[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-581-26":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":619},{"id":5,"name":6,"category":7,"favorite":8},581,"建设工程造价管理基础知识","建筑工程",0,26,50,2873,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,190,202,214,226,238,249,261,273,285,297,309,321,333,345,357,369,381,393,405,417,429,441,453,465,477,489,501,513,525,537,549,559,571,583,595,607],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":27,"analysis":33},896073,1,"单选题","(2016年)关于工程量清单编制总说明的内容，下列说法中正确的是()。",[19,23,26,30],{"key":20,"text":21,"correct":22},"A","建设规模是指工程投资总额",false,{"key":24,"text":25,"correct":22},"B","工程特征是指结构类型及主要施工方案",{"key":27,"text":28,"correct":29},"C","环境保护要求包括避免材料运输影响周边环境的防护要求",true,{"key":31,"text":32,"correct":22},"D","施工现场实际情况是指自然地理条件","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":31,"analysis":33},896074,"(2016年)关于暂列金额，下列说法中正确的是（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":22},"用于必须要发生但暂时不能确定价格的项目",{"key":24,"text":41,"correct":22},"由承包人支配，按签证价格结算",{"key":27,"text":43,"correct":22},"不能用于因工程变更而发生的索赔支付",{"key":31,"text":45,"correct":29},"不同专业预留的暂列金额应分别列项",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":31,"analysis":33},896075,"(2016年)关于依法必须招标工程的标底和招标控制价，下列说法中正确的是()。",[50,52,54,56],{"key":20,"text":51,"correct":22},"招标人有权自行决定是否采用设标底招标、无标底招标以及招标控制价招标",{"key":24,"text":53,"correct":22},"采用设标底招标的，招标人有权决定标底是否在招标文件中公开",{"key":27,"text":55,"correct":22},"采用招标控制价招标的，招标人应在招标文件中明确最高招标限价，也可以规定最低投标限价",{"key":31,"text":57,"correct":29},"公布招标控制价时，还应公布各单位工程的分部分项工程费、措施项目费、其他项目费、规费和税金",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":20,"analysis":33},896076,"(2015年)拟定施工总方案是编制招标工程量清单的一项准备工作，下列选项中属于拟定施工总方案范畴的是( )。",[62,64,66,68],{"key":20,"text":63,"correct":29},"对关键工艺的原则性规定",{"key":24,"text":65,"correct":22},"拟定施工步骤和施工顺序",{"key":27,"text":67,"correct":22},"估算整体工程量",{"key":31,"text":69,"correct":22},"编制施工进度计划",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":27,"analysis":33},896077,"(2015年)招标控制价中暂列金额一般按分部分项工程费的一定比率参考计算，这一比率的范围是( )。",[74,76,78,80],{"key":20,"text":75,"correct":22},"3%～5%",{"key":24,"text":77,"correct":22},"5%～10%",{"key":27,"text":79,"correct":29},"10%～15%",{"key":31,"text":81,"correct":22},"15%～20%",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":31,"analysis":33},896078,"(2010年)关于工程招标的性质，下列说法中正确的是()。",[86,88,90,92],{"key":20,"text":87,"correct":22},"招标是要约",{"key":24,"text":89,"correct":22},"投标是承诺",{"key":27,"text":91,"correct":22},"招标公告是要约",{"key":31,"text":93,"correct":29},"中标通知书是承诺",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":20,"analysis":33},896079,"(2010年)关于招标文件的澄清，下列说法中错误的是()。",[98,100,102,104],{"key":20,"text":99,"correct":29},"招标文件的澄清应在投标截止时间14天前发出",{"key":24,"text":101,"correct":22},"招标文件的澄清应不指明所澄清问题的来源",{"key":27,"text":103,"correct":22},"投标人收到澄清后的确认时间可以采用一个相对的时间",{"key":31,"text":105,"correct":22},"投标人收到澄清后的确认时间可以采用一个绝对的时间",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":31,"analysis":33},896080,"(2010年)下列关于招标控制价的说法中，正确的是()。",[110,112,114,116],{"key":20,"text":111,"correct":22},"招标控制价必须由招标人编制",{"key":24,"text":113,"correct":22},"招标控制价只需公布总价",{"key":27,"text":115,"correct":22},"招标人不得对招标控制价提出异议",{"key":31,"text":117,"correct":29},"招标控制价不应上调或下浮",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":24,"analysis":33},896081,"(2013年)关于标底与招标控制价的编制，下列说法中正确的是()。",[122,124,126,128],{"key":20,"text":123,"correct":22},"招标人不得自行决定是否编制标底",{"key":24,"text":125,"correct":29},"招标人不得规定最低投标限价",{"key":27,"text":127,"correct":22},"编制标底时必须同时设有最高投标限价",{"key":31,"text":129,"correct":22},"招标人不编制标底时应规定最低投标限价",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":31,"analysis":33},896082,"(2013年)招标控制价综合单价的组价包括如下工作：①根据政策规定或造价信息确定工料机单价；②根据工程所在地的定额规定计算工程量；③将定额项目的合价除以清单项目的工程量；④根据费率和利率计算出组价定额项目的合价，则正确的工作顺序是()。",[134,136,138,140],{"key":20,"text":135,"correct":22},"①④②③",{"key":24,"text":137,"correct":22},"①③②④",{"key":27,"text":139,"correct":22},"②①③④",{"key":31,"text":141,"correct":29},"②①④③",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":20,"analysis":33},896083,"(2014年)编制钢筋工程量清单时，适宜采用暂估量加签证处理的钢筋是（）。",[146,148,150,152],{"key":20,"text":147,"correct":29},"支撑双层钢筋用的“铁马”",{"key":24,"text":149,"correct":22},"伸出构件的锚固钢筋",{"key":27,"text":151,"correct":22},"设计注明的搭接钢筋",{"key":31,"text":153,"correct":22},"规范规定的搭接钢筋",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":31,"analysis":33},896084,"(2014年)关于招标控制价及其编制，下列说法中正确的是（）",[158,160,162,164],{"key":20,"text":159,"correct":22},"招标人不得拒绝高于招标控制价的投标报价",{"key":24,"text":161,"correct":22},"当重新公布招标控制价时，原投标截止期不变",{"key":27,"text":163,"correct":22},"经复核认为招标控制价误差大于±3%时，投标人应责成招标人改正",{"key":31,"text":165,"correct":29},"投标人经复核认为招标控制价未按规定编制的，应在招标控制价公布后5日内提出投诉",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":31,"analysis":33},896085,"(2015年)招标人对已发出的招标文件进行的必要修改，应当在投标截止时间( )天内发出。",[170,172,174,176],{"key":20,"text":171,"correct":22},"7",{"key":24,"text":173,"correct":22},"10",{"key":27,"text":175,"correct":22},"14",{"key":31,"text":177,"correct":29},"15",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":20,"analysis":33},896086,"(2015年)关于招标工程量清单中分部分项工程量清单的编制，下列说法中错误的是( )。",[182,184,186,188],{"key":20,"text":183,"correct":29},"招标人只负责项目编码、项目名称、计量单位和工程量四项内容的填写",{"key":24,"text":185,"correct":22},"同一招标工程的项目编码不得有重复",{"key":27,"text":187,"correct":22},"清单所列项目应是在单位工程施工过程中以其本身构成该工程实体的分项工程",{"key":31,"text":189,"correct":22},"当清单计价规范附录中有两个计量单位时，应结合实际情况选择其中一个",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":24,"analysis":33},896087,"(2015年)关于依法必须招标的工程，下列说法中正确的是( )。",[194,196,198,200],{"key":20,"text":195,"correct":22},"国有资金投资的建筑工程招标可不设招标控制价",{"key":24,"text":197,"correct":29},"招标人可以自行决定是否编制标底，标底必须保密",{"key":27,"text":199,"correct":22},"招标人设有最高投标限价的，应当在开标时公布",{"key":31,"text":201,"correct":22},"招标人也可以根据需要，规定最低投标限价",{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":24,"analysis":33},896088,"(2016年)根据《标准施工招标文件》（2007年版），关于“分包和偏差问题处理”的内容应包括于（ ）之中。",[206,208,210,212],{"key":20,"text":207,"correct":22},"招标公告",{"key":24,"text":209,"correct":29},"投标人须知",{"key":27,"text":211,"correct":22},"评标办法",{"key":31,"text":213,"correct":22},"合同条款与格式",{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":20,"analysis":33},896089,"(2016年)关于招标控制价的相关规定，下列说法中正确的是()。",[218,220,222,224],{"key":20,"text":219,"correct":29},"国有资金投资的工程建设项目，应编制招标控制价",{"key":24,"text":221,"correct":22},"招标控制价应在招标文件中公布，仅需公布总价",{"key":27,"text":223,"correct":22},"招标控制价超过批准概算3%以内时，招标人不必将其报原概算审核部门审核",{"key":31,"text":225,"correct":22},"当招标控制价复查结论超高原公布的招标控制价3%以内时，应责成招标人改正",{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":20,"analysis":33},896090,"(2016年)招标人要求总承包人对专业工程进行统一管理和协调的，总承包人可计取总承包服务费，其取费基数为()。",[230,232,234,236],{"key":20,"text":231,"correct":29},"专业工程估算造价",{"key":24,"text":233,"correct":22},"投标报价总额",{"key":27,"text":235,"correct":22},"分部分项工程费用",{"key":31,"text":237,"correct":22},"分部分项工程费与措施费之和",{"id":239,"libraryId":5,"type":15,"typeLabel":16,"stem":240,"options":241,"answer":31,"analysis":33},896091,"(2013年)关于招标控制价，下列说法中正确的是()。",[242,243,245,247],{"key":20,"text":159,"correct":22},{"key":24,"text":244,"correct":22},"利润可按建筑施工企业平均利润率计算",{"key":27,"text":246,"correct":22},"招标控制价超过批准概算10%时，应报原概算审批部门审核",{"key":31,"text":248,"correct":29},"经复查的招标控制价与原招标控制价误差＞±3%的应责成招标人改正",{"id":250,"libraryId":5,"type":15,"typeLabel":16,"stem":251,"options":252,"answer":27,"analysis":33},896092,"(2010年)投标人针对工程量清单中工程量的遗漏或错误，可以采取的正确做法是()。",[253,255,257,259],{"key":20,"text":254,"correct":22},"即向招标人提出异议，要求招标人修改",{"key":24,"text":256,"correct":22},"不向招标人提出异议，风险自留",{"key":27,"text":258,"correct":29},"是否向招标人提出修改意见取决于投标策略",{"key":31,"text":260,"correct":22},"等中标后，要求招标人按实调整",{"id":262,"libraryId":5,"type":15,"typeLabel":16,"stem":263,"options":264,"answer":24,"analysis":33},896093,"(2016年)根据《建设工程工程量清单计价规范》（GB50500--2013），允许投标人根据具体情况对招标工程量清单进行修正或增加的内容是()。",[265,267,269,271],{"key":20,"text":266,"correct":22},"分部分项工程量清单",{"key":24,"text":268,"correct":29},"措施项目清单",{"key":27,"text":270,"correct":22},"暂列金额",{"key":31,"text":272,"correct":22},"计日工",{"id":274,"libraryId":5,"type":15,"typeLabel":16,"stem":275,"options":276,"answer":24,"analysis":33},896094,"(2014年)投标人为使报价具有竞争力，下列有关生产要素询价的做法中，正确的是（）",[277,279,281,283],{"key":20,"text":278,"correct":22},"在通过资格预审前进行询价",{"key":24,"text":280,"correct":29},"尽量向咨询公司进行询价",{"key":27,"text":282,"correct":22},"不论何时何地尽量使用自有机械",{"key":31,"text":284,"correct":22},"劳务市场招募零散工有利于管理",{"id":286,"libraryId":5,"type":15,"typeLabel":16,"stem":287,"options":288,"answer":27,"analysis":33},896095,"(2010年)某施工企业参加一市政道路工程投标，该企业的投标报价为6000万元，则其应交的投标保证金为()万元。",[289,291,293,295],{"key":20,"text":290,"correct":22},"30",{"key":24,"text":292,"correct":22},"60",{"key":27,"text":294,"correct":29},"80",{"key":31,"text":296,"correct":22},"120",{"id":298,"libraryId":5,"type":15,"typeLabel":16,"stem":299,"options":300,"answer":24,"analysis":33},896096,"(2010年)工程量清单计价模式下，确定分部分项工程单价的工作包括：①分析各清单项目的工程内容，②确定计算基础，③计算人工、材料、机械费用，④计算工程内容的工程量与清单单位含量，⑤计算综合单价。对上述工作先后顺序的排列，正确的是()。",[301,303,305,307],{"key":20,"text":302,"correct":22},"①②④⑤③",{"key":24,"text":304,"correct":29},"②①④③⑤",{"key":27,"text":306,"correct":22},"①②④⑧⑤",{"key":31,"text":308,"correct":22},"②①④⑤③",{"id":310,"libraryId":5,"type":15,"typeLabel":16,"stem":311,"options":312,"answer":31,"analysis":33},896097,"(2013年)关于投标保证金，下列说法中正确的是()。",[313,315,317,319],{"key":20,"text":314,"correct":22},"投标保证金的数额不得少于投标总价的2%",{"key":24,"text":316,"correct":22},"招标人应当在签订合同后的30日内退还未中标人的投标保证金",{"key":27,"text":318,"correct":22},"投标人拒绝延长投标有效期的，投标人无权收回其投标保证金",{"key":31,"text":320,"correct":29},"投标保证金的有效期应与投标有效期相同",{"id":322,"libraryId":5,"type":15,"typeLabel":16,"stem":323,"options":324,"answer":31,"analysis":33},896098,"(2013年)下列情形中，属于投标人相互串通投标的是()。",[325,327,329,331],{"key":20,"text":326,"correct":22},"不同投标人的投标报价呈现规律性差异",{"key":24,"text":328,"correct":22},"不同投标人的投标文件由同一单位或个人编制",{"key":27,"text":330,"correct":22},"不同投标人委托了同一单位或个人办理某项投标事宜",{"key":31,"text":332,"correct":29},"投标人之间约定中标人",{"id":334,"libraryId":5,"type":15,"typeLabel":16,"stem":335,"options":336,"answer":27,"analysis":33},896099,"(2014年)对于其他项目中的计日工，投标人正确的报价方式是（）",[337,339,341,343],{"key":20,"text":338,"correct":22},"按政策规定标准估算报价",{"key":24,"text":340,"correct":22},"按招标文件提供的金额报价",{"key":27,"text":342,"correct":29},"自主报价",{"key":31,"text":344,"correct":22},"待签证时报价",{"id":346,"libraryId":5,"type":15,"typeLabel":16,"stem":347,"options":348,"answer":20,"analysis":33},896100,"(2014年)关于工程量清单方式招标工程合同价格风险及风险分担，下列说法中正确的是（）",[349,351,353,355],{"key":20,"text":350,"correct":29},"当出现的风险内容及幅度在招标文件规定的范围内时，综合单价不变",{"key":24,"text":352,"correct":22},"市场价格波动导致施工机具使用费发生变化时，承包人只承担5%以内的价格风险",{"key":27,"text":354,"correct":22},"人工费变化发生的风险全部由发包人承担",{"key":31,"text":356,"correct":22},"承包人管理费的风险一般由发承包双方共同承担",{"id":358,"libraryId":5,"type":15,"typeLabel":16,"stem":359,"options":360,"answer":20,"analysis":33},896101,"(2015年)关于投标报价时综合单价的确定，下列做法中正确的是( )。",[361,363,365,367],{"key":20,"text":362,"correct":29},"以项目特征描述为依据确定综合单价",{"key":24,"text":364,"correct":22},"招标工程量清单特征描述与设计图纸不符时，应以设计图纸为准",{"key":27,"text":366,"correct":22},"应考虑招标文件规定范围（幅度）外的风险费用",{"key":31,"text":368,"correct":22},"消耗量指标的计算应以地区或行业定额为依据",{"id":370,"libraryId":5,"type":15,"typeLabel":16,"stem":371,"options":372,"answer":31,"analysis":33},896102,"(2015年)关于投标报价，下列说法中正确的是( )。",[373,375,377,379],{"key":20,"text":374,"correct":22},"总价措施项目由投标人自主报价",{"key":24,"text":376,"correct":22},"暂列金额依据招标工程量清单总说明，结合项目管理规划自主填报",{"key":27,"text":378,"correct":22},"暂估价依据询价情况填报",{"key":31,"text":380,"correct":29},"投标人对投标报价的任何优惠均应反映在相应清单项目的综合单价中",{"id":382,"libraryId":5,"type":15,"typeLabel":16,"stem":383,"options":384,"answer":20,"analysis":33},896103,"(2016年)投标人在投标报价时，应优先被采用为综合单价编制依据的是()。",[385,387,389,391],{"key":20,"text":386,"correct":29},"企业定额",{"key":24,"text":388,"correct":22},"地区定额",{"key":27,"text":390,"correct":22},"行业定额",{"key":31,"text":392,"correct":22},"国家定额",{"id":394,"libraryId":5,"type":15,"typeLabel":16,"stem":395,"options":396,"answer":31,"analysis":33},896104,"施工企业建立施工项目成本管理责任制、开展成本控制和核算的基础是（ ）。",[397,399,401,403],{"key":20,"text":398,"correct":22},"施工成本预测",{"key":24,"text":400,"correct":22},"施工成本分析",{"key":27,"text":402,"correct":22},"施工成本考核",{"key":31,"text":404,"correct":29},"施工成本计划",{"id":406,"libraryId":5,"type":15,"typeLabel":16,"stem":407,"options":408,"answer":20,"analysis":33},896105,"下列施工成本计划指标中，属于质量指标的是（ ）。",[409,411,413,415],{"key":20,"text":410,"correct":29},"A．设计预算成本计划降低率",{"key":24,"text":412,"correct":22},"单位工程成本计划额",{"key":27,"text":414,"correct":22},"设计预算成本计划降低额",{"key":31,"text":416,"correct":22},"材料计划成本额",{"id":418,"libraryId":5,"type":15,"typeLabel":16,"stem":419,"options":420,"answer":24,"analysis":33},896106,"关于施工形象进度、产值统计、实际成本三者关系的说法，正确的是（ ）。",[421,423,425,427],{"key":20,"text":422,"correct":22},"A．施工形象进度与产值统计所依据的工程量是相同的，但与实际成本计算依据的工程量不同",{"key":24,"text":424,"correct":29},"B．施工形象进度、产值统计、实际成本所依据的工程量应是相同的数值",{"key":27,"text":426,"correct":22},"施工形象进度、产值统计、实际成本所依据的工程量都是互不相同的",{"key":31,"text":428,"correct":22},"产值统计与实际成本所依据的工程量是相同的，但不同于形象进度计算所依据的工作量",{"id":430,"libraryId":5,"type":15,"typeLabel":16,"stem":431,"options":432,"answer":24,"analysis":33},896107,"通过加强施工定额管理和施工任务单管理，控制活劳动和物化劳动的消耗。这属于施工成本管理措施的（ ）。",[433,435,437,439],{"key":20,"text":434,"correct":22},"技术措施",{"key":24,"text":436,"correct":29},"组织措施",{"key":27,"text":438,"correct":22},"经济措施",{"key":31,"text":440,"correct":22},"合同措施",{"id":442,"libraryId":5,"type":15,"typeLabel":16,"stem":443,"options":444,"answer":31,"analysis":33},896108,"关于竞争性成本计划、指导性成本计划和实施性成本计划三者区别的说法，正确的是（ ）。",[445,447,449,451],{"key":20,"text":446,"correct":22},"A．指导性成本计划是项目施工准备阶段的施工预算成本计划，比较详细",{"key":24,"text":448,"correct":22},"B．实施性成本计划是选派项目经理阶段的预算成本计划",{"key":27,"text":450,"correct":22},"指导性成本计划是以项目实施方案为依据编制的",{"key":31,"text":452,"correct":29},"竞争性成本计划是项目投标和签订合同阶段的估算成本计划，比较粗略",{"id":454,"libraryId":5,"type":15,"typeLabel":16,"stem":455,"options":456,"answer":31,"analysis":33},896109,"关于利用时间一成本累积曲线编制施工成本计划的说法，正确的是（ ）。",[457,459,461,463],{"key":20,"text":458,"correct":22},"A．所有工作都按最迟开始时间，对节约资金不利",{"key":24,"text":460,"correct":22},"B．所有工作都按最早开始时间，对节约资金有利",{"key":27,"text":462,"correct":22},"项目经理通过调整关键工作的最早开始时间，将成本控制在计划范围之内",{"key":31,"text":464,"correct":29},"所有工作都按最迟开始时间，降低了项目按期竣工的保证率",{"id":466,"libraryId":5,"type":15,"typeLabel":16,"stem":467,"options":468,"answer":20,"analysis":33},896110,"施工成本控制的步骤是（ ）。",[469,471,473,475],{"key":20,"text":470,"correct":29},"．比较--分析--预测--纠偏--检查",{"key":24,"text":472,"correct":22},"预测--检查--比较--分析--纠偏",{"key":27,"text":474,"correct":22},"检查--比较--分析--预测--纠偏",{"key":31,"text":476,"correct":22},"分析--检查--比较--预测--纠偏",{"id":478,"libraryId":5,"type":15,"typeLabel":16,"stem":479,"options":480,"answer":20,"analysis":33},896111,"施工成本的过程控制中，对于人工费和材料费都可以采用的控制方法是（ ）。",[481,483,485,487],{"key":20,"text":482,"correct":29},"量价分离",{"key":24,"text":484,"correct":22},"包干控制",{"key":27,"text":486,"correct":22},"预算控制",{"key":31,"text":488,"correct":22},"跟踪检查",{"id":490,"libraryId":5,"type":15,"typeLabel":16,"stem":491,"options":492,"answer":24,"analysis":33},896112,"施工项目经理部在对施工机械使用费支出的控制过程中，采取合理受安排施工生产、加强机械调度工作等的成本控制措施，主要作用是控制机械的（ ）。",[493,495,497,499],{"key":20,"text":494,"correct":22},"台班单价",{"key":24,"text":496,"correct":29},"台班数量",{"key":27,"text":498,"correct":22},"台班保养费",{"key":31,"text":500,"correct":22},"台班质量",{"id":502,"libraryId":5,"type":15,"typeLabel":16,"stem":503,"options":504,"answer":27,"analysis":33},896113,"某建筑工程施工至某月月末，出现了工程的费用偏差小于0、进度偏差大于0 的状况，则该工程的已完工作实际费用（ACWP）、计划工作预算费用（BCWS）和已完工作预算费用（BCWP）的关系可表示为（ ）。",[505,507,509,511],{"key":20,"text":506,"correct":22},"BCWP>ACWP>BCWS",{"key":24,"text":508,"correct":22},"BCWS>BCWP>ACWP",{"key":27,"text":510,"correct":29},"ACWP>BCWP>BCWS",{"key":31,"text":512,"correct":22},"BCWS>ACWP>BCWP",{"id":514,"libraryId":5,"type":15,"typeLabel":16,"stem":515,"options":516,"answer":20,"analysis":33},896114,"某打桩工程合同约定，第一个月计划完成工程桩120 根；单价为1.2 万元／根。时值月底，经确认的承包商实际完成的工程桩为110 根；实际单价为1.3 万元／根。在第一个月度内，该打桩工程的已完工作预算费用（BCWP）为（ ）万元。",[517,519,521,523],{"key":20,"text":518,"correct":29},"132",{"key":24,"text":520,"correct":22},"143",{"key":27,"text":522,"correct":22},"144",{"key":31,"text":524,"correct":22},"156",{"id":526,"libraryId":5,"type":15,"typeLabel":16,"stem":527,"options":528,"answer":20,"analysis":33},896115,"某地下工程施工合同约定，计划1 月份开挖土方80000m3，合同单价均为85 元／m3。至1 月底，经确认实际开挖土方90000m3，实际单价为72 元\u002Fm3，则该工程的费用偏差（CV）为（ ）万元。",[529,531,533,535],{"key":20,"text":530,"correct":29},"117",{"key":24,"text":532,"correct":22},"-117",{"key":27,"text":534,"correct":22},"85",{"key":31,"text":536,"correct":22},"-85",{"id":538,"libraryId":5,"type":15,"typeLabel":16,"stem":539,"options":540,"answer":24,"analysis":33},896116,"某地下工程施工合同约定，计划4 月份完成混凝土工程量450m3，合同单价均为600 元\u002Fm3。该工程4 月份实际完成的混凝土工程量为400m3，实际单价700 元／m3。至4 月底，该工程的进度绩效指数（SPI）为（ ）。",[541,543,545,547],{"key":20,"text":542,"correct":22},"0.857",{"key":24,"text":544,"correct":29},"0.889",{"key":27,"text":546,"correct":22},"1.12 5",{"key":31,"text":548,"correct":22},"1.167",{"id":550,"libraryId":5,"type":15,"typeLabel":16,"stem":551,"options":552,"answer":24,"analysis":33},896117,"某地下工程施工合同约定，计划3 月份完成混凝土工程量500m3，合同单价为600 元\u002Fm3。该工程3 月份实际完成的混凝土工程量为400m3，实际单价700 元\u002Fm3。至3 月底，该工程的费用绩效指数（CPI）为（ ）。",[553,555,556,557],{"key":20,"text":554,"correct":22},"0.800",{"key":24,"text":542,"correct":29},{"key":27,"text":548,"correct":22},{"key":31,"text":558,"correct":22},"1.250",{"id":560,"libraryId":5,"type":15,"typeLabel":16,"stem":561,"options":562,"answer":27,"analysis":33},896118,"某工程项目实施过程中，已完工作预算费用曲线（BCWP）与已完工作实际费用曲线（ACWP）靠得很近，而与计划工作预算费用曲线（BCWS）离得很远，则表示该工程项目在（ ）。",[563,565,567,569],{"key":20,"text":564,"correct":22},"A．费用与进度上均是按预定计划目标进行的",{"key":24,"text":566,"correct":22},"B．费用与进度上均没有按预定计划目标进行",{"key":27,"text":568,"correct":29},"费用上是按预定计划目标进行的",{"key":31,"text":570,"correct":22},"进度上是按预定计划目标进行的",{"id":572,"libraryId":5,"type":15,"typeLabel":16,"stem":573,"options":574,"answer":24,"analysis":33},896119,"某工程主体结构混凝土工程量约3200m3，预算单价550 元\u002Fm3，计划4 个月内均衡完成。开工后，混凝土实际采购价格为560 元\u002Fm3。施工至第二个月底，实际完成混凝土工程量l800m3。运用赢得值法，可分析得到该工程发生了费用偏差，此时应采取的可行的纠偏措施是（ ）。",[575,577,579,581],{"key":20,"text":576,"correct":22},"A．加快施工进度",{"key":24,"text":578,"correct":29},"重新选择混凝土供应商",{"key":27,"text":580,"correct":22},"调整工程数量",{"key":31,"text":582,"correct":22},"进行材料代用",{"id":584,"libraryId":5,"type":15,"typeLabel":16,"stem":585,"options":586,"answer":20,"analysis":33},896120,"应用相关比率法进行施工成本分析、考察管理成果的好坏，通常所采用的对比指标具有的特点是（ ）。",[587,589,591,593],{"key":20,"text":588,"correct":29},"性质不同但相关",{"key":24,"text":590,"correct":22},"性质不同又不相关",{"key":27,"text":592,"correct":22},"概念相关时期相同",{"key":31,"text":594,"correct":22},"概念相关时期不同",{"id":596,"libraryId":5,"type":15,"typeLabel":16,"stem":597,"options":598,"answer":24,"analysis":33},896121,"关于分部分项工程成本分析的说法，正确的是（ ）。",[599,601,603,605],{"key":20,"text":600,"correct":22},"A．施工项目成本分析是分部分项工程成本分析的基础",{"key":24,"text":602,"correct":29},"B．分部分项工程成本分析的对象是已完成分部分项工程",{"key":27,"text":604,"correct":22},"分部分项工程成本分析的资料来源是施工预算",{"key":31,"text":606,"correct":22},"分部分项工程成本分析的方法是进行预算成本与实际成本的&ldquo;两算&rdquo;对比",{"id":608,"libraryId":5,"type":15,"typeLabel":16,"stem":609,"options":610,"answer":24,"analysis":33},896122,"施工项目成本分析的基础是（ ）成本分析。",[611,613,615,617],{"key":20,"text":612,"correct":22},"工序",{"key":24,"text":614,"correct":29},"分部分项",{"key":27,"text":616,"correct":22},"单项工程",{"key":31,"text":618,"correct":22},"单位工程",[620,623,626,629,632,635],{"id":15,"name":621,"category":7,"favorite":622},"领导干部任职前廉政法规知识测试题",92,{"id":624,"name":625,"category":7,"favorite":15},595,"建筑结构与设备",{"id":627,"name":628,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":630,"name":631,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":633,"name":634,"category":7,"favorite":8},534,"BIM工程师",{"id":636,"name":634,"category":7,"favorite":8},535]