[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-581-18":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":596},{"id":5,"name":6,"category":7,"favorite":8},581,"建设工程造价管理基础知识","建筑工程",0,18,50,2873,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,190,198,210,222,230,242,254,266,278,290,302,313,325,337,347,359,368,380,392,400,412,424,436,448,460,472,484,496,508,520,532,544,556,565,573,585],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":24,"analysis":33},895670,1,"单选题","关于建设工程施工合同价款纠纷的处理，下列说法中正确的是（）。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","竣工验收不合格，经承包人修复后合格的，承包人支付修复费用的要求应予支持",false,{"key":24,"text":25,"correct":26},"B","竣工验收不合格，经承包人修复后合格的，修复费用应由承包人承担",true,{"key":28,"text":29,"correct":22},"C","竣工验收不合格，多次修复后仍不合格的，发包人应酌情给予承包人部分人修复费用",{"key":31,"text":32,"correct":22},"D","安装后发现加工设备存在质量问题，但承包人参与进场验收的，发包人不应支付承包人设备拆除、重新安装的费用","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":28,"analysis":33},895671,"关于施工合同履行期间的期中支付，下列说法中正确的是（）。",[38,40,42,44],{"key":20,"text":39,"correct":22},"双方对工程计量结果的争议，不影响发包人对已完工工程的期中支付",{"key":24,"text":41,"correct":22},"对已签发支付证书中的计算错误，发包人不得再予修正",{"key":28,"text":43,"correct":26},"进度款支付申请中应包括累计已完成的合同价款",{"key":31,"text":45,"correct":22},"本周期实际支付的合同额为本期完成的合同价款合计",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":28,"analysis":33},895673,"根据我国现行的关于工程预付款的规定，下列说法中正确的是（）。",[50,52,54,56],{"key":20,"text":51,"correct":22},"发包人应在合同签订后一个月内或开工前10 天内支付",{"key":24,"text":53,"correct":22},"当约定需提交预付款保函时则保函的担保金额必须大于预付款金额",{"key":28,"text":55,"correct":26},"发包人不按约定预付且经催促仍不按要求预付的，承包人可停止施工",{"key":31,"text":57,"correct":22},"预付款是发包人为解决承包人在施工过程中的资金周转问题而提供的协助",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":31,"analysis":33},895674,"在工程合同履行过程中出现施工合同无效导致价款纠纷的处理原则，以下说法正确的是()。",[62,64,66,68],{"key":20,"text":63,"correct":22},"建设工程施工合同无效，则无论竣工验收是否合格，承包人请求支付工程价款的，均不予支持",{"key":24,"text":65,"correct":22},"建设工程施工合同无效，且建设工程经竣工验收不合格，修复后的建设工程经竣工验收合格，发包人承担修复费用",{"key":28,"text":67,"correct":22},"建设工程施工合同无效，且建设工程经竣工验收不合格，修复后的建设工程经竣工验收不合格，发包人应向承包人支付由此造成的损失费",{"key":31,"text":69,"correct":26},"没有资质的实际施工人借用有资质的建筑施工企业名义与他人签订建设工程施工合同的行为无效",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":24,"analysis":33},895675,"发包人发出赶工指令，若因承包人原因造成实际进度明显落后于发包人批准的项目进度计划时，以下说法正确的是()。",[74,76,78,80],{"key":20,"text":75,"correct":22},"承包人应采取措施，赶上项目进度计划，费用由双方协商支付",{"key":24,"text":77,"correct":26},"承包人应自费采取措施，赶上项目进度计划",{"key":28,"text":79,"correct":22},"竣工日期延误时，承包人无须承担误期赔偿",{"key":31,"text":81,"correct":22},"竣工日期延误时，承包人可请求发包人顺延工期，发包人应予批准",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":28,"analysis":33},895676,"在工程进度款支付时，因各种原因导致付款时间延误的处理正确的是()。",[86,88,90,92],{"key":20,"text":87,"correct":22},"因发包人的原因未能按合同约定的时间向承包人支付工程进度款的，应从发包人收到付款申请报告后的第15日开始，向承包人支付延期付款的利息",{"key":24,"text":89,"correct":22},"发包人延误付款26天以上，承包人有权向发包人发出要求付款的通知，发包人收到通知后仍不能付款的，承包人可暂停部分工作",{"key":28,"text":91,"correct":26},"双方未能达成延期付款协议，导致工程无法实施，承包人可停止部分或全部工程，发包人承担违约责任，导致工程关键路径延误时，竣工日期顺延",{"key":31,"text":93,"correct":22},"发包人的延误付款达60天以上，并影响到整个工程实施的，承包人有权向发包人发出要求付款的通知，发包人收到通知后仍不能付款的，根据合同的约定向发包人发出解除合同的通知，并有权就因此增加的相关费用向发包人提出索赔",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":24,"analysis":33},895678,"根据FIDIC《施工合同条件》（1999版），关于合同价款调整的规定，下列说法正确的是（）。",[98,100,102,104],{"key":20,"text":99,"correct":22},"工程量的变更与对应费率的乘积超过了中标总金额的1%时才予调整",{"key":24,"text":101,"correct":26},"实际测量工程量比工程量表中工程量变动大于10%时，可调整相应单价",{"key":28,"text":103,"correct":22},"工程师要求改变施工顺序的，不应调整合同价款",{"key":31,"text":105,"correct":22},"承包人配合工程检验所发生的剥露和覆盖，不应调整合同价款",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":31,"analysis":33},895679,"FIDIC施工合同条件规定，如果承包商不能按时收到业主的付款，承包商有权就未付款额收取延误支付期间的融资费。融资费计息方式是()。",[110,112,114,116],{"key":20,"text":111,"correct":22},"按星期计算单利",{"key":24,"text":113,"correct":22},"按星期计算复利",{"key":28,"text":115,"correct":22},"按月计算单利",{"key":31,"text":117,"correct":26},"按月计算复利",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":31,"analysis":33},895680,"在FIDIC合同条件中，工程师确认用于永久工程的材料和设备符合预支条件，在确定其实际费用后，期中支付证书中应增加该费用的()作为工程材料和设备预支款。",[122,124,126,128],{"key":20,"text":123,"correct":22},"50%",{"key":24,"text":125,"correct":22},"60%",{"key":28,"text":127,"correct":22},"70%",{"key":31,"text":129,"correct":26},"80%",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":28,"analysis":33},895681,"根据FIDIC《施工合同文件》（1999年版）通用合同条件，关于发包人对保留金的保留和返还，下列说法中正确的是（）。",[134,136,138,140],{"key":20,"text":135,"correct":22},"每次期中支付时扣留2.5%~5%作为保留金",{"key":24,"text":137,"correct":22},"签发整个工程的接收证书后，返还40%的保留金",{"key":28,"text":139,"correct":26},"工程最后一个缺陷通知期满后，返还剩余的保留金",{"key":31,"text":141,"correct":22},"如承包人有尚未完成的工作，不用返还剩余的保证金",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":28,"analysis":33},895682,"物价波动引起的价款调整，在承包商未能在竣工时间内完成工程的，应选择下列哪个指数或价格进行价格调整()。",[146,148,150,152],{"key":20,"text":147,"correct":22},"工程竣工时间期满前第49天当天适用的每项指数或价格",{"key":24,"text":149,"correct":22},"现行指数或价格",{"key":28,"text":151,"correct":26},"以上两种指数或价格中对业主有利的指数或价格进行价格调整",{"key":31,"text":153,"correct":22},"以上两种指数或价格中对承包商有利的指数或价格进行价格调整",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":28,"analysis":33},895683,"根据《建设项目工程总承包合同示范文本》（GF-2011-0126），发包人按付款 计划表付款时，如承包人的实际进度比约定的目标进度落后30日及以上，发包人有权 ( )。",[158,160,162,164],{"key":20,"text":159,"correct":22},"停止当期结算",{"key":24,"text":161,"correct":22},"自行调整付款计划表",{"key":28,"text":163,"correct":26},"与承包人商定减少当期付款额",{"key":31,"text":165,"correct":22},"与承包人协商抵减合同总额",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":28,"analysis":33},895684,"关于建设工程施工合同索赔，下列说法中正确的是()。",[170,172,174,176],{"key":20,"text":171,"correct":22},"发包人可以在索赔事件发生后暂不通知承包人，待工程结算时一并处理",{"key":24,"text":173,"correct":22},"发包人向承包人提出索赔，承包人无权要求发包人补充提供索赔理由和证据",{"key":28,"text":175,"correct":26},"承包人在收到发包人的索赔资料后，未在规定时间内作出答复，视为该项索赔事件已成立",{"key":31,"text":177,"correct":22},"承包人未在索赔事件发生后的规定时间内发出索赔通知的，应免除发包人的一切责任",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":31,"analysis":33},895685,"根据《建设项目工程总承包合同示范文本GF-2011-0216》，下列说法正确的是（）。",[182,184,186,188],{"key":20,"text":183,"correct":22},"预付款支付的时间和额度在通用条款中约定",{"key":24,"text":185,"correct":22},"预付款抵扣完后，承包人应及时向发包人退还预付款保函",{"key":28,"text":187,"correct":22},"发包人延误付款20 天以上经催告仍不付款的，承包人即可停工",{"key":31,"text":189,"correct":26},"合同解除发包人有权要求承包人支付尚未扣完的预付款",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":31,"analysis":33},895686,"在FIDIC 合同条件中，工程师确认用于永久工程的材料和设备符合预支条件，在确定其实际费用后，其中支付证书中应增加该费用的（）作为工程材料和设备预支款。",[194,195,196,197],{"key":20,"text":123,"correct":22},{"key":24,"text":125,"correct":22},{"key":28,"text":127,"correct":22},{"key":31,"text":129,"correct":26},{"id":199,"libraryId":5,"type":15,"typeLabel":16,"stem":200,"options":201,"answer":24,"analysis":33},895687,"国际工程中，当承包商提交书面结清单后的一定期限内，由工程师向业主发出的证书是（）。",[202,204,206,208],{"key":20,"text":203,"correct":22},"期中支付证书",{"key":24,"text":205,"correct":26},"最终支付证书",{"key":28,"text":207,"correct":22},"履约证书",{"key":31,"text":209,"correct":22},"工程接收证书",{"id":211,"libraryId":5,"type":15,"typeLabel":16,"stem":212,"options":213,"answer":24,"analysis":33},895688,"关于建设工程总承包合同价款的支付，下列说法正确的是（）。",[214,216,218,220],{"key":20,"text":215,"correct":22},"预付款扣完后，由于工程尚未竣工，发包人可以不退还预付款保函",{"key":24,"text":217,"correct":26},"未约定预付款保函的，发包人在合同生效后规定时间内向承包人支付预付款金额",{"key":28,"text":219,"correct":22},"发包人延误付款，应自延误之日起按同期存款利率向承包人支付延期付款利息",{"key":31,"text":221,"correct":22},"发包人延误付款的，承包人有权直接暂停施工",{"id":223,"libraryId":5,"type":15,"typeLabel":16,"stem":224,"options":225,"answer":28,"analysis":33},895689,"根据《建设项目工程总承包合同示范文本》（GF-2011-0126），发包人按付款计划表付款时，如承包人的实际进度比约定的目标进度落后30 日及以上，发包人有权（）。",[226,227,228,229],{"key":20,"text":159,"correct":22},{"key":24,"text":161,"correct":22},{"key":28,"text":163,"correct":26},{"key":31,"text":165,"correct":22},{"id":231,"libraryId":5,"type":15,"typeLabel":16,"stem":232,"options":233,"answer":31,"analysis":33},895690,"在进行竣工结算价款支付的过程中，以下做法错误的是()。",[234,236,238,240],{"key":20,"text":235,"correct":22},"发包人应在收到承包人提交竣工结算款支付申请后规定时间内予以核实，向承包人签发竣工结算支付证书",{"key":24,"text":237,"correct":22},"发包人签发竣工结算支付证书后的规定时间内，按照竣工结算支付证书列明的金额向承包人支付结算款",{"key":28,"text":239,"correct":22},"发包人未按照规定的程序支付竣工结算款的，承包人可催告发包人支付，并有权获得延迟支付的利息",{"key":31,"text":241,"correct":26},"发包人逾期未支付竣工结算款时，除法律另有规定外，承包人可与发包人协商将该工程折价，也可直接向人民法院申请将该工程依法拍卖，发包人就该工程折价或拍卖的价款优先受偿",{"id":243,"libraryId":5,"type":15,"typeLabel":16,"stem":244,"options":245,"answer":31,"analysis":33},895692,"关于工程量清单计价方式下竣工结算的编制原则，下列说法中正确的是()。",[246,248,250,252],{"key":20,"text":247,"correct":22},"措施项目费按双方确认的工程量乘以已标价工程量清单的综合单价计算",{"key":24,"text":249,"correct":22},"总承包服务费按已标价工程量清单的金额计算，不应调整",{"key":28,"text":251,"correct":22},"暂列金额应减去工程价款调整的金额，余额归承包人",{"key":31,"text":253,"correct":26},"工程实施过程中发承包双方已经确认的工程计量结果和合同价款，应直接进入结算",{"id":255,"libraryId":5,"type":15,"typeLabel":16,"stem":256,"options":257,"answer":20,"analysis":33},895693,"工程竣工结算的计价原则中，下列有关其他项目计价规定描述错误的是()。",[258,260,262,264],{"key":20,"text":259,"correct":26},"计日工应按发包人合同确认的事项计算",{"key":24,"text":261,"correct":22},"暂估价应按发承包双方按照《建设工程工程量清单计价规范》的相关规定计算",{"key":28,"text":263,"correct":22},"施工索赔费用应依据发承包双方确认的索赔事项和金额计算",{"key":31,"text":265,"correct":22},"现场签证费用应依据发承包双方签证资料确认的金额计算",{"id":267,"libraryId":5,"type":15,"typeLabel":16,"stem":268,"options":269,"answer":31,"analysis":33},895694,"发包人未按照规定的程序支付竣工结算款的，承包人正确的做法是（）。",[270,272,274,276],{"key":20,"text":271,"correct":22},"将该工程自主拍卖",{"key":24,"text":273,"correct":22},"将该工程折价出售",{"key":28,"text":275,"correct":22},"将该工程抵押贷款",{"key":31,"text":277,"correct":26},"催告发包人支付，并索要延迟付",{"id":279,"libraryId":5,"type":15,"typeLabel":16,"stem":280,"options":281,"answer":31,"analysis":33},895695,"关于竣工结算的编制与审查的说法中，错误的是()。",[282,284,286,288],{"key":20,"text":283,"correct":22},"单位工程竣工结算由承包人编制",{"key":24,"text":285,"correct":22},"建设项目竣工总结算经发承包人签字盖章后有效",{"key":28,"text":287,"correct":22},"竣工结算的编制依据包括经批准的开、竣工报告或停、复工报告",{"key":31,"text":289,"correct":26},"结算中的暂列金额应减去工程价款调整与索赔、现场签证金额，若有余款归承包人",{"id":291,"libraryId":5,"type":15,"typeLabel":16,"stem":292,"options":293,"answer":28,"analysis":33},895696,"按照规定，发包人委托工程造价咨询机构核对竣工结算的，工程造价咨询机构应核对完毕后，结论与承包人不一致时，下列说法中正确的是()。",[294,296,298,300],{"key":20,"text":295,"correct":22},"以工程造价咨询机构的结论为准",{"key":24,"text":297,"correct":22},"以承包人竣工结算文件为准",{"key":28,"text":299,"correct":26},"提交承包人复核",{"key":31,"text":301,"correct":22},"按照合同约定的争议解决方式处理",{"id":303,"libraryId":5,"type":15,"typeLabel":16,"stem":304,"options":305,"answer":31,"analysis":33},895697,"关于建筑安装工程结算的编制，下列说法中正确的是（）。",[306,308,310,312],{"key":20,"text":307,"correct":22},"采用固定总价合同 的，暂列金额不得调整",{"key":24,"text":309,"correct":22},"采用固定总价合同的，税率可不按政府部门新公布的税率调整",{"key":28,"text":311,"correct":22},"规费应按县级建设主管部门规定的费率计算",{"key":31,"text":265,"correct":26},{"id":314,"libraryId":5,"type":15,"typeLabel":16,"stem":315,"options":316,"answer":24,"analysis":33},895698,"对于办理有质量争议工程的竣工结算，下列说法中错误的是()。",[317,319,321,323],{"key":20,"text":318,"correct":22},"已竣工未验收但实际投入使用工程的质量争议按工程保修合同执行，竣工结算按保修合同办理",{"key":24,"text":320,"correct":26},"已竣工未投入使用工程的质量争议按工程保修合同执行，竣工结算按合同约定办理",{"key":28,"text":322,"correct":22},"停工、停建工程的质量争议可在执行工程质量监督机构处理决定后办理竣工结算",{"key":31,"text":324,"correct":22},"已竣工未验收并且未实际投入使用，其无质量争议部分的工程，竣工结算按合同变更办理",{"id":326,"libraryId":5,"type":15,"typeLabel":16,"stem":327,"options":328,"answer":28,"analysis":33},895699,"某工程施工合同对工程款付款时间约定不明，工程尚未交付、工程价款也未结算，现承包人起诉，发包人工程欠款的利息应从()之日计付。",[329,331,333,335],{"key":20,"text":330,"correct":22},"工程计划交付",{"key":24,"text":332,"correct":22},"提交竣工结算文件",{"key":28,"text":334,"correct":26},"当事人起诉",{"key":31,"text":336,"correct":22},"监理工程师暂定付款",{"id":338,"libraryId":5,"type":15,"typeLabel":16,"stem":339,"options":340,"answer":24,"analysis":33},895700,"关于办理有质量争议工程的竣工结算，下列说法中错误的是（）。",[341,343,344,345],{"key":20,"text":342,"correct":22},"已实际投入使用工程的质量争议按工程保修合同执行，竣工结算按合同约定办理",{"key":24,"text":320,"correct":26},{"key":28,"text":322,"correct":22},{"key":31,"text":346,"correct":22},"已竣工未验收并且未实际投入使用，其无质量争议部分的工程，竣工结算按合同约定办理",{"id":348,"libraryId":5,"type":15,"typeLabel":16,"stem":349,"options":350,"answer":28,"analysis":33},895701,"根据《建设工程价款结算暂行办法》，发包人应在一定时间内预付工程款，否则，承包人应在预付时间到期后的一定时间内发出要求预付工程款的通知，若发包人仍不预付，则承包人可在发出通知的（）天后停止施工。",[351,353,355,357],{"key":20,"text":352,"correct":22},"7",{"key":24,"text":354,"correct":22},"10",{"key":28,"text":356,"correct":26},"14",{"key":31,"text":358,"correct":22},"28",{"id":360,"libraryId":5,"type":15,"typeLabel":16,"stem":361,"options":362,"answer":31,"analysis":33},895702,"关于竣工结算的编制与审查的说法中，错误的是（）。",[363,364,366,367],{"key":20,"text":283,"correct":22},{"key":24,"text":365,"correct":22},"建设项目竣工总结算经发、承包人签字盖章后有效。",{"key":28,"text":287,"correct":22},{"key":31,"text":289,"correct":26},{"id":369,"libraryId":5,"type":15,"typeLabel":16,"stem":370,"options":371,"answer":20,"analysis":33},895703,"根据《建设工程价款结算暂行办法》，在具备施工条件的前提下，发包人支付预付款的期限应是（）。",[372,374,376,378],{"key":20,"text":373,"correct":26},"不迟于约定的开工日期前的7 天内",{"key":24,"text":375,"correct":22},"不迟于约定的开工日期后的7 天内",{"key":28,"text":377,"correct":22},"不迟于约定的开工日期前的14 天内",{"key":31,"text":379,"correct":22},"不迟于约定的开工日期后的14 天内",{"id":381,"libraryId":5,"type":15,"typeLabel":16,"stem":382,"options":383,"answer":24,"analysis":33},895704,"关于建设工程竣工结算审核，下列说法中正确的是（）。",[384,386,388,390],{"key":20,"text":385,"correct":22},"非国有企业投资的建设工程，不应委托工程造价咨询机构审核",{"key":24,"text":387,"correct":26},"国有资金投资的建设工程，应当委托工程造价咨询机构审核",{"key":28,"text":389,"correct":22},"承包人不同意造价咨询机构的结算审核结论时，造价咨询机构不得出具审核报告",{"key":31,"text":391,"correct":22},"工程造价咨询机构的核对结论与承包人竣工结算文件不一致的，以造价机构核对结论为准",{"id":393,"libraryId":5,"type":15,"typeLabel":16,"stem":394,"options":395,"answer":28,"analysis":33},895705,"某工程施工合同对于工程款付款时间约定不明，工程尚未交付、工程价款也未结算，现承包人起诉，发包人工程欠款利息应从（）之日计付。",[396,397,398,399],{"key":20,"text":330,"correct":22},{"key":24,"text":332,"correct":22},{"key":28,"text":334,"correct":26},{"key":31,"text":336,"correct":22},{"id":401,"libraryId":5,"type":15,"typeLabel":16,"stem":402,"options":403,"answer":20,"analysis":33},895706,"完整的竣工决算所包含的内容是（）。",[404,406,408,410],{"key":20,"text":405,"correct":26},"竣工财务决算说明书、竣工财务决算报表、工程竣工图、工程竣工造价对比分析",{"key":24,"text":407,"correct":22},"竣工财务决算报表、竣工决算、工程竣工图、工程竣工造价对比分析",{"key":28,"text":409,"correct":22},"竣工财务决算说明书、竣工决算、竣工验收报告、工程竣工造价对比分析",{"key":31,"text":411,"correct":22},"竣工财务决算报表、工程竣工图、工程竣工造价对比分析",{"id":413,"libraryId":5,"type":15,"typeLabel":16,"stem":414,"options":415,"answer":24,"analysis":33},895707,"建设项目竣工财务决算应编制基本建设项目概况表，下列选项中应计入基本建设项目概况表“非经营性项目转出投资”的是（）。",[416,418,420,422],{"key":20,"text":417,"correct":22},"水土保持、城市绿化费用",{"key":24,"text":419,"correct":26},"产权不归属本单位的专用道路建设费",{"key":28,"text":421,"correct":22},"报废工程建设费",{"key":31,"text":423,"correct":22},"产权归本单位的地下管道建设费",{"id":425,"libraryId":5,"type":15,"typeLabel":16,"stem":426,"options":427,"answer":28,"analysis":33},895708,"关于建设工程竣工图的说法中，正确的是（）。",[428,430,432,434],{"key":20,"text":429,"correct":22},"工程竣工图是构成竣工结算的重要组成内容之一。",{"key":24,"text":431,"correct":22},"改、扩建项目涉及原有工程项目变更的，应在原项目施工图上注明修改部分，并加盖“竣工图”标志后作为竣工图。",{"key":28,"text":433,"correct":26},"凡按图竣工没有变动的，由承包人在原施工图加盖“竣工图”标志后，即作为竣工图",{"key":31,"text":435,"correct":22},"当项目有重大改变需重新绘制时，不论何方原因造成，一律由承包人负责重绘新图",{"id":437,"libraryId":5,"type":15,"typeLabel":16,"stem":438,"options":439,"answer":28,"analysis":33},895709,"关于新增无形资产价值的确定与计价，下列说法中正确的是（）。",[440,442,444,446],{"key":20,"text":441,"correct":22},"企业接受捐赠的无形资产，按开发中的实际支出计价",{"key":24,"text":443,"correct":22},"专利权转让价格按成本估计进行",{"key":28,"text":445,"correct":26},"自创非专利技术在自创中发生的费用按当期费用处理",{"key":31,"text":447,"correct":22},"行政划拨的土地使用权作为无形资产核算",{"id":449,"libraryId":5,"type":15,"typeLabel":16,"stem":450,"options":451,"answer":28,"analysis":33},895710,"编制大中型建设项目竣工财务决算报表时，下列属于资金占用的项目是（）。",[452,454,456,458],{"key":20,"text":453,"correct":22},"待冲基建支出",{"key":24,"text":455,"correct":22},"应付款",{"key":28,"text":457,"correct":26},"预付及应收款",{"key":31,"text":459,"correct":22},"来交款",{"id":461,"libraryId":5,"type":15,"typeLabel":16,"stem":462,"options":463,"answer":31,"analysis":33},895711,"下列不属于建设项目竣工财务决算说明书内容的是()。",[464,466,468,470],{"key":20,"text":465,"correct":22},"基本建设项目概况",{"key":24,"text":467,"correct":22},"基建结余资金等分配情况",{"key":28,"text":469,"correct":22},"主要技术经济指标的分析、计算情况",{"key":31,"text":471,"correct":26},"主要实物工程量分析",{"id":473,"libraryId":5,"type":15,"typeLabel":16,"stem":474,"options":475,"answer":28,"analysis":33},895712,"关于建设项目竣工运营后的新增资产，下列说法正确的是（）。",[476,478,480,482],{"key":20,"text":477,"correct":22},"新增资产按资产性质分为固定资产、流动资产和无形资产三大类",{"key":24,"text":479,"correct":22},"分期分批交付生产或使用的工程，待工程全部交付使用后，一次性计算新增固定资产增值",{"key":28,"text":481,"correct":26},"凡购置的达到固定资产标准不需安装的工器具，应在交付使用后计入新增固定资产",{"key":31,"text":483,"correct":22},"企业库存现金、存货及建设单位管理费中未计入固定资产的各项费用等，应在交付使用后计入新增流动资产价值",{"id":485,"libraryId":5,"type":15,"typeLabel":16,"stem":486,"options":487,"answer":20,"analysis":33},895713,"建设周期长、建设内容多的项目，单项工程竣工，具备交付使用条件的，可编制()。",[488,490,492,494],{"key":20,"text":489,"correct":26},"单项工程竣工财务决算",{"key":24,"text":491,"correct":22},"单项工程竣工财务决算书",{"key":28,"text":493,"correct":22},"单项工程竣工财务决算报表",{"key":31,"text":495,"correct":22},"单项工程竣工图",{"id":497,"libraryId":5,"type":15,"typeLabel":16,"stem":498,"options":499,"answer":31,"analysis":33},895714,"下列关于无形资产的计价原则，描述错误的是()。",[500,502,504,506],{"key":20,"text":501,"correct":22},"投资者按无形资产作为资本金或者合作条件投入时，按评估确认或合同协议约定的金额计价",{"key":24,"text":503,"correct":22},"购入的无形资产，按照实际支付的价款计价",{"key":28,"text":505,"correct":22},"企业自创并依法申请取得的无形资产，按开发过程中实际支出计价",{"key":31,"text":507,"correct":26},"无形资产计价入账后，应在其有效使用期期末核算",{"id":509,"libraryId":5,"type":15,"typeLabel":16,"stem":510,"options":511,"answer":20,"analysis":33},895715,"()用来反映建设项目的全部资金来源和资金占用情况，是考核和分析投资效果的依据。",[512,514,516,518],{"key":20,"text":513,"correct":26},"基本建设项目竣工财务决算表",{"key":24,"text":515,"correct":22},"基本建设项目概况表",{"key":28,"text":517,"correct":22},"基本建设项目交付使用资产明细表",{"key":31,"text":519,"correct":22},"基本建设项目交付使用资产总表",{"id":521,"libraryId":5,"type":15,"typeLabel":16,"stem":522,"options":523,"answer":31,"analysis":33},895716,"下列有关竣工决算的编制，描述错误的是()。",[524,526,528,530],{"key":20,"text":525,"correct":22},"项目建设单位应在项目竣工后3个月内完成竣工决算的编制工作",{"key":24,"text":527,"correct":22},"对于按规定报财政部审批的项目，一般应在收到竣工决算报告后1个月内完成审核工作",{"key":28,"text":529,"correct":22},"国家确定的重点小型项目竣工财务决算的审批实行“先审核，后审批”的办法",{"key":31,"text":531,"correct":26},"按照规定竣工决算应在竣工项目办理验收交付手续后3个月内编好",{"id":533,"libraryId":5,"type":15,"typeLabel":16,"stem":534,"options":535,"answer":20,"analysis":33},895717,"下列关于其他资产价值确定，说法正确的是()。",[536,538,540,542],{"key":20,"text":537,"correct":26},"开办费从企业生产经营月份的次月起，按照不短于5年的期限平均摊入管理费用中",{"key":24,"text":539,"correct":22},"开办费从企业生产经营月份的次月起，按照不短于5年的期限平均摊入营业费用中",{"key":28,"text":541,"correct":22},"租入固定资产改良及大修理支出计入固定资产价值",{"key":31,"text":543,"correct":22},"租入固定资产改良及大修理支出应当在其寿命期内分期平均摊销",{"id":545,"libraryId":5,"type":15,"typeLabel":16,"stem":546,"options":547,"answer":24,"analysis":33},895718,"本身具有使用价值，且其价值在于它的使用能产生超额获利能力，一般不作为无形资产入账，自创过程中发生的费用按当期费用处理，按此确定价值的资产是()。",[548,550,552,554],{"key":20,"text":549,"correct":22},"专利权",{"key":24,"text":551,"correct":26},"专有技术",{"key":28,"text":553,"correct":22},"商标权",{"key":31,"text":555,"correct":22},"存货",{"id":557,"libraryId":5,"type":15,"typeLabel":16,"stem":558,"options":559,"answer":28,"analysis":33},895719,"编制建设项目竣工财务决算报表时，下列属于资金占用的项目是()。",[560,561,562,563],{"key":20,"text":453,"correct":22},{"key":24,"text":455,"correct":22},{"key":28,"text":457,"correct":26},{"key":31,"text":564,"correct":22},"未交款",{"id":566,"libraryId":5,"type":15,"typeLabel":16,"stem":567,"options":568,"answer":20,"analysis":33},895720,"完整的竣工决算所包含的内容是()。",[569,570,571,572],{"key":20,"text":405,"correct":26},{"key":24,"text":407,"correct":22},{"key":28,"text":409,"correct":22},{"key":31,"text":411,"correct":22},{"id":574,"libraryId":5,"type":15,"typeLabel":16,"stem":575,"options":576,"answer":24,"analysis":33},895721,"竣工决算文件中，真实记录各种地上、地下建筑物、构筑物、特别是基础、地下管线以及设备安装等隐蔽部分的技术文件是()。",[577,579,581,583],{"key":20,"text":578,"correct":22},"总平面图",{"key":24,"text":580,"correct":26},"竣工图",{"key":28,"text":582,"correct":22},"施工图",{"key":31,"text":584,"correct":22},"交付使用资产明细表",{"id":586,"libraryId":5,"type":15,"typeLabel":16,"stem":587,"options":588,"answer":28,"analysis":33},895722,"()是以实物数量和货币标准为计量单位，综合反映竣工项目从筹建开始到项目竣工交付使用为止的全部建设费用、建设成果和财务情况的总结性文件，是正确核定新增固定资产价值的依据。",[589,590,592,594],{"key":20,"text":580,"correct":22},{"key":24,"text":591,"correct":22},"竣工结算",{"key":28,"text":593,"correct":26},"竣工决算",{"key":31,"text":595,"correct":22},"竣工验收签证书",[597,600,603,606,609,612],{"id":15,"name":598,"category":7,"favorite":599},"领导干部任职前廉政法规知识测试题",92,{"id":601,"name":602,"category":7,"favorite":15},595,"建筑结构与设备",{"id":604,"name":605,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":607,"name":608,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":610,"name":611,"category":7,"favorite":8},534,"BIM工程师",{"id":613,"name":611,"category":7,"favorite":8},535]