[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-581-23":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":616},{"id":5,"name":6,"category":7,"favorite":8},581,"建设工程造价管理基础知识","建筑工程",0,23,50,2873,[13,34,46,58,70,82,94,105,117,129,141,153,165,177,189,201,211,223,235,247,257,269,281,293,305,317,329,341,353,364,376,388,400,412,424,436,448,460,472,484,496,508,520,532,544,556,568,580,592,604],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":24,"analysis":33},895923,1,"单选题","(2013年)下列工程计价的标准和依据中，适用于项目建设前期各阶段对建设投资进行预测和估计的是()。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","工程量清单计价规范",false,{"key":24,"text":25,"correct":26},"B","工程定额",true,{"key":28,"text":29,"correct":22},"C","工程量清单计量规范",{"key":31,"text":32,"correct":22},"D","工程承包合同文件","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":28,"analysis":33},895924,"(2014年)下列关于工程计价的说法中，正确的是（）。",[38,40,42,44],{"key":20,"text":39,"correct":22},"工程计价包括计算工程量和套定额两个环节",{"key":24,"text":41,"correct":22},"建筑安装工程费=Σ基本构造单元工程量×相应单价",{"key":28,"text":43,"correct":26},"工程计价包括工程单价的确定和总价的计算",{"key":31,"text":45,"correct":22},"工程计价中的工程单价仅只综合单价",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":31,"analysis":33},895925,"(2015年)根据我国建设市场发展现状，工程量清单计价和计量规范主要适用于( )。",[50,52,54,56],{"key":20,"text":51,"correct":22},"项目建设前提各阶段工程造价的估计",{"key":24,"text":53,"correct":22},"项目初步设计阶段概算的预测",{"key":28,"text":55,"correct":22},"项目施工图设计阶段预算的预测",{"key":31,"text":57,"correct":26},"项目合同价格的形成和后续合同价格的管理",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":28,"analysis":33},895926,"(2016年)关于工程定额，下列说法正确的是()。",[62,64,66,68],{"key":20,"text":63,"correct":22},"劳动定额主要表现形式为时间定额，机械消耗定额主要表现形式为产量定额",{"key":24,"text":65,"correct":22},"企业定额是企业内部使用的预算定额",{"key":28,"text":67,"correct":26},"补充定额只能在指定范围内使用",{"key":31,"text":69,"correct":22},"地区统一定额应根据地区工程技术特点、施工生产和管理水平独立编制",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":31,"analysis":33},895927,"(2015年)依法必须采用工程量清单招标的建设项目，投标人需要采用而招标人不需采用的计价依据是( )。",[74,76,78,80],{"key":20,"text":75,"correct":22},"国家、地区或行业定额资料",{"key":24,"text":77,"correct":22},"工程造价信息、资料和指数",{"key":28,"text":79,"correct":22},"计价活动相关规章课程",{"key":31,"text":81,"correct":26},"企业定额",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":24,"analysis":33},895928,"(2015年)工程计量工作包括工程项目的划分和工程量的计算，下列关于工程计量工作的说法中正确的是( )。",[86,88,90,92],{"key":20,"text":87,"correct":22},"项目划分须按预算定额规定的定额子项进行",{"key":24,"text":89,"correct":26},"通过项目划分确定单位工程基本构造单位",{"key":28,"text":91,"correct":22},"工程量的计算须按工程量清单计算规范的规则进行计算",{"key":31,"text":93,"correct":22},"工程量的计算应依据施工图设计文件，不应依据施工组织设计文件",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":28,"analysis":33},895929,"(2016年)下列说法中，符合工程计价基本原理的是()。",[98,100,102,103],{"key":20,"text":99,"correct":22},"工程计价的基本原理在于项目划分与工程量计算",{"key":24,"text":101,"correct":22},"工程计价分为项目的分解与组合两个阶段",{"key":28,"text":43,"correct":26},{"key":31,"text":104,"correct":22},"工程单价包括生产要素单价、工料单价和综合单价",{"id":106,"libraryId":5,"type":15,"typeLabel":16,"stem":107,"options":108,"answer":24,"analysis":33},895930,"(2013年)关于工程量清单编制中的项目特殊描述，下列说法中正确的是()。",[109,111,113,115],{"key":20,"text":110,"correct":22},"措施项目无需描述项目特征",{"key":24,"text":112,"correct":26},"应按计量规范附录中规定的项目特征，结合技术规范、标准图集加以描述",{"key":28,"text":114,"correct":22},"对完成清单项目可能发生的具体工作和操作程序仍需加以描述",{"key":31,"text":116,"correct":22},"图纸中已有的工程规格、型号、材质等可不描述",{"id":118,"libraryId":5,"type":15,"typeLabel":16,"stem":119,"options":120,"answer":20,"analysis":33},895931,"(2013年)招标工程清单编制时，在总承包服务费计价表中，应由招标人填写的内容是()。",[121,123,125,127],{"key":20,"text":122,"correct":26},"服务内容",{"key":24,"text":124,"correct":22},"项目价值",{"key":28,"text":126,"correct":22},"费率",{"key":31,"text":128,"correct":22},"金额",{"id":130,"libraryId":5,"type":15,"typeLabel":16,"stem":131,"options":132,"answer":24,"analysis":33},895932,"(2014年)招标人在工程量清单中提供的用于支付必然发生但暂不能确定价格的材料、工程设备价及专业工程金额是（）。",[133,135,137,139],{"key":20,"text":134,"correct":22},"暂列金额",{"key":24,"text":136,"correct":26},"暂估价",{"key":28,"text":138,"correct":22},"总承包服务费",{"key":31,"text":140,"correct":22},"价差预备费",{"id":142,"libraryId":5,"type":15,"typeLabel":16,"stem":143,"options":144,"answer":28,"analysis":33},895933,"(2015年)关于工程量清单的编制，下列说法中正确的是( )。",[145,147,149,151],{"key":20,"text":146,"correct":22},"项目编码以五级全国统一编码设置，用十二位阿拉伯数字表示",{"key":24,"text":148,"correct":22},"编制分部分项工程量清单时，必须对工作内容进行描述",{"key":28,"text":150,"correct":26},"补充项目的编码由计算规范的代码与B和三位阿拉伯数字组成",{"key":31,"text":152,"correct":22},"按施工方案计算的措施费，必须写明“计算基础”、“费率”的数值",{"id":154,"libraryId":5,"type":15,"typeLabel":16,"stem":155,"options":156,"answer":20,"analysis":33},895934,"(2015年)关于总承包服务费的支付，下列说法中正确的是( )。",[157,159,161,163],{"key":20,"text":158,"correct":26},"建设单位向总承包单位支付",{"key":24,"text":160,"correct":22},"分包单位向总承包单位支付",{"key":28,"text":162,"correct":22},"专业承包单位向总承包单位支付",{"key":31,"text":164,"correct":22},"专业承包单位向建设单位支付",{"id":166,"libraryId":5,"type":15,"typeLabel":16,"stem":167,"options":168,"answer":28,"analysis":33},895935,"(2016年)对于不能计量工程量的措施项目，当按施工方案计算措施费时，若无“计算基础”和“费率”数值，则()。",[169,171,173,175],{"key":20,"text":170,"correct":22},"以定额基价为计算基础，以国家、行业、地区定额中相应的费率计算金额",{"key":24,"text":172,"correct":22},"以“定额人工费+定额机械费”为计算基础，以国家、行业、地区定额中相应费率计算金额",{"key":28,"text":174,"correct":26},"只填写“金额”数值，在备注中说明施工方案出处或计算方法",{"key":31,"text":176,"correct":22},"以备注中说明的计算方法，补充填写“计算基础”和“费率”",{"id":178,"libraryId":5,"type":15,"typeLabel":16,"stem":179,"options":180,"answer":28,"analysis":33},895936,"(2016年)根据《建设工程工程量清单计价规范》（GB 50500-2013），下列关于计日工的说法中正确的是()。",[181,183,185,187],{"key":20,"text":182,"correct":22},"招标工程量清单计日工数量为暂定，计日工费不计入投标总价",{"key":24,"text":184,"correct":22},"发包人通知承包人以计日工方式实施的零星工作，承包人可以视情况决定是否执行",{"key":28,"text":186,"correct":26},"计日工表的费用项目包括人工费、材料费、施工机械使用费、企业管理费和利润",{"key":31,"text":188,"correct":22},"计日工金额不列入期中支付，在竣工结算时一并支付",{"id":190,"libraryId":5,"type":15,"typeLabel":16,"stem":191,"options":192,"answer":28,"analysis":33},895937,"(2010年)采用工程量清单计价方式招标时，对工程量清单的完整性和准确性负责的是()。",[193,195,197,199],{"key":20,"text":194,"correct":22},"编制招标文件的招标代理人",{"key":24,"text":196,"correct":22},"编制清单的工程造价咨询人",{"key":28,"text":198,"correct":26},"发布招标文件的招标人",{"key":31,"text":200,"correct":22},"确定中标的投标人",{"id":202,"libraryId":5,"type":15,"typeLabel":16,"stem":203,"options":204,"answer":28,"analysis":33},895938,"(2010年)根据《建设工程工程量清单计价规范》(GB50500-2008)的规定，在合同约定之外的或者因变更而产生的、工程量清单中没有的且难以事先商定价格的额外工作，应计列入()之中。",[205,206,207,209],{"key":20,"text":134,"correct":22},{"key":24,"text":136,"correct":22},{"key":28,"text":208,"correct":26},"计日工",{"key":31,"text":210,"correct":22},"措施项目费",{"id":212,"libraryId":5,"type":15,"typeLabel":16,"stem":213,"options":214,"answer":28,"analysis":33},895939,"(2014年)编制工程量清单出现计算规范附录中未包括的清单项目时，编制人应作补充，下列有关编制补充项目的说法中正确的是（）。",[215,217,219,221],{"key":20,"text":216,"correct":22},"补充项目编码应由B与三位阿拉伯数字组成",{"key":24,"text":218,"correct":22},"补充项目应报县级工程造价管理机构备案",{"key":28,"text":220,"correct":26},"补充项目的工作内容应予以明确",{"key":31,"text":222,"correct":22},"补充项目编码应顺序编制，起始序号有编制人根据需要自主确定",{"id":224,"libraryId":5,"type":15,"typeLabel":16,"stem":225,"options":226,"answer":20,"analysis":33},895940,"(2014年)在工程量清单中，最能体现部分分项工程项目自身价值的本质是（）。",[227,229,231,233],{"key":20,"text":228,"correct":26},"项目特征",{"key":24,"text":230,"correct":22},"项目编码",{"key":28,"text":232,"correct":22},"项目名称",{"key":31,"text":234,"correct":22},"项目计量单位",{"id":236,"libraryId":5,"type":15,"typeLabel":16,"stem":237,"options":238,"answer":24,"analysis":33},895941,"(2016年)根据《建设工程工程量清单计价规范》（GB50500—2013），下列关于工程量清单项目编码的说法中，正确的是()。",[239,241,243,245],{"key":20,"text":240,"correct":22},"第三级编码为分部工程顺序码，由三位数字表示",{"key":24,"text":242,"correct":26},"第五级编码应根据拟建工程的工程量清单项目名称设置，不得重码",{"key":28,"text":244,"correct":22},"同一标段含有多个单位工程，不同单位工程中项目特征相同的工程应采用相同编码",{"key":31,"text":246,"correct":22},"补充项目编码以“B”加上计量规范代码后跟三位数字表示",{"id":248,"libraryId":5,"type":15,"typeLabel":16,"stem":249,"options":250,"answer":31,"analysis":33},895942,"(2016年)采用工程量清单计价的总承包服务费计价表中，应由投标人填写的内容是()。",[251,252,253,255],{"key":20,"text":124,"correct":22},{"key":24,"text":122,"correct":22},{"key":28,"text":254,"correct":22},"计算基础",{"key":31,"text":256,"correct":26},"费率和金额",{"id":258,"libraryId":5,"type":15,"typeLabel":16,"stem":259,"options":260,"answer":31,"analysis":33},895943,"(2015年)关于工程量清单中的计日工，下列说法中正确的是( )。",[261,263,265,267],{"key":20,"text":262,"correct":22},"即指零星工作所消耗的人工工时",{"key":24,"text":264,"correct":22},"在投标时计入总价，其数量和单价由投标人填报",{"key":28,"text":266,"correct":22},"应按投标文件载明的数量和单价进行结算",{"key":31,"text":268,"correct":26},"在编制招标工程量清单时，暂定数量由招标人填写",{"id":270,"libraryId":5,"type":15,"typeLabel":16,"stem":271,"options":272,"answer":24,"analysis":33},895944,"(2014年)作为工程定额体系的重要组成部分，预算定额是（）。",[273,275,277,279],{"key":20,"text":274,"correct":22},"完成一定计价单位的某一施工过程所需要消耗的人工、材料和机械台班数量标准",{"key":24,"text":276,"correct":26},"完成一定计量单位合格分项工程和结构构件所需消耗的人工、材料、施工机械台班数量及其费用标准",{"key":28,"text":278,"correct":22},"完成单位合格扩大分项工程所需消耗的人工、材料和施工机械台班数量及费用标准",{"key":31,"text":280,"correct":22},"完成一个规定计量单位建筑安装产品的费用消耗标准",{"id":282,"libraryId":5,"type":15,"typeLabel":16,"stem":283,"options":284,"answer":28,"analysis":33},895945,"(2012年)下列用时中，同时包含在劳动定额和预算定额人工消耗量中的是( )。",[285,287,289,291],{"key":20,"text":286,"correct":22},"隐蔽工程验收的影响时间",{"key":24,"text":288,"correct":22},"工序搭接发生的停歇时间",{"key":28,"text":290,"correct":26},"不可避免的中断时间",{"key":31,"text":292,"correct":22},"加工材料所需的时间",{"id":294,"libraryId":5,"type":15,"typeLabel":16,"stem":295,"options":296,"answer":28,"analysis":33},895946,"(2013年)关于预算定额人工、材料、机械台班消耗量的计算和确认，下列说法中正确的是()。",[297,299,301,303],{"key":20,"text":298,"correct":22},"人工消耗中包含超出预算定额取定运距后的超运距工",{"key":24,"text":300,"correct":22},"材料损耗量按照材料消耗量的一定比例计算",{"key":28,"text":302,"correct":26},"各种胶结、涂料等材料的配合比用料，按换算法计算",{"key":31,"text":304,"correct":22},"按小组产量计算机械台班产量时，机械幅度差系数取10%",{"id":306,"libraryId":5,"type":15,"typeLabel":16,"stem":307,"options":308,"answer":20,"analysis":33},895947,"(2014年)某挖土机挖土一次正常循环工作时间为50s，每次循环平均挖土量为0.5m3，机械正常利用系数为0.8，机械幅度差系数为25%，按8小时工作制考虑，挖土方预算定额的机械台班消耗量为（）台班\u002F1000m3。",[309,311,313,315],{"key":20,"text":310,"correct":26},"5.43",{"key":24,"text":312,"correct":22},"7.2",{"key":28,"text":314,"correct":22},"8",{"key":31,"text":316,"correct":22},"8.68",{"id":318,"libraryId":5,"type":15,"typeLabel":16,"stem":319,"options":320,"answer":31,"analysis":33},895948,"(2016年)完成某分部分项工程1m3需基本用工0.5工日，超运距用工0.05工日，辅助用工0.1工日。如人工幅度差系数为10%，则该工程预算定额人工工日消耗量为()供给\u002F10m3。",[321,323,325,327],{"key":20,"text":322,"correct":22},"6.05",{"key":24,"text":324,"correct":22},"5.85",{"key":28,"text":326,"correct":22},"7.00",{"key":31,"text":328,"correct":26},"7.15",{"id":330,"libraryId":5,"type":15,"typeLabel":16,"stem":331,"options":332,"answer":31,"analysis":33},895949,"(2015年)在正常施工条件下，完成10m3混凝土梁浇捣需4个基本用工，0.5个辅助用工，0.3个超运距用工，若人工幅度差系数为10%，则该梁混凝土浇捣预算定额人工消耗量为( )工日\u002F10m3。",[333,335,337,339],{"key":20,"text":334,"correct":22},"5.20",{"key":24,"text":336,"correct":22},"5.23",{"key":28,"text":338,"correct":22},"5.25",{"key":31,"text":340,"correct":26},"5.28",{"id":342,"libraryId":5,"type":15,"typeLabel":16,"stem":343,"options":344,"answer":31,"analysis":33},895950,"(2010年)下列人工费用中，不属于预算定额基价构成内容的是()。",[345,347,349,351],{"key":20,"text":346,"correct":22},"施工作业的生产工人工资",{"key":24,"text":348,"correct":22},"施工机械操作人员工资",{"key":28,"text":350,"correct":22},"工人夜间施工的夜班补助",{"key":31,"text":352,"correct":26},"大型施工机械安装与拆卸所发生的人工费",{"id":354,"libraryId":5,"type":15,"typeLabel":16,"stem":355,"options":356,"answer":31,"analysis":33},895951,"(2014年)完成某单位分部分项工程需要基本用工4.2工日，超运距用工0.3工日，辅助用工1工日，人工幅度系数为10%，则该单位分部分项工作预算定额人工消耗量为（）工日。",[357,359,361,363],{"key":20,"text":358,"correct":22},"5.92",{"key":24,"text":360,"correct":22},"5.95",{"key":28,"text":362,"correct":22},"6.02",{"key":31,"text":322,"correct":26},{"id":365,"libraryId":5,"type":15,"typeLabel":16,"stem":366,"options":367,"answer":31,"analysis":33},895952,"(2016年)下列材料损耗，应计入预算定额材料损耗量的是()。",[368,370,372,374],{"key":20,"text":369,"correct":22},"场外运输损耗",{"key":24,"text":371,"correct":22},"工地仓储损耗",{"key":28,"text":373,"correct":22},"一般性检验鉴定损耗",{"key":31,"text":375,"correct":26},"施工加工损耗",{"id":377,"libraryId":5,"type":15,"typeLabel":16,"stem":378,"options":379,"answer":20,"analysis":33},895953,"预算定额是编制概算定额的基础，是以（ ）为对象编制的定额。",[380,382,384,386],{"key":20,"text":381,"correct":26},"建筑物各个分部分项工程",{"key":24,"text":383,"correct":22},"同一性质的施工过程",{"key":28,"text":385,"correct":22},"扩大的分部分项工程",{"key":31,"text":387,"correct":22},"整个建筑物和构筑物",{"id":389,"libraryId":5,"type":15,"typeLabel":16,"stem":390,"options":391,"answer":24,"analysis":33},895954,"(2010年)下列工程中，属于概算指标编制对象的是()。",[392,394,396,398],{"key":20,"text":393,"correct":22},"分项工程",{"key":24,"text":395,"correct":26},"单位工程",{"key":28,"text":397,"correct":22},"分部工程",{"key":31,"text":399,"correct":22},"整个建筑物",{"id":401,"libraryId":5,"type":15,"typeLabel":16,"stem":402,"options":403,"answer":31,"analysis":33},895955,"(2013年)关于概算指标的编制，下列说法中正确的是()。",[404,406,408,410],{"key":20,"text":405,"correct":22},"概算指标分为建筑安装工程概算指标和设备工器具概算指标",{"key":24,"text":407,"correct":22},"综合概算指标的准确性高于单项概算指标",{"key":28,"text":409,"correct":22},"单项形式的概算指标对工程结构形式可不作说明",{"key":31,"text":411,"correct":26},"构筑物的概算指标以预算书确定的价值为准，不必进行建筑面积换算",{"id":413,"libraryId":5,"type":15,"typeLabel":16,"stem":414,"options":415,"answer":31,"analysis":33},895956,"根据已建工程或现有工程的价格数据和资料，经分析、归纳和整理编制而形成的定额是（ ）。",[416,418,420,422],{"key":20,"text":417,"correct":22},"预算定额",{"key":24,"text":419,"correct":22},"概算定额",{"key":28,"text":421,"correct":22},"概算指标",{"key":31,"text":423,"correct":26},"投资估算指标",{"id":425,"libraryId":5,"type":15,"typeLabel":16,"stem":426,"options":427,"answer":20,"analysis":33},895957,"(2013年)下列工程项目总投资构成项中，应计入单项工程投资估算指标中的是()。",[428,430,432,434],{"key":20,"text":429,"correct":26},"生产家具购置费",{"key":24,"text":431,"correct":22},"基本预备费",{"key":28,"text":433,"correct":22},"涨价预备费",{"key":31,"text":435,"correct":22},"铺底流动资金",{"id":437,"libraryId":5,"type":15,"typeLabel":16,"stem":438,"options":439,"answer":24,"analysis":33},895958,"(2013年)已知每平方米砖墙的勾缝时间为8min，则每立方米一砖半厚墙所需的勾缝时间为()min。",[440,442,444,446],{"key":20,"text":441,"correct":22},"12.00",{"key":24,"text":443,"correct":26},"21.92",{"key":28,"text":445,"correct":22},"22.22",{"key":31,"text":447,"correct":22},"33.33",{"id":449,"libraryId":5,"type":15,"typeLabel":16,"stem":450,"options":451,"answer":31,"analysis":33},895959,"(2013年)通过计时观察，完成某工程的基本工时为6h\u002Fm，辅助工作时间为工序作业时间的8%，规范时间占工作时间的15%，则完成该工程的时间定额是()工日\u002Fm3。",[452,454,456,458],{"key":20,"text":453,"correct":22},"0.93",{"key":24,"text":455,"correct":22},"0.94",{"key":28,"text":457,"correct":22},"0.95",{"key":31,"text":459,"correct":26},"0.96",{"id":461,"libraryId":5,"type":15,"typeLabel":16,"stem":462,"options":463,"answer":31,"analysis":33},895960,"(2014年)下列对于测时法的特征描述中，正确的是（）。",[464,466,468,470],{"key":20,"text":465,"correct":22},"测时法既适用于测定重复的循环工作时间，也适用于测定非循环工作时间",{"key":24,"text":467,"correct":22},"选择测时法比接续测时法准确、完善，但观察技术也较之复杂",{"key":28,"text":469,"correct":22},"当所测定的各工序的延续时间比较短时，接续测时法较选择测试法方便",{"key":31,"text":471,"correct":26},"测时法的观测次数应该根据误差理论和经验数据相结合的方法来确定",{"id":473,"libraryId":5,"type":15,"typeLabel":16,"stem":474,"options":475,"answer":24,"analysis":33},895961,"(2014年)在对材料消耗过程测定与观察的基础上，通过完成产品数量和材料消耗量的计算而确定各种材料消耗定额的方法是（）",[476,478,480,482],{"key":20,"text":477,"correct":22},"实验室试验法",{"key":24,"text":479,"correct":26},"现场技术测定法",{"key":28,"text":481,"correct":22},"现场统计法",{"key":31,"text":483,"correct":22},"理论计算法",{"id":485,"libraryId":5,"type":15,"typeLabel":16,"stem":486,"options":487,"answer":31,"analysis":33},895962,"(2014年)根据国家相关法律、法规和政策规定，因停工学习、执行国家或社会义务等原因，按计时工资标准支付的工资属于人工日工资单价中的（）",[488,490,492,494],{"key":20,"text":489,"correct":22},"基本工资",{"key":24,"text":491,"correct":22},"奖金",{"key":28,"text":493,"correct":22},"津贴补贴",{"key":31,"text":495,"correct":26},"特殊情况下支付的工资",{"id":497,"libraryId":5,"type":15,"typeLabel":16,"stem":498,"options":499,"answer":20,"analysis":33},895963,"(2015年)某出料容量750L的混凝土搅拌机，每循环一次的正常延续时间为9分钟，机械正常利用系数为0.9。按8小时工作制考虑，该机械的台班产量定额为( )。",[500,502,504,506],{"key":20,"text":501,"correct":26},"36m3\u002F台班",{"key":24,"text":503,"correct":22},"40m3\u002F台班",{"key":28,"text":505,"correct":22},"0.28台班\u002Fm3",{"key":31,"text":507,"correct":22},"0.25台班\u002Fm3",{"id":509,"libraryId":5,"type":15,"typeLabel":16,"stem":510,"options":511,"answer":24,"analysis":33},895964,"(2016年)下列机械工作时间中，属于有效工作时间的是()。",[512,514,516,518],{"key":20,"text":513,"correct":22},"筑路机在工作区末端的掉头时间",{"key":24,"text":515,"correct":26},"体积达标而未达到载重吨位的货物汽车运输时间",{"key":28,"text":517,"correct":22},"机械在工作地点之间的转移时间",{"key":31,"text":519,"correct":22},"装车数量不足而在低负荷下工作的时间",{"id":521,"libraryId":5,"type":15,"typeLabel":16,"stem":522,"options":523,"answer":28,"analysis":33},895965,"(2016年)某出料容量750L的砂浆搅拌机，每一次循环工作中，运料、装料、搅拌、卸料、终端需要的时间分别为150s、40s、250s、50s、40s，运料和其他时间的交叠时间为50s，机械利用系数为0.8。该机械的台班产量定额为()m3\u002F台班。",[524,526,528,530],{"key":20,"text":525,"correct":22},"29.79",{"key":24,"text":527,"correct":22},"32.60",{"key":28,"text":529,"correct":26},"36.00",{"key":31,"text":531,"correct":22},"39.27",{"id":533,"libraryId":5,"type":15,"typeLabel":16,"stem":534,"options":535,"answer":24,"analysis":33},895966,"(2016年)从甲、乙两地采购某工程材料，采购量及有关费用如下表所示，该工程材料的材料单价为()元\u002Ft。注：下表中的数据为不含税价格：",[536,538,540,542],{"key":20,"text":537,"correct":22},"262.08",{"key":24,"text":539,"correct":26},"262.16",{"key":28,"text":541,"correct":22},"262.42",{"key":31,"text":543,"correct":22},"262.50",{"id":545,"libraryId":5,"type":15,"typeLabel":16,"stem":546,"options":547,"answer":24,"analysis":33},895967,"(2015年)某工地商品混凝土从甲、乙两地采购，甲地采购量及材料单价分别为400m3、350元／m3，乙地采购量及有关费用如下表所示，则该工地商品混凝土的材料单价应为( )元／m3。",[548,550,552,554],{"key":20,"text":549,"correct":22},"341.00",{"key":24,"text":551,"correct":26},"341.68",{"key":28,"text":553,"correct":22},"342.50",{"key":31,"text":555,"correct":22},"343.06",{"id":557,"libraryId":5,"type":15,"typeLabel":16,"stem":558,"options":559,"answer":24,"analysis":33},895968,"(2012年)关于施工机械安拆费和场外运费的说法，正确的是()。",[560,562,564,566],{"key":20,"text":561,"correct":22},"安拆费指安拆一次所需的人工，材料和机械使用费之和",{"key":24,"text":563,"correct":26},"安拆费中包括机械辅助设施的折旧费",{"key":28,"text":565,"correct":22},"能自行开动机械的安拆费不予计算",{"key":31,"text":567,"correct":22},"塔式起重机安拆费的超高增加费应计入机械台班单价",{"id":569,"libraryId":5,"type":15,"typeLabel":16,"stem":570,"options":571,"answer":31,"analysis":33},895969,"(2013年)下列工人工作时间消耗中，属于有效工作时间的是()。",[572,574,576,578],{"key":20,"text":573,"correct":22},"因混凝土养护引起的停工时间",{"key":24,"text":575,"correct":22},"偶然停工（停水、停电）增加的时间",{"key":28,"text":577,"correct":22},"产品质量不合格返工的工作时间",{"key":31,"text":579,"correct":26},"准备施工工具花费的时间",{"id":581,"libraryId":5,"type":15,"typeLabel":16,"stem":582,"options":583,"answer":28,"analysis":33},895970,"(2013年)下列费用项目中，应计入进口材料运杂费中的是()。",[584,586,588,590],{"key":20,"text":585,"correct":22},"国际运费",{"key":24,"text":587,"correct":22},"国际运输保险费",{"key":28,"text":589,"correct":26},"到岸后外埠中转运输费",{"key":31,"text":591,"correct":22},"进口环节税费",{"id":593,"libraryId":5,"type":15,"typeLabel":16,"stem":594,"options":595,"answer":31,"analysis":33},895971,"(2013年)某材料自甲、乙两地采购，相关信息如下表所示，则其材料单价为()元／t。",[596,598,600,602],{"key":20,"text":597,"correct":22},"63.80",{"key":24,"text":599,"correct":22},"63.83",{"key":28,"text":601,"correct":22},"64.26",{"key":31,"text":603,"correct":26},"64.30",{"id":605,"libraryId":5,"type":15,"typeLabel":16,"stem":606,"options":607,"answer":24,"analysis":33},895972,"(2014年)正常施工条件下，完成单位合格建筑产品所需某材料的不可避免损耗量为0.90kg，已知该材料的损耗率为7.20%，则其总消耗量为（）kg。",[608,610,612,614],{"key":20,"text":609,"correct":22},"13.50",{"key":24,"text":611,"correct":26},"13.40",{"key":28,"text":613,"correct":22},"12.50",{"key":31,"text":615,"correct":22},"11.60",[617,620,623,626,629,632],{"id":15,"name":618,"category":7,"favorite":619},"领导干部任职前廉政法规知识测试题",92,{"id":621,"name":622,"category":7,"favorite":15},595,"建筑结构与设备",{"id":624,"name":625,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":627,"name":628,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":630,"name":631,"category":7,"favorite":8},534,"BIM工程师",{"id":633,"name":631,"category":7,"favorite":8},535]