[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-581-25":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":618},{"id":5,"name":6,"category":7,"favorite":8},581,"建设工程造价管理基础知识","建筑工程",0,25,50,2873,[13,34,46,58,70,82,94,106,118,130,142,153,165,177,186,198,210,222,234,246,258,270,282,294,306,318,330,342,354,366,378,390,402,414,426,438,450,462,474,486,498,510,522,534,546,558,570,582,594,606],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":24,"analysis":33},896023,1,"单选题","(2016年)下列原因中，不能据以调整设计概算的是()。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","超出原设计范围的重大变更",false,{"key":24,"text":25,"correct":26},"B","超出承包人预期的货币贬值和汇率变化",true,{"key":28,"text":29,"correct":22},"C","超出基本预备费规定范围的不可抗拒重大自然灾害引起的工程变动和费用增加",{"key":31,"text":32,"correct":22},"D","超出价差预备费的国家重大政策性调整","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":31,"analysis":33},896024,"(2016年)某地拟建一工程，与其类似的已完工程单方工程造价为4500元\u002F㎡，其中人、材料、施工机具使用费分别占工程造价的15%、55%和10%，拟建工程地区与类似工程地区人工、材料、施工机具使用费差异系数分别为1.05、1.03和0.98。假定以人、材、机费用之和为基数取费，综合费率为25%。用类似工程预算法计算的拟建工程造价指标为()元\u002F㎡。",[38,40,42,44],{"key":20,"text":39,"correct":22},"3699.00",{"key":24,"text":41,"correct":22},"4590.75",{"key":28,"text":43,"correct":22},"4599.00",{"key":31,"text":45,"correct":26},"4623.75",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":20,"analysis":33},896025,"(2009年)当初步设计达到一定深度、建筑结构比较明确、能结合图纸计算工程量时，编制单位工程概算宜采用()。",[50,52,54,56],{"key":20,"text":51,"correct":26},"扩大单价法",{"key":24,"text":53,"correct":22},"概算指标法",{"key":28,"text":55,"correct":22},"类似工程预算法",{"key":31,"text":57,"correct":22},"综合单价法",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":20,"analysis":33},896026,"(2009年)柱网布置是否合理，对工程造价和面积的利用效率都有较大影响。建筑设计中对柱网布置应注意()。",[62,64,66,68],{"key":20,"text":63,"correct":26},"适当扩大柱距和跨度能使厂房有更大的灵活性",{"key":24,"text":65,"correct":22},"单跨厂房跨度不变时，层数越多越经济",{"key":28,"text":67,"correct":22},"多跨厂房柱间距不变时，跨度越大造价越低",{"key":31,"text":69,"correct":22},"柱网布置与厂房的高度无关",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":20,"analysis":33},896027,"(2010年)下列关于建筑设计评价的说法中，错误的是()。",[74,76,78,80],{"key":20,"text":75,"correct":26},"建筑物周长与建筑面积之比越高越经济",{"key":24,"text":77,"correct":22},"厂房展开面积主要用于确定多层厂房的经济层数",{"key":28,"text":79,"correct":22},"厂房有效面积与建筑面积之比主要用于评价柱网布置的合理性",{"key":31,"text":81,"correct":22},"工程全寿命成本用于评价建筑物功能水平的合理性",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":20,"analysis":33},896028,"(2013年)工业项目总平面设计中，影响工程造价的主要因素包括()。",[86,88,90,92],{"key":20,"text":87,"correct":26},"现场条件、占地面积、功能分区、运输方式",{"key":24,"text":89,"correct":22},"现场条件、产品方案、运输方式、柱网布置",{"key":28,"text":91,"correct":22},"占地面积、功能分区、空间组合、建筑材料",{"key":31,"text":93,"correct":22},"功能分区、空间组合、设备选型、厂址方案",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":28,"analysis":33},896029,"(2013年)关于多层民用住宅工程造价与其影响因素的关系，下列说法中正确的是()。",[98,100,102,104],{"key":20,"text":99,"correct":22},"层数增加，单位造价降低",{"key":24,"text":101,"correct":22},"层高增加，单位造价降低",{"key":28,"text":103,"correct":26},"建筑物周长系数越低，造价越低",{"key":31,"text":105,"correct":22},"宽度增加，单位造价上升",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":24,"analysis":33},896030,"(2013年)照国家有关规定，作为年度固定资产投资计划、计划投资总额及构成数额的编制和确定依据的是()。",[110,112,114,116],{"key":20,"text":111,"correct":22},"经批准的投资估算",{"key":24,"text":113,"correct":26},"经批准的设计概算",{"key":28,"text":115,"correct":22},"经批准的施工图预算",{"key":31,"text":117,"correct":22},"经批准的工程决算",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":24,"analysis":33},896031,"(2013年)关于建设项目总概算的编制，下列说法中正确的是()。",[122,124,126,128],{"key":20,"text":123,"correct":22},"项目总概算应按照建设单位规定的统一表格进行编制",{"key":24,"text":125,"correct":26},"对工程建设其他费的各组成项目应分别列项计算",{"key":28,"text":127,"correct":22},"主要建筑安装材料汇总表只需列出建设项目的钢筋、水泥等主要材料各自的总消耗量",{"key":31,"text":129,"correct":22},"总概算编制说明应装订于总概算文件最后",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":24,"analysis":33},896032,"(2014年)在建设项目各阶段的工程造价中，一经批准将作为控制建设项目投资最高限额的是（）",[134,136,138,140],{"key":20,"text":135,"correct":22},"投资估算",{"key":24,"text":137,"correct":26},"设计概算",{"key":28,"text":139,"correct":22},"施工图预算",{"key":31,"text":141,"correct":22},"竣工结算",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":20,"analysis":33},896033,"(2014年)当初步设计深度较深.有详细的设备清单时，最能精确的编制设备安装工程费概算的方法是（）",[146,148,149,151],{"key":20,"text":147,"correct":26},"预算单价法",{"key":24,"text":51,"correct":22},{"key":28,"text":150,"correct":22},"设备价值百分比法",{"key":31,"text":152,"correct":22},"综合吨位指标法",{"id":154,"libraryId":5,"type":15,"typeLabel":16,"stem":155,"options":156,"answer":24,"analysis":33},896034,"(2015年)关于建筑设计对民用住宅项目工程造价的影响，下列说法中正确的是( )。",[157,159,161,163],{"key":20,"text":158,"correct":22},"加大住宅宽度，不利于降低单方造价",{"key":24,"text":160,"correct":26},"降低住宅层高，有利于降低单方造价",{"key":28,"text":162,"correct":22},"结构面积系数越大，越有利于降低单方造价",{"key":31,"text":164,"correct":22},"住宅层数越多，越有利于降低单方造价",{"id":166,"libraryId":5,"type":15,"typeLabel":16,"stem":167,"options":168,"answer":31,"analysis":33},896035,"(2015年)当建设项目为一个单项工程时，其设计概算应采用的编制形式是( )。",[169,171,173,175],{"key":20,"text":170,"correct":22},"单位工程概算、单项工程综合概算和建设项目总概算二级",{"key":24,"text":172,"correct":22},"单位工程概算和单项工程综合概算二级",{"key":28,"text":174,"correct":22},"单项工程综合概算和建设项目总概算二级",{"key":31,"text":176,"correct":26},"单位工程概算和建设项目总概算二级",{"id":178,"libraryId":5,"type":15,"typeLabel":16,"stem":179,"options":180,"answer":24,"analysis":33},896036,"(2015年)在建筑工程初步设计文件深度不够、不能准确计算出工程量的情况下，可采用的设计概算编制方法是()。",[181,183,184,185],{"key":20,"text":182,"correct":22},"概算定额法",{"key":24,"text":53,"correct":26},{"key":28,"text":147,"correct":22},{"key":31,"text":152,"correct":22},{"id":187,"libraryId":5,"type":15,"typeLabel":16,"stem":188,"options":189,"answer":28,"analysis":33},896037,"(2015年)设计概算一经批准一般不得进行调整，其总投资反映( )时的价格水平。",[190,192,194,196],{"key":20,"text":191,"correct":22},"项目立项",{"key":24,"text":193,"correct":22},"可行性研究",{"key":28,"text":195,"correct":26},"概算编制",{"key":31,"text":197,"correct":22},"项目施工",{"id":199,"libraryId":5,"type":15,"typeLabel":16,"stem":200,"options":201,"answer":31,"analysis":33},896038,"(2016年)某地拟建一办公楼，当地类似工程的单位工程概算指标为3600元\u002F㎡。概算指标为瓷砖地面，拟建工程为复合木地板，每100㎡该类建筑中铺贴地面面积为50㎡，当地预算定额中瓷砖地面和复合木地板的预算单价分别为128元\u002F㎡、190元\u002F㎡。假定以人、材、机费用之和为基数取费，综合费率为25%。则用概算指标法计算的拟建工程造价指标为()元\u002F㎡。",[202,204,206,208],{"key":20,"text":203,"correct":22},"2918.75",{"key":24,"text":205,"correct":22},"3413.75",{"key":28,"text":207,"correct":22},"3631.00",{"key":31,"text":209,"correct":26},"3638.75",{"id":211,"libraryId":5,"type":15,"typeLabel":16,"stem":212,"options":213,"answer":20,"analysis":33},896039,"(2013年)采用定额单价发编制施工图预算时，下列做法正确的是()。",[214,216,218,220],{"key":20,"text":215,"correct":26},"若分项工程主要材料品种与预算单价规定材料不一致，需要按实际使用材料价格换算预算单价",{"key":24,"text":217,"correct":22},"因施工工艺条件与预算单价的不一致而致工人、机械的数量增加，只调价不调量",{"key":28,"text":219,"correct":22},"因施工工艺条件与预算单价的不一致而致工人、机械的数量减少，既调价也调量",{"key":31,"text":221,"correct":22},"对于定额项目计价中未包括的主材费用，应按造价管理机构发布的造价信息价补充进定额基价",{"id":223,"libraryId":5,"type":15,"typeLabel":16,"stem":224,"options":225,"answer":28,"analysis":33},896040,"(2014年)关于建设工程预算，符合组合与分解层次关系的是（）",[226,228,230,232],{"key":20,"text":227,"correct":22},"单位工程预算、单位工程综合预算、类似工程预算",{"key":24,"text":229,"correct":22},"单位工程预算、类似工程预算、建设项目总预算",{"key":28,"text":231,"correct":26},"单位工程预算、单项工程综合预算、建设项目总预算",{"key":31,"text":233,"correct":22},"单位工程综合预算、类似工程预算、建设项目总预算",{"id":235,"libraryId":5,"type":15,"typeLabel":16,"stem":236,"options":237,"answer":24,"analysis":33},896041,"(2015年)单位建筑工程预算的费用项目包括( )。",[238,240,242,244],{"key":20,"text":239,"correct":22},"建筑安装工程费用、设备及工器具购置费、建设单位管理费",{"key":24,"text":241,"correct":26},"人、才、机费用及企业管理费、利润、规费、税金",{"key":28,"text":243,"correct":22},"人、才、机费用及企业管理费、工程建设其他费用",{"key":31,"text":245,"correct":22},"分部分项工程费、措施费、规费、税金、工程建设其他费用",{"id":247,"libraryId":5,"type":15,"typeLabel":16,"stem":248,"options":249,"answer":28,"analysis":33},896042,"(2016年)关于施工图预算的含义，下列说法中正确的是()。",[250,252,254,256],{"key":20,"text":251,"correct":22},"是设计阶段对工程建设所需资金的粗略计算",{"key":24,"text":253,"correct":22},"其成果文件一般不属于设计文件的组成部分",{"key":28,"text":255,"correct":26},"可以由施工企业根据企业定额考虑自身实力计算",{"key":31,"text":257,"correct":22},"其价格性质为预期，不具有市场性质",{"id":259,"libraryId":5,"type":15,"typeLabel":16,"stem":260,"options":261,"answer":20,"analysis":33},896043,"(2015年)关于各级施工图预算的构成内容，下列说法中正确的是( )。",[262,264,266,268],{"key":20,"text":263,"correct":26},"建设项目总预算反映施工图设计阶段建设项目的预算总投资",{"key":24,"text":265,"correct":22},"建设项目总预算由组成该项目的各个单项工程综合预算费用相加而成",{"key":28,"text":267,"correct":22},"单项工程综合预算由单项工程的建筑工程费和设备及工器具购置费组成",{"key":31,"text":269,"correct":22},"单位工程预算由单位建筑工程预算和单位安装工程预算费用组成",{"id":271,"libraryId":5,"type":15,"typeLabel":16,"stem":272,"options":273,"answer":24,"analysis":33},896044,"(2010年)应用预算单价法编制施工图预算时，在套用定额单价后，紧接的工作是()。",[274,276,278,280],{"key":20,"text":275,"correct":22},"计算工程量",{"key":24,"text":277,"correct":26},"工料分析",{"key":28,"text":279,"correct":22},"编写编制说明",{"key":31,"text":281,"correct":22},"计算造价",{"id":283,"libraryId":5,"type":15,"typeLabel":16,"stem":284,"options":285,"answer":20,"analysis":33},896045,"(2013年)关于施工图预算的作用，下列说法中正确的是()。",[286,288,290,292],{"key":20,"text":287,"correct":26},"施工图预算可以作为业主拨付工程进度款的基础",{"key":24,"text":289,"correct":22},"施工图预算是工程造价管理部门制定招标控制价的依据",{"key":28,"text":291,"correct":22},"施工图预算是业主方进行施工图预算与施工预算“两算”对比的依据",{"key":31,"text":293,"correct":22},"施工图预算是施工单位安排建设资金计划的依据",{"id":295,"libraryId":5,"type":15,"typeLabel":16,"stem":296,"options":297,"answer":28,"analysis":33},896046,"(2014年)未达到固定资产标准的工器具购置费的计算基数一般为（）",[298,300,302,304],{"key":20,"text":299,"correct":22},"工程建设其他费",{"key":24,"text":301,"correct":22},"建设安装工程费",{"key":28,"text":303,"correct":26},"设备购置费",{"key":31,"text":305,"correct":22},"设备及安装工程费",{"id":307,"libraryId":5,"type":15,"typeLabel":16,"stem":308,"options":309,"answer":31,"analysis":33},896047,"(2014年)建设工程预算编制中的总预算由（）组成。",[310,312,314,316],{"key":20,"text":311,"correct":22},"综合预算和工程建设其他费、预备费",{"key":24,"text":313,"correct":22},"预备费、建设期利息及铺底流动资金",{"key":28,"text":315,"correct":22},"综合预算和工程建设其他费、铺底流动资金",{"key":31,"text":317,"correct":26},"综合预算和工程建设其他费、预备费、建设期利息及铺底流动资金",{"id":319,"libraryId":5,"type":15,"typeLabel":16,"stem":320,"options":321,"answer":28,"analysis":33},896048,"(2016年)某单项工程的单位建筑工程预算为1000万元，单位安装工程预算为500万元，设备购置预算为600万元，未达到固定资产标准的工器具购置预算为60万元，若预备费率费5%，则该单项工程施工图预算为()万元。",[322,324,326,328],{"key":20,"text":323,"correct":22},"1500",{"key":24,"text":325,"correct":22},"2100",{"key":28,"text":327,"correct":26},"2160",{"key":31,"text":329,"correct":22},"2268",{"id":331,"libraryId":5,"type":15,"typeLabel":16,"stem":332,"options":333,"answer":24,"analysis":33},896049,"根据《中华人民共和国招标投标法》及相关法规，对必须招标的项目，招标人行为符合要求的是（ ）。（2016）",[334,336,338,340],{"key":20,"text":335,"correct":22},"就同一招标项目向潜在投标人提供有差别的项目信息",{"key":24,"text":337,"correct":26},"委托两家招标代理机构，设置两处报名点接受投标人报名",{"key":28,"text":339,"correct":22},"以特定行业的业绩、奖项作为加分条件",{"key":31,"text":341,"correct":22},"限定或者指定特定的品牌",{"id":343,"libraryId":5,"type":15,"typeLabel":16,"stem":344,"options":345,"answer":20,"analysis":33},896050,"在签订合同的谈判中，为了防范货币贬值或者通货膨胀的风险，招标人和中标人一般通过()约定风险分担方式（2013）",[346,348,350,352],{"key":20,"text":347,"correct":26},"确定价格调整条款",{"key":24,"text":349,"correct":22},"确定合同价格条款",{"key":28,"text":351,"correct":22},"调整工程范围",{"key":31,"text":353,"correct":22},"确定合同款支付方式",{"id":355,"libraryId":5,"type":15,"typeLabel":16,"stem":356,"options":357,"answer":20,"analysis":33},896051,"投标人根据招标文件在约定期限内向招标人提交投标文件的行为，称为（ ）。 （2014）",[358,360,362,364],{"key":20,"text":359,"correct":26},"要约",{"key":24,"text":361,"correct":22},"承诺",{"key":28,"text":363,"correct":22},"要约邀请",{"key":31,"text":365,"correct":22},"合同生效",{"id":367,"libraryId":5,"type":15,"typeLabel":16,"stem":368,"options":369,"answer":24,"analysis":33},896052,"【2018年真题】根据《政府采购法实施条例》，政府采购工程依法不进行招标的，可以采用的采购方式是（ ）。",[370,372,374,376],{"key":20,"text":371,"correct":22},"询价",{"key":24,"text":373,"correct":26},"单一来源采购",{"key":28,"text":375,"correct":22},"直接确定",{"key":31,"text":377,"correct":22},"框架协议",{"id":379,"libraryId":5,"type":15,"typeLabel":16,"stem":380,"options":381,"answer":31,"analysis":33},896053,"【2018年真题】关于招标价格的说法，正确的是（ ）。",[382,384,386,388],{"key":20,"text":383,"correct":22},"招标时可以设定最低投标限价",{"key":24,"text":385,"correct":22},"招标时应当编制标底",{"key":28,"text":387,"correct":22},"招标的项目应当采用工程量清单计价",{"key":31,"text":389,"correct":26},"招标时可以设定最高投标限价",{"id":391,"libraryId":5,"type":15,"typeLabel":16,"stem":392,"options":393,"answer":28,"analysis":33},896054,"【2016年真题】下列招标人的行为中合法的是（ ）。",[394,396,398,400],{"key":20,"text":395,"correct":22},"招标人可以根据需要组织部分潜在投标人踏勘项目现场",{"key":24,"text":397,"correct":22},"招标人可以限定或者指定特定的专利、品牌、原产地或供应商",{"key":28,"text":399,"correct":26},"依法必须进行招标的项目以非特定行业的奖项作为加分条件",{"key":31,"text":401,"correct":22},"依法必须进行招标的项目招标人限定投标人必须为国有企业",{"id":403,"libraryId":5,"type":15,"typeLabel":16,"stem":404,"options":405,"answer":28,"analysis":33},896055,"【2018年真题】根据《招标投标法》，可以确定中标人的主体是（ ）。",[406,408,410,412],{"key":20,"text":407,"correct":22},"经招标人授权的招标代理机构",{"key":24,"text":409,"correct":22},"建设行政主管部门",{"key":28,"text":411,"correct":26},"经招标人授权的评标委员会",{"key":31,"text":413,"correct":22},"招标投标有形市场",{"id":415,"libraryId":5,"type":15,"typeLabel":16,"stem":416,"options":417,"answer":20,"analysis":33},896056,"【2018年真题】根据《招标投标法》，中标通知书自（ ）发生法律效力。",[418,420,422,424],{"key":20,"text":419,"correct":26},"发出之日",{"key":24,"text":421,"correct":22},"作出之日",{"key":28,"text":423,"correct":22},"盖章之日",{"key":31,"text":425,"correct":22},"收到之日",{"id":427,"libraryId":5,"type":15,"typeLabel":16,"stem":428,"options":429,"answer":28,"analysis":33},896057,"【2018年真题】根据《招标投标法实施条例》，履约保证金的上限是中标合同金额的（ ）。",[430,432,434,436],{"key":20,"text":431,"correct":22},"2%",{"key":24,"text":433,"correct":22},"5%",{"key":28,"text":435,"correct":26},"10%",{"key":31,"text":437,"correct":22},"20%",{"id":439,"libraryId":5,"type":15,"typeLabel":16,"stem":440,"options":441,"answer":20,"analysis":33},896058,"关于投标文件的说法，正确的是（ ）。2017",[442,444,446,448],{"key":20,"text":443,"correct":26},"通常投标文件中需要提交投标担保",{"key":24,"text":445,"correct":22},"投标文件在对招标文件的实质性要求作出响应后，可另外提出新的要求",{"key":28,"text":447,"correct":22},"投标书只需要盖有投标企业公章或企业法定代表人名章",{"key":31,"text":449,"correct":22},"投标书可由项目所在地的企业项目经理部组织投标，不需要授权委托书",{"id":451,"libraryId":5,"type":15,"typeLabel":16,"stem":452,"options":453,"answer":24,"analysis":33},896059,"【2017年真题】关于招标文件澄清或者修改的说法，正确的是（ ）",[454,456,458,460],{"key":20,"text":455,"correct":22},"招标文件的效力高于其澄清或修改文件",{"key":24,"text":457,"correct":26},"澄清或者修改的内容可能影响投标文件编制的，招标人应在投标截止时间至少15日前澄清或者修改",{"key":28,"text":459,"correct":22},"澄清或者修改可以以口头形式通知所有获取招标文件的潜在投标人",{"key":31,"text":461,"correct":22},"澄清或者修改通知至投标截止时间不足15日的，在征得全部投标人同意后，可按原投标截止时间开标",{"id":463,"libraryId":5,"type":15,"typeLabel":16,"stem":464,"options":465,"answer":24,"analysis":33},896060,"【2018年真题】发售招标文件收取的费用应当限于补偿（ ）的成本支出。",[466,468,470,472],{"key":20,"text":467,"correct":22},"编制招标文件",{"key":24,"text":469,"correct":26},"印刷、邮寄招标文件",{"key":28,"text":471,"correct":22},"招标人办公",{"key":31,"text":473,"correct":22},"招标活动",{"id":475,"libraryId":5,"type":15,"typeLabel":16,"stem":476,"options":477,"answer":31,"analysis":33},896061,"【2017年真题】关于投标文件撤回和撤销的说法，正确的是（ ）",[478,480,482,484],{"key":20,"text":479,"correct":22},"投标人可以选择电话或书面方式通知招标人撤回投标文件",{"key":24,"text":481,"correct":22},"招标人收取的投标保证金，应当自收到投标人撤回通知之日起10日内退还",{"key":28,"text":483,"correct":22},"投标截止时间后投标人撤销投标文件的，招标人应当退还投标保证金",{"key":31,"text":485,"correct":26},"投标人撤回已提交的投标文件，应当在投标截止时间前通知招标人",{"id":487,"libraryId":5,"type":15,"typeLabel":16,"stem":488,"options":489,"answer":20,"analysis":33},896062,"【2017年真题】关于投标文件的送达与签收的说法，正确的是（ ）。",[490,492,494,496],{"key":20,"text":491,"correct":26},"投标人应当在投标截止时间前，将投标文件送达投标地点",{"key":24,"text":493,"correct":22},"招标人签收投标文件后，可以开启投标文件",{"key":28,"text":495,"correct":22},"投标截止时间后送达的投标文件，招标人不得拒收",{"key":31,"text":497,"correct":22},"未按招标文件要求密封的投标文件，招标人不得拒收",{"id":499,"libraryId":5,"type":15,"typeLabel":16,"stem":500,"options":501,"answer":24,"analysis":33},896063,"(2011年)某投标人在递交投标文件的同时，按规定递交了投标保证金，其投标总价为5000万元，则其投标保证金数额最高为()万元。",[502,504,506,508],{"key":20,"text":503,"correct":22},"50",{"key":24,"text":505,"correct":26},"80",{"key":28,"text":507,"correct":22},"100",{"key":31,"text":509,"correct":22},"160",{"id":511,"libraryId":5,"type":15,"typeLabel":16,"stem":512,"options":513,"answer":31,"analysis":33},896064,"(2014年)施工投标报价的主要工作有：①复核工程量，②研究招标文件，③确定基础标价，④编制投标文件，其正确的工作流程是（）",[514,516,518,520],{"key":20,"text":515,"correct":22},"①②③④",{"key":24,"text":517,"correct":22},"②③①④",{"key":28,"text":519,"correct":22},"①②④③",{"key":31,"text":521,"correct":26},"②①③④",{"id":523,"libraryId":5,"type":15,"typeLabel":16,"stem":524,"options":525,"answer":24,"analysis":33},896065,"(2016年)施工项目投标报价的工作包括：①收集投标信息；②选择报价策略；③组建投标班子；④确定基础标价；⑤确定投标报价；⑥研究招标文件，以上工作正确的先后顺序是()。",[526,528,530,532],{"key":20,"text":527,"correct":22},"⑥①③②④⑤",{"key":24,"text":529,"correct":26},"③⑥①④②⑤",{"key":28,"text":531,"correct":22},"③①⑥②④⑤",{"key":31,"text":533,"correct":22},"⑥③①④②⑤",{"id":535,"libraryId":5,"type":15,"typeLabel":16,"stem":536,"options":537,"answer":24,"analysis":33},896066,"(2016年)投标人在投标前期研究招标文件时，对合同形式进行分析的主要内容为()。",[538,540,542,544],{"key":20,"text":539,"correct":22},"承包商任务",{"key":24,"text":541,"correct":26},"计价方式",{"key":28,"text":543,"correct":22},"付款办法",{"key":31,"text":545,"correct":22},"合同价款调整",{"id":547,"libraryId":5,"type":15,"typeLabel":16,"stem":548,"options":549,"answer":31,"analysis":33},896067,"(2013年)关于招标文件的编制，下列说法中错误的是()。",[550,552,554,556],{"key":20,"text":551,"correct":22},"当未进行资格预审时招标文件应包括招标公告",{"key":24,"text":553,"correct":22},"应规定重新招标和不再招标的条件",{"key":28,"text":555,"correct":22},"招标控制价应在招标时(或在招标文件中)一并公布",{"key":31,"text":557,"correct":26},"投标人须知前附表与投标人须知正文内容有抵触的以投标人须知前附表为准",{"id":559,"libraryId":5,"type":15,"typeLabel":16,"stem":560,"options":561,"answer":24,"analysis":33},896068,"(2013年)关于招标文件的澄清，下列说法中错误的是()。",[562,564,566,568],{"key":20,"text":563,"correct":22},"投标人应以信函、电报等可以有形地表现所载内容的形式向招标人提出疑问",{"key":24,"text":565,"correct":26},"招标文件的澄清应发给所有投标人并指明澄清问题的来源",{"key":28,"text":567,"correct":22},"澄清发出的时间距投标截止日不足15天的应推迟投标截止时间",{"key":31,"text":569,"correct":22},"投标人收到澄清的确认时间可以是相对时间，也可以是绝对时间",{"id":571,"libraryId":5,"type":15,"typeLabel":16,"stem":572,"options":573,"answer":20,"analysis":33},896069,"(2014年)在招标投标过程中，载明招标文件获取方式的应是（）。",[574,576,578,580],{"key":20,"text":575,"correct":26},"招标公告",{"key":24,"text":577,"correct":22},"资格预审公告",{"key":28,"text":579,"correct":22},"招标文件",{"key":31,"text":581,"correct":22},"投标文件",{"id":583,"libraryId":5,"type":15,"typeLabel":16,"stem":584,"options":585,"answer":24,"analysis":33},896070,"(2014年)下列内容中，属于招标工程量清单编制依据的是（）。",[586,588,590,592],{"key":20,"text":587,"correct":22},"分部分项工程清单",{"key":24,"text":589,"correct":26},"拟定的招标文件",{"key":28,"text":591,"correct":22},"招标控制价",{"key":31,"text":593,"correct":22},"潜在招标人的潜质及能力",{"id":595,"libraryId":5,"type":15,"typeLabel":16,"stem":596,"options":597,"answer":20,"analysis":33},896071,"(2014年)招标工程量清单应根据常规施工方案编制，拟定常规施工方案时（）",[598,600,602,604],{"key":20,"text":599,"correct":26},"应对主要项目进行估算，如土方石.混凝土",{"key":24,"text":601,"correct":22},"需对施工总方案中的重大问题及关键工艺作明确具体的规定",{"key":28,"text":603,"correct":22},"不需计算人、材、机资源需要量",{"key":31,"text":605,"correct":22},"不比考虑节假日与气候对工期的影响",{"id":607,"libraryId":5,"type":15,"typeLabel":16,"stem":608,"options":609,"answer":24,"analysis":33},896072,"(2015年)招标工程量清单是招标文件的组成部分，其准确性由()负责。",[610,612,614,616],{"key":20,"text":611,"correct":22},"招标代理机构",{"key":24,"text":613,"correct":26},"招标人",{"key":28,"text":615,"correct":22},"编制工程量清单的造价咨询机构",{"key":31,"text":617,"correct":22},"招标工程量清单的编制人",[619,622,625,628,631,634],{"id":15,"name":620,"category":7,"favorite":621},"领导干部任职前廉政法规知识测试题",92,{"id":623,"name":624,"category":7,"favorite":15},595,"建筑结构与设备",{"id":626,"name":627,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":629,"name":630,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":632,"name":633,"category":7,"favorite":8},534,"BIM工程师",{"id":635,"name":633,"category":7,"favorite":8},535]