[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-581-15":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":583},{"id":5,"name":6,"category":7,"favorite":8},581,"建设工程造价管理基础知识","建筑工程",0,15,50,2873,[13,34,46,58,70,82,94,106,118,130,142,154,163,174,186,198,206,214,226,238,250,262,273,285,295,307,319,331,343,351,363,375,383,392,400,412,420,432,444,456,468,478,490,501,511,523,535,547,559,571],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":30,"analysis":33},895499,1,"单选题","在编制脚手架工程量清单时，其工作内容不包括()。",[19,23,26,29],{"key":20,"text":21,"correct":22},"A","场内、场外材料搬运",false,{"key":24,"text":25,"correct":22},"B","安全网的铺设",{"key":27,"text":28,"correct":22},"C","选择附墙点与主体连接",{"key":30,"text":31,"correct":32},"D","测试手动装置、安全锁等",true,"",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":20,"analysis":33},895500,"在编制措施项目清单时，关于钢筋混凝土模版及支架费项目，应在清单中列明（）。",[38,40,42,44],{"key":20,"text":39,"correct":32},"项目编码",{"key":24,"text":41,"correct":22},"计算基础",{"key":27,"text":43,"correct":22},"取费费率",{"key":30,"text":45,"correct":22},"工作内容",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":20,"analysis":33},895501,"拟定施工总方案是编制招标工程量清单的一项准备工作，下列选项中属于拟定施工总方案的范畴的是（）。",[50,52,54,56],{"key":20,"text":51,"correct":32},"对关键工艺的原则性规定",{"key":24,"text":53,"correct":22},"拟定施工步骤和施工顺序",{"key":27,"text":55,"correct":22},"估算整体工程量",{"key":30,"text":57,"correct":22},"编制施工进度计划",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":20,"analysis":33},895502,"编制招标工程量清单中分部分项工程量清单时，项目特征可以不描述的是（）。",[62,64,66,68],{"key":20,"text":63,"correct":32},"梁的标高",{"key":24,"text":65,"correct":22},"混凝土的强度等级",{"key":27,"text":67,"correct":22},"门(窗)框外围尺寸或洞口尺寸",{"key":30,"text":69,"correct":22},"油漆(涂料)的品种",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":30,"analysis":33},895503,"施工招标工程量清单中，应由投标人自主报价的其他项目是（）。",[74,76,78,80],{"key":20,"text":75,"correct":22},"专业工程暂估价",{"key":24,"text":77,"correct":22},"暂列金额",{"key":27,"text":79,"correct":22},"工程设备暂估价",{"key":30,"text":81,"correct":32},"计日工单价",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":24,"analysis":33},895504,"关于标底与招标控制价的编制，下列说法中正确的是()。",[86,88,90,92],{"key":20,"text":87,"correct":22},"招标人不得自行决定是否编制标底",{"key":24,"text":89,"correct":32},"招标人不得规定最低投标限价",{"key":27,"text":91,"correct":22},"编制标底时必须同时设有最高投标限价",{"key":30,"text":93,"correct":22},"招标人不编制标底时应规定最低投标限价",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":30,"analysis":33},895505,"下列关于招标控制价的说法中，正确的是()。",[98,100,102,104],{"key":20,"text":99,"correct":22},"招标控制价必须由招标人编制",{"key":24,"text":101,"correct":22},"招标控制价只需公布总价",{"key":27,"text":103,"correct":22},"招标人不得对招标控制价提出异议",{"key":30,"text":105,"correct":32},"招标控制价不应上调或下浮",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":20,"analysis":33},895507,"关于招标控制价的相关规定，下列说法中正确的是()。",[110,112,114,116],{"key":20,"text":111,"correct":32},"国有资金投资的工程建设项目，应编制招标控制价",{"key":24,"text":113,"correct":22},"招标控制价应在招标文件中公布，仅需公布总价",{"key":27,"text":115,"correct":22},"招标控制价超过批准概算3%以内时，招标人不必将其报原概算审批部门审核",{"key":30,"text":117,"correct":22},"当招标控制价复查结论超过原公布的招标控制价3%以内时，应责成招标人改正",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":30,"analysis":33},895508,"关于依法必须招标工程的标底和招标控制价，下列说法中正确的是()。",[122,124,126,128],{"key":20,"text":123,"correct":22},"招标人有权白行决定是否采用设标底招标、无标底招标以及招标控制价招标",{"key":24,"text":125,"correct":22},"采用设标底招标的，招标人有权决定标底是否在招标文件中公开",{"key":27,"text":127,"correct":22},"采用招标控制价招标的，招标人应在招标文件中明确最高投标限价，也可以规定最低投标限价",{"key":30,"text":129,"correct":32},"公布招标控制价时，还应公布各单位工程的分部分项工程费、措施项目费、其他项目费、规费和税金",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":30,"analysis":33},895509,"关于招标控制价及其编制，下列说法中正确的是()。",[134,136,138,140],{"key":20,"text":135,"correct":22},"招标人不得拒绝高于招标控制价的投标报价",{"key":24,"text":137,"correct":22},"当重新公布招标控制价时，原投标截止期不变",{"key":27,"text":139,"correct":22},"经复核认为招标控制价误差大于±3%时，投标人应责成招标人改正",{"key":30,"text":141,"correct":32},"投标人经复核认为招标控制价未按规定编制的，应在招标控制价公布后5日内提出投诉",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":27,"analysis":33},895510,"关于招标控制价及其编制的说法，正确的是（）。",[146,148,150,152],{"key":20,"text":147,"correct":22},"综合单价中包括应由招标人承担的风险费用",{"key":24,"text":149,"correct":22},"招标人供应的材料，总承包服务费应按材料价值的1.5%计算",{"key":27,"text":151,"correct":32},"措施项目费应按招标文件中提供的措施项目清单确定",{"key":30,"text":153,"correct":22},"招标文件提供暂估价的主要材料，其主材费用应计入其他项目清单费用",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":24,"analysis":33},895511,"关于标底与招标控制价的编制，下列说法中正确的是（）。",[158,160,161,162],{"key":20,"text":159,"correct":22},"招标人不得自行诀定是否编制标底",{"key":24,"text":89,"correct":32},{"key":27,"text":91,"correct":22},{"key":30,"text":93,"correct":22},{"id":164,"libraryId":5,"type":15,"typeLabel":16,"stem":165,"options":166,"answer":30,"analysis":33},895512,"关于招标控制价，下列说法中正确的是（）。",[167,168,170,172],{"key":20,"text":135,"correct":22},{"key":24,"text":169,"correct":22},"利润可按建筑施工企业平均利润率计算",{"key":27,"text":171,"correct":22},"招标控制价超过批准概算10%时，应报原概算审批部门审核",{"key":30,"text":173,"correct":32},"经复查的招标控制价与原招标控制价误差±3%的应责成招标人改正",{"id":175,"libraryId":5,"type":15,"typeLabel":16,"stem":176,"options":177,"answer":30,"analysis":33},895513,"招标控制价综合单价的组价包括如下工作：①根据政策规定或造价信息确定工料机单价；②根据工程所在地的定额规定计算工程量；③将定额项目的合价除以清单项目的工程量；④根据费率和利率计算出组价定额项目的合价口则正确的工作顺序是（）",[178,180,182,184],{"key":20,"text":179,"correct":22},"①④②③",{"key":24,"text":181,"correct":22},"①③②④",{"key":27,"text":183,"correct":22},"②①③④",{"key":30,"text":185,"correct":32},"②①④③",{"id":187,"libraryId":5,"type":15,"typeLabel":16,"stem":188,"options":189,"answer":27,"analysis":33},895514,"招标控制价中暂列金额一般按分部分项工程费的一定比率参考计算，这一比率的范围是（）。",[190,192,194,196],{"key":20,"text":191,"correct":22},"3%～5%",{"key":24,"text":193,"correct":22},"5%～10%",{"key":27,"text":195,"correct":32},"10%～15%",{"key":30,"text":197,"correct":22},"15%～20%",{"id":199,"libraryId":5,"type":15,"typeLabel":16,"stem":200,"options":201,"answer":30,"analysis":33},895515,"下列关于招标控制价的说法中，正确的是（）。",[202,203,204,205],{"key":20,"text":99,"correct":22},{"key":24,"text":101,"correct":22},{"key":27,"text":103,"correct":22},{"key":30,"text":105,"correct":32},{"id":207,"libraryId":5,"type":15,"typeLabel":16,"stem":208,"options":209,"answer":24,"analysis":33},895516,"招标控制价的编制中，综合单价的组价包括如下工作：①根据政策规定或造价信息确定工料机单价；②根据工程所在地的定额规定计算工程量；③将定额项目的合价除以清单项目的工程量；④根据费率和利率计算出组价定额项目的合价。则正确的组价顺序是()。",[210,211,212,213],{"key":20,"text":179,"correct":22},{"key":24,"text":185,"correct":32},{"key":27,"text":183,"correct":22},{"key":30,"text":181,"correct":22},{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":27,"analysis":33},895517,"某工程投标总价为5000万元，则投标保证金最高不得超过()。",[218,220,222,224],{"key":20,"text":219,"correct":22},"20万元",{"key":24,"text":221,"correct":22},"50万元",{"key":27,"text":223,"correct":32},"80万元",{"key":30,"text":225,"correct":22},"100万元",{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":20,"analysis":33},895518,"关于工程量清单方式招标工程合同价格风险及风险分担，下列说法中正确的是( )。",[230,232,234,236],{"key":20,"text":231,"correct":32},"当出现的风险内容及幅度在招标文件规定的范围内时，综合单价不变",{"key":24,"text":233,"correct":22},"市场价格波动导致施工机具使用费发生变化时，承包人只承担5%以内的价格风险",{"key":27,"text":235,"correct":22},"人工费变化发生的风险全部由发包人承担",{"key":30,"text":237,"correct":22},"承包人管理费的风险一般由发承包双方共同承担",{"id":239,"libraryId":5,"type":15,"typeLabel":16,"stem":240,"options":241,"answer":24,"analysis":33},895520,"投标人为使报价具有竞争力，下列有关生产要素询价的做法中，正确的是()。",[242,244,246,248],{"key":20,"text":243,"correct":22},"在通过资格预审前进行询价",{"key":24,"text":245,"correct":32},"尽量向咨询公司进行询价",{"key":27,"text":247,"correct":22},"不论何时何地尽量使用自有机械",{"key":30,"text":249,"correct":22},"劳务市场招募零散工有利于管理",{"id":251,"libraryId":5,"type":15,"typeLabel":16,"stem":252,"options":253,"answer":20,"analysis":33},895521,"投标人在投标报价时，应优先被采用为综合单价编制依据的是()。",[254,256,258,260],{"key":20,"text":255,"correct":32},"企业定额",{"key":24,"text":257,"correct":22},"地区定额",{"key":27,"text":259,"correct":22},"行业定额",{"key":30,"text":261,"correct":22},"国家定额",{"id":263,"libraryId":5,"type":15,"typeLabel":16,"stem":264,"options":265,"answer":24,"analysis":33},895522,"根据《建设工程工程量清单计价规范》GB50500-2013，允许投标人根据具体情况对招标工程量清单进行修正或增加的内容是()。",[266,268,270,271],{"key":20,"text":267,"correct":22},"分部分项工程量清单",{"key":24,"text":269,"correct":32},"措施项目清单",{"key":27,"text":77,"correct":22},{"key":30,"text":272,"correct":22},"计日工",{"id":274,"libraryId":5,"type":15,"typeLabel":16,"stem":275,"options":276,"answer":20,"analysis":33},895523,"关于投标报价时综合单价的确定，下列做法中正确的是()。",[277,279,281,283],{"key":20,"text":278,"correct":32},"以项目特征描述为依据确定综合单价",{"key":24,"text":280,"correct":22},"招标工程量清单特征描述与设计图纸不符时，应以设计图纸为准",{"key":27,"text":282,"correct":22},"应考虑招标文件规定范围（幅度）外的风险费用",{"key":30,"text":284,"correct":22},"消耗量指标的计算应以地区或行业定额为依据",{"id":286,"libraryId":5,"type":15,"typeLabel":16,"stem":287,"options":288,"answer":20,"analysis":33},895524,"根据《建设工程工程量清单计价规范》GB 50500-2013，下列费用项目中需纳入分部分项工程项目综合单价的是（）。",[289,291,292,293],{"key":20,"text":290,"correct":32},"工程设备估价",{"key":24,"text":75,"correct":22},{"key":27,"text":77,"correct":22},{"key":30,"text":294,"correct":22},"计日工费",{"id":296,"libraryId":5,"type":15,"typeLabel":16,"stem":297,"options":298,"answer":27,"analysis":33},895525,"对于其他项目中的计日工，投标人正确的报价方式是( )。",[299,301,303,305],{"key":20,"text":300,"correct":22},"按政策规定标准估算报价",{"key":24,"text":302,"correct":22},"按招标文件提供的金额报价",{"key":27,"text":304,"correct":32},"自主报价",{"key":30,"text":306,"correct":22},"待签证时报价",{"id":308,"libraryId":5,"type":15,"typeLabel":16,"stem":309,"options":310,"answer":27,"analysis":33},895526,"编制投标报价，下列关于分部分项工程综合单价确定的描述中，正确的是()。",[311,313,315,317],{"key":20,"text":312,"correct":22},"招投标过程中，当出现招标文件中分部分项工程量清单特征描述与设计图纸不符时，投标人应以设计图纸为准，结合规范确定投标报价的综合单价",{"key":24,"text":314,"correct":22},"施工中施工图纸或设计变更与工程量清单特征描述不一致时，应按工程量清单特征，确定综合单价",{"key":27,"text":316,"correct":32},"综合单价应包括承包人承担的5%以内的材料、工程设备的价格风险，10%以内的施工机具使用费风险",{"key":30,"text":318,"correct":22},"承包人应承担法律、法规、规章或有关政策出台导致工程税金、规费的变化",{"id":320,"libraryId":5,"type":15,"typeLabel":16,"stem":321,"options":322,"answer":24,"analysis":33},895527,"根据《建设工程工程量清单计价规范》GB 50500-2013，关于施工发承包投标报价的编制，下列做法正确的是（）。",[323,325,327,329],{"key":20,"text":324,"correct":22},"设计图纸与招标工程量清单项目特征描述不同的，以设计图纸特征为准",{"key":24,"text":326,"correct":32},"暂列金额应按照招标工程量清单中列出的金额填写，不得变动",{"key":27,"text":328,"correct":22},"材料、工程设备暂估价应按暂估单价，乘以所需数量后计入其他项目费",{"key":30,"text":330,"correct":22},"总承包服务费应按照投标人提出的协调、配合和服务项目自主报价",{"id":332,"libraryId":5,"type":15,"typeLabel":16,"stem":333,"options":334,"answer":24,"analysis":33},895528,"某施工企业投标一城市基础设施项目，投标总价为5000万元，则投标保证金最高数额为()万元。",[335,337,339,341],{"key":20,"text":336,"correct":22},"50",{"key":24,"text":338,"correct":32},"80",{"key":27,"text":340,"correct":22},"76",{"key":30,"text":342,"correct":22},"100",{"id":344,"libraryId":5,"type":15,"typeLabel":16,"stem":345,"options":346,"answer":24,"analysis":33},895529,"投标人为使报价具有竞争力，下列有关生产要素询价的做法中，正确的是（）。",[347,348,349,350],{"key":20,"text":243,"correct":22},{"key":24,"text":245,"correct":32},{"key":27,"text":247,"correct":22},{"key":30,"text":249,"correct":22},{"id":352,"libraryId":5,"type":15,"typeLabel":16,"stem":353,"options":354,"answer":24,"analysis":33},895530,"关于投标报价的说法，正确的是（）。",[355,357,359,361],{"key":20,"text":356,"correct":22},"询价通常可向生产厂商、销售商、咨询公司以及招标人询问",{"key":24,"text":358,"correct":32},"投标人可以利用工程量清单的错、漏、多项，运用投标技巧，提高报价质量",{"key":27,"text":360,"correct":22},"复核工程量清单中的工程量，对于有明显错误的可以修改清单工程量",{"key":30,"text":362,"correct":22},"只要投标人的标价明显低于其他投标报价，评标委员会就可作为废标处理",{"id":364,"libraryId":5,"type":15,"typeLabel":16,"stem":365,"options":366,"answer":30,"analysis":33},895531,"关于合同价款与合同类型，下列说法正确的是（）。",[367,369,371,373],{"key":20,"text":368,"correct":22},"招标文件与投标文件不一致的地方，以招标文件为准",{"key":24,"text":370,"correct":22},"中标人应当自中标通知书收到之日起30 天内与招标人订立书面合同",{"key":27,"text":372,"correct":22},"工期特别近、技术特别复杂的项目应采用总价合同",{"key":30,"text":374,"correct":32},"实行工程量清单计价的工程，应采用单价合同",{"id":376,"libraryId":5,"type":15,"typeLabel":16,"stem":377,"options":378,"answer":27,"analysis":33},895532,"对于其他项目中的计日工，投标人正确的报价方式是（）。",[379,380,381,382],{"key":20,"text":300,"correct":22},{"key":24,"text":302,"correct":22},{"key":27,"text":304,"correct":32},{"key":30,"text":306,"correct":22},{"id":384,"libraryId":5,"type":15,"typeLabel":16,"stem":385,"options":386,"answer":30,"analysis":33},895533,"关于招标控制价及其编制，下列说法中正确的是（）。",[387,388,389,390],{"key":20,"text":135,"correct":22},{"key":24,"text":137,"correct":22},{"key":27,"text":139,"correct":22},{"key":30,"text":391,"correct":32},"投标人经复核认为招标控制价未按规定编制的，应在招标控制价公布后5 日内提出投诉",{"id":393,"libraryId":5,"type":15,"typeLabel":16,"stem":394,"options":395,"answer":20,"analysis":33},895534,"关于工程量清单方式招标工程合同价格风险及风险分担，下列说法中正确的是（）。",[396,397,398,399],{"key":20,"text":231,"correct":32},{"key":24,"text":233,"correct":22},{"key":27,"text":235,"correct":22},{"key":30,"text":237,"correct":22},{"id":401,"libraryId":5,"type":15,"typeLabel":16,"stem":402,"options":403,"answer":30,"analysis":33},895535,"关于投标报价，下列说法中正确的是（）。",[404,406,408,410],{"key":20,"text":405,"correct":22},"总价措施项目均由投标人自主报价",{"key":24,"text":407,"correct":22},"暂列金额依据招标工程量清单总说明，结合项目管理规划自主填报",{"key":27,"text":409,"correct":22},"暂估价依据询价情况填报",{"key":30,"text":411,"correct":32},"投标人对投标报价的任何优惠均应反映在相应清单项目的综合单价中",{"id":413,"libraryId":5,"type":15,"typeLabel":16,"stem":414,"options":415,"answer":20,"analysis":33},895536,"关于投标报价时综合单价的确定，下列做法中正确的是（）。",[416,417,418,419],{"key":20,"text":278,"correct":32},{"key":24,"text":280,"correct":22},{"key":27,"text":282,"correct":22},{"key":30,"text":284,"correct":22},{"id":421,"libraryId":5,"type":15,"typeLabel":16,"stem":422,"options":423,"answer":30,"analysis":33},895537,"下列情形中，属于投标人互相串通投标的是()。",[424,426,428,430],{"key":20,"text":425,"correct":22},"不同投标人的投标报价呈现有规律性差异",{"key":24,"text":427,"correct":22},"不同投标人的投标文件由同一单位或个人编制",{"key":27,"text":429,"correct":22},"不同投标人委托了同一单位或个人办理某项投标事宜",{"key":30,"text":431,"correct":32},"投标人之间约定中标人",{"id":433,"libraryId":5,"type":15,"typeLabel":16,"stem":434,"options":435,"answer":30,"analysis":33},895538,"关于联合体投标需要遵循的规定，下列说法中正确的是（）。",[436,438,440,442],{"key":20,"text":437,"correct":22},"联合体各方签订共同投标协议后，可再以自己名义单独投标",{"key":24,"text":439,"correct":22},"资格预审后联合体增减、更换成员的，其投标有效性待定",{"key":27,"text":441,"correct":22},"由同一专业的单位组成的联合体，按其中较高资质确定联合体资质等级",{"key":30,"text":443,"correct":32},"联合体投标的，可以联合体牵头人的名义提交投标保证金",{"id":445,"libraryId":5,"type":15,"typeLabel":16,"stem":446,"options":447,"answer":30,"analysis":33},895539,"关于投标保证金，下列说法中正确的是()。",[448,450,452,454],{"key":20,"text":449,"correct":22},"投标保证金的数额不得少于投标总价的2％",{"key":24,"text":451,"correct":22},"投标人应当在签订合同后的30日内退还未中标人的投标保证金",{"key":27,"text":453,"correct":22},"投标人拒绝延长投标有效期的，投标人无权收回其投标保证金",{"key":30,"text":455,"correct":32},"投标保证金的有效期与投标有效期相同",{"id":457,"libraryId":5,"type":15,"typeLabel":16,"stem":458,"options":459,"answer":27,"analysis":33},895540,"关于规费的计算，下列说法中正确的是()。",[460,462,464,466],{"key":20,"text":461,"correct":22},"规费虽具有强制性，但根据其组成又可以细分为可竞争性的费用和不可竞争性的费用",{"key":24,"text":463,"correct":22},"规费由社会保险费和工程排污费组成",{"key":27,"text":465,"correct":32},"社会保险费由养老保险费、失业保险费、医疗保险费、生育保险费、工伤保险费组成",{"key":30,"text":467,"correct":22},"规费由意外伤害保险费、住房公积金、工程排污费组成",{"id":469,"libraryId":5,"type":15,"typeLabel":16,"stem":470,"options":471,"answer":30,"analysis":33},895541,"下列费用项目中，应由投标人确定额度，并计入其他项目清单与机架汇总表中的是（）。",[472,473,475,476],{"key":20,"text":77,"correct":22},{"key":24,"text":474,"correct":22},"材料暂估价",{"key":27,"text":75,"correct":22},{"key":30,"text":477,"correct":32},"总承包服务费",{"id":479,"libraryId":5,"type":15,"typeLabel":16,"stem":480,"options":481,"answer":27,"analysis":33},895542,"关于联合体投标的说法，正确的是（）。",[482,484,486,488],{"key":20,"text":483,"correct":22},"联合体投标是指投标人相互约定在招标项目中分别以高、中、低价位报价的投标",{"key":24,"text":485,"correct":22},"由同一专业的单位组成的联合体，按照资质等级较高的单位确定资质等级",{"key":27,"text":487,"correct":32},"通过资格预审的联合体，各方组成结构、职责及财务能力等条件不得改变",{"key":30,"text":489,"correct":22},"联合体中牵头人提交的投标保证金对其他成员不具有约束力",{"id":491,"libraryId":5,"type":15,"typeLabel":16,"stem":492,"options":493,"answer":30,"analysis":33},895543,"关于投标保证金，下列说法中正确的是（）",[494,496,498,499],{"key":20,"text":495,"correct":22},"投标保证金的数额不得少于投标总价的2%",{"key":24,"text":497,"correct":22},"招标人应当在签订合同后的30 日内退还未中标人的投标保证金",{"key":27,"text":453,"correct":22},{"key":30,"text":500,"correct":32},"投标保证金的有效期应与投标有效期相同",{"id":502,"libraryId":5,"type":15,"typeLabel":16,"stem":503,"options":504,"answer":30,"analysis":33},895544,"下列情形中，属于投标人相互串通投标的是（）。",[505,507,508,510],{"key":20,"text":506,"correct":22},"不同投标人的投标报价呈现规律性差异",{"key":24,"text":427,"correct":22},{"key":27,"text":509,"correct":22},"不同投标人委托了统一单位或个人办理某项投标事宜",{"key":30,"text":431,"correct":32},{"id":512,"libraryId":5,"type":15,"typeLabel":16,"stem":513,"options":514,"answer":24,"analysis":33},895545,"下列内容中，属于招标工程量清单编制依据的是（）。",[515,517,519,521],{"key":20,"text":516,"correct":22},"分部分项工程清单",{"key":24,"text":518,"correct":32},"拟定的招标文件",{"key":27,"text":520,"correct":22},"招标控制价",{"key":30,"text":522,"correct":22},"潜在投标人的潜质及能力",{"id":524,"libraryId":5,"type":15,"typeLabel":16,"stem":525,"options":526,"answer":20,"analysis":33},895546,"编制钢筋工程量清单时，适应采用暂估量加签证处理的钢筋是（）。",[527,529,531,533],{"key":20,"text":528,"correct":32},"支撑双层钢筋用的“铁马”",{"key":24,"text":530,"correct":22},"伸出构件的锚固钢筋",{"key":27,"text":532,"correct":22},"设计注明的搭接钢筋",{"key":30,"text":534,"correct":22},"规范规定的搭接钢筋",{"id":536,"libraryId":5,"type":15,"typeLabel":16,"stem":537,"options":538,"answer":27,"analysis":33},895547,"下列情形中，不属于投标人串通投标的是（）。",[539,541,543,545],{"key":20,"text":540,"correct":22},"投标人A 与B 的项目经理为同一人",{"key":24,"text":542,"correct":22},"投标人C 与D 的投标文件相互错装",{"key":27,"text":544,"correct":32},"投标人E 和F 在同一时刻提前递交投标文件",{"key":30,"text":546,"correct":22},"投标人G 与H 作为暗标的技术标由同一人编制",{"id":548,"libraryId":5,"type":15,"typeLabel":16,"stem":549,"options":550,"answer":27,"analysis":33},895548,"投标人针对工程量清单中工程量的遗漏或错误，可以采取的正确做法是（）。",[551,553,555,557],{"key":20,"text":552,"correct":22},"即向招标人提出异议，要求招标人修改",{"key":24,"text":554,"correct":22},"不向招标人提出异议，风险自留",{"key":27,"text":556,"correct":32},"是否向招标人提出修改意见取决于投标策略",{"key":30,"text":558,"correct":22},"等中标后，要求招标人按实调整",{"id":560,"libraryId":5,"type":15,"typeLabel":16,"stem":561,"options":562,"answer":20,"analysis":33},895549,"关于分布分项工程量清单编制的说法，正确的是（）。",[563,565,567,569],{"key":20,"text":564,"correct":32},"施工工程量大于按计算规则计算出的工程量的部分，由投标人在综合单价中考虑",{"key":24,"text":566,"correct":22},"在清单项目“工程内容”中包含的工作内容必须进行项目特征的描述",{"key":27,"text":568,"correct":22},"计价规范中就某一清单项目给出两个及以上计量单位时应选择最方便计算的单位",{"key":30,"text":570,"correct":22},"同一标段的工程量清单中含有多个项目特征相同的单位工程时，可采用相同的项目编码",{"id":572,"libraryId":5,"type":15,"typeLabel":16,"stem":573,"options":574,"answer":27,"analysis":33},895550,"根据《建设工程工程量清单计价规范》GB50500-2013，关于承发包双方施工阶段风险分摊原则的表述正确的是()。",[575,577,579,581],{"key":20,"text":576,"correct":22},"各类原因所致人工费变化的风险由承包人承担",{"key":24,"text":578,"correct":22},"10％以内的材料价格风险由承包人承担",{"key":27,"text":580,"correct":32},"10％以内的施工机械使用费风险由承包人承担",{"key":30,"text":582,"correct":22},"5％以内的人工费风险由承包人承担",[584,587,590,593,596,599],{"id":15,"name":585,"category":7,"favorite":586},"领导干部任职前廉政法规知识测试题",92,{"id":588,"name":589,"category":7,"favorite":15},595,"建筑结构与设备",{"id":591,"name":592,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":594,"name":595,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":597,"name":598,"category":7,"favorite":8},534,"BIM工程师",{"id":600,"name":598,"category":7,"favorite":8},535]