[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-581-22":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":612},{"id":5,"name":6,"category":7,"favorite":8},581,"建设工程造价管理基础知识","建筑工程",0,22,50,2873,[13,34,46,58,70,82,94,106,115,127,139,149,161,173,181,193,205,217,229,241,253,265,277,289,301,313,325,337,349,361,373,385,397,409,421,433,445,457,469,481,493,504,516,528,540,552,564,576,588,600],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":27,"analysis":33},895873,1,"单选题","(2013年)下列工程项目目标控制方法中，可用来找出工程质量主要影响因素的是()。",[19,23,26,30],{"key":20,"text":21,"correct":22},"A","直方图法",false,{"key":24,"text":25,"correct":22},"B","鱼刺图法",{"key":27,"text":28,"correct":29},"C","排列图法",true,{"key":31,"text":32,"correct":22},"D","S曲线法","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":27,"analysis":33},895874,"(2011年)下列进度计划表中，用来确定年度施工项目的投资额和年末形象进度，并阐明建设条件落实情况的是()。",[38,40,42,44],{"key":20,"text":39,"correct":22},"投资计划年度分配表",{"key":24,"text":41,"correct":22},"年度建设资金平衡表",{"key":27,"text":43,"correct":29},"年度计划项目表",{"key":31,"text":45,"correct":22},"工程项目进度平衡表",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":31,"analysis":33},895875,"(2010年)下列方法中，可同时用来控制工程造价和工程进度的是()。",[50,52,54,56],{"key":20,"text":51,"correct":22},"S曲线和直方图法",{"key":24,"text":53,"correct":22},"直方图和控制图法",{"key":27,"text":55,"correct":22},"排列图法和香蕉曲线法",{"key":31,"text":57,"correct":29},"香蕉曲线法和S曲线法",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":24,"analysis":33},895876,"(2015年)根据《建筑施工组织设计规范》，施工组织总设计应由()主持编制。",[62,64,66,68],{"key":20,"text":63,"correct":22},"总承包单位技术负责人",{"key":24,"text":65,"correct":29},"施工项目负责人",{"key":27,"text":67,"correct":22},"总承包单位法定代表人",{"key":31,"text":69,"correct":22},"施工项目技术负责人",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":31,"analysis":33},895877,"(2015年)下列控制措施中，属于工程项目目标被动控制措施的是( )。",[74,76,78,80],{"key":20,"text":75,"correct":22},"制定实施计划时，考虑影响目标实现和计划实施的不利因素",{"key":24,"text":77,"correct":22},"说明和揭示影响目标实现和计划实施的潜在风险因素",{"key":27,"text":79,"correct":22},"制定必要的备用方案，以应对可能出现的影响目标实现的情况",{"key":31,"text":81,"correct":29},"跟踪目标实施情况，发现目标偏离时及时采取纠偏措施",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":31,"analysis":33},895878,"（2017年考题）编制单位工程施工进度计划时,确定工作项目持续时间需要考虑每班工人数量、限定每班工人数量上限的因素是（ ）。",[86,88,90,92],{"key":20,"text":87,"correct":22},"工作项目工程量",{"key":24,"text":89,"correct":22},"最小劳动组合",{"key":27,"text":91,"correct":22},"人工产量定额",{"key":31,"text":93,"correct":29},"最小工作面",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":20,"analysis":33},895879,"（2017年考题）应用直方图法分析工程质量状况时,直方图出现折齿型分布的原因是（ ）。",[98,100,102,104],{"key":20,"text":99,"correct":29},"数据分组不当或组距确定不当",{"key":24,"text":101,"correct":22},"少量材料不合格",{"key":27,"text":103,"correct":22},"短时间內工人操作不熟练",{"key":31,"text":105,"correct":22},"数据分类不当",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":20,"analysis":33},895880,"(2012年)下列工程项目计划表中，用来阐明各单位工程的建筑面积、投资额、新增固定资产、新增生产能力等建筑总规模及本年计划完成情况的是()。",[110,112,113,114],{"key":20,"text":111,"correct":29},"年度竣工投产交付使用计划表",{"key":24,"text":43,"correct":22},{"key":27,"text":41,"correct":22},{"key":31,"text":39,"correct":22},{"id":116,"libraryId":5,"type":15,"typeLabel":16,"stem":117,"options":118,"answer":27,"analysis":33},895881,"(2014年)根据世界银行对工程项目建设成本的规定，下列费用应计入项目间接建设成本的是（）",[119,121,123,125],{"key":20,"text":120,"correct":22},"临时公告设施及场地的维持费",{"key":24,"text":122,"correct":22},"建筑保险和债卷费",{"key":27,"text":124,"correct":29},"开工试车费",{"key":31,"text":126,"correct":22},"土地征购费",{"id":128,"libraryId":5,"type":15,"typeLabel":16,"stem":129,"options":130,"answer":24,"analysis":33},895882,"(2013年)国外建筑工程造价构成中，反映工程造价估算日期至工程竣工日期之前，工程各个主要组成部分的人工、材料和设备等未知价格增长部分是()。",[131,133,135,137],{"key":20,"text":132,"correct":22},"直接建设成本",{"key":24,"text":134,"correct":29},"建设成本上升费",{"key":27,"text":136,"correct":22},"不可预见准备金",{"key":31,"text":138,"correct":22},"未明确项目准备金",{"id":140,"libraryId":5,"type":15,"typeLabel":16,"stem":141,"options":142,"answer":27,"analysis":33},895883,"(2015年)根据世界银行对建设工程造价构成的规定，只能作为一种储备可能不动用的费用是( )。",[143,144,146,147],{"key":20,"text":138,"correct":22},{"key":24,"text":145,"correct":22},"基本预备费",{"key":27,"text":136,"correct":29},{"key":31,"text":148,"correct":22},"建设成本上升费用",{"id":150,"libraryId":5,"type":15,"typeLabel":16,"stem":151,"options":152,"answer":27,"analysis":33},895884,"(2016年)关于我国建设项目投资，以下说法正确的是()。",[153,155,157,159],{"key":20,"text":154,"correct":22},"非生产性建设项目总投资由固定资产投资和铺底流动资金组成",{"key":24,"text":156,"correct":22},"生产性建设项目总投资由工程费用、工程建设其他费用和预备费三部分组成",{"key":27,"text":158,"correct":29},"建设投资是为了完成工程项目建设，在建设期内投入且形成现金流出的全部费用",{"key":31,"text":160,"correct":22},"建设投资由固定资产投资和建设期利息组成",{"id":162,"libraryId":5,"type":15,"typeLabel":16,"stem":163,"options":164,"answer":31,"analysis":33},895885,"（2017 年考题）根据现行建设项目工程造价构成的相关规定，工程造价是指（ ）。",[165,167,169,171],{"key":20,"text":166,"correct":22},"为完成工程项目建造，生产性设备及配合工程安装设备的费用",{"key":24,"text":168,"correct":22},"建设期内直接用于工程建造、设备购置及其安装的建设投资",{"key":27,"text":170,"correct":22},"为完成工程项目建设，在建设期内投入且形成现金流出的全部费用",{"key":31,"text":172,"correct":29},"在建设期内预计或实际支出的建设费用",{"id":174,"libraryId":5,"type":15,"typeLabel":16,"stem":175,"options":176,"answer":20,"analysis":33},895886,"该目录编辑中,暂无试题,后续更新。",[177,178,179,180],{"key":20,"text":20,"correct":29},{"key":24,"text":24,"correct":22},{"key":27,"text":27,"correct":22},{"key":31,"text":31,"correct":22},{"id":182,"libraryId":5,"type":15,"typeLabel":16,"stem":183,"options":184,"answer":24,"analysis":33},895887,"(2010年)根据《建设工程工程量清单计价规范》（GB50500-2008）的规定，安全文明施工费应计列于()之中。",[185,187,189,191],{"key":20,"text":186,"correct":22},"分部分项工程量清单计价表",{"key":24,"text":188,"correct":29},"以计算基础乘费率的形式表示的措施项目清单与计价表",{"key":27,"text":190,"correct":22},"其他项目清单与计价汇总表",{"key":31,"text":192,"correct":22},"规费、税金项目清单与计价表",{"id":194,"libraryId":5,"type":15,"typeLabel":16,"stem":195,"options":196,"answer":20,"analysis":33},895888,"(2013年)在国外建筑安装工程费用构成中，承包商投标报价时不计入和分摊进单价，而需单独列项的是()。",[197,199,201,203],{"key":20,"text":198,"correct":29},"临时设施费",{"key":24,"text":200,"correct":22},"总部管理费",{"key":27,"text":202,"correct":22},"利润",{"key":31,"text":204,"correct":22},"税金",{"id":206,"libraryId":5,"type":15,"typeLabel":16,"stem":207,"options":208,"answer":27,"analysis":33},895889,"(2013年)关于规费的计算，下列说法正确的是()。",[209,211,213,215],{"key":20,"text":210,"correct":22},"规费虽具有强制性，但根据其组成又可以细分为可竞争性的费用和不可竞争性的费用",{"key":24,"text":212,"correct":22},"规费由社会保险费和工程排污费组成",{"key":27,"text":214,"correct":29},"社会保险费由养老保险费、失业保险费、医疗保险费、生育保险费、工伤保险费组成",{"key":31,"text":216,"correct":22},"规费由意外伤害保险费、住房公积金、工程排污费组成",{"id":218,"libraryId":5,"type":15,"typeLabel":16,"stem":219,"options":220,"answer":24,"analysis":33},895890,"(2014年)根据我国现行建筑安装工程费用项目组成的规定，下列有关费用的表述中不正确的是（）",[221,223,225,227],{"key":20,"text":222,"correct":22},"人工费是指支付给直接从事建筑安装工程施工作业的生产工人和附属生产单位工人的各项费用",{"key":24,"text":224,"correct":29},"材料费中的材料单价由材料原价、材料运杂费、运输损耗费、材料损耗费、采购及保管费五项组成",{"key":27,"text":226,"correct":22},"材料费包含构成或计划构成永久工程一部分的工程设备费",{"key":31,"text":228,"correct":22},"施工机具使用费包含仪器仪表使用费",{"id":230,"libraryId":5,"type":15,"typeLabel":16,"stem":231,"options":232,"answer":20,"analysis":33},895891,"(2015年)根据我国现行建筑安装工程费项目组成的规定，下列费用应列入暂列金额的是()。",[233,235,237,239],{"key":20,"text":234,"correct":29},"施工过程中可能发生的工程变更及索赔、现场签证等费用",{"key":24,"text":236,"correct":22},"应建设单位要求，完成建设项目之外的零星项目费用",{"key":27,"text":238,"correct":22},"对建设单位自行采购的材料进行保管所发生的费用",{"key":31,"text":240,"correct":22},"施工用电、用水的开办费",{"id":242,"libraryId":5,"type":15,"typeLabel":16,"stem":243,"options":244,"answer":24,"analysis":33},895892,"(2016年)根据我国现行建筑安装工程费用项目构成的规定，下列费用中属于安全文明费的是()。",[245,247,249,251],{"key":20,"text":246,"correct":22},"夜间施工时，临时可移动照明灯具的设置、拆除费用",{"key":24,"text":248,"correct":29},"工人的安全防护用品的购置费用",{"key":27,"text":250,"correct":22},"地下室施工时所采用的照明设施拆除费",{"key":31,"text":252,"correct":22},"建筑物的临时保护设施费",{"id":254,"libraryId":5,"type":15,"typeLabel":16,"stem":255,"options":256,"answer":20,"analysis":33},895893,"(2017年)根据现行建筑安装工程费用项目组成的规定，下列费用项目中，属于施工机具使用费的是（）。",[257,259,261,263],{"key":20,"text":258,"correct":29},"仪器仪表使用费",{"key":24,"text":260,"correct":22},"施工机械财产保险费",{"key":27,"text":262,"correct":22},"大型机械进出费",{"key":31,"text":264,"correct":22},"大型机械安拆费",{"id":266,"libraryId":5,"type":15,"typeLabel":16,"stem":267,"options":268,"answer":24,"analysis":33},895894,"(2014年)关于建筑安装工程费用中的规费，下列说法中正确的是（）",[269,271,273,275],{"key":20,"text":270,"correct":22},"规费是指由县级及以上有关权利部门规定必须缴纳或计取的费用",{"key":24,"text":272,"correct":29},"规费包括工程排污费和住房公积金",{"key":27,"text":274,"correct":22},"投标人在投标报价时填写的规费可高于规定的标准",{"key":31,"text":276,"correct":22},"社会保险费中包括建筑安装工程一切险的投保费用",{"id":278,"libraryId":5,"type":15,"typeLabel":16,"stem":279,"options":280,"answer":27,"analysis":33},895895,"(2016年)关于国外建筑安装工程费用的计算，下列说法正确的是（）。",[281,283,285,287],{"key":20,"text":282,"correct":22},"分包工程费不包括分包工程的管理费和利润",{"key":24,"text":284,"correct":22},"材料的预涨费计入管理费",{"key":27,"text":286,"correct":29},"开办费一般包括了工地清理费及完工后清理费",{"key":31,"text":288,"correct":22},"建设安装工程费用是以工程造价指数的形式衡量",{"id":290,"libraryId":5,"type":15,"typeLabel":16,"stem":291,"options":292,"answer":20,"analysis":33},895896,"(2015年)根据我国现行建筑安装工程费用项目组成的规定，下列关于措施项目费用的说法中正确的是( )。",[293,295,297,299],{"key":20,"text":294,"correct":29},"冬雨季施工费是冬、雨季施工增加的临时设施，防滑处理，雨雪排除等费用",{"key":24,"text":296,"correct":22},"施工排水、降水费有排水和降水两个独立的费用项目组成",{"key":27,"text":298,"correct":22},"当单层建筑物檐口高度超过15m，可计算超高施工增加费",{"key":31,"text":300,"correct":22},"已完工程及设备保护费是指分部工程或结构部位验收前，对已完工程及设备采取必要保护措施所发生的费用",{"id":302,"libraryId":5,"type":15,"typeLabel":16,"stem":303,"options":304,"answer":24,"analysis":33},895897,"(2013年)施工过程中用于现场工人的防暑降温费，属于安全文明施工措施费中的()。",[305,307,309,311],{"key":20,"text":306,"correct":22},"环境保护",{"key":24,"text":308,"correct":29},"文明施工",{"key":27,"text":310,"correct":22},"安全施工",{"key":31,"text":312,"correct":22},"临时设施",{"id":314,"libraryId":5,"type":15,"typeLabel":16,"stem":315,"options":316,"answer":24,"analysis":33},895898,"(2015年)关于进口设备外贸手续费的计算，下列公式中正确的是( )。",[317,319,321,323],{"key":20,"text":318,"correct":22},"外贸手续费=FOB*人民币外汇汇率x外贸手续费率",{"key":24,"text":320,"correct":29},"外贸手续费=CIFx人民币外汇汇率x外贸手续费率",{"key":27,"text":322,"correct":22},"外贸手续费=(FOB*人名币外汇汇率)\u002F(1-外贸手续费率)*外贸手续费率",{"key":31,"text":324,"correct":22},"外贸手续费=(CIF*人名币外汇汇率)\u002F(1-外贸手续费率)*外贸手续费率",{"id":326,"libraryId":5,"type":15,"typeLabel":16,"stem":327,"options":328,"answer":27,"analysis":33},895899,"(2014年)关于设备及工器具购置费用，下列说法中正确的是（）。",[329,331,333,335],{"key":20,"text":330,"correct":22},"它是由设备购置费和工具、器具及生活家居购置费组成。",{"key":24,"text":332,"correct":22},"它是固定资产投资中的消极部分",{"key":27,"text":334,"correct":29},"在工业建筑中，它占工程造价比重的增大意味着生产技术的进步",{"key":31,"text":336,"correct":22},"在民用建筑中，它占工程造价比重的增大意味着资本有机构成的提高",{"id":338,"libraryId":5,"type":15,"typeLabel":16,"stem":339,"options":340,"answer":24,"analysis":33},895900,"(2014年)已知国内制造厂某非标准设备所用材料费、加工费、辅助材料费、专用工具费、废品损失费共20万元，外购配置费3万元，非标准设备设计费1万元，包装费率1%，利率为8%，若其他费用不考虑，则该设备的原价为（）",[341,343,345,347],{"key":20,"text":342,"correct":22},"25.82万元",{"key":24,"text":344,"correct":29},"25.85万元",{"key":27,"text":346,"correct":22},"26.09万元",{"key":31,"text":348,"correct":22},"29.09万元",{"id":350,"libraryId":5,"type":15,"typeLabel":16,"stem":351,"options":352,"answer":31,"analysis":33},895901,"(2015年)采用成本计算估价法计算非标准设备租赁时，下列表述中正确的是( )。",[353,355,357,359],{"key":20,"text":354,"correct":22},"专用工具费=（材料费+加工费）×专用工具费率",{"key":24,"text":356,"correct":22},"加工费=设备总重量×（1+加工损耗系数）×设备每吨加工费",{"key":27,"text":358,"correct":22},"包装费的计算基数中不应包含废品损失费",{"key":31,"text":360,"correct":29},"利润的计算基数中不应包含外购配套件费",{"id":362,"libraryId":5,"type":15,"typeLabel":16,"stem":363,"options":364,"answer":31,"analysis":33},895902,"(2015年)某批进口设备离岸价格为1000万元人民币，国际运费为100万元人民币，运输保险费费率为1%。则该批设备的关税完税价格税为( )万元人民币。",[365,367,369,371],{"key":20,"text":366,"correct":22},"1100.00",{"key":24,"text":368,"correct":22},"1110.00",{"key":27,"text":370,"correct":22},"1111.00",{"key":31,"text":372,"correct":29},"1111.11",{"id":374,"libraryId":5,"type":15,"typeLabel":16,"stem":375,"options":376,"answer":24,"analysis":33},895903,"(2016年)进口设备的原价是指进口设备的()。",[377,379,381,383],{"key":20,"text":378,"correct":22},"到岸价",{"key":24,"text":380,"correct":29},"抵岸价",{"key":27,"text":382,"correct":22},"离岸价",{"key":31,"text":384,"correct":22},"运费在内价",{"id":386,"libraryId":5,"type":15,"typeLabel":16,"stem":387,"options":388,"answer":27,"analysis":33},895904,"(2016年)已知生产某非标准设备所需材料费、加工费、辅助材料费、专用工器具费合计为30万元，废品损失率为10%，外购配套件费为5万元，包装费率为2%，利润率为10%。用成本估算发计算该设备的利润值为()万元。",[389,391,393,395],{"key":20,"text":390,"correct":22},"3.366",{"key":24,"text":392,"correct":22},"3.370",{"key":27,"text":394,"correct":29},"3.376",{"key":31,"text":396,"correct":22},"3.876",{"id":398,"libraryId":5,"type":15,"typeLabel":16,"stem":399,"options":400,"answer":31,"analysis":33},895905,"(2013年)下列费用项目中，计入工程建设其他费中专利及专有技术使用费的是()。",[401,403,405,407],{"key":20,"text":402,"correct":22},"专利及专有技术在项目全寿命期的使用费",{"key":24,"text":404,"correct":22},"在生产期支付的商标权费",{"key":27,"text":406,"correct":22},"国内设计资料费",{"key":31,"text":408,"correct":29},"国外设计资料费",{"id":410,"libraryId":5,"type":15,"typeLabel":16,"stem":411,"options":412,"answer":20,"analysis":33},895906,"(2014年)关于建设用地的取得及使用年限，下列说法正确的是（）",[413,415,417,419],{"key":20,"text":414,"correct":29},"获取建设用地使用权的方式可以是租赁或转让",{"key":24,"text":416,"correct":22},"通过协议出让获取土地使用权的方式分为投标、竞拍、挂牌三种",{"key":27,"text":418,"correct":22},"城市公益事业用地不得以划拨方式取得",{"key":31,"text":420,"correct":22},"将土地使用权无偿交付给使用者的，其土地使用年限最高为70年",{"id":422,"libraryId":5,"type":15,"typeLabel":16,"stem":423,"options":424,"answer":20,"analysis":33},895907,"(2016年)下列与建设用地有关的费用中，归农村集体经济组织所有的是()。",[425,427,429,431],{"key":20,"text":426,"correct":29},"土地补偿费",{"key":24,"text":428,"correct":22},"青苗补偿费",{"key":27,"text":430,"correct":22},"拆迁补偿费",{"key":31,"text":432,"correct":22},"新菜地开发建设基金",{"id":434,"libraryId":5,"type":15,"typeLabel":16,"stem":435,"options":436,"answer":20,"analysis":33},895908,"(2014年)关于征地补偿费用，下列表述中正确的是（）",[437,439,441,443],{"key":20,"text":438,"correct":29},"地上附着物补偿应根据协调征地方案前地上附着物的实际情况确定",{"key":24,"text":440,"correct":22},"土地补偿和安置补偿费的总和不得超过土地被征用前三年平均年产值的15倍",{"key":27,"text":442,"correct":22},"征用未开发的规划菜地按一年只种一茬的标准缴纳新菜地开发建设基金",{"key":31,"text":444,"correct":22},"征收耕地占用税时，对于占用前三年曾用于种植农作物的土地不得视为耕地",{"id":446,"libraryId":5,"type":15,"typeLabel":16,"stem":447,"options":448,"answer":20,"analysis":33},895909,"(2015年)下列费用项目中，应在研究试验费中列支的是()。",[449,451,453,455],{"key":20,"text":450,"correct":29},"为验证设计数据而进行必要的研究试验所需的费用",{"key":24,"text":452,"correct":22},"新产品试验费",{"key":27,"text":454,"correct":22},"施工企业技术革新的研究试验费",{"key":31,"text":456,"correct":22},"设计模型制作费",{"id":458,"libraryId":5,"type":15,"typeLabel":16,"stem":459,"options":460,"answer":24,"analysis":33},895910,"(2015年)关于联合试运转费，下列说法中正确的是()。",[461,463,465,467],{"key":20,"text":462,"correct":22},"包括对整个生产线或装置运行无负荷和有负荷试运转所发生的费用",{"key":24,"text":464,"correct":29},"包括施工单位参加试运转人员的工资以及专家指导费",{"key":27,"text":466,"correct":22},"包括试运转中暴露的因设备缺陷发生的处理费用",{"key":31,"text":468,"correct":22},"包括对单台设备进行单机试运转工作的调试费",{"id":470,"libraryId":5,"type":15,"typeLabel":16,"stem":471,"options":472,"answer":27,"analysis":33},895911,"(2016年)关于工程建设其他费用，下列说法中正确的是()。",[473,475,477,479],{"key":20,"text":474,"correct":22},"建设单位管理费一般按建筑安装工程费乘以相应费率计算",{"key":24,"text":476,"correct":22},"研究试验费包括新产品试制费",{"key":27,"text":478,"correct":29},"改扩建项目的场地准备及临时设施费一般只计拆除清理费",{"key":31,"text":480,"correct":22},"不拥有产权的专用通信设施投资，列入市政公用设施费",{"id":482,"libraryId":5,"type":15,"typeLabel":16,"stem":483,"options":484,"answer":31,"analysis":33},895912,"(2013年)下列费用项目中，属于工程建设其他费中研究试验费的是()。",[485,487,489,491],{"key":20,"text":486,"correct":22},"新产品试制费",{"key":24,"text":488,"correct":22},"水文地质勘察费",{"key":27,"text":490,"correct":22},"特殊设备安全监督检验费",{"key":31,"text":492,"correct":29},"委托专业机构验证设计参数而发生的验证费",{"id":494,"libraryId":5,"type":15,"typeLabel":16,"stem":495,"options":496,"answer":24,"analysis":33},895913,"(2013年)在我国建设项目投资构成中，超规超限设备运输增加的费用属于()。",[497,499,500,502],{"key":20,"text":498,"correct":22},"设备及工器具购置费",{"key":24,"text":145,"correct":29},{"key":27,"text":501,"correct":22},"工程建设其他费",{"key":31,"text":503,"correct":22},"建筑安装工程费",{"id":505,"libraryId":5,"type":15,"typeLabel":16,"stem":506,"options":507,"answer":27,"analysis":33},895914,"(2013年)根据我国现行建设项目投资构成，下列费用项目中属于建设期利息包含内容的是()。",[508,510,512,514],{"key":20,"text":509,"correct":22},"建设单位建设期后发生的利息",{"key":24,"text":511,"correct":22},"施工单位建设期长期贷款利息",{"key":27,"text":513,"correct":29},"国内代理机构收取的贷款管理费",{"key":31,"text":515,"correct":22},"国外贷款机构收取的转贷费",{"id":517,"libraryId":5,"type":15,"typeLabel":16,"stem":518,"options":519,"answer":24,"analysis":33},895915,"(2014年)某项目共需要贷款资金900万元，建设期为3年，按年度均衡筹资，第1年贷款为300万元，第二年贷款为400万元，建设期内只计利息但不支付，年利率为10%，则第2年的建设期利息应为（）万元。",[520,522,524,526],{"key":20,"text":521,"correct":22},"50.0",{"key":24,"text":523,"correct":29},"51.5",{"key":27,"text":525,"correct":22},"71.5",{"key":31,"text":527,"correct":22},"86.65",{"id":529,"libraryId":5,"type":15,"typeLabel":16,"stem":530,"options":531,"answer":27,"analysis":33},895916,"(2015年)某建设项目建设期为二年，建设期内第一年货款400万元，第二年货款500万元，贷款在年内均衡发放，年利率为10%。建设期内只计息不支付，则该项目建设期贷款利息为( )万元。",[532,534,536,538],{"key":20,"text":533,"correct":22},"85.0",{"key":24,"text":535,"correct":22},"85.9",{"key":27,"text":537,"correct":29},"87.0",{"key":31,"text":539,"correct":22},"109.0",{"id":541,"libraryId":5,"type":15,"typeLabel":16,"stem":542,"options":543,"answer":27,"analysis":33},895917,"(2015年)某建设项目建筑安装工程费为6000万元，设备购置费为1000万元，工程建设其他费用为2000万元，建设期利息为500万元。若基本预备费费率为5%，则该建设项目的基本预备费为( )万元。",[544,546,548,550],{"key":20,"text":545,"correct":22},"350",{"key":24,"text":547,"correct":22},"400",{"key":27,"text":549,"correct":29},"450",{"key":31,"text":551,"correct":22},"475",{"id":553,"libraryId":5,"type":15,"typeLabel":16,"stem":554,"options":555,"answer":27,"analysis":33},895918,"(2016年)某建设项目静态投资为10000万元，项目建设前期年限为1年，建设期为2年，第一年完成投资40%，第二年完成投资60%。在年平均价格上涨率为6%的情况下，该项目价差预备费应为()万元。",[556,558,560,562],{"key":20,"text":557,"correct":22},"666.3",{"key":24,"text":559,"correct":22},"981.6",{"key":27,"text":561,"correct":29},"1306.2",{"key":31,"text":563,"correct":22},"1640.5",{"id":565,"libraryId":5,"type":15,"typeLabel":16,"stem":566,"options":567,"answer":24,"analysis":33},895919,"(2016年)某项目建设期为2年，第一年贷款3000万元，第二年贷款2000万元，贷款年**均衡发放，年利率为8%，建设期内只计息不付息。该项目建设期利息为()万元。",[568,570,572,574],{"key":20,"text":569,"correct":22},"366.4",{"key":24,"text":571,"correct":29},"449.6",{"key":27,"text":573,"correct":22},"572.8",{"key":31,"text":575,"correct":22},"659.2",{"id":577,"libraryId":5,"type":15,"typeLabel":16,"stem":578,"options":579,"answer":27,"analysis":33},895920,"（2017 年考题）某建设项目静态投资20000 万元，项目建设前期年限为1 年，建设期为2 年，计划每年完成投资50%，年均投资价格上涨率为5%，该项目建设期价差预备费为（ ）万元。",[580,582,584,586],{"key":20,"text":581,"correct":22},"1006.25",{"key":24,"text":583,"correct":22},"1525.00",{"key":27,"text":585,"correct":29},"2056.56",{"key":31,"text":587,"correct":22},"2601.25",{"id":589,"libraryId":5,"type":15,"typeLabel":16,"stem":590,"options":591,"answer":31,"analysis":33},895921,"(2014年)预备费包括基本预备费和价差预备费，其中价差预备费的计算应是（）。",[592,594,596,598],{"key":20,"text":593,"correct":22},"以编制年费的静态投资额为基数，采用单利方法",{"key":24,"text":595,"correct":22},"以编制年费的静态投资额为基数，采用复利方法",{"key":27,"text":597,"correct":22},"以估算年份价格水平的投资额为基数，采用单利方法",{"key":31,"text":599,"correct":29},"以估算年份价格水平的投资额为基数，采用复利方法",{"id":601,"libraryId":5,"type":15,"typeLabel":16,"stem":602,"options":603,"answer":27,"analysis":33},895922,"(2013年)下列关于工程计价的说法中，正确的是()。",[604,606,608,610],{"key":20,"text":605,"correct":22},"工程计价包含计算工程量和套定额两个环节",{"key":24,"text":607,"correct":22},"建筑安装工程费=∑基本构造单元工程量×相应单价",{"key":27,"text":609,"correct":29},"工程计价包括工程单价的确定和总价的计算",{"key":31,"text":611,"correct":22},"工程计价中的工程单价仅指综合单价",[613,616,619,622,625,628],{"id":15,"name":614,"category":7,"favorite":615},"领导干部任职前廉政法规知识测试题",92,{"id":617,"name":618,"category":7,"favorite":15},595,"建筑结构与设备",{"id":620,"name":621,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":623,"name":624,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":626,"name":627,"category":7,"favorite":8},534,"BIM工程师",{"id":629,"name":627,"category":7,"favorite":8},535]