[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-581-16":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":583},{"id":5,"name":6,"category":7,"favorite":8},581,"建设工程造价管理基础知识","建筑工程",0,16,50,2873,[13,34,46,58,70,82,94,106,118,130,138,150,162,174,186,198,210,222,234,246,258,270,282,294,306,318,330,342,354,366,378,390,399,411,423,435,447,456,464,474,486,498,510,520,529,538,547,556,565,574],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":30,"analysis":33},895551,1,"单选题","在施工成本管理的各类措施中，一般不需增加费用，而且是其他各类措施的前提和保障的是（）。",[19,23,26,29],{"key":20,"text":21,"correct":22},"A","过程控制措施",false,{"key":24,"text":25,"correct":22},"B","经济措施",{"key":27,"text":28,"correct":22},"C","技术措施",{"key":30,"text":31,"correct":32},"D","组织措施",true,"",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":20,"analysis":33},895552,"项目经理部对竣工工程成本核算的目的是（）。",[38,40,42,44],{"key":20,"text":39,"correct":32},"考核项目管理绩效",{"key":24,"text":41,"correct":22},"寻求进一步降低成本的途径",{"key":27,"text":43,"correct":22},"考核企业经营效益",{"key":30,"text":45,"correct":22},"分析成本偏差的原因",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":27,"analysis":33},895553,"施工成本分析是在（）的基础上，对成本的形成过程和影响因素进行分析。",[50,52,54,56],{"key":20,"text":51,"correct":22},"施工成本计划",{"key":24,"text":53,"correct":22},"施工成本预测",{"key":27,"text":55,"correct":32},"施工成本核算",{"key":30,"text":57,"correct":22},"施工成本考核",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":20,"analysis":33},895554,"为了取得成本管理的理想效果，项目经理可采取的组织措施是（）。",[62,64,66,68],{"key":20,"text":63,"correct":32},"加强施工调度，避免窝工损失",{"key":24,"text":65,"correct":22},"进行技术经济分析，确定最佳施工方案",{"key":27,"text":67,"correct":22},"对各种变更及时落实业主签证",{"key":30,"text":69,"correct":22},"研究合同条款，寻找索赔机会",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":27,"analysis":33},895555,"根据建设工程项目施工成本的组成，属于直接成本的是（）",[74,76,78,80],{"key":20,"text":75,"correct":22},"工具用具使用费",{"key":24,"text":77,"correct":22},"职工教育经费",{"key":27,"text":79,"correct":32},"机械折旧费",{"key":30,"text":81,"correct":22},"管理人员工资",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":27,"analysis":33},895556,"作为施工企业全面成本管理的重要环节，施工项目成本控制应贯穿于（）的全过程。",[86,88,90,92],{"key":20,"text":87,"correct":22},"从项目策划开始到项目开始运营",{"key":24,"text":89,"correct":22},"从项目设计开始到项目开始运营",{"key":27,"text":91,"correct":32},"从项目投标开始到项目保证金返还",{"key":30,"text":93,"correct":22},"从项目施工开始到项目竣工验收",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":27,"analysis":33},895557,"建筑施工企业编制实施性成本计划时，宜以（）为依据。",[98,100,102,104],{"key":20,"text":99,"correct":22},"施工图预算成本",{"key":24,"text":101,"correct":22},"工程概算成本",{"key":27,"text":103,"correct":32},"施工预算成本",{"key":30,"text":105,"correct":22},"施工结算成本",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":24,"analysis":33},895558,"某施工企业经过投标获得了某工程的施工任务，合同签订后，公司有关部门开始选派项目经理并编制成本计划。该阶段所编制的成本计划属于（）。",[110,112,114,116],{"key":20,"text":111,"correct":22},"竞争性成本计划",{"key":24,"text":113,"correct":32},"指导性成本计划",{"key":27,"text":115,"correct":22},"实施性成本计划",{"key":30,"text":117,"correct":22},"战略性成本计划",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":30,"analysis":33},895559,"某工程的赢得值曲线如下图，关于t1 时点成本和进度状态的说法，正确的是（）。",[122,124,126,128],{"key":20,"text":123,"correct":22},"费用节约、进度超前",{"key":24,"text":125,"correct":22},"费用超支、进度拖延",{"key":27,"text":127,"correct":22},"费用节约、进度拖延",{"key":30,"text":129,"correct":32},"费用超支、进度超前",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":20,"analysis":33},895560,"下列时间-成本累计曲线中，符合施工计划成本变化规律的曲线是（）。",[134,135,136,137],{"key":20,"text":20,"correct":32},{"key":24,"text":24,"correct":22},{"key":27,"text":27,"correct":22},{"key":30,"text":30,"correct":22},{"id":139,"libraryId":5,"type":15,"typeLabel":16,"stem":140,"options":141,"answer":30,"analysis":33},895561,"建设工程项目施工准备阶段的施工预算成本计划以项目实施方案为依据，采用（）编制。",[142,144,146,148],{"key":20,"text":143,"correct":22},"人工定额",{"key":24,"text":145,"correct":22},"概算定额",{"key":27,"text":147,"correct":22},"预算定额",{"key":30,"text":149,"correct":32},"施工定额",{"id":151,"libraryId":5,"type":15,"typeLabel":16,"stem":152,"options":153,"answer":30,"analysis":33},895562,"关于施工图预算和施工预算的说法，错误的是（）。",[154,156,158,160],{"key":20,"text":155,"correct":22},"施工预算的材料消耗量一般低于施工图预算的材料消耗量",{"key":24,"text":157,"correct":22},"施工预算是施工企业内部管理的一种文件，与建设单位无直接关系",{"key":27,"text":159,"correct":22},"施工预算的用工量一般比施工图预算的用工量低",{"key":30,"text":161,"correct":32},"施工图预算中的脚手架是根据施工方案确定的搭设方式和材料计算的",{"id":163,"libraryId":5,"type":15,"typeLabel":16,"stem":164,"options":165,"answer":24,"analysis":33},895563,"在编制施工成本计划时，通常需要进行“两算”对比分析，“两算”指的是（）。",[166,168,170,172],{"key":20,"text":167,"correct":22},"施工图预算、成本核算",{"key":24,"text":169,"correct":32},"施工图预算、施工预算",{"key":27,"text":171,"correct":22},"施工预算、成本核算",{"key":30,"text":173,"correct":22},"施工预算、施工决算",{"id":175,"libraryId":5,"type":15,"typeLabel":16,"stem":176,"options":177,"answer":24,"analysis":33},895564,"施工成本控制需要进行实际成本情况与施工成本计划的比较，其中实际成本情况是通过（）反映的。",[178,180,182,184],{"key":20,"text":179,"correct":22},"工程变更文件",{"key":24,"text":181,"correct":32},"进度报告",{"key":27,"text":183,"correct":22},"施工组织设计",{"key":30,"text":185,"correct":22},"分包合同",{"id":187,"libraryId":5,"type":15,"typeLabel":16,"stem":188,"options":189,"answer":20,"analysis":33},895565,"施工企业组织生产、编制施工计划。签发任务书的依据是（）。",[190,192,194,196],{"key":20,"text":191,"correct":32},"施工预算",{"key":24,"text":193,"correct":22},"施工图预算",{"key":27,"text":195,"correct":22},"投标报价",{"key":30,"text":197,"correct":22},"项目经理的责任成本",{"id":199,"libraryId":5,"type":15,"typeLabel":16,"stem":200,"options":201,"answer":20,"analysis":33},895566,"若按项目组成编制施工成本计划，项目应按（）的顺序依次进行分解。",[202,204,206,208],{"key":20,"text":203,"correct":32},"单项工程-单位工程-分部工程-分项工程",{"key":24,"text":205,"correct":22},"单项工程-分部工程-单位工程-分项工程",{"key":27,"text":207,"correct":22},"单位工程-单项工程-分部工程-分项工程",{"key":30,"text":209,"correct":22},"单位工程-单项工程-分项工程-分部工程",{"id":211,"libraryId":5,"type":15,"typeLabel":16,"stem":212,"options":213,"answer":24,"analysis":33},895567,"编制大中型建设工程项目施工成本支出计划时，要在项目总的方面考虑总的预备费，也要在（）中考虑不可预见费。",[214,216,218,220],{"key":20,"text":215,"correct":22},"前期工作",{"key":24,"text":217,"correct":32},"主要分项工程",{"key":27,"text":219,"correct":22},"企业管理费",{"key":30,"text":221,"correct":22},"所有的分项工程",{"id":223,"libraryId":5,"type":15,"typeLabel":16,"stem":224,"options":225,"answer":27,"analysis":33},895568,"采用时间一成本累积曲线编制建设工程项目进度计划时，从节约资金贷款利息的角度出发，适宜采取的做法是（）。",[226,228,230,232],{"key":20,"text":227,"correct":22},"所有工作均按最早时间开始",{"key":24,"text":229,"correct":22},"关键工作均按最迟开始时间开始",{"key":27,"text":231,"correct":32},"所有工作均按最迟开始时间开始",{"key":30,"text":233,"correct":22},"关键工作均按最早开始时间开始",{"id":235,"libraryId":5,"type":15,"typeLabel":16,"stem":236,"options":237,"answer":24,"analysis":33},895569,"关于施工成本控制的说法，正确的是（）。",[238,240,242,244],{"key":20,"text":239,"correct":22},"施工成本管理体系由社会有关组织进行评审和认证",{"key":24,"text":241,"correct":32},"要做好施工成本的过程控制，必须制定规范化的过程控制程序",{"key":27,"text":243,"correct":22},"管理行为控制程序是进行成本过程控制的重点",{"key":30,"text":245,"correct":22},"管理行为控制程序和指标控制程序是相互独立的",{"id":247,"libraryId":5,"type":15,"typeLabel":16,"stem":248,"options":249,"answer":24,"analysis":33},895570,"某土方工程，计划总工程量为4800m3预算单价为580 元\u002Fm3，计划6 个月内均衡完成，开工后，实际单价为600 元\u002Fm3，施工至第3 个月底，累计实际完成工程量3000m3，若运用赢得值法分析，则至第3 个月底的费用偏差为（）万元。",[250,252,254,256],{"key":20,"text":251,"correct":22},"-34.8",{"key":24,"text":253,"correct":32},"-6",{"key":27,"text":255,"correct":22},"6",{"key":30,"text":257,"correct":22},"34.8",{"id":259,"libraryId":5,"type":15,"typeLabel":16,"stem":260,"options":261,"answer":30,"analysis":33},895571,"施工项目年度成本分析的重点是（）",[262,264,266,268],{"key":20,"text":263,"correct":22},"通过实际成本与目标成本的对比，分析目标成本落实情况",{"key":24,"text":265,"correct":22},"通过对技术组织措施执行效果的分析，寻求更加有效的节约途径",{"key":27,"text":267,"correct":22},"通过实际成本与计划成本的对比，分析成本降低水平",{"key":30,"text":269,"correct":32},"针对下一年度进展情况，制定切实可行的成本管理措施",{"id":271,"libraryId":5,"type":15,"typeLabel":16,"stem":272,"options":273,"answer":24,"analysis":33},895572,"业务核算是施工成本分析的依据之一，其目的是（）。",[274,276,278,280],{"key":20,"text":275,"correct":22},"预测成本变化发展的趋势",{"key":24,"text":277,"correct":32},"迅速取得资料，及时采取措施调整经济活动",{"key":27,"text":279,"correct":22},"计算当前的实际成本水平",{"key":30,"text":281,"correct":22},"记录企业的一切生产经营活动",{"id":283,"libraryId":5,"type":15,"typeLabel":16,"stem":284,"options":285,"answer":24,"analysis":33},895573,"分部分项工程成本分析采用的\"三算\"对比分析法，其\"三算\"对比指的是（）的比较。",[286,288,290,292],{"key":20,"text":287,"correct":22},"概算成本、预算成本、决算成本",{"key":24,"text":289,"correct":32},"预算成本、目标成本、实际成本",{"key":27,"text":291,"correct":22},"月度成本、季度成本、年度成本",{"key":30,"text":293,"correct":22},"预算成本、计划成本、目标成本",{"id":295,"libraryId":5,"type":15,"typeLabel":16,"stem":296,"options":297,"answer":27,"analysis":33},895574,"在建设工程项目施工成本分析中，成本盈亏异常分析属于（）方法。",[298,300,302,304],{"key":20,"text":299,"correct":22},"因素分析",{"key":24,"text":301,"correct":22},"综合成本分析",{"key":27,"text":303,"correct":32},"专项成本分析",{"key":30,"text":305,"correct":22},"成本项目分析",{"id":307,"libraryId":5,"type":15,"typeLabel":16,"stem":308,"options":309,"answer":24,"analysis":33},895575,"某项目在进行资金成本分析时，其计算期实际工程款收入为220 万元，计算期实际成本支出为119万元，计划工期成本为150 万元，则该项目成本支出率为（）。",[310,312,314,316],{"key":20,"text":311,"correct":22},"30.69%",{"key":24,"text":313,"correct":32},"54.09%",{"key":27,"text":315,"correct":22},"68.18%",{"key":30,"text":317,"correct":22},"79.33%",{"id":319,"libraryId":5,"type":15,"typeLabel":16,"stem":320,"options":321,"answer":20,"analysis":33},895576,"成本核算要求的归集“三同步”是指（）的取值范围应当一致。",[322,324,326,328],{"key":20,"text":323,"correct":32},"形象进度、产值统计、实际成本",{"key":24,"text":325,"correct":22},"成本预测、成本计划、成本分析",{"key":27,"text":327,"correct":22},"目标成本、预算成本、实际成本",{"key":30,"text":329,"correct":22},"人工成本、材料成本、机械成本",{"id":331,"libraryId":5,"type":15,"typeLabel":16,"stem":332,"options":333,"answer":20,"analysis":33},895577,"关于施工成本分析依据的说法，正确的是（）。",[334,336,338,340],{"key":20,"text":335,"correct":32},"统计核算可以用货币计算",{"key":24,"text":337,"correct":22},"业务核算主要是价值核算",{"key":27,"text":339,"correct":22},"统计核算的计量尺度比会计核算窄",{"key":30,"text":341,"correct":22},"会计核算可以对尚未发生的经济活动进核算",{"id":343,"libraryId":5,"type":15,"typeLabel":16,"stem":344,"options":345,"answer":30,"analysis":33},895578,"某项目施工成本数据如下表，根据差额计算法，成本降低率提高对成本降低额的影响程度为（）万元。",[346,348,350,352],{"key":20,"text":347,"correct":22},"0.6",{"key":24,"text":349,"correct":22},"0.7",{"key":27,"text":351,"correct":22},"1.1",{"key":30,"text":353,"correct":32},"1.2",{"id":355,"libraryId":5,"type":15,"typeLabel":16,"stem":356,"options":357,"answer":30,"analysis":33},895579,"在FIDIC合同条件下，当变更的工程量与对该项工作规定的具体费率的乘积超过了接受合同额的一定比例时，其费率或单价可以调整，该比例为()。",[358,360,362,364],{"key":20,"text":359,"correct":22},"10％",{"key":24,"text":361,"correct":22},"1％",{"key":27,"text":363,"correct":22},"0.1％",{"key":30,"text":365,"correct":32},"0.01％",{"id":367,"libraryId":5,"type":15,"typeLabel":16,"stem":368,"options":369,"answer":27,"analysis":33},895580,"根据《建设项目工程总承包合同示范文本》(GF2011-0126)，下列属于施工变更的是( )。",[370,372,374,376],{"key":20,"text":371,"correct":22},"对区域内标准标高的调整",{"key":24,"text":373,"correct":22},"对备品备件采购数量的调整",{"key":27,"text":375,"correct":32},"发包人对竣工检验合格的项目重新进行竣工试验",{"key":30,"text":377,"correct":22},"因发包人原因暂停工程超过45天，调减受影响的部分工程",{"id":379,"libraryId":5,"type":15,"typeLabel":16,"stem":380,"options":381,"answer":20,"analysis":33},895581,"根据《建设项目工程总承包合同示范文本》(GB-2011-0216)，下列变更事项中属于设计变更的是()。",[382,384,386,388],{"key":20,"text":383,"correct":32},"基准控制点的调整",{"key":24,"text":385,"correct":22},"备品备件采购数量的调整",{"key":27,"text":387,"correct":22},"新增加的施工障碍处理",{"key":30,"text":389,"correct":22},"增加的附加试验",{"id":391,"libraryId":5,"type":15,"typeLabel":16,"stem":392,"options":393,"answer":27,"analysis":33},895582,"根据《建设项目工程总承包合同示范为本（试行）》GF-2011-2016，下列属于施工变更的是（）。",[394,396,397,398],{"key":20,"text":395,"correct":22},"对区域内标准高的调整",{"key":24,"text":373,"correct":22},{"key":27,"text":375,"correct":32},{"key":30,"text":377,"correct":22},{"id":400,"libraryId":5,"type":15,"typeLabel":16,"stem":401,"options":402,"answer":24,"analysis":33},895583,"根据《建设项目工程总承包合同示范文本GF-2011-0216》，下列属于施工变更的是()。",[403,405,407,409],{"key":20,"text":404,"correct":22},"对配套工程系统的工艺调整",{"key":24,"text":406,"correct":32},"发包人要求增加的附加试验",{"key":27,"text":408,"correct":22},"对区域内基准控制点的调整",{"key":30,"text":410,"correct":22},"对实施赶工指令所作的调整",{"id":412,"libraryId":5,"type":15,"typeLabel":16,"stem":413,"options":414,"answer":24,"analysis":33},895584,"根据《建设项目工程总承包合同示范文本》(GF-2011-0216)，下列关于变更程序的说法中正确的是()。",[415,417,419,421],{"key":20,"text":416,"correct":22},"发包人要求的变更，应事先以书面或口头形式通知承包人",{"key":24,"text":418,"correct":32},"承包人接到发包人变更通知后，有义务在规定时间内向发包人提交书面建议报告",{"key":27,"text":420,"correct":22},"承包人有义务接受发包人要求的变更，无须通过建议报告表达不支持的观点",{"key":30,"text":422,"correct":22},"承包人在提交变更建议报告后，在等待发包人回复的时间内，可停止相关工作",{"id":424,"libraryId":5,"type":15,"typeLabel":16,"stem":425,"options":426,"answer":30,"analysis":33},895585,"根据FIDIC合同条件的规定，下列有关工程量变更引起的价格调整的情形，错误的是()。",[427,429,431,433],{"key":20,"text":428,"correct":22},"该部分工程不是合同中规定的“固定费率项目”",{"key":24,"text":430,"correct":22},"该部分工程实际测量的工程量比工程量表规定的工程量的变动大于10%",{"key":27,"text":432,"correct":22},"该部分工程工程量的变更与相对应费率的乘积超过了中标金额的0.01%",{"key":30,"text":434,"correct":32},"由于工程量的变更直接造成该部分工程每单位工程量费用的变动超过0.1%",{"id":436,"libraryId":5,"type":15,"typeLabel":16,"stem":437,"options":438,"answer":30,"analysis":33},895586,"在FIDIC 合同条件下，当变更的工程量与对该项工作规定的具体费率的乘积超过了接受合同额的一定比例时，其费率或单价可以调整，该比例为（）。",[439,441,443,445],{"key":20,"text":440,"correct":22},"10%",{"key":24,"text":442,"correct":22},"1%",{"key":27,"text":444,"correct":22},"0.1%",{"key":30,"text":446,"correct":32},"0.01%",{"id":448,"libraryId":5,"type":15,"typeLabel":16,"stem":449,"options":450,"answer":27,"analysis":33},895587,"根据《建设项目工程总承包合同示范文本》（GF-2011-0126），下列属于施工变更的是（）。",[451,452,453,454],{"key":20,"text":371,"correct":22},{"key":24,"text":373,"correct":22},{"key":27,"text":375,"correct":32},{"key":30,"text":455,"correct":22},"因发包人原因暂停工程超过45 天，调减受影响的部分工程",{"id":457,"libraryId":5,"type":15,"typeLabel":16,"stem":458,"options":459,"answer":24,"analysis":33},895588,"根据《建设项目工程总承包合同示范文本GF-2011-0216》，下列属于施工变更的是（）。",[460,461,462,463],{"key":20,"text":404,"correct":22},{"key":24,"text":406,"correct":32},{"key":27,"text":408,"correct":22},{"key":30,"text":410,"correct":22},{"id":465,"libraryId":5,"type":15,"typeLabel":16,"stem":466,"options":467,"answer":27,"analysis":33},895589,"根据《建设项目工程总承包合同示范文本》，下列属于施工变更的是（）。",[468,469,471,473],{"key":20,"text":371,"correct":22},{"key":24,"text":470,"correct":22},"对备品备件采购数量的增减",{"key":27,"text":472,"correct":32},"发包人对竣工试验合格的项目重新进行竣工试验",{"key":30,"text":455,"correct":22},{"id":475,"libraryId":5,"type":15,"typeLabel":16,"stem":476,"options":477,"answer":20,"analysis":33},895590,"根据《建设工程工程量清单计价规范（GB50500-2013），对于任一招标工程量清单项目，如果因业主方变更的原因导致工程量偏差，则调整原则为（）。",[478,480,482,484],{"key":20,"text":479,"correct":32},"当工程量增加超过15%以上时，其增加部分的工程量单价应予调低",{"key":24,"text":481,"correct":22},"当工程量增加超过15%以上时，其增加部分的工程量单价应予调高",{"key":27,"text":483,"correct":22},"当工程量减少超过15%以上时，其相应部分的措施费应予调低",{"key":30,"text":485,"correct":22},"当工程量增加超过15%以上时，其相应部分的措施费应予调高",{"id":487,"libraryId":5,"type":15,"typeLabel":16,"stem":488,"options":489,"answer":20,"analysis":33},895591,"根据《建设工程工程量清单计价规范》（GB50500-2013），某工程签订了单价合同，在执行过程中，某分项工程原清单工程量1000m3，综合单价为25 元\u002Fm3，后因业主方原因实际工程量变更为1500m3，合同中约定，若实际工程量超过计划工程量15%以上，超过部分综合单价调整为原来的0.9，不考虑其他因素，则该分项工程的结算款应为（）。",[490,492,494,496],{"key":20,"text":491,"correct":32},"36625",{"key":24,"text":493,"correct":22},"35000",{"key":27,"text":495,"correct":22},"33750",{"key":30,"text":497,"correct":22},"32875",{"id":499,"libraryId":5,"type":15,"typeLabel":16,"stem":500,"options":501,"answer":20,"analysis":33},895592,"某建设工程由于业主临时设计变更导致停工，承包商的工人窝工8 个工日，窝工费为300 元\u002F工日；承包商租赁的挖土机窝工2 个台班，挖土机租赁费为1000 元\u002F台班，动力费160 元\u002F台班，承包商自有的自卸汽车窝工2 个台班，该汽车折旧费用400 元\u002F台班，动力费为200 元\u002F台班，则承包商可以向业主索赔的费用为（）元。",[502,504,506,508],{"key":20,"text":503,"correct":32},"5200",{"key":24,"text":505,"correct":22},"4800",{"key":27,"text":507,"correct":22},"5400",{"key":30,"text":509,"correct":22},"5800",{"id":511,"libraryId":5,"type":15,"typeLabel":16,"stem":512,"options":513,"answer":24,"analysis":33},895593,"承包商可以向业主提起索赔的情形是（ ）。 A. 承包商为确保质量而增加的措施费 B. 监理工程师提出的工程变更造成费用的增加 C. 分包商因返工造成费用增加、工期顺延 D. 承包商自行采购材料的质量有问题造成费用增加、工期顺延",[514,515,516,517,518],{"key":20,"text":20,"correct":22},{"key":24,"text":24,"correct":32},{"key":27,"text":27,"correct":22},{"key":30,"text":30,"correct":22},{"key":519,"text":519,"correct":22},"E",{"id":521,"libraryId":5,"type":15,"typeLabel":16,"stem":522,"options":523,"answer":24,"analysis":33},895594,"工程施工过程中发生索赔事件以后，承包人首先要做的工作是（ ）。 A.向监理工程师提交索赔证据 B.提出索赔意向通知 C.提交索赔报告 D.与业主就索赔事项进行谈判",[524,525,526,527,528],{"key":20,"text":20,"correct":22},{"key":24,"text":24,"correct":32},{"key":27,"text":27,"correct":22},{"key":30,"text":30,"correct":22},{"key":519,"text":519,"correct":22},{"id":530,"libraryId":5,"type":15,"typeLabel":16,"stem":531,"options":532,"answer":27,"analysis":33},895595,"根据《标准施工招标文件》，关于施工合同索赔程序的规定，正确的是（ ）。 A.设计变更发生后，承包人应在14 天内向发包人提交索赔通知 B.索赔事件持续进行，承包人应在事件终了后立即提交索赔报告 C.承包人在发出索赔意向通知书后28 天内，向监理人正式递交索赔通知书 D.索赔意向通知发出后42 天内，承包人应向监理人提交正式索赔报告",[533,534,535,536,537],{"key":20,"text":20,"correct":22},{"key":24,"text":24,"correct":22},{"key":27,"text":27,"correct":32},{"key":30,"text":30,"correct":22},{"key":519,"text":519,"correct":22},{"id":539,"libraryId":5,"type":15,"typeLabel":16,"stem":540,"options":541,"answer":24,"analysis":33},895596,"关于对承包人索赔文件审核的说法，正确的是（ ）。 A.监理人收到承包人提交的索赔通知书后，应及时转交发包人，监理人无权要求承包人提交原始记录 B.承包人接受索赔处理结果的，发包人应在索赔处理结果答复后28 天内完成赔付 C.监理人根据发包人的授权，在收到索赔通知书的60 天内将索赔处理结果答复承包人 D.承包人不接受索赔处理结果的，应直接向法院起诉索赔",[542,543,544,545,546],{"key":20,"text":20,"correct":22},{"key":24,"text":24,"correct":32},{"key":27,"text":27,"correct":22},{"key":30,"text":30,"correct":22},{"key":519,"text":519,"correct":22},{"id":548,"libraryId":5,"type":15,"typeLabel":16,"stem":549,"options":550,"answer":27,"analysis":33},895597,"关于建设工程索赔成立条件的说法，正确的是（ ）。 A.导致索赔的事件必须是对方的过错，索赔才能成立 B.只要对方存在过错，不管是否造成损失，索赔都能成立 C.不按照合同规定的程序提交索赔报告，索赔不能成立 D.只要索赔事件的事实存在，在合同有效期内任何时候提出索赔都能成立",[551,552,553,554,555],{"key":20,"text":20,"correct":22},{"key":24,"text":24,"correct":22},{"key":27,"text":27,"correct":32},{"key":30,"text":30,"correct":22},{"key":519,"text":519,"correct":22},{"id":557,"libraryId":5,"type":15,"typeLabel":16,"stem":558,"options":559,"answer":30,"analysis":33},895598,"根据《标准施工招标文件》，对于承包人向发包人的索赔请求，其索赔意向书应交由（ ）审核。 A.业主 B.设计人 C.项目经理 D.监理人",[560,561,562,563,564],{"key":20,"text":20,"correct":22},{"key":24,"text":24,"correct":22},{"key":27,"text":27,"correct":22},{"key":30,"text":30,"correct":32},{"key":519,"text":519,"correct":22},{"id":566,"libraryId":5,"type":15,"typeLabel":16,"stem":567,"options":568,"answer":27,"analysis":33},895599,"政府投资工程的承包人向发包人提出的索赔请求，索赔文件应该交由（ ）进行审核。 A.造价鉴定机构 B.造价咨询人 C.监理人 D.政府造价管理部门",[569,570,571,572,573],{"key":20,"text":20,"correct":22},{"key":24,"text":24,"correct":22},{"key":27,"text":27,"correct":32},{"key":30,"text":30,"correct":22},{"key":519,"text":519,"correct":22},{"id":575,"libraryId":5,"type":15,"typeLabel":16,"stem":576,"options":577,"answer":24,"analysis":33},895600,"根据《标准施工招标文件》中的通用条款，承包人按合同约定提交的最终结清申请单中，只限于提出（ ）。 A.在合同工程接收证书颁发前 B.在合同工作接收证书颁发后 C.在竣工付款证书接收前 D.在缺陷责任期终止证书颁发后",[578,579,580,581,582],{"key":20,"text":20,"correct":22},{"key":24,"text":24,"correct":32},{"key":27,"text":27,"correct":22},{"key":30,"text":30,"correct":22},{"key":519,"text":519,"correct":22},[584,587,590,593,596,599],{"id":15,"name":585,"category":7,"favorite":586},"领导干部任职前廉政法规知识测试题",92,{"id":588,"name":589,"category":7,"favorite":15},595,"建筑结构与设备",{"id":591,"name":592,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":594,"name":595,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":597,"name":598,"category":7,"favorite":8},534,"BIM工程师",{"id":600,"name":598,"category":7,"favorite":8},535]