"type":15,"typeLabel":16,"stem":371,"options":372,"answer":27,"analysis":33},896152,"(2014年)关于施工合同履行期间的期中支付，下列说法中正确的是（）。",[373,375,377,379],{"key":20,"text":374,"correct":22},"双方对工程计量结果的争议，不影响发包人对已完工工程的期中支付",{"key":24,"text":376,"correct":22},"对已签发支付证书中的计算错误。发包人不得再予修正",{"key":27,"text":378,"correct":32},"进度款制度申请中应包括累计已完成的合同价款",{"key":30,"text":380,"correct":22},"本周起实际支付的合同额为本期完成的合同价款合计",{"id":382,"libraryId":5,"type":15,"typeLabel":16,"stem":383,"options":384,"answer":24,"analysis":33},896153,"(2014年)关于办理有质量争议工程的竣工结算，下列说法中错误的是（）。",[385,387,389,391],{"key":20,"text":386,"correct":22},"已实际投入使用工程的质量争议按工程保修合同执行，竣工结算按合同约定办理",{"key":24,"text":388,"correct":32},"已竣工未投入使用工程的质量争议按工程保修合同执行，竣工结算按合同约定办理",{"key":27,"text":390,"correct":22},"停工、停建工程的质量争议可在执行工程质量监督机构处理决定后办理竣工结算",{"key":30,"text":392,"correct":22},"已竣工未验收并且为实际投入使用，其无质量争议部分的工程，进攻结算按合同约定办理",{"id":394,"libraryId":5,"type":15,"typeLabel":16,"stem":395,"options":396,"answer":24,"analysis":33},896154,"(2014年)关于垫资施工合同价款纠纷处理，下列说法正确的是（）。",[397,399,401,403],{"key":20,"text":398,"correct":22},"合同约定垫资利率高于中国人民银行发布的同期同类贷款利率的，按合同约定返还垫资利息",{"key":24,"text":400,"correct":32},"当事人对垫资没有约定的，按照工程欠款处理",{"key":27,"text":402,"correct":22},"当事人对垫资利息没有约定的，按中国人民银行发布的同期同类贷款利率计算利息",{"key":30,"text":404,"correct":22},"垫资达到合同综合一定比例以上时为无效合同",{"id":406,"libraryId":5,"type":15,"typeLabel":16,"stem":407,"options":408,"answer":27,"analysis":33},896155,"(2015年)下列文件和资料中，可作为建设工程工程量计量依据的是( )。",[409,411,413,415],{"key":20,"text":410,"correct":22},"造价管理机构发布的调价文件",{"key":24,"text":412,"correct":22},"造价管理机构发布的价格信息",{"key":27,"text":414,"correct":32},"质量合格证书",{"key":30,"text":416,"correct":22},"各种预付款支付凭证",{"id":418,"libraryId":5,"type":15,"typeLabel":16,"stem":419,"options":420,"answer":30,"analysis":33},896156,"(2015年)关于建筑安装工程结算的编制，下列说法中正确的是( )。",[421,423,425,427],{"key":20,"text":422,"correct":22},"采用固定总价合同的，暂列金额不得调整",{"key":24,"text":424,"correct":22},"采用固定总价合同的，税率可不按政府部门新公布的税率调整",{"key":27,"text":426,"correct":22},"规费应按县级建设主管部门规定的费率计算",{"key":30,"text":428,"correct":32},"现场签证费用应依据点承包双方签证资料确认的金额计算",{"id":430,"libraryId":5,"type":15,"typeLabel":16,"stem":431,"options":432,"answer":24,"analysis":33},896157,"(2015年)关于建设工程施工合同价款纠纷的处理，下列说法中正确的是( )。",[433,435,437,439],{"key":20,"text":434,"correct":22},"竣工验收不合格，经承包人修复后合格的，承包人支付修复费用的要求应予支持",{"key":24,"text":436,"correct":32},"竣工验收不合格，经承包人修复后合格的，修复费用应由承包人承担",{"key":27,"text":438,"correct":22},"竣工验收不合格，多次修复后仍不合格的，发包人应酌情给予承包人部分人修复费用",{"key":30,"text":440,"correct":22},"安装后发现甲供设备存在质量问题，但承包人参与进场验收的，发包人不应支付承包人设备拆除、重新安装的费用",{"id":442,"libraryId":5,"type":15,"typeLabel":16,"stem":443,"options":444,"answer":27,"analysis":33},896158,"(2015年)关于工程造价咨询人从事工程造价鉴定工作，下列做法中正确的是( )。",[445,447,449,451],{"key":20,"text":446,"correct":22},"不需收集施工过程中的施工组织、质量、工期等资料",{"key":24,"text":448,"correct":22},"可以安排经验丰富的造价员独立承担鉴定工作",{"key":27,"text":450,"correct":32},"应收集鉴定项目同时期、同类型工程的技术经济指标",{"key":30,"text":452,"correct":22},"工程造价鉴定书中可不对鉴定过程中使用的技术手段进行描进",{"id":454,"libraryId":5,"type":15,"typeLabel":16,"stem":455,"options":456,"answer":20,"analysis":33},896159,"(2016年)由发包人提供的工程材料、工程设备的金额，应在合同价款的期中支付和结算中予以扣出。具体的扣出标准是()。",[457,459,461,463],{"key":20,"text":458,"correct":32},"按签约单价和签约数量",{"key":24,"text":460,"correct":22},"按实际采购单价和实际数量",{"key":27,"text":462,"correct":22},"按签约单价和实际数量",{"key":30,"text":464,"correct":22},"按实际采购单价和签约数量",{"id":466,"libraryId":5,"type":15,"typeLabel":16,"stem":467,"options":468,"answer":30,"analysis":33},896160,"(2016年)关于工程量清单计价方式下竣工结算的编制原则，下列说法中正确的是()。",[469,471,473,475],{"key":20,"text":470,"correct":22},"措施项目费按双方确认的工程量乘以已标价工程量清单的综合单价计算",{"key":24,"text":472,"correct":22},"总承包服务费按已标价工程量清单的金额计算，不应调整",{"key":27,"text":474,"correct":22},"暂列金额应减去工程价款调整的金额，余额归承包人",{"key":30,"text":476,"correct":32},"工程实施过程中发承包双方已经确认的工程计量结果和合同价款，应直接进入结算",{"id":478,"libraryId":5,"type":15,"typeLabel":16,"stem":479,"options":480,"answer":30,"analysis":33},896161,"(2016年)施工合同价款纠纷处理中，一方当事人拒不履行，另一方当事人可以请求人民法院执行的文书是()。",[481,483,485,487],{"key":20,"text":482,"correct":22},"和解协议书",{"key":24,"text":484,"correct":22},"造价认定书",{"key":27,"text":486,"correct":22},"行政调解书",{"key":30,"text":488,"correct":32},"仲裁调解书",{"id":490,"libraryId":5,"type":15,"typeLabel":16,"stem":491,"options":492,"answer":30,"analysis":33},896162,"根据《建设工程工程量清单计价规范》（GB50500-2013），关于工程项目合同类型选择的说法，正确的是（ ）。",[493,495,497,499],{"key":20,"text":494,"correct":22},"A．对使用工程量清单计价的工程，必须采用单价合同，不适用于总价合同",{"key":24,"text":496,"correct":22},"B．采用单价合同时，工程量清单可以不作为合同的组成部分",{"key":27,"text":498,"correct":22},"采用总价合同时，工程量清单中的工程量不具备合同约束力",{"key":30,"text":500,"correct":32},"对使用工程量清单计价的工程，宜采用单价合同，但并不排斥总价合同",{"id":502,"libraryId":5,"type":15,"typeLabel":16,"stem":503,"options":504,"answer":30,"analysis":33},896163,"根据《建设工程工程量清单计价规范》（GB50500&mdash;2013），单价合同和总价合同两种合同形式均可采用工程量清单计价，其主要区别在于（ ）。",[505,507,509,511],{"key":20,"text":506,"correct":22},"A．采用单价合同时，工程量清单中所填写的工程量不可调整",{"key":24,"text":508,"correct":22},"B．采用总价合同时，工程量清单中所填写的工程量可调整",{"key":27,"text":510,"correct":22},"采用固定单价合同时，工程量清单项目综合单价在约定条件内可调整",{"key":30,"text":512,"correct":32},"采用固定单价合同时，工程量清单项目综合单价在约定条件内不可调整",{"id":514,"libraryId":5,"type":15,"typeLabel":16,"stem":515,"options":516,"answer":20,"analysis":33},896164,"某工程采用单价合同，施工过程中承包人向发包人提交了已完工程量报告，发包人决定进行工程计量，下列计量结果有效的是（ ）。",[517,519,521,523],{"key":20,"text":518,"correct":32},"A．发包人在计量前24 小时通知承包人，但计量时承包人没有在场",{"key":24,"text":520,"correct":22},"B．发包人在没有通知承包人的情况下到现场计量",{"key":27,"text":522,"correct":22},"发包人没有在预定的时间去现场计量，而是在方便的时候进行计量",{"key":30,"text":524,"correct":22},"发包人单独对承包人返工重做的分项工程计量",{"id":526,"libraryId":5,"type":15,"typeLabel":16,"stem":527,"options":528,"answer":20,"analysis":33},896165,"关于总价合同计量的说法，正确的是（ ）。",[529,531,533,535],{"key":20,"text":530,"correct":32},"A．采用经审定批准的施工图纸及其预算方式发包形式的总价合同，其各项目的工程量是承包人用于结算的最终工程量",{"key":24,"text":532,"correct":22},"B．采用工程量清单方式招标形成的总价合同，其工程量必须以承包人实际完成的工程量确定",{"key":27,"text":534,"correct":22},"承包人不需要在每个计量周期向发包人提交已完成工程量报告",{"key":30,"text":536,"correct":22},"发包人应在收到工程量计量报告后14 天内进行复核",{"id":538,"libraryId":5,"type":15,"typeLabel":16,"stem":539,"options":540,"answer":20,"analysis":33},896166,"根据《建设工程工程量清单计价规范》（GB50500&mdash;2013），关于暂列金额的说法，正确的是（ ）。",[541,543,545,547],{"key":20,"text":542,"correct":32},"A．已签约合同中的暂列金额应由发包人掌握使用",{"key":24,"text":544,"correct":22},"B．已签约合同中的暂列金额应由承包人掌握使用",{"key":27,"text":546,"correct":22},"发包人按照合同规定将暂列金额作出支付后，剩余金额归承包人所有",{"key":30,"text":548,"correct":22},"发包人按照合同规定将暂列金额作出支付后，剩余金额由发包人和承包人共同所有",{"id":550,"libraryId":5,"type":15,"typeLabel":16,"stem":551,"options":552,"answer":27,"analysis":33},896167,"根据《建设工程工程量清单计价规范》（GB50500&mdash;2013），如果因发包人原因删减了合同中原定的某项工作，致使承包人发生的费用或（和）得到的收益不能被包括在其他已支付的项目中，也未被包含在任何可替代的工作中，则承包人（ ）。",[553,555,557,559],{"key":20,"text":554,"correct":22},"A．只能提出费用补偿，不能提出利润补偿",{"key":24,"text":556,"correct":22},"B．只能提出利润补偿，不能提出费用补偿",{"key":27,"text":558,"correct":32},"有权提出费用及利润补偿",{"key":30,"text":560,"correct":22},"无权要求任何费用和利润补偿",{"id":562,"libraryId":5,"type":15,"typeLabel":16,"stem":563,"options":564,"answer":30,"analysis":33},896168,"某工程合同工期约定为6 个月，签订的合同价为95 万元，则该工程适宜采用（ ）方式结算工程款。",[565,567,569,571],{"key":20,"text":566,"correct":22},"按月结算",{"key":24,"text":568,"correct":22},"其他方式结算",{"key":27,"text":570,"correct":22},"分段结算",{"key":30,"text":572,"correct":32},"竣工后一次结算",{"id":574,"libraryId":5,"type":15,"typeLabel":16,"stem":575,"options":576,"answer":20,"analysis":33},896169,"某基础工程包含土方和混凝土两个子项工程，工程量清单中的土方工程量为4400m3，混凝土工程量为2000m3，合同约定土石方工程综合单价为75 元\u002Fm3，混凝土工程综合单价为420 元／m3；工程预付款额度为合同价的15%，主要材料和构配件所占比重为60%。则该工程预付款的额度及起扣点分别为（ ）万元。",[577,579,581,583],{"key":20,"text":578,"correct":32},"17.55,87.75",{"key":24,"text":580,"correct":22},"17.10,99.45",{"key":27,"text":582,"correct":22},"17.10,87.75",{"key":30,"text":584,"correct":22},"17.55,99.45",{"id":586,"libraryId":5,"type":15,"typeLabel":16,"stem":587,"options":588,"answer":20,"analysis":33},896170,"某单价合同履行中，承包人提交了已完工程量报告，发包人认为需要到现场计量，并在计量前24小时通知了承包人，但承包人收到通知后没有派人参加。则关于发包人现场计量结果的说法，正确的是（ ）。",[589,591,593,595],{"key":20,"text":590,"correct":32},"以发包人的计量核实结果为准",{"key":24,"text":592,"correct":22},"以承包人的计量核实结果为准",{"key":27,"text":594,"correct":22},"由监理工程师根据具体情况确定",{"key":30,"text":596,"correct":22},"双方的计量核实结果均无效",{"id":598,"libraryId":5,"type":15,"typeLabel":16,"stem":599,"options":600,"answer":27,"analysis":33},896171,"某工程项目施工合同约定竣工时间为2016年12月30日，承包人施工质量不合格返工导致总工期延误了2个月；2017年1月项目所在地政府出台了新政策，直接导致承包人计入总造价的税金增加20万元。关于增加的20万元税金责任承担的说法，正确的是（ ）。",[601,603,605,607],{"key":20,"text":602,"correct":22},"由承包人和发包人共同承担，理由是国家政策变化，非承包人的责任",{"key":24,"text":604,"correct":22},"由发包人承担，理由是国家政策变化，承包人没有义务承担",{"key":27,"text":606,"correct":32},"由承包人承担，理由是承包人责任导致延期，进而导致税金增加",{"key":30,"text":608,"correct":22},"由发包人承担，理由是承包人承担质量问题责任，发包人承担政策变化的风险",{"id":610,"libraryId":5,"type":15,"typeLabel":16,"stem":611,"options":612,"answer":24,"analysis":33},896172,"根据九部委《标准施工招标文件》，监理人对隐蔽工程重新检查，经经验证明工程质量符合合同要求的，发包人应补偿承包人（ ）。",[613,615,617,619],{"key":20,"text":614,"correct":22},"工期和费用",{"key":24,"text":616,"correct":32},"工期、费用和利润",{"key":27,"text":618,"correct":22},"费用和利润",{"key":30,"text":620,"correct":22},"工期和利润",[622,625,628,631,634,637],{"id":15,"name":623,"category":7,"favorite":624},"领导干部任职前廉政法规知识测试题",92,{"id":626,"name":627,"category":7,"favorite":15},595,"建筑结构与设备",{"id":629,"name":630,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":632,"name":633,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":635,"name":636,"category":7,"favorite":8},534,"BIM工程师",{"id":638,"name":636,"category":7,"favorite":8},535]