[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-581-14":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":601},{"id":5,"name":6,"category":7,"favorite":8},581,"建设工程造价管理基础知识","建筑工程",0,14,50,2873,[13,34,46,58,70,82,94,104,116,128,139,151,163,175,187,199,211,223,235,247,258,270,282,294,302,314,323,335,347,359,369,381,393,404,414,426,434,446,458,469,481,493,505,517,529,541,553,565,577,589],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":27,"analysis":33},895448,1,"单选题","根据《招标投标法》， 开标的主持者是（ ）。",[19,23,26,30],{"key":20,"text":21,"correct":22},"A","建设行政主管部门",false,{"key":24,"text":25,"correct":22},"B","招标代理机构",{"key":27,"text":28,"correct":29},"C","招标人",true,{"key":31,"text":32,"correct":22},"D","投标人推选的代表","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":24,"analysis":33},895449,"关于招标价格的说法， 正确的是（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":22},"招标时可以设定最低投标限价",{"key":24,"text":41,"correct":29},"招标时可以设定最高投标限价",{"key":27,"text":43,"correct":22},"招标时应当编制标底",{"key":31,"text":45,"correct":22},"招标的项目应当采用工程量清单计价",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":20,"analysis":33},895450,"某高速公路项目进行招标， 开标后允许（ ）。",[50,52,54,56],{"key":20,"text":51,"correct":29},"评标委员会要求投标人以书面形式澄清含义不明确的内容",{"key":24,"text":53,"correct":22},"投标人再增加优惠条件",{"key":27,"text":55,"correct":22},"投标人撤销投标文件",{"key":31,"text":57,"correct":22},"招标人更改招标文件中说明的评标定标办法",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":20,"analysis":33},895451,"某市政工程施工招标项目估算价为 5000 万元， 其投标保证金不得超过（ ） 万元",[62,64,66,68],{"key":20,"text":63,"correct":29},"80",{"key":24,"text":65,"correct":22},"100",{"key":27,"text":67,"correct":22},"150",{"key":31,"text":69,"correct":22},"200",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":24,"analysis":33},895452,"根据《招标投标法实施条例》， 国有资金占控股地位的依法必须进行招标的项目， 关于如何确定中标人的说法， 正确的是（ ）。",[74,76,78,80],{"key":20,"text":75,"correct":22},"招标人可以确定任何一名中标候选人为中标人",{"key":24,"text":77,"correct":29},"招标人可以授权评标委员会直接确定中标人",{"key":27,"text":79,"correct":22},"排名第一的中标候选人放弃中标， 必须重新招标",{"key":31,"text":81,"correct":22},"排名第一的中标候选人被查实不符合条件的， 应当重新评标",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":27,"analysis":33},895453,"下列不属于招标人和投标人串通投标的是（ ）。",[86,88,90,92],{"key":20,"text":87,"correct":22},"招标人在开标前开启投标文件， 将信息透露给其他投标人",{"key":24,"text":89,"correct":22},"招标人授意投标人修改投标文件",{"key":27,"text":91,"correct":29},"开标前， 投标人对招标文件发出异议",{"key":31,"text":93,"correct":22},"招标人在开标前向投标人通知评标委员会成员信息和标底",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":24,"analysis":33},895454,"某投标人对招标项目的评标结果有异议，应当依法先向规定的受理人提出异议。该受理人应当是（ ）。",[98,100,101,103],{"key":20,"text":99,"correct":22},"评标委员会",{"key":24,"text":28,"correct":29},{"key":27,"text":102,"correct":22},"行政监督部门",{"key":31,"text":25,"correct":22},{"id":105,"libraryId":5,"type":15,"typeLabel":16,"stem":106,"options":107,"answer":27,"analysis":33},895455,"对于应当招标的工程建设项目，经批准可以不采用招标发包的情形是（ ）。",[108,110,112,114],{"key":20,"text":109,"correct":22},"拟公开招标的费用与项目价值相比，不值得",{"key":24,"text":111,"correct":22},"当地投标企业较少",{"key":27,"text":113,"correct":29},"采购人依法能够自行建设、生产或者提供",{"key":31,"text":115,"correct":22},"受自然地域限制的",{"id":117,"libraryId":5,"type":15,"typeLabel":16,"stem":118,"options":119,"answer":24,"analysis":33},895456,"根据《政府采购法实施条例》， 政府采购工程依法不进行招标的， 可以采用的采购方式是（ ）",[120,122,124,126],{"key":20,"text":121,"correct":22},"询价",{"key":24,"text":123,"correct":29},"单一来源采购",{"key":27,"text":125,"correct":22},"直接确定",{"key":31,"text":127,"correct":22},"框架协议",{"id":129,"libraryId":5,"type":15,"typeLabel":16,"stem":130,"options":131,"answer":24,"analysis":33},895457,"国有资金占控股或主导地位依法必须招标的项目有（ ）情形的可邀请招标。",[132,134,136,137],{"key":20,"text":133,"correct":22},"项目技术比较复杂",{"key":24,"text":135,"correct":29},"拟进行公开招标的费用占项目合同金额比例过大",{"key":27,"text":115,"correct":22},{"key":31,"text":138,"correct":22},"工程项目工期紧",{"id":140,"libraryId":5,"type":15,"typeLabel":16,"stem":141,"options":142,"answer":20,"analysis":33},895458,"依法必须招标的建设项目， 招标人应当自确定中标人之日起（ ） 日内， 向有关行政监督部门提交招标投标情况的书面报告",[143,145,147,149],{"key":20,"text":144,"correct":29},"15",{"key":24,"text":146,"correct":22},"20",{"key":27,"text":148,"correct":22},"30",{"key":31,"text":150,"correct":22},"60",{"id":152,"libraryId":5,"type":15,"typeLabel":16,"stem":153,"options":154,"answer":20,"analysis":33},895459,"下列建设工程项目招投标活动中， 属于合同要约行为的是( )。",[155,157,159,161],{"key":20,"text":156,"correct":29},"提交投标文件",{"key":24,"text":158,"correct":22},"订立承包合同",{"key":27,"text":160,"correct":22},"发出中标通知书",{"key":31,"text":162,"correct":22},"发布招标公告",{"id":164,"libraryId":5,"type":15,"typeLabel":16,"stem":165,"options":166,"answer":24,"analysis":33},895460,"根据《招标投标法》， 中标通知书自（） 发生法律效力",[167,169,171,173],{"key":20,"text":168,"correct":22},"作出之日",{"key":24,"text":170,"correct":29},"发出之日",{"key":27,"text":172,"correct":22},"盖章之日",{"key":31,"text":174,"correct":22},"收到之日",{"id":176,"libraryId":5,"type":15,"typeLabel":16,"stem":177,"options":178,"answer":24,"analysis":33},895461,"建设工程合同的订立程序中，属于要约的是（ ）。",[179,181,183,185],{"key":20,"text":180,"correct":22},"招标人通过媒体发布招标公告",{"key":24,"text":182,"correct":29},"投标人根据招标文件内容在规定的期限内向招标人提交投标文件",{"key":27,"text":184,"correct":22},"向符合条件的投标人发出招标文件",{"key":31,"text":186,"correct":22},"招标人通过评标确定中标人，发出中标通知书",{"id":188,"libraryId":5,"type":15,"typeLabel":16,"stem":189,"options":190,"answer":24,"analysis":33},895462,"关于联合体投标的说法， 正确的是（ ）",[191,193,195,197],{"key":20,"text":192,"correct":22},"两个以上自然人也可以组成联合体， 进行投标",{"key":24,"text":194,"correct":29},"联合体各方均应当具备规定的相应资格条件",{"key":27,"text":196,"correct":22},"联合体各方， 可以各自代表自己的名义进行投标",{"key":31,"text":198,"correct":22},"由同一专业组成的联合体， 按照资质等级较高的单位确定资质等级",{"id":200,"libraryId":5,"type":15,"typeLabel":16,"stem":201,"options":202,"answer":31,"analysis":33},895463,"投标有效期应从（ ）之日起计算。",[203,205,207,209],{"key":20,"text":204,"correct":22},"开始提交投标文件",{"key":24,"text":206,"correct":22},"提交投标保证金",{"key":27,"text":208,"correct":22},"确定中标结果",{"key":31,"text":210,"correct":29},"招标文件规定的提交投标文件截至",{"id":212,"libraryId":5,"type":15,"typeLabel":16,"stem":213,"options":214,"answer":24,"analysis":33},895464,"乙施工单位通过招投标程序中标了甲开发公司的一个施工项目。签约前，甲要求让利5%，否则不签施工合同。后双方按中标价签订了设备合同，同时签订了让利5%的补充协议。竣工结算时，甲按让利协议扣减结算总价5%，乙以自己亏损为由不同意让利并向法院提起诉讼，要求按中标价结算。下列说法正确的是（ ）。",[215,217,219,221],{"key":20,"text":216,"correct":22},"该补充协议属于可撤销合同",{"key":24,"text":218,"correct":29},"应以备案合同作为结算工程价款依据",{"key":27,"text":220,"correct":22},"应以补充协议作为结算工程价款依据",{"key":31,"text":222,"correct":22},"乙方行为构成合同违约",{"id":224,"libraryId":5,"type":15,"typeLabel":16,"stem":225,"options":226,"answer":31,"analysis":33},895465,"据我国有关法规规定， 下列关于招标文件出售的说法中， 正确的是( )。",[227,229,231,233],{"key":20,"text":228,"correct":22},"自招标文件出售之日起至停止出售之日止， 最短不得少于 20 日",{"key":24,"text":230,"correct":22},"对招标文件的收费应合理， 遵循微利的原则",{"key":27,"text":232,"correct":22},"招标人在售出招标文件后， 可随时终止招标",{"key":31,"text":234,"correct":29},"招标文件售出后， 不予退还",{"id":236,"libraryId":5,"type":15,"typeLabel":16,"stem":237,"options":238,"answer":27,"analysis":33},895466,"某按工程量清单计价的招标工程， 投标人在复核工程量清单时发现工程数量与设计文件和现场实际有较大的差异， 则投标人的正确处理方式是( )",[239,241,243,245],{"key":20,"text":240,"correct":22},"自行调整清单数量， 在附录中加以说明， 并按调整后的数量投标",{"key":24,"text":242,"correct":22},"根据清单数量和投标人复核的数量分别报价， 供业主选择",{"key":27,"text":244,"correct":29},"以适当的方式要求业主澄清， 视结果进行投标",{"key":31,"text":246,"correct":22},"不予理会， 按照招标文件提供的清单数量进行投标",{"id":248,"libraryId":5,"type":15,"typeLabel":16,"stem":249,"options":250,"answer":31,"analysis":33},895467,"根据《招标投标法》 ， 招标人对已发出的招标文件进行必要的澄清或者修改的， 应当在招标文件要求提交投标文件截止时间至少( )日前书面通知。",[251,253,255,257],{"key":20,"text":252,"correct":22},"7",{"key":24,"text":254,"correct":22},"14",{"key":27,"text":256,"correct":22},"21",{"key":31,"text":144,"correct":29},{"id":259,"libraryId":5,"type":15,"typeLabel":16,"stem":260,"options":261,"answer":27,"analysis":33},895468,"关于招标文件的说法， 正确的是（ ）。",[262,264,266,268],{"key":20,"text":263,"correct":22},"招标人可以在招标文件中设定最高投标限价和最低投标限价",{"key":24,"text":265,"correct":22},"潜在招标人对招标文件有异议的， 应当在投标截止时间 15 日前提出",{"key":27,"text":267,"correct":29},"招标人应当在招标文件中载明招标有效期， 投标有效期从提交投标文件的截止之日算起",{"key":31,"text":269,"correct":22},"招标人对已经发出的招标文件进行必要的澄清的， 应当在投标截止时间至少 10 日之前， 通知所有获取招标文件的潜在投标人",{"id":271,"libraryId":5,"type":15,"typeLabel":16,"stem":272,"options":273,"answer":24,"analysis":33},895469,"发售招标文件收取的费用应当限于补偿（ ） 的成本支出。",[274,276,278,280],{"key":20,"text":275,"correct":22},"编制招标文件",{"key":24,"text":277,"correct":29},"印刷、 邮寄招标文件",{"key":27,"text":279,"correct":22},"招标人办公",{"key":31,"text":281,"correct":22},"招标活动",{"id":283,"libraryId":5,"type":15,"typeLabel":16,"stem":284,"options":285,"answer":24,"analysis":33},895470,"关于招标文件的澄清，下列说法中错误的是()。",[286,288,290,292],{"key":20,"text":287,"correct":22},"投标人应以信函、电报等可以有形地表现所载内容的形式向招标人提出疑问",{"key":24,"text":289,"correct":29},"招标文件的澄清应发给所有投标人并指明澄清问题的来源",{"key":27,"text":291,"correct":22},"澄清发出的时间距投标截止日不足15天的应推迟投标截止时间",{"key":31,"text":293,"correct":22},"投标人收到澄清的确认时间可以是相对时间，也可以是绝对时间",{"id":295,"libraryId":5,"type":15,"typeLabel":16,"stem":296,"options":297,"answer":27,"analysis":33},895471,"如果修改招标文件的时间距投标截止时间不足( )天，相应推后投标截止时间。",[298,299,300,301],{"key":20,"text":252,"correct":22},{"key":24,"text":254,"correct":22},{"key":27,"text":144,"correct":29},{"key":31,"text":146,"correct":22},{"id":303,"libraryId":5,"type":15,"typeLabel":16,"stem":304,"options":305,"answer":27,"analysis":33},895472,"根据《标准施工招标文件》（2007年版），进行了资格预审的施工招标文件应包括（）。",[306,308,310,312],{"key":20,"text":307,"correct":22},"招标公告",{"key":24,"text":309,"correct":22},"投标资格条件",{"key":27,"text":311,"correct":29},"投标邀请书",{"key":31,"text":313,"correct":22},"评标委员会名单",{"id":315,"libraryId":5,"type":15,"typeLabel":16,"stem":316,"options":317,"answer":31,"analysis":33},895474,"招标人对已发出的招标文件进行的必要修改，应当在投标截止时间（）天前发出。",[318,319,321,322],{"key":20,"text":252,"correct":22},{"key":24,"text":320,"correct":22},"10",{"key":27,"text":254,"correct":22},{"key":31,"text":144,"correct":29},{"id":324,"libraryId":5,"type":15,"typeLabel":16,"stem":325,"options":326,"answer":31,"analysis":33},895475,"根据《建设工程工程量清单计价规范》GB 50500-2013，在招标文件未另有要求的情况下，投标报价的综合单价一般要考虑的风险因素是（）。",[327,329,331,333],{"key":20,"text":328,"correct":22},"政策法规的变化",{"key":24,"text":330,"correct":22},"人工单价的市场变化",{"key":27,"text":332,"correct":22},"政府定价材料的价格变化",{"key":31,"text":334,"correct":29},"管理费、利润的风险",{"id":336,"libraryId":5,"type":15,"typeLabel":16,"stem":337,"options":338,"answer":31,"analysis":33},895476,"施工投标报价的主要工作有：①复核工程量；②研究招标文件；③确定基础标价；④编制投标文件，其正确的工作流程是( )。",[339,341,343,345],{"key":20,"text":340,"correct":22},"①②③④",{"key":24,"text":342,"correct":22},"②③①④",{"key":27,"text":344,"correct":22},"①②④③",{"key":31,"text":346,"correct":29},"②①③④",{"id":348,"libraryId":5,"type":15,"typeLabel":16,"stem":349,"options":350,"answer":24,"analysis":33},895477,"施工项目投标报价的工作包括：①收集投标信息；②选择报价策略；③组建投标班子；④确定基础标价；⑤确定投标报价；⑥研究招标文件。以下工作正确的先后顺序是()。",[351,353,355,357],{"key":20,"text":352,"correct":22},"⑥①③②④⑤",{"key":24,"text":354,"correct":29},"③⑥①④②⑤",{"key":27,"text":356,"correct":22},"③①⑥②④⑤",{"key":31,"text":358,"correct":22},"⑥③①④②⑤",{"id":360,"libraryId":5,"type":15,"typeLabel":16,"stem":361,"options":362,"answer":24,"analysis":33},895478,"某投标人在递交投标文件的同时，按规定递交了投标保证金，其投标总价为5000 万元，则其投标保证金数额最高为（）万元。",[363,365,366,367],{"key":20,"text":364,"correct":22},"50",{"key":24,"text":63,"correct":29},{"key":27,"text":65,"correct":22},{"key":31,"text":368,"correct":22},"160",{"id":370,"libraryId":5,"type":15,"typeLabel":16,"stem":371,"options":372,"answer":31,"analysis":33},895479,"工程总承包的投标文件中应包含的内容是（）。",[373,375,377,379],{"key":20,"text":374,"correct":22},"地下管线资料、气象和水文观测资料",{"key":24,"text":376,"correct":22},"定位放线的基准点和基准标高",{"key":27,"text":378,"correct":22},"经审批的规划许可证",{"key":31,"text":380,"correct":29},"承包人建议书",{"id":382,"libraryId":5,"type":15,"typeLabel":16,"stem":383,"options":384,"answer":20,"analysis":33},895480,"关于投标保证金的说法，正确的是（ ）。",[385,387,389,391],{"key":20,"text":386,"correct":29},"投标保证金有效期应当与投标有效期一致",{"key":24,"text":388,"correct":22},"投标保证金不得超过招标项目估算价的10%",{"key":27,"text":390,"correct":22},"实行两阶段招标的，招标人要求投标人提交投标保证金的，应当在第一阶段提出",{"key":31,"text":392,"correct":22},"投标截止后投标人撤销投标文件的，招标人应当退还投标保证金，但无需支付银行同期存款利息",{"id":394,"libraryId":5,"type":15,"typeLabel":16,"stem":395,"options":396,"answer":20,"analysis":33},895481,"在招标投标过程中，载明招标文件获取方式的应是()。",[397,398,400,402],{"key":20,"text":307,"correct":29},{"key":24,"text":399,"correct":22},"资格预审公告",{"key":27,"text":401,"correct":22},"招标文件",{"key":31,"text":403,"correct":22},"投标文件",{"id":405,"libraryId":5,"type":15,"typeLabel":16,"stem":406,"options":407,"answer":27,"analysis":33},895482,"关于招标文件的澄清和修改，下列说法中错误的是()。",[408,409,411,413],{"key":20,"text":287,"correct":22},{"key":24,"text":410,"correct":22},"招标文件的澄清无须发给所有投标人澄清问题的来源",{"key":27,"text":412,"correct":29},"澄清发出的时间距投标截止日不足10天的应推迟投标截止时间",{"key":31,"text":293,"correct":22},{"id":415,"libraryId":5,"type":15,"typeLabel":16,"stem":416,"options":417,"answer":24,"analysis":33},895483,"投标人在投标前期研究招标文件时，对合同形式进行分析的主要内容为()。",[418,420,422,424],{"key":20,"text":419,"correct":22},"承包商任务",{"key":24,"text":421,"correct":29},"计价方式",{"key":27,"text":423,"correct":22},"付款办法",{"key":31,"text":425,"correct":22},"合同价款调整",{"id":427,"libraryId":5,"type":15,"typeLabel":16,"stem":428,"options":429,"answer":31,"analysis":33},895484,"该目录暂无试题,后续会陆续更新。",[430,431,432,433],{"key":20,"text":20,"correct":22},{"key":24,"text":24,"correct":22},{"key":27,"text":27,"correct":22},{"key":31,"text":31,"correct":29},{"id":435,"libraryId":5,"type":15,"typeLabel":16,"stem":436,"options":437,"answer":31,"analysis":33},895485,"其他项目清单中，无须由招标人根据拟建工程实际情况提出估算额度的费用项目是()。",[438,440,442,444],{"key":20,"text":439,"correct":22},"暂列金额",{"key":24,"text":441,"correct":22},"材料暂估价",{"key":27,"text":443,"correct":22},"专业工程暂估价",{"key":31,"text":445,"correct":29},"计日工费用",{"id":447,"libraryId":5,"type":15,"typeLabel":16,"stem":448,"options":449,"answer":20,"analysis":33},895486,"关于招标工程量清单中分部分项工程量清单的编制，下列说法中错误的是（）。",[450,452,454,456],{"key":20,"text":451,"correct":29},"招标人只负责项目编码、项目名称、计量单位和工程量四项内容的填写",{"key":24,"text":453,"correct":22},"同一招标工程的项目编码不得有重码",{"key":27,"text":455,"correct":22},"清单所列项目应是在单位工程施工过程中以其本身构成该工程实体的分项工程",{"key":31,"text":457,"correct":22},"当清单计价规范附录中有两个计量单位时，应结合实际情况选择其中一个",{"id":459,"libraryId":5,"type":15,"typeLabel":16,"stem":460,"options":461,"answer":24,"analysis":33},895487,"招标人在工程量清单中提供的用于支付必然发生但暂不能确定价格的材料、工程设备的单价及专业工程的金额是( )。",[462,463,465,467],{"key":20,"text":439,"correct":22},{"key":24,"text":464,"correct":29},"暂估价",{"key":27,"text":466,"correct":22},"总承包服务费",{"key":31,"text":468,"correct":22},"价差预备费",{"id":470,"libraryId":5,"type":15,"typeLabel":16,"stem":471,"options":472,"answer":27,"analysis":33},895488,"关于工程量清单编制总说明的内容，下列说法中正确的是()。",[473,475,477,479],{"key":20,"text":474,"correct":22},"建设规模是指工程投资总额",{"key":24,"text":476,"correct":22},"工程特征是指结构类型及主要施工方案",{"key":27,"text":478,"correct":29},"环境保护要求包括避免材料运输影响周边环境的防护要求",{"key":31,"text":480,"correct":22},"施工现场实际情况是指自然地理条件",{"id":482,"libraryId":5,"type":15,"typeLabel":16,"stem":483,"options":484,"answer":24,"analysis":33},895489,"下列关于发承包阶段合同价款约定的说法，正确的是()。",[485,487,489,491],{"key":20,"text":486,"correct":22},"对于直接发包的项目，如按初步设计总概算投资包干时，应以中标时确定的金额为签约合同价",{"key":24,"text":488,"correct":29},"对于直接发包的项目，如按施工图预算包干，则应以审查后的施工图总预算或综合预算为准",{"key":27,"text":490,"correct":22},"招标人发布的招标文件提出了各项要求，主要对承包方有约束力",{"key":31,"text":492,"correct":22},"招标文件包括招标文件的构成以及澄清，但并不含对其修改的内容",{"id":494,"libraryId":5,"type":15,"typeLabel":16,"stem":495,"options":496,"answer":20,"analysis":33},895490,"编制钢筋工程量清单时，适宜采用暂估量加签证处理的钢筋是()。",[497,499,501,503],{"key":20,"text":498,"correct":29},"支撑双层钢筋用的“铁马”",{"key":24,"text":500,"correct":22},"伸出构件的锚固钢筋",{"key":27,"text":502,"correct":22},"设计注明的搭接钢筋",{"key":31,"text":504,"correct":22},"规范规定的搭接钢筋",{"id":506,"libraryId":5,"type":15,"typeLabel":16,"stem":507,"options":508,"answer":24,"analysis":33},895491,"关于依法必须招标的工程，下列说法中正确的是()。",[509,511,513,515],{"key":20,"text":510,"correct":22},"国有资金投资的建筑工程招标可不设招标控制价",{"key":24,"text":512,"correct":29},"招标人可以自行决定是否编制标底，标底必须保密",{"key":27,"text":514,"correct":22},"招标人设有最高投标限价的，应当在开标时公布",{"key":31,"text":516,"correct":22},"招标人也可以根据需要，规定最低投标限价",{"id":518,"libraryId":5,"type":15,"typeLabel":16,"stem":519,"options":520,"answer":20,"analysis":33},895492,"为编制招标工程量清单，在拟定常规的施工组织设计时，正确的做法是（）。",[521,523,525,527],{"key":20,"text":522,"correct":29},"根据概算指标和类似工程估算整体工程量时，仅对主要项目加以估算",{"key":24,"text":524,"correct":22},"拟定施工总方案时需要考虑施工步骤",{"key":27,"text":526,"correct":22},"在满足工期要求的前提下，施工进度计划应尽量推后以降低风险",{"key":31,"text":528,"correct":22},"在计算工、料、机资源需要量时，不必考虑节假日、气候的影响",{"id":530,"libraryId":5,"type":15,"typeLabel":16,"stem":531,"options":532,"answer":24,"analysis":33},895493,"关于招标工程量清单中其他项目清单的编制，下列说法中正确的是（）",[533,535,537,539],{"key":20,"text":534,"correct":22},"投标人情况、发包人对工程管理要求对其内容会有直接影响",{"key":24,"text":536,"correct":29},"暂列金额可以只列总额，但不同专业预留的暂列金额应分别列项",{"key":27,"text":538,"correct":22},"专业工程暂估价应包括利润、规费和税金",{"key":31,"text":540,"correct":22},"计日工的暂定数量可以由投标人填写",{"id":542,"libraryId":5,"type":15,"typeLabel":16,"stem":543,"options":544,"answer":20,"analysis":33},895494,"招标工程量清单应根据常规施工方案编制，拟定常规施工方案时（）。",[545,547,549,551],{"key":20,"text":546,"correct":29},"应对主要项目进行估算，如土石方、混凝土",{"key":24,"text":548,"correct":22},"需对施工总方案中的重大问题及关键工艺作明确具体的规定",{"key":27,"text":550,"correct":22},"不需计算人、材、机资源消耗量",{"key":31,"text":552,"correct":22},"不需考虑节假日与气候对工期的影响",{"id":554,"libraryId":5,"type":15,"typeLabel":16,"stem":555,"options":556,"answer":27,"analysis":33},895495,"关于招标工程量清单编制的说法，正确的有()。",[557,559,561,563],{"key":20,"text":558,"correct":22},"脚手架工程应列入以综合单价形式计价的措施项目清单",{"key":24,"text":560,"correct":22},"暂估价用于支付可能发生也可能不发生的材料及专业工程",{"key":27,"text":562,"correct":29},"暂列金额是招标人考虑工程建设工程中不可预见、不能确定的因素而暂定的一笔费用",{"key":31,"text":564,"correct":22},"计日工清单中由招标人列项，招标人填写数量与单价",{"id":566,"libraryId":5,"type":15,"typeLabel":16,"stem":567,"options":568,"answer":20,"analysis":33},895496,"拟定施工总方案是编制招标工程量清单的一项准备工作，下列选项中属于拟定施工总方案范畴的是()。",[569,571,573,575],{"key":20,"text":570,"correct":29},"对关键工艺的原则性规定",{"key":24,"text":572,"correct":22},"拟定施工步骤和施工顺序",{"key":27,"text":574,"correct":22},"估算整体工程量",{"key":31,"text":576,"correct":22},"编制施工进度计划",{"id":578,"libraryId":5,"type":15,"typeLabel":16,"stem":579,"options":580,"answer":20,"analysis":33},895497,"招标人要求总承包人对专业工程进行统一管理和协调的，总承包人可计取总承包服务费，其取费基数为()。",[581,583,585,587],{"key":20,"text":582,"correct":29},"专业工程估算造价",{"key":24,"text":584,"correct":22},"投标报价总额",{"key":27,"text":586,"correct":22},"分部分项工程费用",{"key":31,"text":588,"correct":22},"分部分项工程费与措施费之和",{"id":590,"libraryId":5,"type":15,"typeLabel":16,"stem":591,"options":592,"answer":27,"analysis":33},895498,"下列关于投标人须知描述错误的是()。",[593,595,597,599],{"key":20,"text":594,"correct":22},"在正文中的未尽事宜可以通过“投标人须知前附表”进行进一步明确",{"key":24,"text":596,"correct":22},"“投标人须知前附表”由招标人根据招标项目具体特点和实际需要编制和填写",{"key":27,"text":598,"correct":29},"“投标人须知前附表”无须与招标文件的其他章节相衔接",{"key":31,"text":600,"correct":22},"“投标人须知前附表”不得与投标人须知正文内容相抵触",[602,605,608,611,614,617],{"id":15,"name":603,"category":7,"favorite":604},"领导干部任职前廉政法规知识测试题",92,{"id":606,"name":607,"category":7,"favorite":15},595,"建筑结构与设备",{"id":609,"name":610,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":612,"name":613,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":615,"name":616,"category":7,"favorite":8},534,"BIM工程师",{"id":618,"name":616,"category":7,"favorite":8},535]