[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-581-24":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":605},{"id":5,"name":6,"category":7,"favorite":8},581,"建设工程造价管理基础知识","建筑工程",0,24,50,2873,[13,34,46,58,70,82,94,106,118,130,142,152,164,176,188,199,211,223,234,246,254,266,278,290,302,314,326,338,346,358,370,382,394,406,418,430,442,454,466,476,488,500,512,524,536,548,560,569,581,593],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":27,"analysis":33},895973,1,"单选题","(2015年)根据施工过程工时研究结果，与工人所担负的工作量大小无关的必须消耗时间是( )。",[19,23,26,30],{"key":20,"text":21,"correct":22},"A","基本工作时间",false,{"key":24,"text":25,"correct":22},"B","辅助工作时间",{"key":27,"text":28,"correct":29},"C","准备与结束工作时间",true,{"key":31,"text":32,"correct":22},"D","多余工作时间","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":31,"analysis":33},895974,"(2015年)用水泥砂浆砌筑2m3砖墙，标准砖(240mmx115mmx53mm)的总耗用量为1113块。已知砖的损耗率为5%，则标准砖、砂浆的净用量分别为( )。",[38,40,42,44],{"key":20,"text":39,"correct":22},"1057块、0.372m3",{"key":24,"text":41,"correct":22},"1057块、0.454m3",{"key":27,"text":43,"correct":22},"1060块、0.372m3",{"key":31,"text":45,"correct":29},"1060块、0.449m3",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":31,"analysis":33},895975,"(2015年)某大型施工机械需配机上司机、机上操作人员各1名，若年制度工作日为250天，年工作台班为200台班，人工日工资单价均为100元\u002F工日，则该施工机械的台班人工费为( )元。",[50,52,54,56],{"key":20,"text":51,"correct":22},"100",{"key":24,"text":53,"correct":22},"125",{"key":27,"text":55,"correct":22},"200",{"key":31,"text":57,"correct":29},"250",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":31,"analysis":33},895976,"(2016年)若完成1m3墙体砌筑工作的基本工时为0.5工日，辅助工作时间占工序时间的4%，准备与结束工作时间、不可避免的中断时间、休息时间分别占工作时间的6%、3%和12%，该工程时间定额为()工日\u002Fm3。",[62,64,66,68],{"key":20,"text":63,"correct":22},"0.581",{"key":24,"text":65,"correct":22},"0.608",{"key":27,"text":67,"correct":22},"0.629",{"key":31,"text":69,"correct":29},"0.659",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":24,"analysis":33},895977,"(2017年)已知人工挖某土方1m3的基本工作时间为1个工作日，辅助工作时间占工序作业时间的5%，准备与结束工作时间、不可避免的中断时间、休息时间分别占工作日的3%、2%、15%，该人工挖土的时间定额为（）工日\u002F10m3。",[74,76,78,80],{"key":20,"text":75,"correct":22},"13.33",{"key":24,"text":77,"correct":29},"13.16",{"key":27,"text":79,"correct":22},"13.13",{"key":31,"text":81,"correct":22},"12.50",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":24,"analysis":33},895978,"（2016 年考题）从甲、乙两地采购某工程材料，采购量及有关费用如下表所示，该工程材料的材料单价为（ ）元\u002Ft。",[86,88,90,92],{"key":20,"text":87,"correct":22},"262.08",{"key":24,"text":89,"correct":29},"262.16",{"key":27,"text":91,"correct":22},"262.42",{"key":31,"text":93,"correct":22},"262.50",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":24,"analysis":33},895979,"对工人工作时间进行分类研究时将工人在工作班内消耗的工作时间分为必需消耗的时间和损失时间。 中损失时间中包括多余和偶然工作、停工、违背劳动纪律所引起的损失时间。下列时间中可以在制定定额时适当考虑的是（ ）。",[98,100,102,104],{"key":20,"text":99,"correct":22},"A．多余工作时间",{"key":24,"text":101,"correct":29},"偶然工作时间",{"key":27,"text":103,"correct":22},"施工造成的停工时间",{"key":31,"text":105,"correct":22},"违反劳动纪律时间",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":27,"analysis":33},895980,"某工人小组在正常的施工条件下进行砖墙的砌筑，下列作业过程所消耗的时间属于必须消耗时间的是（ ）。",[110,112,114,116],{"key":20,"text":111,"correct":22},"A．工人对经检验不合格的部位重新砌筑使用的时间",{"key":24,"text":113,"correct":22},"B．砂浆没有按时运抵工作面而引起的停工时间",{"key":27,"text":115,"correct":29},"工人砌筑砖墙所消耗的时间",{"key":31,"text":117,"correct":22},"由于工地停电使砌筑施工无法进行所消耗的时间",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":24,"analysis":33},895981,"某施工企业结合自身情况确定砌筑“1 砖混水砖墙”子目中人工消耗量。已知砌筑小组由3 名工人组成，在正常施工条件下，经测算完成10m3 砖墙砌筑耗时40 小时。则在正常施工条件下，砌筑l0m3“l 砖混水砖墙”的劳动定额为（ ）工日。",[122,124,126,128],{"key":20,"text":123,"correct":22},"5",{"key":24,"text":125,"correct":29},"15",{"key":27,"text":127,"correct":22},"40",{"key":31,"text":129,"correct":22},"120",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":24,"analysis":33},895982,"某施工机械的产量定额为2.56（lOOm3／台班），与之配合的工人小组有4 人，则与该机械配合的人工时间定额为（ ）工日\u002F100m3。",[134,136,138,140],{"key":20,"text":135,"correct":22},"0.016",{"key":24,"text":137,"correct":29},"1.563",{"key":27,"text":139,"correct":22},"10.24",{"key":31,"text":141,"correct":22},"0.391",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":27,"analysis":33},895983,"已知某挖土机挖土的一个工作循环需2min，每循环一次挖土0.5m3，工作班的延续时间为8h，时间利用系数K=O.85，则该机械的产量定额为（ ）m3／台班。",[146,148,149,151],{"key":20,"text":147,"correct":22},"12.8",{"key":24,"text":125,"correct":22},{"key":27,"text":150,"correct":29},"102",{"key":31,"text":129,"correct":22},{"id":153,"libraryId":5,"type":15,"typeLabel":16,"stem":154,"options":155,"answer":24,"analysis":33},895984,"编制施工机械台班使用定额时，可计入定额时间的是（ ）。",[156,158,160,162],{"key":20,"text":157,"correct":22},"A．因技术人员过错造成机械降低负荷情况下的工作时间",{"key":24,"text":159,"correct":29},"B．机械使用过程中进行的必要的保养所造成的中断时间",{"key":27,"text":161,"correct":22},"操作机械的工人违反劳动纪律所消耗的时间",{"key":31,"text":163,"correct":22},"施工组织不当造成的机械停工时间",{"id":165,"libraryId":5,"type":15,"typeLabel":16,"stem":166,"options":167,"answer":24,"analysis":33},895985,"施工机械台班产量定额等于（ ）。",[168,170,172,174],{"key":20,"text":169,"correct":22},"A．机械净工作生产率&times;工作班延续时间",{"key":24,"text":171,"correct":29},"B．机械净工作生产率&times;工作班延续时间&times;机械利用系数",{"key":27,"text":173,"correct":22},"机械净工作生产率&times;机械利用系数",{"key":31,"text":175,"correct":22},"机械净工作生产率&times;工作班延续时间&times;机械运行时间",{"id":177,"libraryId":5,"type":15,"typeLabel":16,"stem":178,"options":179,"answer":31,"analysis":33},895986,"编制某施工机械台班使用定额，测定该机械小时的生产率为6 机械利用系数平均为80%，工作班延续时间为8 小时，则该机械的台班产量定额为（ ）。",[180,182,184,186],{"key":20,"text":181,"correct":22},"64",{"key":24,"text":183,"correct":22},"60",{"key":27,"text":185,"correct":22},"48",{"key":31,"text":187,"correct":29},"38.4",{"id":189,"libraryId":5,"type":15,"typeLabel":16,"stem":190,"options":191,"answer":31,"analysis":33},895987,"编制人工定额时，工人必须消耗的时间不包括（ ）。",[192,194,196,198],{"key":20,"text":193,"correct":22},"有效工作时间",{"key":24,"text":195,"correct":22},"休息时间",{"key":27,"text":197,"correct":22},"不可避免中断时间",{"key":31,"text":101,"correct":29},{"id":200,"libraryId":5,"type":15,"typeLabel":16,"stem":201,"options":202,"answer":27,"analysis":33},895988,"(2010年)根据单项工程的一般划分原则，下列单项工程中属于辅助生产设施的是()。",[203,205,207,209],{"key":20,"text":204,"correct":22},"废水处理站",{"key":24,"text":206,"correct":22},"水塔",{"key":27,"text":208,"correct":29},"机修车间",{"key":31,"text":210,"correct":22},"职工医院",{"id":212,"libraryId":5,"type":15,"typeLabel":16,"stem":213,"options":214,"answer":24,"analysis":33},895989,"编制人工定额时，应计入定额时间的是（）。",[215,217,219,221],{"key":20,"text":216,"correct":22},"擅自离开工作岗位的时间",{"key":24,"text":218,"correct":29},"辅助工作消耗的时间",{"key":27,"text":220,"correct":22},"工作时间内聊天的时间",{"key":31,"text":222,"correct":22},"工作面未准备好导致的停工时间",{"id":224,"libraryId":5,"type":15,"typeLabel":16,"stem":225,"options":226,"answer":20,"analysis":33},895990,"某出料容量0.5m3的混凝土搅拌机，每一次循环中，装料、搅拌、卸料、中断需要的时间分别为1、3、1、1分钟，机械利用系数为0.8，则该搅拌机的台班产量定额是（ ）m3\u002F台班。",[227,229,231,232],{"key":20,"text":228,"correct":29},"32",{"key":24,"text":230,"correct":22},"36",{"key":27,"text":127,"correct":22},{"key":31,"text":233,"correct":22},"50",{"id":235,"libraryId":5,"type":15,"typeLabel":16,"stem":236,"options":237,"answer":20,"analysis":33},895991,"(2010年)下列工程造价指数中，适合采用综合指数形式表示的是()。",[238,240,242,244],{"key":20,"text":239,"correct":29},"设备、工器具价格指数",{"key":24,"text":241,"correct":22},"建筑安装工程造价指数",{"key":27,"text":243,"correct":22},"单项工程造价指数",{"key":31,"text":245,"correct":22},"建设项目造价指数",{"id":247,"libraryId":5,"type":15,"typeLabel":16,"stem":248,"options":249,"answer":27,"analysis":33},895992,"(2010年)假设q1、P1分别表示报告期的采购数量与价格，qo、Po分别表示基期的采购数量与价格，则派氏综合指数为()。",[250,251,252,253],{"key":20,"text":20,"correct":22},{"key":24,"text":24,"correct":22},{"key":27,"text":27,"correct":29},{"key":31,"text":31,"correct":22},{"id":255,"libraryId":5,"type":15,"typeLabel":16,"stem":256,"options":257,"answer":24,"analysis":33},895993,"(2014年)最能体现信动态性变化特征，并且在工程价格的市场机制中起重要作用的工程造价信息主要包括（）",[258,260,262,264],{"key":20,"text":259,"correct":22},"工程造价指数在建工程信息和已完工程信息",{"key":24,"text":261,"correct":29},"价格信息、工程造价指数和已完工程信息",{"key":27,"text":263,"correct":22},"人工价格信息、材料价格信息及在建工程信息",{"key":31,"text":265,"correct":22},"价格信息、工程造价指数及刚开工的工程信息",{"id":267,"libraryId":5,"type":15,"typeLabel":16,"stem":268,"options":269,"answer":24,"analysis":33},895994,"(2009年)某工程在建设期初预计和建设期第一年末实际发生的设备、工器具购置情况如下表所示。与建设期初相比，第一年末的设备、工器具价格指数为()。",[270,272,274,276],{"key":20,"text":271,"correct":22},"0.9802",{"key":24,"text":273,"correct":29},"1.0811",{"key":27,"text":275,"correct":22},"1.1072",{"key":31,"text":277,"correct":22},"1.197",{"id":279,"libraryId":5,"type":15,"typeLabel":16,"stem":280,"options":281,"answer":24,"analysis":33},895995,"(2010年)从信息管理组织角度，可以将工程造价信息分为()。",[282,284,286,288],{"key":20,"text":283,"correct":22},"文件式信息和非文件式信息",{"key":24,"text":285,"correct":29},"系统化信息和非系统化信息",{"key":27,"text":287,"correct":22},"宏观信息和微观信息",{"key":31,"text":289,"correct":22},"固定信息和流动信息",{"id":291,"libraryId":5,"type":15,"typeLabel":16,"stem":292,"options":293,"answer":24,"analysis":33},895996,"(2013年)表明某经济现象某一期对其上一期或前一期的综合变动程度的指数属于()。",[294,296,298,300],{"key":20,"text":295,"correct":22},"综合指数",{"key":24,"text":297,"correct":29},"环比指数",{"key":27,"text":299,"correct":22},"定基指数",{"key":31,"text":301,"correct":22},"平均数指数",{"id":303,"libraryId":5,"type":15,"typeLabel":16,"stem":304,"options":305,"answer":27,"analysis":33},895997,"(2013年)若以∑q1p0／∑q0p0为造价指数，则该指标属于()。",[306,308,310,312],{"key":20,"text":307,"correct":22},"质量指标指数",{"key":24,"text":309,"correct":22},"派氏价格指数",{"key":27,"text":311,"correct":29},"以基期的质量指标作为同度量因素的指数",{"key":31,"text":313,"correct":22},"以报告期的质量指标作为同度量因素的指数",{"id":315,"libraryId":5,"type":15,"typeLabel":16,"stem":316,"options":317,"answer":20,"analysis":33},895998,"(2014年)工程造价信息分类应从系统工程的角度出发，放在具体的应用环境中考虑，综合项目的实施环境和信息技术工具，这体现了工程造价信息分类的（）原则。",[318,320,322,324],{"key":20,"text":319,"correct":29},"综合实用性",{"key":24,"text":321,"correct":22},"稳定性",{"key":27,"text":323,"correct":22},"兼容性",{"key":31,"text":325,"correct":22},"可扩展性",{"id":327,"libraryId":5,"type":15,"typeLabel":16,"stem":328,"options":329,"answer":27,"analysis":33},895999,"(2015年)某类建筑材料本身的价格不高，但所需的运输费用却很高，该类建筑材料的价格信息一般具有较明显的()。",[330,332,334,336],{"key":20,"text":331,"correct":22},"专业性",{"key":24,"text":333,"correct":22},"季节性",{"key":27,"text":335,"correct":29},"区域性",{"key":31,"text":337,"correct":22},"动态性",{"id":339,"libraryId":5,"type":15,"typeLabel":16,"stem":340,"options":341,"answer":20,"analysis":33},896000,"(2016年)下列工程造价指数，既属于总指数又可用综合指数形式表示的是()。",[342,343,344,345],{"key":20,"text":239,"correct":29},{"key":24,"text":241,"correct":22},{"key":27,"text":243,"correct":22},{"key":31,"text":245,"correct":22},{"id":347,"libraryId":5,"type":15,"typeLabel":16,"stem":348,"options":349,"answer":20,"analysis":33},896001,"(2016年)某建筑工程报告期各项费用构成和各单项价格指数如下表所示，则该工程的建筑安装工程造价指数为()。",[350,352,354,356],{"key":20,"text":351,"correct":29},"0.995",{"key":24,"text":353,"correct":22},"0.996",{"key":27,"text":355,"correct":22},"0.997",{"key":31,"text":357,"correct":22},"0.998",{"id":359,"libraryId":5,"type":15,"typeLabel":16,"stem":360,"options":361,"answer":27,"analysis":33},896002,"(2011年)预计某年度应收账款1800万元，应付账款1300万元，预收账款700万元，预付款500万元，存货1000万元，现金400万元。则该年度流动资金估算额为()万元。",[362,364,366,368],{"key":20,"text":363,"correct":22},"700",{"key":24,"text":365,"correct":22},"1100",{"key":27,"text":367,"correct":29},"1700",{"key":31,"text":369,"correct":22},"2100",{"id":371,"libraryId":5,"type":15,"typeLabel":16,"stem":372,"options":373,"answer":24,"analysis":33},896003,"(2013年)关于生产技术方案的选择，下列说法中正确的是()。",[374,376,378,380],{"key":20,"text":375,"correct":22},"应结合市场需求确定建设规模",{"key":24,"text":377,"correct":29},"生产方法应与拟采用的原材料相适应",{"key":27,"text":379,"correct":22},"工艺流程宜具有刚性安排",{"key":31,"text":381,"correct":22},"应选择最先进的生产方法",{"id":383,"libraryId":5,"type":15,"typeLabel":16,"stem":384,"options":385,"answer":20,"analysis":33},896004,"(2014年)对于技术密集型建设项目，选择建设地区应遵循的原则是（）",[386,388,390,392],{"key":20,"text":387,"correct":29},"选择在大中型发达城市",{"key":24,"text":389,"correct":22},"靠近原料产地",{"key":27,"text":391,"correct":22},"靠近产地消费地",{"key":31,"text":393,"correct":22},"靠近电（能）源地",{"id":395,"libraryId":5,"type":15,"typeLabel":16,"stem":396,"options":397,"answer":27,"analysis":33},896005,"(2016年)按照形成资产法编制建设项目投资估算表，下列费用中可计入固定资产其他费用的是()。",[398,400,402,404],{"key":20,"text":399,"correct":22},"开办费",{"key":24,"text":401,"correct":22},"非专利技术使用费",{"key":27,"text":403,"correct":29},"土地使用权取得费",{"key":31,"text":405,"correct":22},"生产准备费",{"id":407,"libraryId":5,"type":15,"typeLabel":16,"stem":408,"options":409,"answer":31,"analysis":33},896006,"(2014年)某地拟于2015年新建一年产60万吨产品的生产线，该地区2013年建成的年产50万吨相同产品的生产线的建设投资额为5000万元。假定2013年至2015年该地区工程造价年均递增5%。则该生产线的建设投资为（）万元。",[410,412,414,416],{"key":20,"text":411,"correct":22},"6000",{"key":24,"text":413,"correct":22},"6300",{"key":27,"text":415,"correct":22},"6600",{"key":31,"text":417,"correct":29},"6615",{"id":419,"libraryId":5,"type":15,"typeLabel":16,"stem":420,"options":421,"answer":24,"analysis":33},896007,"(2010年)关于生产技术方案选择的基本原则，下列说法中错误的是()。",[422,424,426,428],{"key":20,"text":423,"correct":22},"先进适用",{"key":24,"text":425,"correct":29},"节约土地",{"key":27,"text":427,"correct":22},"安全可靠",{"key":31,"text":429,"correct":22},"经济合理",{"id":431,"libraryId":5,"type":15,"typeLabel":16,"stem":432,"options":433,"answer":27,"analysis":33},896008,"(2010年)下列流动资金分项详细估算的计算式中，正确的是()。",[434,436,438,440],{"key":20,"text":435,"correct":22},"应收账款=年营业收入／应收账款周转次数",{"key":24,"text":437,"correct":22},"预收账款=年经营成本／预收账款周转次数",{"key":27,"text":439,"correct":29},"产成品=（年经营成本-年其他营业费用）／产成品周转次数",{"key":31,"text":441,"correct":22},"预付账款=存贷／预付账款周转次数",{"id":443,"libraryId":5,"type":15,"typeLabel":16,"stem":444,"options":445,"answer":31,"analysis":33},896009,"(2013年)采用分项详细估算法估算项目流动资金时，流动资产的正确构成是()。",[446,448,450,452],{"key":20,"text":447,"correct":22},"应付账款+预付账款+存货+年其他费用",{"key":24,"text":449,"correct":22},"应付账款+应收账款－存货+现金",{"key":27,"text":451,"correct":22},"应付账款+存货+预收账款+现金",{"key":31,"text":453,"correct":29},"预付账款+现金+应收账款+存货",{"id":455,"libraryId":5,"type":15,"typeLabel":16,"stem":456,"options":457,"answer":24,"analysis":33},896010,"(2014年)关于项目决策和工程造价的关系，下列说法中正确的是（）",[458,460,462,464],{"key":20,"text":459,"correct":22},"工程造价的正确性是项目决策合理性的前提",{"key":24,"text":461,"correct":29},"项目决策的内容是决定工程造价的基础",{"key":27,"text":463,"correct":22},"投资估算的深度影响项目决策的精确度",{"key":31,"text":465,"correct":22},"投资决策阶段对工程造价的影响程度不大",{"id":467,"libraryId":5,"type":15,"typeLabel":16,"stem":468,"options":469,"answer":24,"analysis":33},896011,"(2014年)可行性研究阶段投资估算的精确度的要求为：误差控制在±（）%以内。",[470,471,473,474],{"key":20,"text":123,"correct":22},{"key":24,"text":472,"correct":29},"10",{"key":27,"text":125,"correct":22},{"key":31,"text":475,"correct":22},"20",{"id":477,"libraryId":5,"type":15,"typeLabel":16,"stem":478,"options":479,"answer":31,"analysis":33},896012,"(2015年)建设地点选择时需进行费用分析，下列费用中应列入项目投资费用比较的是( )。",[480,482,484,486],{"key":20,"text":481,"correct":22},"动力供应费",{"key":24,"text":483,"correct":22},"燃料运入费",{"key":27,"text":485,"correct":22},"产品运出费",{"key":31,"text":487,"correct":29},"建材运输费",{"id":489,"libraryId":5,"type":15,"typeLabel":16,"stem":490,"options":491,"answer":24,"analysis":33},896013,"(2015年)世界银行贷款项目的投资估算常采用朗格系数法推算建设项目的静态投资，该方法的计算基数是()。",[492,494,496,498],{"key":20,"text":493,"correct":22},"主体工程费",{"key":24,"text":495,"correct":29},"设备购置费",{"key":27,"text":497,"correct":22},"其他工程费",{"key":31,"text":499,"correct":22},"安装工程费",{"id":501,"libraryId":5,"type":15,"typeLabel":16,"stem":502,"options":503,"answer":31,"analysis":33},896014,"(2015年)按照形成资产法编制建设投资估算表，下列费用中应列入无形资产费用的是()。",[504,506,508,510],{"key":20,"text":505,"correct":22},"建设单位管理费",{"key":24,"text":507,"correct":22},"土地使用权",{"key":27,"text":509,"correct":22},"生产设备及开办费",{"key":31,"text":511,"correct":29},"非专利技术",{"id":513,"libraryId":5,"type":15,"typeLabel":16,"stem":514,"options":515,"answer":31,"analysis":33},896015,"(2016年)建设项目投资决策阶段，在技术方案中选择生产方法时应重点关注()。",[516,518,520,522],{"key":20,"text":517,"correct":22},"是否选择了合理的物料消耗定额",{"key":24,"text":519,"correct":22},"是否符合工艺流程的柔性安排",{"key":27,"text":521,"correct":22},"是否使工艺流程中的工序合理衔接",{"key":31,"text":523,"correct":29},"是否符合节能清洁要求",{"id":525,"libraryId":5,"type":15,"typeLabel":16,"stem":526,"options":527,"answer":20,"analysis":33},896016,"(2016年)某地2016年拟建一年产50万吨产品的工业项目，预计建设期为3年，该地区2013年已建年产40万吨的类似项目投资为2亿元。已知生产能力指数为0.9，该地区2013、2016年同类工程造价指数分别为108、112，预计拟建项目建设期内工程造价年上涨率为5%。用生产能力指数法估算的拟建项目静态投资为()亿元。",[528,530,532,534],{"key":20,"text":529,"correct":29},"2.54",{"key":24,"text":531,"correct":22},"2.74",{"key":27,"text":533,"correct":22},"2.75",{"key":31,"text":535,"correct":22},"2.94",{"id":537,"libraryId":5,"type":15,"typeLabel":16,"stem":538,"options":539,"answer":24,"analysis":33},896017,"(2016年)下列安装工程费估算公式中，适用于估算工业炉窑砌筑和工艺保温或绝热工程安装工程费的是()。",[540,542,544,546],{"key":20,"text":541,"correct":22},"设备原价×设备安装费率（%）",{"key":24,"text":543,"correct":29},"重量（体积、面积）总量×单位重量（体积、面积）安装费指标",{"key":27,"text":545,"correct":22},"设备原价×材料费占设备费百分比×材料安装费率（%）",{"key":31,"text":547,"correct":22},"安装工程功能总量×功能单位安装工程费指标",{"id":549,"libraryId":5,"type":15,"typeLabel":16,"stem":550,"options":551,"answer":27,"analysis":33},896018,"(2010年)下列概算编制方法中，用于设备及安装工程概算编制的方法为()",[552,554,556,558],{"key":20,"text":553,"correct":22},"概算定额法",{"key":24,"text":555,"correct":22},"类似工程预算法",{"key":27,"text":557,"correct":29},"扩大单价法",{"key":31,"text":559,"correct":22},"概算指标法",{"id":561,"libraryId":5,"type":15,"typeLabel":16,"stem":562,"options":563,"answer":27,"analysis":33},896019,"(2013年)某拟建工程初步设计已达到必要的深度，能够据此计算出扩大分项工程的工程量，则能较为准确地编制拟建工程概算的方法是()。",[564,565,566,567],{"key":20,"text":559,"correct":22},{"key":24,"text":555,"correct":22},{"key":27,"text":553,"correct":29},{"key":31,"text":568,"correct":22},"综合吨位指标法",{"id":570,"libraryId":5,"type":15,"typeLabel":16,"stem":571,"options":572,"answer":27,"analysis":33},896020,"(2014年)下列建筑设计影响工程造价的选项中，属于影响工业建筑但一般不影响民用建筑的因素是（）",[573,575,577,579],{"key":20,"text":574,"correct":22},"建筑物平面形状",{"key":24,"text":576,"correct":22},"项目利益相关者",{"key":27,"text":578,"correct":29},"柱网布置",{"key":31,"text":580,"correct":22},"风险因素",{"id":582,"libraryId":5,"type":15,"typeLabel":16,"stem":583,"options":584,"answer":24,"analysis":33},896021,"(2014年)单位工程概算按其工作性质可分为单位建设工程概算和单位设备及安装工程概算两类，下列属于单位设备及安装工程概算的是（）。",[585,587,589,591],{"key":20,"text":586,"correct":22},"通风、空调工程概算",{"key":24,"text":588,"correct":29},"工器具及生产家具购置费概算",{"key":27,"text":590,"correct":22},"电气、照明工程概算",{"key":31,"text":592,"correct":22},"弱电工程概算",{"id":594,"libraryId":5,"type":15,"typeLabel":16,"stem":595,"options":596,"answer":24,"analysis":33},896022,"(2016年)关于住宅建筑设计中的结构面积系数，下列说法中正确的是()。",[597,599,601,603],{"key":20,"text":598,"correct":22},"结构面积系数越大，设计方案越经济",{"key":24,"text":600,"correct":29},"房间平均面积越大，结构面积系数越小",{"key":27,"text":602,"correct":22},"结构面积系数与房间户型组成有关，与房屋长度.宽度无关",{"key":31,"text":604,"correct":22},"结构面积系数与房屋结构有关，与房屋外形无关",[606,609,612,615,618,621],{"id":15,"name":607,"category":7,"favorite":608},"领导干部任职前廉政法规知识测试题",92,{"id":610,"name":611,"category":7,"favorite":15},595,"建筑结构与设备",{"id":613,"name":614,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":616,"name":617,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":619,"name":620,"category":7,"favorite":8},534,"BIM工程师",{"id":622,"name":620,"category":7,"favorite":8},535]