[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-581-21":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":590},{"id":5,"name":6,"category":7,"favorite":8},581,"建设工程造价管理基础知识","建筑工程",0,21,50,2873,[13,34,46,58,70,81,93,104,116,128,136,148,158,170,180,192,202,214,223,235,247,258,270,279,291,303,315,327,339,350,358,370,382,394,406,414,426,438,450,462,474,486,498,510,522,531,543,555,566,578],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":20,"analysis":33},895823,1,"单选题","(2013年)下列费用中，属于建设工程静态投资的是()。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","基本预备费",true,{"key":24,"text":25,"correct":26},"B","涨价预备费",false,{"key":28,"text":29,"correct":26},"C","建设期贷款利息",{"key":31,"text":32,"correct":26},"D","建设工程有关税费","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":24,"analysis":33},895824,"(2009年)对于政府投资项目而言，作为拟建项目工程造价最高限额的是经有关部门批准的()。",[38,40,42,44],{"key":20,"text":39,"correct":26},"投资估算",{"key":24,"text":41,"correct":22},"工程概算",{"key":28,"text":43,"correct":26},"施工图预算",{"key":31,"text":45,"correct":26},"承包合同价",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":24,"analysis":33},895825,"(2013年)根据《建筑工程施工质量验收统一验收标准》，下列工程中，属于分项工程的是()。",[50,52,54,56],{"key":20,"text":51,"correct":26},"电气工程",{"key":24,"text":53,"correct":22},"钢筋工程",{"key":28,"text":55,"correct":26},"屋面工程",{"key":31,"text":57,"correct":26},"桩基工程",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":20,"analysis":33},895826,"(2012年)对于一般工业与民用建筑工程而言，下列工程中，属于分部工程的是()。",[62,64,66,68],{"key":20,"text":63,"correct":22},"通风与空调工程",{"key":24,"text":65,"correct":26},"砖砌体工程",{"key":28,"text":67,"correct":26},"玻璃幕墙工程",{"key":31,"text":69,"correct":26},"裱糊与软包工程",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":31,"analysis":33},895827,"(2011年)对于一般工业与民用建筑工程而言，下列工程中，属于分部工程的是()。",[74,76,78,79],{"key":20,"text":75,"correct":26},"砌体工程",{"key":24,"text":77,"correct":26},"幕墙工程",{"key":28,"text":53,"correct":26},{"key":31,"text":80,"correct":22},"电梯工程",{"id":82,"libraryId":5,"type":15,"typeLabel":16,"stem":83,"options":84,"answer":20,"analysis":33},895828,"(2011年)根据《国务院关于投资体制改革的决定》，企业不使用政府资金投资建设《政府核准的投资项目目录》中的项目时，企业仅需向政府提交()。",[85,87,89,91],{"key":20,"text":86,"correct":22},"项目申请报告",{"key":24,"text":88,"correct":26},"项目可行性研究报告",{"key":28,"text":90,"correct":26},"项目开工报告",{"key":31,"text":92,"correct":26},"项目初步设计文件",{"id":94,"libraryId":5,"type":15,"typeLabel":16,"stem":95,"options":96,"answer":24,"analysis":33},895829,"(2010年)对于一般工业项目的办公楼而言，下列工程中属于分部工程的是()。",[97,99,100,102],{"key":20,"text":98,"correct":26},"土方开挖与回填工程",{"key":24,"text":63,"correct":22},{"key":28,"text":101,"correct":26},"玻璃屏幕工程",{"key":31,"text":103,"correct":26},"门窗制作与安装工程",{"id":105,"libraryId":5,"type":15,"typeLabel":16,"stem":106,"options":107,"answer":31,"analysis":33},895830,"(2010年)城镇市政基础设施工程的建设单位应在开工前向()申请领取施工许可证。",[108,110,112,114],{"key":20,"text":109,"correct":26},"国务院建设主管部门",{"key":24,"text":111,"correct":26},"工程所在地省级以上人民政府建设主管部门",{"key":28,"text":113,"correct":26},"工程所在地市级以上人民政府建设主管部门",{"key":31,"text":115,"correct":22},"工程所在地县级以上人民政府建设主管部门",{"id":117,"libraryId":5,"type":15,"typeLabel":16,"stem":118,"options":119,"answer":28,"analysis":33},895831,"(2014年)根据《国务院关于投资体制改革的决定》，对于采用投资补助方式的政府投资项目，政府需要审批的文件是（）。",[120,122,124,126],{"key":20,"text":121,"correct":26},"项目建议书",{"key":24,"text":123,"correct":26},"可行性研究报告",{"key":28,"text":125,"correct":22},"资金申请报告",{"key":31,"text":127,"correct":26},"初步设计和概算",{"id":129,"libraryId":5,"type":15,"typeLabel":16,"stem":130,"options":131,"answer":31,"analysis":33},895832,"(2015年)根据《国务院关于投资体制改革的决定》，对于采用贷款贴息方式的政府投资项目，政府需要审批()。",[132,133,134,135],{"key":20,"text":121,"correct":26},{"key":24,"text":123,"correct":26},{"key":28,"text":41,"correct":26},{"key":31,"text":125,"correct":22},{"id":137,"libraryId":5,"type":15,"typeLabel":16,"stem":138,"options":139,"answer":28,"analysis":33},895833,"(2016年)根据《建筑工程施工质量验收统一标准》，下列工程中，属于分项工程的是()。",[140,142,144,146],{"key":20,"text":141,"correct":26},"计算机机房工程",{"key":24,"text":143,"correct":26},"轻钢结构工程",{"key":28,"text":145,"correct":22},"土方开挖工程",{"key":31,"text":147,"correct":26},"外墙防水工程",{"id":149,"libraryId":5,"type":15,"typeLabel":16,"stem":150,"options":151,"answer":20,"analysis":33},895834,"(2016年)根据《国务院关于投资体制改革的决定》，对于采用直接投资和资本金注入方式的政府投资项目，除特殊情况外，政府部门不再审批()。",[152,154,156,157],{"key":20,"text":153,"correct":22},"开工报告",{"key":24,"text":155,"correct":26},"初步设计",{"key":28,"text":41,"correct":26},{"key":31,"text":123,"correct":26},{"id":159,"libraryId":5,"type":15,"typeLabel":16,"stem":160,"options":161,"answer":20,"analysis":33},895835,"(2013年)下列项目开工建设准备工作中，在办理工程质量监督手续之后才能进行的工作是()。",[162,164,166,168],{"key":20,"text":163,"correct":22},"办理施工许可证",{"key":24,"text":165,"correct":26},"编制施工组织设计",{"key":28,"text":167,"correct":26},"编制监理规划",{"key":31,"text":169,"correct":26},"审查施工图设计文件",{"id":171,"libraryId":5,"type":15,"typeLabel":16,"stem":172,"options":173,"answer":31,"analysis":33},895836,"(2014年)根据《建筑工程施工质量验收统一标准》，下列工程中，属于分部工程的是（）。",[174,176,177,178],{"key":20,"text":175,"correct":26},"木门窗安装工程",{"key":24,"text":147,"correct":26},{"key":28,"text":145,"correct":26},{"key":31,"text":179,"correct":22},"智能建筑工程",{"id":181,"libraryId":5,"type":15,"typeLabel":16,"stem":182,"options":183,"answer":20,"analysis":33},895837,"(2014年)实行建设项目法人责任制的项目，项目董事会需要负责的工作是（）。",[184,186,188,190],{"key":20,"text":185,"correct":22},"筹措建设资金并按时偿还债务",{"key":24,"text":187,"correct":26},"组织编制并上报项目初步设计文件",{"key":28,"text":189,"correct":26},"编制和确定工程招标方案",{"key":31,"text":191,"correct":26},"组织工程建设实施并控制项目目标",{"id":193,"libraryId":5,"type":15,"typeLabel":16,"stem":194,"options":195,"answer":24,"analysis":33},895838,"(2009年)对于一般工业与民用建筑工程而言，下列工程中属于分项工程的是()。",[196,197,198,200],{"key":20,"text":57,"correct":26},{"key":24,"text":53,"correct":22},{"key":28,"text":199,"correct":26},"钢结构工程",{"key":31,"text":201,"correct":26},"地下防水工程",{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":28,"analysis":33},895839,"(2009年)根据《关于实行建设项目法人责任制的暂行规定》，项目总经理的职权之一是()。",[206,208,210,212],{"key":20,"text":207,"correct":26},"提出项目开工报告",{"key":24,"text":209,"correct":26},"审核项目初步设计和概算文件",{"key":28,"text":211,"correct":22},"组织工程招标工作",{"key":31,"text":213,"correct":26},"提出项目竣工验收申请报告",{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":28,"analysis":33},895840,"(2013年)根据《国务院关于投资体制改革的决定》，实施核准制的项目，企业应向政府主管部门提交()。",[218,219,221,222],{"key":20,"text":121,"correct":26},{"key":24,"text":220,"correct":26},"项目可行性研究",{"key":28,"text":86,"correct":22},{"key":31,"text":90,"correct":26},{"id":224,"libraryId":5,"type":15,"typeLabel":16,"stem":225,"options":226,"answer":24,"analysis":33},895841,"(2012年)根据《关于实行建设项目法人责任制的暂行规定》，建设项目董事会的基本职责是()。",[227,229,231,233],{"key":20,"text":228,"correct":26},"组织编制初步设计文件",{"key":24,"text":230,"correct":22},"负责筹措建设资金",{"key":28,"text":232,"correct":26},"负责控制建设投资",{"key":31,"text":234,"correct":26},"组织单项工程竣工验收",{"id":236,"libraryId":5,"type":15,"typeLabel":16,"stem":237,"options":238,"answer":28,"analysis":33},895842,"(2011年)建设单位在办理工程质量监督注册手续时，需提供()。",[239,241,243,245],{"key":20,"text":240,"correct":26},"投标文件",{"key":24,"text":242,"correct":26},"专项施工方案",{"key":28,"text":244,"correct":22},"施工组织设计",{"key":31,"text":246,"correct":26},"施工图设计文件",{"id":248,"libraryId":5,"type":15,"typeLabel":16,"stem":249,"options":250,"answer":24,"analysis":33},895843,"(2011年)根据《关于实行建设项目法人责任制的暂行规定》，项目总经理的基本职责是()。",[251,253,255,256],{"key":20,"text":252,"correct":26},"筹措工程建设投资",{"key":24,"text":254,"correct":22},"组织工程建设实施",{"key":28,"text":207,"correct":26},{"key":31,"text":257,"correct":26},"审定债务偿还计划",{"id":259,"libraryId":5,"type":15,"typeLabel":16,"stem":260,"options":261,"answer":28,"analysis":33},895844,"(2015年)下列工程中，属于分部工程的是()。",[262,264,266,268],{"key":20,"text":263,"correct":26},"既有工厂的车间扩建工程",{"key":24,"text":265,"correct":26},"工业车间的设备安装工程",{"key":28,"text":267,"correct":22},"房屋建筑的装饰装修工程",{"key":31,"text":269,"correct":26},"基础工程中的土方开挖工程",{"id":271,"libraryId":5,"type":15,"typeLabel":16,"stem":272,"options":273,"answer":28,"analysis":33},895845,"（2017年考题）根据《国务院关于投资体制改革的决定》,对于采用直接投资和资本金注入方式的政府投资项目,除特殊情况外,政府主管部门不再审批（ ）。",[274,275,277,278],{"key":20,"text":121,"correct":26},{"key":24,"text":276,"correct":26},"项目初步设计",{"key":28,"text":90,"correct":22},{"key":31,"text":88,"correct":26},{"id":280,"libraryId":5,"type":15,"typeLabel":16,"stem":281,"options":282,"answer":24,"analysis":33},895846,"（2017年考题）为了实现工程造价的模拟计算和动态控制,可应用建筑信建模(BIM)技术,在包含进度数据的建筑模型上加载费用数据而形成（ ）模型。",[283,285,287,289],{"key":20,"text":284,"correct":26},"6D",{"key":24,"text":286,"correct":22},"5D",{"key":28,"text":288,"correct":26},"4D",{"key":31,"text":290,"correct":26},"3D",{"id":292,"libraryId":5,"type":15,"typeLabel":16,"stem":293,"options":294,"answer":28,"analysis":33},895847,"(2012年)工程项目管理组织机构采用直线制形式的优点是()。",[295,297,299,301],{"key":20,"text":296,"correct":26},"人员机动、组织灵活",{"key":24,"text":298,"correct":26},"多方指导、辅助决策",{"key":28,"text":300,"correct":22},"权力集中、职责分明",{"key":31,"text":302,"correct":26},"横向联系、信息流畅",{"id":304,"libraryId":5,"type":15,"typeLabel":16,"stem":305,"options":306,"answer":31,"analysis":33},895848,"(2011年)关于Partnering模式的说法，正确的是()。",[307,309,311,313],{"key":20,"text":308,"correct":26},"Partnering协议是业主与承包商之间的协议",{"key":24,"text":310,"correct":26},"Partnering模式是一种独立存在的承发包模式",{"key":28,"text":312,"correct":26},"Partnering模式特别强调工程参建各方基层人员的参与",{"key":31,"text":314,"correct":22},"Partnering协议不是法律意义上的合同",{"id":316,"libraryId":5,"type":15,"typeLabel":16,"stem":317,"options":318,"answer":20,"analysis":33},895849,"(2010年)下列工程项目管理组织机构模式中，结构简单，隶属关系明确，易于统一指挥，决策迅速的是()。",[319,321,323,325],{"key":20,"text":320,"correct":22},"直线制",{"key":24,"text":322,"correct":26},"矩阵制",{"key":28,"text":324,"correct":26},"职能制",{"key":31,"text":326,"correct":26},"直线职能制",{"id":328,"libraryId":5,"type":15,"typeLabel":16,"stem":329,"options":330,"answer":20,"analysis":33},895850,"(2015年)关于CM承包模式的说法，正确的是( )。",[331,333,335,337],{"key":20,"text":332,"correct":22},"CM合同采用成本加酬金的计价方式",{"key":24,"text":334,"correct":26},"分包合同由CM单位与分包单位签订",{"key":28,"text":336,"correct":26},"总包与分包之间的差价归CM单位",{"key":31,"text":338,"correct":26},"订立CM合同时需要一次确定施工合同总价",{"id":340,"libraryId":5,"type":15,"typeLabel":16,"stem":341,"options":342,"answer":24,"analysis":33},895851,"(2016年)下列项目管理组织机构形式中，未明确项目经理角色的是()组织机构。",[343,344,346,348],{"key":20,"text":324,"correct":26},{"key":24,"text":345,"correct":22},"弱矩阵制",{"key":28,"text":347,"correct":26},"平衡矩阵制",{"key":31,"text":349,"correct":26},"强矩阵制",{"id":351,"libraryId":5,"type":15,"typeLabel":16,"stem":352,"options":353,"answer":28,"analysis":33},895852,"(2015年)某施工组织机构如下图所示，该组织机构属于()组织形式。",[354,355,356,357],{"key":20,"text":320,"correct":26},{"key":24,"text":324,"correct":26},{"key":28,"text":326,"correct":22},{"key":31,"text":322,"correct":26},{"id":359,"libraryId":5,"type":15,"typeLabel":16,"stem":360,"options":361,"answer":31,"analysis":33},895853,"(2013年)代理型CM合同由建设单位与分包单位直接签订，一般采用()的合同形式。",[362,364,366,368],{"key":20,"text":363,"correct":26},"固定单价",{"key":24,"text":365,"correct":26},"可调总价",{"key":28,"text":367,"correct":26},"GMP加酬金",{"key":31,"text":369,"correct":22},"简单的成本加酬金",{"id":371,"libraryId":5,"type":15,"typeLabel":16,"stem":372,"options":373,"answer":24,"analysis":33},895854,"(2014年)工程项目承包模式中，建设单位组织协调工作量小，但风险较大的是（）。",[374,376,378,380],{"key":20,"text":375,"correct":26},"总分包模式",{"key":24,"text":377,"correct":22},"合作体承包模式",{"key":28,"text":379,"correct":26},"平等承包模式",{"key":31,"text":381,"correct":26},"联合体承包模式",{"id":383,"libraryId":5,"type":15,"typeLabel":16,"stem":384,"options":385,"answer":20,"analysis":33},895855,"(2009年)建设工程采用CM承包模式时，CM单位有代理型和非代理型两种。工程分包商的签约对象是()。",[386,388,390,392],{"key":20,"text":387,"correct":22},"代理型为业主，非代理型为CM单位",{"key":24,"text":389,"correct":26},"代理型为CM单位，非代理型为业主",{"key":28,"text":391,"correct":26},"无论代理型或非代理型，均为业主",{"key":31,"text":393,"correct":26},"无论代理型或非代理型，均为CM单位",{"id":395,"libraryId":5,"type":15,"typeLabel":16,"stem":396,"options":397,"answer":31,"analysis":33},895856,"(2012年)关于CM承包模式的说法，正确的是()。",[398,400,402,404],{"key":20,"text":399,"correct":26},"CM单位负责分包工程的发包",{"key":24,"text":401,"correct":26},"CM合同总价在签订CM合同时即确定",{"key":28,"text":403,"correct":26},"CMP可大大减少CM单位的承包风险",{"key":31,"text":405,"correct":22},"CM单位不赚取总包与分包之间的差价",{"id":407,"libraryId":5,"type":15,"typeLabel":16,"stem":408,"options":409,"answer":20,"analysis":33},895857,"(2011年)下列工程项目管理组织机构形式中，具有较大的机动性和灵活性，能够实现集权与分权的最优结合，但因有双重领导，容易产生扯皮现象的是()。",[410,411,412,413],{"key":20,"text":322,"correct":22},{"key":24,"text":326,"correct":26},{"key":28,"text":320,"correct":26},{"key":31,"text":324,"correct":26},{"id":415,"libraryId":5,"type":15,"typeLabel":16,"stem":416,"options":417,"answer":28,"analysis":33},895858,"(2014年)工程项目管理组织机构采用直线制形式的主要优点是（）。",[418,420,422,424],{"key":20,"text":419,"correct":26},"管理业务专门化，易提高工作质量",{"key":24,"text":421,"correct":26},"部门间横向联系强，管理效率高",{"key":28,"text":423,"correct":22},"隶属关系明确，易实现统一指挥",{"key":31,"text":425,"correct":26},"集权与分权结合，管理机构灵活",{"id":427,"libraryId":5,"type":15,"typeLabel":16,"stem":428,"options":429,"answer":31,"analysis":33},895859,"(2016年)CM(ConstructionManagement)承包模式的特点是()。",[430,432,434,436],{"key":20,"text":431,"correct":26},"建设单位与分包单位直接签订合同",{"key":24,"text":433,"correct":26},"采用流水施工法施工",{"key":28,"text":435,"correct":26},"CM单位可赚取总分包之间的差价",{"key":31,"text":437,"correct":22},"采用快速路径法施工",{"id":439,"libraryId":5,"type":15,"typeLabel":16,"stem":440,"options":441,"answer":20,"analysis":33},895860,"（2017年考题）建设工程采用平行承包模式的特点是（ ）",[442,444,446,448],{"key":20,"text":443,"correct":22},"有利于缩短建设工期",{"key":24,"text":445,"correct":26},"不利于控制工程质量",{"key":28,"text":447,"correct":26},"业主组织管理简单",{"key":31,"text":449,"correct":26},"工程造价控制难度小",{"id":451,"libraryId":5,"type":15,"typeLabel":16,"stem":452,"options":453,"answer":28,"analysis":33},895861,"（2017年考题）下列计划表中,属于建设单位计划体系中工程项目建设总进度计划的是（ ）。",[454,456,458,460],{"key":20,"text":455,"correct":26},"年度计划项目表",{"key":24,"text":457,"correct":26},"年度建设资金平衡表",{"key":28,"text":459,"correct":22},"投资计划年度分配表",{"key":31,"text":461,"correct":26},"年度设备平衡表",{"id":463,"libraryId":5,"type":15,"typeLabel":16,"stem":464,"options":465,"answer":31,"analysis":33},895862,"（2017年考题）直线职能制组织结构的特点是（ ）。",[466,468,470,472],{"key":20,"text":467,"correct":26},"信息传递路径较短",{"key":24,"text":469,"correct":26},"容易形成多头领导",{"key":28,"text":471,"correct":26},"各职能部门间横向联系强",{"key":31,"text":473,"correct":22},"各职能部门职责清楚",{"id":475,"libraryId":5,"type":15,"typeLabel":16,"stem":476,"options":477,"answer":24,"analysis":33},895863,"(2013年)根据《建筑施工组织设计规范》，单位工程施工组织设计应由()主持编制。",[478,480,482,484],{"key":20,"text":479,"correct":26},"建设单位项目负责人",{"key":24,"text":481,"correct":22},"施工项目负责人",{"key":28,"text":483,"correct":26},"施工单位技术负责人",{"key":31,"text":485,"correct":26},"施工项目技术负责人",{"id":487,"libraryId":5,"type":15,"typeLabel":16,"stem":488,"options":489,"answer":28,"analysis":33},895864,"(2012年)下列工程项目目标控制方法中，可用来判断工程造价偏差的是()。",[490,492,494,496],{"key":20,"text":491,"correct":26},"控制图法",{"key":24,"text":493,"correct":26},"鱼刺图法",{"key":28,"text":495,"correct":22},"S曲线法",{"key":31,"text":497,"correct":26},"网络计划法",{"id":499,"libraryId":5,"type":15,"typeLabel":16,"stem":500,"options":501,"answer":20,"analysis":33},895865,"(2011年)下列工程项目目标控制方法组中，控制的原理基本相同、目的也相同的是()。",[502,504,506,508],{"key":20,"text":503,"correct":22},"香蕉曲线法和S曲线法",{"key":24,"text":505,"correct":26},"网络计划法和香蕉曲线法",{"key":28,"text":507,"correct":26},"排列图法和网络计划法",{"key":31,"text":509,"correct":26},"S曲线法和排列图法",{"id":511,"libraryId":5,"type":15,"typeLabel":16,"stem":512,"options":513,"answer":24,"analysis":33},895866,"(2010年)下列进度计划表中，用来明确各种设计文件交付日期，主要设备交货日期，施工单位进场日期，水、电及道路接通日期等的是()。",[514,516,518,520],{"key":20,"text":515,"correct":26},"工程项目总进度计划表",{"key":24,"text":517,"correct":22},"工程项目进度平衡表",{"key":28,"text":519,"correct":26},"工程项目施工总进度表",{"key":31,"text":521,"correct":26},"单位工程总进度计划表",{"id":523,"libraryId":5,"type":15,"typeLabel":16,"stem":524,"options":525,"answer":20,"analysis":33},895867,"(2014年)下列工程项目目标控制方法中，可用来掌握产品质量波动情况及质量特征的分布规律，以便对质量状况进行分析判断的是（ ）。",[526,528,529,530],{"key":20,"text":527,"correct":22},"直方图法",{"key":24,"text":493,"correct":26},{"key":28,"text":491,"correct":26},{"key":31,"text":495,"correct":26},{"id":532,"libraryId":5,"type":15,"typeLabel":16,"stem":533,"options":534,"answer":28,"analysis":33},895868,"(2016年)香蕉曲线法和S曲线法均可用来控制工程造价和工程进度。二者的主要区别是：香蕉曲线以()为基础绘制。",[535,537,539,541],{"key":20,"text":536,"correct":26},"施工横道计划",{"key":24,"text":538,"correct":26},"流水施工计划",{"key":28,"text":540,"correct":22},"工程网络计划",{"key":31,"text":542,"correct":26},"挣值分析计划",{"id":544,"libraryId":5,"type":15,"typeLabel":16,"stem":545,"options":546,"answer":24,"analysis":33},895869,"(2014年)根据《建筑施工组织设计规范》，按编制对象不同，施工组织设计的三个层次是指（）。",[547,549,551,553],{"key":20,"text":548,"correct":26},"施工总平面图、施工总进度计划和资源需求计划",{"key":24,"text":550,"correct":22},"施工组织总设计、单位工程施工组织设计和施工方案",{"key":28,"text":552,"correct":26},"施工总平面图、施工总进度计划和专项施工方案",{"key":31,"text":554,"correct":26},"施工组织总设计、单位工程施工进度计划和施工作业计划",{"id":556,"libraryId":5,"type":15,"typeLabel":16,"stem":557,"options":558,"answer":20,"analysis":33},895870,"(2016年)根据《建筑施工组织设计规范》，施工组织设计有三个层次是指()。",[559,560,562,564],{"key":20,"text":550,"correct":22},{"key":24,"text":561,"correct":26},"施工组织总设计、单项工程施工组织设计和施工进度计划",{"key":28,"text":563,"correct":26},"施工组织设计、施工进度计划和施工方案",{"key":31,"text":565,"correct":26},"指导性施工组织设计、实施性施工组织设计和施工方案",{"id":567,"libraryId":5,"type":15,"typeLabel":16,"stem":568,"options":569,"answer":31,"analysis":33},895871,"(2009年)作为施工承包单位计划体系的重要内容，项目管理实施规划应由()编制。",[570,572,574,576],{"key":20,"text":571,"correct":26},"企业管理层在投标之前",{"key":24,"text":573,"correct":26},"项目经理部在投标之前",{"key":28,"text":575,"correct":26},"企业管理层在开工之前",{"key":31,"text":577,"correct":22},"项目经理部在开工之前",{"id":579,"libraryId":5,"type":15,"typeLabel":16,"stem":580,"options":581,"answer":20,"analysis":33},895872,"(2009年)为了有效地控制建设工程项目目标，可采取的组织措施之一是()。",[582,584,586,588],{"key":20,"text":583,"correct":22},"制订工作考核标准",{"key":24,"text":585,"correct":26},"论证技术方案",{"key":28,"text":587,"correct":26},"审查工程付款",{"key":31,"text":589,"correct":26},"选择合同计价方式",[591,594,597,600,603,606],{"id":15,"name":592,"category":7,"favorite":593},"领导干部任职前廉政法规知识测试题",92,{"id":595,"name":596,"category":7,"favorite":15},595,"建筑结构与设备",{"id":598,"name":599,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":601,"name":602,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":604,"name":605,"category":7,"favorite":8},534,"BIM工程师",{"id":607,"name":605,"category":7,"favorite":8},535]