[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-581-17":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":593},{"id":5,"name":6,"category":7,"favorite":8},581,"建设工程造价管理基础知识","建筑工程",0,17,50,2873,[13,32,44,56,68,80,92,104,116,128,140,152,164,176,188,200,212,224,236,248,260,272,284,296,308,320,332,344,356,368,380,392,404,416,428,440,452,462,474,486,498,510,518,528,536,545,555,564,572,584],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":25,"analysis":31},895601,1,"单选题","下列工作内容中，属于反索赔工作内容的是（ ）。 A.收集准备索赔资料 B.编写法律诉讼文件 C.防止对方提出索赔 D.发出最终索赔通知",[19,22,24,27,29],{"key":20,"text":20,"correct":21},"A",false,{"key":23,"text":23,"correct":21},"B",{"key":25,"text":25,"correct":26},"C",true,{"key":28,"text":28,"correct":21},"D",{"key":30,"text":30,"correct":21},"E","",{"id":33,"libraryId":5,"type":15,"typeLabel":16,"stem":34,"options":35,"answer":23,"analysis":31},895603,"工程计量过程中，对于钻孔桩的桩长一般采用（）进行计量。",[36,38,40,42],{"key":20,"text":37,"correct":21},"均摊法",{"key":23,"text":39,"correct":26},"图纸法",{"key":25,"text":41,"correct":21},"断面法",{"key":28,"text":43,"correct":21},"分解计量法",{"id":45,"libraryId":5,"type":15,"typeLabel":16,"stem":46,"options":47,"answer":25,"analysis":31},895604,"某工程施工合同规定用价格指数调整法对建安工程价款进行动态结算，某分部工程预算进度款为300万元，相关调整要素和数据如下表所示，则调整后该分部工程结算款为（）万元。",[48,50,52,54],{"key":20,"text":49,"correct":21},"321.63",{"key":23,"text":51,"correct":21},"303.54",{"key":25,"text":53,"correct":26},"298.74",{"key":28,"text":55,"correct":21},"280.65",{"id":57,"libraryId":5,"type":15,"typeLabel":16,"stem":58,"options":59,"answer":20,"analysis":31},895605,"按照我国现行规定，合同价款采用造价信息差额调整法调整时，当承包人投标报价中材料单价低于基准单价，施工期间材料单价涨幅以（）为基础超过合同约定的风险幅度值时，其超过部分按实调整。",[60,62,64,66],{"key":20,"text":61,"correct":26},"基准单价",{"key":23,"text":63,"correct":21},"投标报价",{"key":25,"text":65,"correct":21},"市场价格",{"key":28,"text":67,"correct":21},"投标价和基准价的平均值",{"id":69,"libraryId":5,"type":15,"typeLabel":16,"stem":70,"options":71,"answer":20,"analysis":31},895606,"实际费用法是工程费用索赔中最常用的一种计算方法，该方法的计算原则是（）。",[72,74,76,78],{"key":20,"text":73,"correct":26},"以承包商为某项索赔工作所支付的实际开支为根据",{"key":23,"text":75,"correct":21},"以承包商为某项索赔工作所支付的含税工程造价为根据",{"key":25,"text":77,"correct":21},"以承包商为某项索赔工作所支付的直接工程费为根据",{"key":28,"text":79,"correct":21},"以承包商为某项索赔工作所支付的直接费为根据",{"id":81,"libraryId":5,"type":15,"typeLabel":16,"stem":82,"options":83,"answer":20,"analysis":31},895607,"根据《建设工程工程量计价规范》，关于暂列金额的说法，正确的是（）。",[84,86,88,90],{"key":20,"text":85,"correct":26},"已签约合同中的暂列金额应由发包人掌握使用",{"key":23,"text":87,"correct":21},"已签约合同中的暂列金额应由承包人掌握使用",{"key":25,"text":89,"correct":21},"发包人按照合同规定将暂列金额作出支付后，剩余金额归承包人所有",{"key":28,"text":91,"correct":21},"发包人按照合同规定将暂列金额作出支付后，剩余金额由发包人和承包人共同所有",{"id":93,"libraryId":5,"type":15,"typeLabel":16,"stem":94,"options":95,"answer":25,"analysis":31},895608,"在用起扣点计算法扣回预付款时，起扣点计算公式为T=P-(M\u002FN)则式中N是指()。",[96,98,100,102],{"key":20,"text":97,"correct":21},"工程预付款总额",{"key":23,"text":99,"correct":21},"工程合同总额",{"key":25,"text":101,"correct":26},"主要材料及构件所占比重",{"key":28,"text":103,"correct":21},"累计完成工程金额",{"id":105,"libraryId":5,"type":15,"typeLabel":16,"stem":106,"options":107,"answer":25,"analysis":31},895609,"某承包工程总价为500万元，其中材料费占45％，该工程计划工期为500天，材料储备定额天数为60天，则应支付预付款()万元。",[108,110,112,114],{"key":20,"text":109,"correct":21},"36.99",{"key":23,"text":111,"correct":21},"225",{"key":25,"text":113,"correct":26},"27",{"key":28,"text":115,"correct":21},"60",{"id":117,"libraryId":5,"type":15,"typeLabel":16,"stem":118,"options":119,"answer":28,"analysis":31},895610,"发包人应当开始支付不低于当年施工进度计划的安全文明施工费总额60％的期限是工程开工后的()天内。",[120,122,124,126],{"key":20,"text":121,"correct":21},"7",{"key":23,"text":123,"correct":21},"14",{"key":25,"text":125,"correct":21},"21",{"key":28,"text":127,"correct":26},"28",{"id":129,"libraryId":5,"type":15,"typeLabel":16,"stem":130,"options":131,"answer":23,"analysis":31},895611,"某工程承包人向发包人递交了200万元的进度款支付申请。按照《建设工程工程量清单计价规范》GB50500-2013的规定，下列关于进度款支付的说法中，正确的是()。",[132,134,136,138],{"key":20,"text":133,"correct":21},"向承包人支付不少于180万元的进度款",{"key":23,"text":135,"correct":26},"向承包人支付不少于120万元的进度款",{"key":25,"text":137,"correct":21},"向承包人支付不少于200万元的进度款",{"key":28,"text":139,"correct":21},"向承包人支付不少于100万元的进度款",{"id":141,"libraryId":5,"type":15,"typeLabel":16,"stem":142,"options":143,"answer":23,"analysis":31},895613,"最终结清是指合同约定的缺陷责任期终止后，承包人已按合同规定完成全部剩余工作且质量合格的，发包人与承包人结清全部剩余款项的活动，以下说法错误的是()。",[144,146,148,150],{"key":20,"text":145,"correct":21},"缺陷责任期终止后，承包人已按合同规定完成全部剩余工作且质量合格的，发包人签发缺陷责任期终止证书",{"key":23,"text":147,"correct":26},"缺陷责任期终止后，承包人在合同内享有的索赔权利也自行终止",{"key":25,"text":149,"correct":21},"发包人收到承包人提交的最终结清申请单后的14天内予以核实，向承包人签发最终支付证书",{"key":28,"text":151,"correct":21},"发包人应在签发最终结清支付证书后的14天内，按照最终结清支付证书列明的金额向承包人支付最终结清款",{"id":153,"libraryId":5,"type":15,"typeLabel":16,"stem":154,"options":155,"answer":20,"analysis":31},895614,"根据最高人民法院有关司法解释，下列不予支持的诉讼请求是()。",[156,158,160,162],{"key":20,"text":157,"correct":26},"垫资工程款利息没有约定的情况下，承包人请求支付利息",{"key":23,"text":159,"correct":21},"施工合同无效，但工程竣工验收合格，承包人请求参照合同约定支付工程款",{"key":25,"text":161,"correct":21},"施工合同无效，已完工程质量合格，承包人请求参照合同约定支付工程价款",{"key":28,"text":163,"correct":21},"施工合同无效，已完工程质量不合格但修复后工程验收合格，发包人请求承包人承担修复费用",{"id":165,"libraryId":5,"type":15,"typeLabel":16,"stem":166,"options":167,"answer":25,"analysis":31},895615,"关于施工合同履行期间的期中支付，下列说法中正确的是（ ）。",[168,170,172,174],{"key":20,"text":169,"correct":21},"双方对工程计量结果的争议，不影响发包人对已完工工程的期中支付",{"key":23,"text":171,"correct":21},"对已签发支付证书中的计算错误，发包人不得再予修正",{"key":25,"text":173,"correct":26},"进度款支付申请中应包括累计已完成的合同价款",{"key":28,"text":175,"correct":21},"本周期实际支付的合同额为本期完成的合同价款合计",{"id":177,"libraryId":5,"type":15,"typeLabel":16,"stem":178,"options":179,"answer":28,"analysis":31},895616,"关于最终结清，下列说法中正确的是( )。",[180,182,184,186],{"key":20,"text":181,"correct":21},"最终结清是在工程保修期满后对剩余质量保证金的最终结清",{"key":23,"text":183,"correct":21},"最终结清支付证书一经签发，承包人对合同内享有的索赔权利即自行终止",{"key":25,"text":185,"correct":21},"质量保证金不足以抵减发包人工程缺陷修复费用的，应按合同约定的争议解决方法处理",{"key":28,"text":187,"correct":26},"最终结清付款涉及政府投资的，应按国库集中支付等国家相关规定和专用条款约定办理",{"id":189,"libraryId":5,"type":15,"typeLabel":16,"stem":190,"options":191,"answer":23,"analysis":31},895617,"关于垫资施工合同价款纠纷处理，下列说法正确的是( )。",[192,194,196,198],{"key":20,"text":193,"correct":21},"合同约定垫资利率高于中国人民银行发布的同期同类贷款利率的，按合同约定返还垫资利息",{"key":23,"text":195,"correct":26},"当事人对垫资没有约定的，按照工程欠款处理",{"key":25,"text":197,"correct":21},"当事人对垫资利息没有约定的，按中国人民银行发布的同期同类贷款利率计算利息",{"key":28,"text":199,"correct":21},"垫资达到合同总和一定比例以上时为无效合同",{"id":201,"libraryId":5,"type":15,"typeLabel":16,"stem":202,"options":203,"answer":28,"analysis":31},895618,"根据《建设工程工程量清单计价规范》（GB50500——2013），发包人应在工程开工后的28天内预付不低于当年施工进度计划的安全文明施工费总额的（）。",[204,206,208,210],{"key":20,"text":205,"correct":21},"30%",{"key":23,"text":207,"correct":21},"40%",{"key":25,"text":209,"correct":21},"50%",{"key":28,"text":211,"correct":26},"60%",{"id":213,"libraryId":5,"type":15,"typeLabel":16,"stem":214,"options":215,"answer":25,"analysis":31},895620,"已知某建筑工程施工合同总额为8000万元，工程预付款按合同金额的20%计取，主要材料及构件造价占合同额50%。预付款起扣点为()万元。",[216,218,220,222],{"key":20,"text":217,"correct":21},"1600",{"key":23,"text":219,"correct":21},"4000",{"key":25,"text":221,"correct":26},"4800",{"key":28,"text":223,"correct":21},"6400",{"id":225,"libraryId":5,"type":15,"typeLabel":16,"stem":226,"options":227,"answer":20,"analysis":31},895622,"建设工程最终结清的工作事项和时间节点包括：①提交最终结清申请单；②签发最终结清支付证书；③签发缺陷责任期终止证书；④最终结清付款；⑤缺陷责任期终止。按时间先后顺序排列正确的是()。",[228,230,232,234],{"key":20,"text":229,"correct":26},"⑤③①②④",{"key":23,"text":231,"correct":21},"①②④⑤③",{"key":25,"text":233,"correct":21},"③①②④⑤",{"key":28,"text":235,"correct":21},"①③②⑤④",{"id":237,"libraryId":5,"type":15,"typeLabel":16,"stem":238,"options":239,"answer":28,"analysis":31},895623,"施工合同价款纠纷处理中，一方当事人拒不履行，另一方当事人可以请求人民法院执行的文书是()。",[240,242,244,246],{"key":20,"text":241,"correct":21},"和解协议书",{"key":23,"text":243,"correct":21},"造价认定书",{"key":25,"text":245,"correct":21},"行政调解书",{"key":28,"text":247,"correct":26},"仲裁调解书",{"id":249,"libraryId":5,"type":15,"typeLabel":16,"stem":250,"options":251,"answer":20,"analysis":31},895624,"下列承包商发生的行为中，发包人可以请求解除施工合同，应予支持的是()。",[252,254,256,258],{"key":20,"text":253,"correct":26},"明确表示或者以行为表明不履行合同主要义务的",{"key":23,"text":255,"correct":21},"合同约定的期限内没有完工",{"key":25,"text":257,"correct":21},"已经完成的建设工程质量不合格",{"key":28,"text":259,"correct":21},"将承包的建设工程分包的",{"id":261,"libraryId":5,"type":15,"typeLabel":16,"stem":262,"options":263,"answer":23,"analysis":31},895625,"在施工合同履行期间，下列属于工程计量范围的是()。",[264,266,268,270],{"key":20,"text":265,"correct":21},"工程变更修订的工程定额内容",{"key":23,"text":267,"correct":26},"合同文件中规定的各种费用支付项目",{"key":25,"text":269,"correct":21},"暂列金额中的计日工",{"key":28,"text":271,"correct":21},"擅自超出施工图纸施工的工程",{"id":273,"libraryId":5,"type":15,"typeLabel":16,"stem":274,"options":275,"answer":20,"analysis":31},895626,"工程预付款起扣点表示()。",[276,278,280,282],{"key":20,"text":277,"correct":26},"未施工工程尚需的主要材料及构件的价值相当于工程预付款数额",{"key":23,"text":279,"correct":21},"已施工工程尚需的主要材料及构件的价值相当于工程预付款数额",{"key":25,"text":281,"correct":21},"未施工工程尚需工程款相当于预付款数额",{"key":28,"text":283,"correct":21},"已施工工程尚需工程款相当于预付款数额",{"id":285,"libraryId":5,"type":15,"typeLabel":16,"stem":286,"options":287,"answer":20,"analysis":31},895627,"关于合同履行过程中因不可抗力解除合同的价款结算与支付的说法，不正确的是()。",[288,290,292,294],{"key":20,"text":289,"correct":26},"由于不可抗力解除合同的，承包人应自行支付撤离现场所需的费用",{"key":23,"text":291,"correct":21},"发包人应向承包人支付已实施或部分实施的措施项目应付价款",{"key":25,"text":293,"correct":21},"发包人一经支付材料和工程设备货款，则该材料和工程设备成为发包人的财产",{"key":28,"text":295,"correct":21},"发包人应向承包人支付承包人为完成合同工程而预期开支的任何合理费用",{"id":297,"libraryId":5,"type":15,"typeLabel":16,"stem":298,"options":299,"answer":25,"analysis":31},895629,"关于工程造价咨询人从事工程造价鉴定工作，下列做法中正确的是()。",[300,302,304,306],{"key":20,"text":301,"correct":21},"不需收集施工过程中的施工组织、质量、工期等资料",{"key":23,"text":303,"correct":21},"可以安排经验丰富的造价员独立承担鉴定工作",{"key":25,"text":305,"correct":26},"应收集鉴定项目同时期、同类型工程的技术经济指标",{"key":28,"text":307,"correct":21},"工程造价鉴定书中可不对鉴定过程中使用的技术手段进行描述",{"id":309,"libraryId":5,"type":15,"typeLabel":16,"stem":310,"options":311,"answer":28,"analysis":31},895630,"关于施工合同工程预付款，下列说法中正确的是（）。",[312,314,316,318],{"key":20,"text":313,"correct":21},"承包人预付款的担保金额通常高于发包人的预付款",{"key":23,"text":315,"correct":21},"采用起扣点计算法抵扣预付款对承包人比较不利",{"key":25,"text":317,"correct":21},"预付款的担保金额不会随着预付款的扣回而减少",{"key":28,"text":319,"correct":26},"预付款的额度通常与主要材料和构件费用占建安费的比例相关",{"id":321,"libraryId":5,"type":15,"typeLabel":16,"stem":322,"options":323,"answer":20,"analysis":31},895631,"关于施工合同工程价款的期中支付，下列说法中正确的是（）。",[324,326,328,330],{"key":20,"text":325,"correct":26},"期中进度款的支付比例，一般不低于期中价款总额的60%",{"key":23,"text":327,"correct":21},"期中进度款的支付比例，一般不高于期中价款总额的80%",{"key":25,"text":329,"correct":21},"综合单价发生调整的项目，其增减费在竣工结算时一并结算",{"key":28,"text":331,"correct":21},"发承包双方如对部分计量结果存在争议，等待争议解决后再支付全部进度款",{"id":333,"libraryId":5,"type":15,"typeLabel":16,"stem":334,"options":335,"answer":25,"analysis":31},895634,"根据《建设工程工程量清单计价规范》GB50500-2013，关于工程预付款的支付和扣回，下列说法中正确的是()。",[336,338,340,342],{"key":20,"text":337,"correct":21},"预付款的比例原则上不低于合同金额的10%，不高于合同金额的20%",{"key":23,"text":339,"correct":21},"从已施工工程的主要材料及构件的价值相当于工程预付款数额时起扣",{"key":25,"text":341,"correct":26},"原已支付预付款的扣回，抵扣方式应当由双方当事人在合同中明确约定",{"key":28,"text":343,"correct":21},"发包人应在预付款扣完后14天内一次性将全额预付款保函退还给承包人",{"id":345,"libraryId":5,"type":15,"typeLabel":16,"stem":346,"options":347,"answer":23,"analysis":31},895635,"关于工程计量的方法，下列说法正确的是()。",[348,350,352,354],{"key":20,"text":349,"correct":21},"按照合同文件中规定的工程量予以计量",{"key":23,"text":351,"correct":26},"不符合合同文件要求的工程不予计量",{"key":25,"text":353,"correct":21},"单价合同工程量必须按现行定额规定的工程量计算规则计量",{"key":28,"text":355,"correct":21},"总价合同项目的工程量是予以计量的最终工程量",{"id":357,"libraryId":5,"type":15,"typeLabel":16,"stem":358,"options":359,"answer":28,"analysis":31},895636,"预付款担保保证承包人能够按合同规定的目的使用并及时偿还发包人已支付的全部预付金额。下列有关预付款担保的说法错误的是()。",[360,362,364,366],{"key":20,"text":361,"correct":21},"预付款担保的担保金额通常与发包人的预付款是等值的",{"key":23,"text":363,"correct":21},"承包人的预付款保函的担保金额根据预付款扣回的数额相应递减，但在预付款全部扣回之前一直保持有效",{"key":25,"text":365,"correct":21},"发包人应在预付款扣完后的14天内将预付款保函退还给承包人",{"key":28,"text":367,"correct":26},"预付款担保只能采用银行保函一种形式",{"id":369,"libraryId":5,"type":15,"typeLabel":16,"stem":370,"options":371,"answer":23,"analysis":31},895637,"某进度款支付申请报告包含了下列内容：①累计已完成的合同价款；②累计已实际支付的合同价款；③本周期已完成的计日工价款；④本周期应扣回预付款。据此，发包人本周期应支付的合同价款是()。",[372,374,376,378],{"key":20,"text":373,"correct":21},"①+②-③-④",{"key":23,"text":375,"correct":26},"①-②+③-④",{"key":25,"text":377,"correct":21},"②-①+③-④",{"key":28,"text":379,"correct":21},"①+②+③-④",{"id":381,"libraryId":5,"type":15,"typeLabel":16,"stem":382,"options":383,"answer":20,"analysis":31},895639,"某工程合同总价为5000万元，合同工期180天，材料费占合同总价的60%，材料储备定额天数为25天。材料供应在途天数为5天。用公式计算法来求得该工程的预付款为( )万元。",[384,386,388,390],{"key":20,"text":385,"correct":26},"417",{"key":23,"text":387,"correct":21},"500",{"key":25,"text":389,"correct":21},"694",{"key":28,"text":391,"correct":21},"833",{"id":393,"libraryId":5,"type":15,"typeLabel":16,"stem":394,"options":395,"answer":23,"analysis":31},895640,"关于办理有质量争议工程的竣工结算，下列说法中错误的是( )。",[396,398,400,402],{"key":20,"text":397,"correct":21},"已实际投入使用工程的质量争议按工程保修合同执行，竣工结算按合同约定办理",{"key":23,"text":399,"correct":26},"已竣工未投入使用工程的质量争议按工程保修合同执行，竣工结算按合同约定办理",{"key":25,"text":401,"correct":21},"停工、停建工程的质量争议可在执行工程质量监督机构处理决定后办理竣工结算",{"key":28,"text":403,"correct":21},"已竣工未验收并且未实际投入使用，其无质量争议部分的工程，竣工结算按合同约定办理",{"id":405,"libraryId":5,"type":15,"typeLabel":16,"stem":406,"options":407,"answer":28,"analysis":31},895644,"建设工程已实际交付，但施工合同没有约定付款时间，则拖欠工程款利息的起算日期为()。",[408,410,412,414],{"key":20,"text":409,"correct":21},"提交竣工结算文件之日",{"key":23,"text":411,"correct":21},"确认竣工结算文件之日",{"key":25,"text":413,"correct":21},"竣工验收合格之日",{"key":28,"text":415,"correct":26},"工程实际交付之日",{"id":417,"libraryId":5,"type":15,"typeLabel":16,"stem":418,"options":419,"answer":23,"analysis":31},895645,"国际工程中的预付款扣回，一般为工程进度累计金额超过合同价格的()时开始起扣，每月从进度款中按一定比例扣回。",[420,422,424,426],{"key":20,"text":421,"correct":21},"5%-10%",{"key":23,"text":423,"correct":26},"10%-20%",{"key":25,"text":425,"correct":21},"10%-30%",{"key":28,"text":427,"correct":21},"30%-40%",{"id":429,"libraryId":5,"type":15,"typeLabel":16,"stem":430,"options":431,"answer":25,"analysis":31},895646,"承包人可根据确定的工程计量结果向发包人提出支付工程进度款申请，发包人应在14天内支付最高限额为()的工程价款作为工程进度款，",[432,434,436,438],{"key":20,"text":433,"correct":21},"70%",{"key":23,"text":435,"correct":21},"80%",{"key":25,"text":437,"correct":26},"90%",{"key":28,"text":439,"correct":21},"100%",{"id":441,"libraryId":5,"type":15,"typeLabel":16,"stem":442,"options":443,"answer":20,"analysis":31},895648,"最终结清时，如果承包人被扣留的质量保证金不足以抵减发包人工程缺陷修复费用的，()应承担不足部分的补偿责任。",[444,446,448,450],{"key":20,"text":445,"correct":26},"承包人",{"key":23,"text":447,"correct":21},"发包人",{"key":25,"text":449,"correct":21},"监理人",{"key":28,"text":451,"correct":21},"建设主管部门",{"id":453,"libraryId":5,"type":15,"typeLabel":16,"stem":454,"options":455,"answer":28,"analysis":31},895650,"当承发包双方的合同价款纠纷提交仲裁时，如果仲裁是在仲裁机构要求停止施工的情况下进行，承包人应对合同工程采取保护措施，由此增加的费用由()承担。",[456,457,458,460],{"key":20,"text":447,"correct":21},{"key":23,"text":445,"correct":21},{"key":25,"text":459,"correct":21},"发包人和承包人",{"key":28,"text":461,"correct":26},"败诉方",{"id":463,"libraryId":5,"type":15,"typeLabel":16,"stem":464,"options":465,"answer":20,"analysis":31},895651,"根据《建设工程工程量清单计价规范》GB 50500-2013，关于工程计量，下列说法中正确的是（）。",[466,468,470,472],{"key":20,"text":467,"correct":26},"合同文件中规定的各种费用支付项目应予计量",{"key":23,"text":469,"correct":21},"因异常恶劣天气造成的返工工程量不予计量",{"key":25,"text":471,"correct":21},"成本加酬金合同应按照总价合同的计量规定进行计量",{"key":28,"text":473,"correct":21},"总价合同应按实际完成的工程量计算",{"id":475,"libraryId":5,"type":15,"typeLabel":16,"stem":476,"options":477,"answer":28,"analysis":31},895652,"关于建设项目竣工结清阶段承包人索赔的权利和期限，下列说法中正确的是（）。",[478,480,482,484],{"key":20,"text":479,"correct":21},"承包人接受竣工结算支付证书后再物权提出任何索赔",{"key":23,"text":481,"correct":21},"承包人只能提出工程接收证书颁发前的索赔",{"key":25,"text":483,"correct":21},"承包人提出索赔的期限自缺陷责任期满时终止",{"key":28,"text":485,"correct":26},"承包人提出索赔的期限自接受最终支付证书终止",{"id":487,"libraryId":5,"type":15,"typeLabel":16,"stem":488,"options":489,"answer":25,"analysis":31},895653,"调解是解决工程合同价款纠纷的一种途径，下列关于调解的说法中正确是（）。",[490,492,494,496],{"key":20,"text":491,"correct":21},"承包人对调解书有异议时，可以停止施工",{"key":23,"text":493,"correct":21},"发承包双方签字认可的调解书不能作为合同的补充文件",{"key":25,"text":495,"correct":26},"发承包双方可在合同履行期间协议调换或终止合同约定的调解人",{"key":28,"text":497,"correct":21},"调解人的任期在竣工结算经发承包双方确认时终止",{"id":499,"libraryId":5,"type":15,"typeLabel":16,"stem":500,"options":501,"answer":25,"analysis":31},895654,"下列建设工程施工合同无效情况下产生的价款纠纷，法院不予支持的是（）。",[502,504,506,508],{"key":20,"text":503,"correct":21},"工程竣工验收合格，承包人请求按合同支付工程价款",{"key":23,"text":505,"correct":21},"工程竣工验收不合格、但修复后合格，发包人要求承包人承担修复费用",{"key":25,"text":507,"correct":26},"工程竣工验收不合格、修复后仍不合格，承包人请求支付工程价款",{"key":28,"text":509,"correct":21},"承包人超越资质等级签订施工合同，但竣工前取得相应资质等级，请求按照有效合同处理",{"id":511,"libraryId":5,"type":15,"typeLabel":16,"stem":512,"options":513,"answer":20,"analysis":31},895656,"某工程合同总价为5000 万元，合同工期180 天，材料费占合同总价的60%，材料储备定额天数为25 天。材料供应在途天数为5 天。用公式计算法来求得该工程的预付款为（）万元。",[514,515,516,517],{"key":20,"text":385,"correct":26},{"key":23,"text":387,"correct":21},{"key":25,"text":389,"correct":21},{"key":28,"text":391,"correct":21},{"id":519,"libraryId":5,"type":15,"typeLabel":16,"stem":520,"options":521,"answer":28,"analysis":31},895657,"施工合同履行期间，下列不属于工程计量范围的是（）。",[522,524,525,527],{"key":20,"text":523,"correct":21},"工程变更修改的工程量清单内容",{"key":23,"text":267,"correct":21},{"key":25,"text":526,"correct":21},"暂列金额中的专业工程",{"key":28,"text":271,"correct":26},{"id":529,"libraryId":5,"type":15,"typeLabel":16,"stem":530,"options":531,"answer":28,"analysis":31},895660,"发包人应当开始支付不低于当年施工进度计划的安全文明施工费总额60%的期限是工程开工后的（）天内。",[532,533,534,535],{"key":20,"text":121,"correct":21},{"key":23,"text":123,"correct":21},{"key":25,"text":125,"correct":21},{"key":28,"text":127,"correct":26},{"id":537,"libraryId":5,"type":15,"typeLabel":16,"stem":538,"options":539,"answer":23,"analysis":31},895662,"关于工程计量的方法，下列说法正确的是（）。",[540,541,542,543],{"key":20,"text":349,"correct":21},{"key":23,"text":351,"correct":26},{"key":25,"text":353,"correct":21},{"key":28,"text":544,"correct":21},"总价合同各项目的工程量是予以计量的最终工程量",{"id":546,"libraryId":5,"type":15,"typeLabel":16,"stem":547,"options":548,"answer":20,"analysis":31},895663,"根据最高人民法院有关司法解释，下列不予支持的诉讼请求是（）。",[549,550,552,554],{"key":20,"text":157,"correct":26},{"key":23,"text":551,"correct":21},"施工合同无效，但工程竣工验收合格，承包人请求合同约定支付工程价款",{"key":25,"text":553,"correct":21},"施工合同无效，已宪工程质量合格，承包人请求合同约定支付工程价款",{"key":28,"text":163,"correct":21},{"id":556,"libraryId":5,"type":15,"typeLabel":16,"stem":557,"options":558,"answer":28,"analysis":31},895664,"关于最终结清，下列说法中正确的是（）。",[559,560,561,562],{"key":20,"text":181,"correct":21},{"key":23,"text":183,"correct":21},{"key":25,"text":185,"correct":21},{"key":28,"text":563,"correct":26},"最终结清付款涉及政府投资的，应按国家集中支付相关规定和专用条款约定办理",{"id":565,"libraryId":5,"type":15,"typeLabel":16,"stem":566,"options":567,"answer":23,"analysis":31},895665,"关于垫资施工合同价款纠纷处理，下列说法正确的是（）。",[568,569,570,571],{"key":20,"text":193,"correct":21},{"key":23,"text":195,"correct":26},{"key":25,"text":197,"correct":21},{"key":28,"text":199,"correct":21},{"id":573,"libraryId":5,"type":15,"typeLabel":16,"stem":574,"options":575,"answer":25,"analysis":31},895667,"下列文件和资料中，可作为建设工程工程量计量依据的是（）。",[576,578,580,582],{"key":20,"text":577,"correct":21},"造价管理机构发布的调价文件",{"key":23,"text":579,"correct":21},"造价管理机构发布的价格信息",{"key":25,"text":581,"correct":26},"质量合格证书",{"key":28,"text":583,"correct":21},"各种预付款支付凭证",{"id":585,"libraryId":5,"type":15,"typeLabel":16,"stem":586,"options":587,"answer":25,"analysis":31},895668,"关于施工合同履行期间的期中支付，下面说法中正确的是（）。",[588,589,590,591],{"key":20,"text":169,"correct":21},{"key":23,"text":171,"correct":21},{"key":25,"text":173,"correct":26},{"key":28,"text":592,"correct":21},"本周起实际支付的合同额为本期完成的合同价款合计",[594,597,600,603,606,609],{"id":15,"name":595,"category":7,"favorite":596},"领导干部任职前廉政法规知识测试题",92,{"id":598,"name":599,"category":7,"favorite":15},595,"建筑结构与设备",{"id":601,"name":602,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":604,"name":605,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":607,"name":608,"category":7,"favorite":8},534,"BIM工程师",{"id":610,"name":608,"category":7,"favorite":8},535]