[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-581-13":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":581},{"id":5,"name":6,"category":7,"favorite":8},581,"建设工程造价管理基础知识","建筑工程",0,13,50,2873,[13,34,46,58,68,80,92,102,114,126,134,143,155,165,177,189,197,209,221,233,245,253,265,277,285,293,305,317,329,341,353,365,377,389,401,413,421,433,441,453,465,473,485,497,509,521,533,545,557,569],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":27,"analysis":33},895396,1,"单选题","关于设计概算的调整，下列说法正确的是()。",[19,23,26,30],{"key":20,"text":21,"correct":22},"A","若设计概算已通过批准，则不得调整",false,{"key":24,"text":25,"correct":22},"B","一个工程可多次调整设计概算",{"key":27,"text":28,"correct":29},"C","当发生超出原设计范围的重大变更时，允许调整概算",true,{"key":31,"text":32,"correct":22},"D","当市场价格波动较大超出价差预备费时，允许调整概算","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":24,"analysis":33},895397,"利用概算指标法编制拟建工程概算，已知概算指标中每100㎡建筑面积中分摊的人工消耗量为500工日。拟建工程与概算指标相比，仅楼地面做法不同，概算指标为瓷砖地面，拟建工程为花岗岩地面。查预算定额得到铺瓷砖和花岗岩地面的人工消耗量分别为37工日\u002F100㎡和24工日\u002F100㎡。拟建工程楼地面面积占建筑面积的65%。则对概算指标修正后的人工消耗量为()工日\u002F100㎡。",[38,40,42,44],{"key":20,"text":39,"correct":22},"316.55",{"key":24,"text":41,"correct":29},"491.55",{"key":27,"text":43,"correct":22},"508.45",{"key":31,"text":45,"correct":22},"845.00",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":24,"analysis":33},895398,"当初步设计深度不够，不能准确地计算出工程量，但工程设计技术比较成熟而又有类似工程概算指标可以利用时，可采用的方法是()。",[50,52,54,56],{"key":20,"text":51,"correct":22},"概算定额法",{"key":24,"text":53,"correct":29},"概算指标法",{"key":27,"text":55,"correct":22},"类似工程预算法",{"key":31,"text":57,"correct":22},"类似工程概算法",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":24,"analysis":33},895399,"在建筑工程初步设计文件深度不够、不能准确计算出工程量的情况下，可采用的设计概算编制方法是（）。",[62,63,64,66],{"key":20,"text":51,"correct":22},{"key":24,"text":53,"correct":29},{"key":27,"text":65,"correct":22},"预算单价法",{"key":31,"text":67,"correct":22},"综合吨位指标法",{"id":69,"libraryId":5,"type":15,"typeLabel":16,"stem":70,"options":71,"answer":20,"analysis":33},895400,"已知某引进设备吨重为50t，设备原价3000万元，每吨设备安装费指标为8万元，同类国产设备的安装费率为15%，则该设备安装费为()万元。",[72,74,76,78],{"key":20,"text":73,"correct":29},"400",{"key":24,"text":75,"correct":22},"425",{"key":27,"text":77,"correct":22},"450",{"key":31,"text":79,"correct":22},"500",{"id":81,"libraryId":5,"type":15,"typeLabel":16,"stem":82,"options":83,"answer":27,"analysis":33},895401,"下列有关建筑结构选择的说法不正确的是()。",[84,86,88,90],{"key":20,"text":85,"correct":22},"对于五层以下的建筑物一般选用砌体结构",{"key":24,"text":87,"correct":22},"对于大中型工业厂房一般选用钢筋混凝土结构",{"key":27,"text":89,"correct":29},"对于多层房屋或大跨度结构，钢筋混凝土结构更优",{"key":31,"text":91,"correct":22},"对于高层或者超高层结构，框架结构和剪力墙结构比较经济",{"id":93,"libraryId":5,"type":15,"typeLabel":16,"stem":94,"options":95,"answer":24,"analysis":33},895402,"拟建工程初步设计与已完工程或在建工程的设计相类似而又没有可用的概算指标时采用，但必须对建筑结构差异和价差进行调整，适用于()方法。",[96,97,98,100],{"key":20,"text":53,"correct":22},{"key":24,"text":55,"correct":29},{"key":27,"text":99,"correct":22},"分组计算审查法",{"key":31,"text":101,"correct":22},"标准预算审查法",{"id":103,"libraryId":5,"type":15,"typeLabel":16,"stem":104,"options":105,"answer":20,"analysis":33},895403,"某建设项目由各个单项工程构成，应包含在其中某单项工程综合概算中的费用项目是()。",[106,108,110,112],{"key":20,"text":107,"correct":29},"工器具及生产家具购置费",{"key":24,"text":109,"correct":22},"办公和生活用品购置费",{"key":27,"text":111,"correct":22},"研究试验费",{"key":31,"text":113,"correct":22},"基本预备费",{"id":115,"libraryId":5,"type":15,"typeLabel":16,"stem":116,"options":117,"answer":20,"analysis":33},895404,"对于民用建设项目，衡量单元组成、户型设计的结构面积系数是（）之比。",[118,120,122,124],{"key":20,"text":119,"correct":29},"住宅结构面积与建筑面积",{"key":24,"text":121,"correct":22},"建筑面积与住宅结构面积",{"key":27,"text":123,"correct":22},"住宅结构面积与房屋平均面积",{"key":31,"text":125,"correct":22},"房屋平均面积与住宅结构面积",{"id":127,"libraryId":5,"type":15,"typeLabel":16,"stem":128,"options":129,"answer":27,"analysis":33},895405,"某拟建工程初步设计已达到必要的深度，能够据此计算出扩大分项工程的工程量，则能较为准确地编制拟建工程概算的方法是( )。",[130,131,132,133],{"key":20,"text":53,"correct":22},{"key":24,"text":55,"correct":22},{"key":27,"text":51,"correct":29},{"key":31,"text":67,"correct":22},{"id":135,"libraryId":5,"type":15,"typeLabel":16,"stem":136,"options":137,"answer":27,"analysis":33},895406,"下列概算编制方法中，用于设备及安装工程概算编制的方法为( )。",[138,139,140,142],{"key":20,"text":51,"correct":22},{"key":24,"text":55,"correct":22},{"key":27,"text":141,"correct":29},"扩大单价法",{"key":31,"text":53,"correct":22},{"id":144,"libraryId":5,"type":15,"typeLabel":16,"stem":145,"options":146,"answer":24,"analysis":33},895407,"关于建筑设计因素对工业项目工程造价的影响，下列说法中正确的是（）。",[147,149,151,153],{"key":20,"text":148,"correct":22},"建筑周长系数越高，建筑工程造价越低",{"key":24,"text":150,"correct":29},"多跨厂房跨度不变，中跨数目越多越经济",{"key":27,"text":152,"correct":22},"大中型工业厂房一般选用砌体结构，以降低造价",{"key":31,"text":154,"correct":22},"建筑物面积或体积的增加，一般会引起单位面积造价的增加",{"id":156,"libraryId":5,"type":15,"typeLabel":16,"stem":157,"options":158,"answer":20,"analysis":33},895408,"当初步设计深度不够，只有设备出厂而无详细规格、重量时，编制设备安装工程费概算可选用的方法是（）。",[159,161,163,164],{"key":20,"text":160,"correct":29},"设备价值百分比法",{"key":24,"text":162,"correct":22},"设备系数法",{"key":27,"text":67,"correct":22},{"key":31,"text":65,"correct":22},{"id":166,"libraryId":5,"type":15,"typeLabel":16,"stem":167,"options":168,"answer":27,"analysis":33},895409,"下列建筑设计影响工程造价的选项中，属于影响工业建筑但一般不影响民用建筑的因素是（）。",[169,171,173,175],{"key":20,"text":170,"correct":22},"建筑物平面形状",{"key":24,"text":172,"correct":22},"项目利益相关者",{"key":27,"text":174,"correct":29},"柱网布置",{"key":31,"text":176,"correct":22},"风险因素",{"id":178,"libraryId":5,"type":15,"typeLabel":16,"stem":179,"options":180,"answer":27,"analysis":33},895410,"关于多层民用住宅工程造价与其影响因素的关系，下列说法中正确的是（）。",[181,183,185,187],{"key":20,"text":182,"correct":22},"层数增加，单位造价降低",{"key":24,"text":184,"correct":22},"层高增加，单位造价降低",{"key":27,"text":186,"correct":29},"建筑物周长系数越低，造价越低",{"key":31,"text":188,"correct":22},"宽度增加，单位造价上升",{"id":190,"libraryId":5,"type":15,"typeLabel":16,"stem":191,"options":192,"answer":24,"analysis":33},895411,"利用概算指标法编制拟建工程概算，已知概算指标中每100m2 建筑面积中分摊的人工消耗量为500 工日。拟建工程与概算指标相比，仅楼地面做法不同，概算指标为瓷砖地面，拟建工程为花岗岩地面。查预算定额得到铺瓷砖和花岗岩地面的人工消耗量分别为37 工日\u002F100m2 和24 工日\u002F100m2。拟建工程楼地面面积占建筑面积的65%。则对概算指标修正后的人工消耗量为（）工日\u002F100m2。",[193,194,195,196],{"key":20,"text":39,"correct":22},{"key":24,"text":41,"correct":29},{"key":27,"text":43,"correct":22},{"key":31,"text":45,"correct":22},{"id":198,"libraryId":5,"type":15,"typeLabel":16,"stem":199,"options":200,"answer":24,"analysis":33},895412,"按照国家有关规定，作为年度固定资产投资计划、计划投资总额及构成数额的编制和确定依据的是（）",[201,203,205,207],{"key":20,"text":202,"correct":22},"经批准的投资估算",{"key":24,"text":204,"correct":29},"经批准的设计概算",{"key":27,"text":206,"correct":22},"经批准的施工图预算",{"key":31,"text":208,"correct":22},"经批准的工程决算",{"id":210,"libraryId":5,"type":15,"typeLabel":16,"stem":211,"options":212,"answer":24,"analysis":33},895413,"关于建设项目总概算的编制，下列说法中正确的是（）。",[213,215,217,219],{"key":20,"text":214,"correct":22},"项目总概算应按照建设单位规定的统一表格进行编制",{"key":24,"text":216,"correct":29},"对工程建设其它费的各组成项目应分别列项计算",{"key":27,"text":218,"correct":22},"主要建筑安装材料汇总表只需列出建设项目的钢筋、水泥等主要材料各自的总消耗量",{"key":31,"text":220,"correct":22},"总概算编制说明应装订于总概算文件最后",{"id":222,"libraryId":5,"type":15,"typeLabel":16,"stem":223,"options":224,"answer":24,"analysis":33},895414,"在建设项目各阶段的工程造价中，一经批准将作为控制建设项目投资最高限额的是（）。",[225,227,229,231],{"key":20,"text":226,"correct":22},"投资估算",{"key":24,"text":228,"correct":29},"设计概算",{"key":27,"text":230,"correct":22},"施工图预算",{"key":31,"text":232,"correct":22},"竣工结算",{"id":234,"libraryId":5,"type":15,"typeLabel":16,"stem":235,"options":236,"answer":24,"analysis":33},895415,"单位工程概算按其工作性质可分为单位建筑工程概算和单位设备及安装工程概算两类，下列属于单位设备及安装工程概算的是（）。",[237,239,241,243],{"key":20,"text":238,"correct":22},"通风、空调工程概算",{"key":24,"text":240,"correct":29},"工器具及生产家具购置费概算",{"key":27,"text":242,"correct":22},"电气、照明工程概算",{"key":31,"text":244,"correct":22},"弱电工程概算",{"id":246,"libraryId":5,"type":15,"typeLabel":16,"stem":247,"options":248,"answer":20,"analysis":33},895416,"当初步设计深度较深，有详细的设备清单时，最能精确的编制设备安装工程费概算的方式是（）。",[249,250,251,252],{"key":20,"text":65,"correct":29},{"key":24,"text":141,"correct":22},{"key":27,"text":160,"correct":22},{"key":31,"text":67,"correct":22},{"id":254,"libraryId":5,"type":15,"typeLabel":16,"stem":255,"options":256,"answer":20,"analysis":33},895417,"工业建筑设计评价中，下列不同平面形状的建筑物，其建筑物周长与建筑面积比KW 按从小到大顺序排列正确的是（）。",[257,259,261,263],{"key":20,"text":258,"correct":29},"正方形→矩形→T 形→L 形",{"key":24,"text":260,"correct":22},"矩形→正方形→T 形→L 形",{"key":27,"text":262,"correct":22},"T 形→L 形→正方形→矩形",{"key":31,"text":264,"correct":22},"L 形→T 形→矩形→正方形",{"id":266,"libraryId":5,"type":15,"typeLabel":16,"stem":267,"options":268,"answer":24,"analysis":33},895418,"关于建筑设计对民用住宅项目工程造价的影响，下列说法中正确的是（）。",[269,271,273,275],{"key":20,"text":270,"correct":22},"加大住宅宽度，不利于降低单方造价",{"key":24,"text":272,"correct":29},"降低住宅层高，有利于降低单方造价",{"key":27,"text":274,"correct":22},"结构面积系数越大，越有利于降低单方造价",{"key":31,"text":276,"correct":22},"住宅层数越多，越有利于降低单方造价",{"id":278,"libraryId":5,"type":15,"typeLabel":16,"stem":279,"options":280,"answer":20,"analysis":33},895419,"某建设项目由若干单项工程构成，应包含在其中某单项工程综合概算中的费用项目是（）。",[281,282,283,284],{"key":20,"text":107,"correct":29},{"key":24,"text":109,"correct":22},{"key":27,"text":111,"correct":22},{"key":31,"text":113,"correct":22},{"id":286,"libraryId":5,"type":15,"typeLabel":16,"stem":287,"options":288,"answer":27,"analysis":33},895420,"某拟建工程初步设计已达到必要的深度，能够据此计算出扩大分项工程的工程量，则能较为谁确地编制拟建工程概算的方法是（）。",[289,290,291,292],{"key":20,"text":53,"correct":22},{"key":24,"text":55,"correct":22},{"key":27,"text":51,"correct":29},{"key":31,"text":67,"correct":22},{"id":294,"libraryId":5,"type":15,"typeLabel":16,"stem":295,"options":296,"answer":20,"analysis":33},895421,"在满足住宅功能和质量前提下，()有利于降低造价。",[297,299,301,303],{"key":20,"text":298,"correct":29},"适当加大住宅宽度",{"key":24,"text":300,"correct":22},"增加住宅层数",{"key":27,"text":302,"correct":22},"适当提高层高",{"key":31,"text":304,"correct":22},"提高结构面积系数",{"id":306,"libraryId":5,"type":15,"typeLabel":16,"stem":307,"options":308,"answer":20,"analysis":33},895422,"工业项目总平面设计中，影响工程造价的主要因素包括（）。",[309,311,313,315],{"key":20,"text":310,"correct":29},"现场条件、占地面积、功能分区、运输方式",{"key":24,"text":312,"correct":22},"现场条件、产品方案、运输方式、柱网布置",{"key":27,"text":314,"correct":22},"占地面积、功能分区、空间组合、建筑材料",{"key":31,"text":316,"correct":22},"功能分区、空间组合、设备选型、厂址方案",{"id":318,"libraryId":5,"type":15,"typeLabel":16,"stem":319,"options":320,"answer":24,"analysis":33},895423,"通常情况下建筑周长系数越低，设计()。",[321,323,325,327],{"key":20,"text":322,"correct":22},"越昂贵",{"key":24,"text":324,"correct":29},"越经济",{"key":27,"text":326,"correct":22},"与该指标无关",{"key":31,"text":328,"correct":22},"一样",{"id":330,"libraryId":5,"type":15,"typeLabel":16,"stem":331,"options":332,"answer":27,"analysis":33},895424,"关于建设工程预算，符合组合与分解层次关系的是( )。",[333,335,337,339],{"key":20,"text":334,"correct":22},"单位工程预算、单项工程综合预算、类似工程预算",{"key":24,"text":336,"correct":22},"单位工程预算、类似工程预算、建设项目总预算",{"key":27,"text":338,"correct":29},"单位工程预算、单项工程综合预算、建设项目总预算",{"key":31,"text":340,"correct":22},"单位工程综合预算、类似工程预算、建设项目总预算",{"id":342,"libraryId":5,"type":15,"typeLabel":16,"stem":343,"options":344,"answer":24,"analysis":33},895425,"单位建筑工程预算是建筑工程各专业单位工程施工图预算的总称，下列属于按其工程性质划分的是（ ）",[345,347,349,351],{"key":20,"text":346,"correct":22},"煤气工程预算，电气设备安装工程预算、工业管道工程预算",{"key":24,"text":348,"correct":29},"一般土建工程预算，给排水工程预算，采暖通风工程预算",{"key":27,"text":350,"correct":22},"电气设备安装工程预算、工业管道工程预算和热力设备安装工程预算",{"key":31,"text":352,"correct":22},"给排水工程预算，机械设备安装工程预算、电气设备安装工程预算、工业管道工程预算",{"id":354,"libraryId":5,"type":15,"typeLabel":16,"stem":355,"options":356,"answer":20,"analysis":33},895426,"关于施工图预算的作用，下列说法中正确的是( )。",[357,359,361,363],{"key":20,"text":358,"correct":29},"施工图预算可以作为业主拨付工程进度款的基础",{"key":24,"text":360,"correct":22},"施工图预算是工程造价管理部门制定招标控制价的依据",{"key":27,"text":362,"correct":22},"施工图预算是业主方进行施工图预算与施工预算“两算”对比的依据",{"key":31,"text":364,"correct":22},"施工图预算是施工单位安排建设资金计划的依据",{"id":366,"libraryId":5,"type":15,"typeLabel":16,"stem":367,"options":368,"answer":27,"analysis":33},895428,"施工图预算的二级预算编制形式是指（）。",[369,371,373,375],{"key":20,"text":370,"correct":22},"编制人编制、审核人审核",{"key":24,"text":372,"correct":22},"建筑安装工程预算，设备工器具购置费预算",{"key":27,"text":374,"correct":29},"单位工程预算、建设项目总预算",{"key":31,"text":376,"correct":22},"单项工程综合预算、建设项目总预算",{"id":378,"libraryId":5,"type":15,"typeLabel":16,"stem":379,"options":380,"answer":20,"analysis":33},895430,"关于各级施工图预算的构成内容，下列说法中正确的是（）。",[381,383,385,387],{"key":20,"text":382,"correct":29},"建设项目总预算反映施工图设计阶段建设项目的预算总投资",{"key":24,"text":384,"correct":22},"建设项目总预算由组成该项目的各个单项工程综合预算费用相加而成",{"key":27,"text":386,"correct":22},"单项工程综合预算由单项工程的建筑工程费和设备及工器具购置费组成",{"key":31,"text":388,"correct":22},"单位工程预算由单位建筑工程预算和单位安装工程预算费用组成",{"id":390,"libraryId":5,"type":15,"typeLabel":16,"stem":391,"options":392,"answer":31,"analysis":33},895431,"工料单价法编制施工图预算的工作有：①计算主材费；②套用工料单价；③计算措施项目人材机费用；④划分工程项目和计算工程量；⑤进行工料分析。下列工作排序正确的是（）。",[393,395,397,399],{"key":20,"text":394,"correct":22},"④②⑤①③",{"key":24,"text":396,"correct":22},"④⑤①②③",{"key":27,"text":398,"correct":22},"②④⑤①③",{"key":31,"text":400,"correct":29},"④②③⑤①",{"id":402,"libraryId":5,"type":15,"typeLabel":16,"stem":403,"options":404,"answer":31,"analysis":33},895432,"编制某工程施工图预算，套用预算定额后得到的人工、甲材料、乙材料、机械台班的消耗量分别为15 工日、12m3.0.5m3.2 台班，预算单价与市场单价如下表所示。措施费为直接工程费的7%。则用实物法计算的该工程的直接费为（）元。",[405,407,409,411],{"key":20,"text":406,"correct":22},"4654.50",{"key":24,"text":408,"correct":22},"5045.05",{"key":27,"text":410,"correct":22},"5157.40",{"key":31,"text":412,"correct":29},"5547.95",{"id":414,"libraryId":5,"type":15,"typeLabel":16,"stem":415,"options":416,"answer":20,"analysis":33},895433,"关于施工图预算的作用，下列说法中正确的是（）。",[417,418,419,420],{"key":20,"text":358,"correct":29},{"key":24,"text":360,"correct":22},{"key":27,"text":362,"correct":22},{"key":31,"text":364,"correct":22},{"id":422,"libraryId":5,"type":15,"typeLabel":16,"stem":423,"options":424,"answer":24,"analysis":33},895434,"定额单价法和实物量法是编制施工图预算的两种方法，关于这两种方法的编制步骤和特点，下列说法中正确的是（）。",[425,427,429,431],{"key":20,"text":426,"correct":22},"定额单价法在计算得到分项工程工程量后，先套用消耗量，在进行工料分析",{"key":24,"text":428,"correct":29},"实物量法在计算得到分项工程工程量后，先套用消耗量定额，在进行工料分析",{"key":27,"text":430,"correct":22},"定额单价法反映市场价格水平",{"key":31,"text":432,"correct":22},"实物量法编制速度快，但调价计算繁琐",{"id":434,"libraryId":5,"type":15,"typeLabel":16,"stem":435,"options":436,"answer":27,"analysis":33},895435,"关于建设工程预算，符合组合与分解层次关系的是（）。",[437,438,439,440],{"key":20,"text":334,"correct":22},{"key":24,"text":336,"correct":22},{"key":27,"text":338,"correct":29},{"key":31,"text":340,"correct":22},{"id":442,"libraryId":5,"type":15,"typeLabel":16,"stem":443,"options":444,"answer":24,"analysis":33},895436,"采用实物量法编制施工图预算时，在按人工、材料、机械台班的市场价计算人、材、机费用之后，下一个步骤是（）。",[445,447,449,451],{"key":20,"text":446,"correct":22},"进行工料分析",{"key":24,"text":448,"correct":29},"计算管理费、利润等费用",{"key":27,"text":450,"correct":22},"计算工程量",{"key":31,"text":452,"correct":22},"编写编制说明",{"id":454,"libraryId":5,"type":15,"typeLabel":16,"stem":455,"options":456,"answer":27,"analysis":33},895437,"未达到固定资产标准的工器具购置费的计算基数一般为（）。",[457,459,461,463],{"key":20,"text":458,"correct":22},"工程建设其他费",{"key":24,"text":460,"correct":22},"建筑安装工程费",{"key":27,"text":462,"correct":29},"设备购置费",{"key":31,"text":464,"correct":22},"设备及安装工程费",{"id":466,"libraryId":5,"type":15,"typeLabel":16,"stem":467,"options":468,"answer":20,"analysis":33},895438,"关于各级施工图预算的构成内容，下列说法中正确的是（ ）。",[469,470,471,472],{"key":20,"text":382,"correct":29},{"key":24,"text":384,"correct":22},{"key":27,"text":386,"correct":22},{"key":31,"text":388,"correct":22},{"id":474,"libraryId":5,"type":15,"typeLabel":16,"stem":475,"options":476,"answer":27,"analysis":33},895439,"下列费用项目中，不在单位工程施工图预算编制范围之内的是（）。",[477,479,481,483],{"key":20,"text":478,"correct":22},"构筑物建筑工程费",{"key":24,"text":480,"correct":22},"工业管道安装工程费",{"key":27,"text":482,"correct":29},"炉窑购置费",{"key":31,"text":484,"correct":22},"弱电工程安装工程费",{"id":486,"libraryId":5,"type":15,"typeLabel":16,"stem":487,"options":488,"answer":31,"analysis":33},895440,"在编制施工图预算的下列各项工作步骤中，同时适用于预算单价法和实物法的是（）。",[489,491,493,495],{"key":20,"text":490,"correct":22},"套人工、材料、机械台班定额消耗量",{"key":24,"text":492,"correct":22},"汇总各类人工、材料、机械台班消耗量",{"key":27,"text":494,"correct":22},"套当时当地人工、材料、机械台班单价",{"key":31,"text":496,"correct":29},"汇总人工、材料、机械台班总费用",{"id":498,"libraryId":5,"type":15,"typeLabel":16,"stem":499,"options":500,"answer":20,"analysis":33},895441,"采用定额单价发编制施工图预算时，下列做法正确的是（）。",[501,503,505,507],{"key":20,"text":502,"correct":29},"若分项工程主要材料品种与预算单价规定材料不一致，需要按实际使用材料价格换算预算单价",{"key":24,"text":504,"correct":22},"因施工工艺条件与预算单价的不一致而致工人、机械的数量增加，只调价不调量",{"key":27,"text":506,"correct":22},"因施工工艺条件与预算单价的不一致而致工人、机械的数量减少，既调价也调量",{"key":31,"text":508,"correct":22},"对于定额项目计价中未包括的主材费用，应按造价管理机构发布的造价信息价补充进定额",{"id":510,"libraryId":5,"type":15,"typeLabel":16,"stem":511,"options":512,"answer":31,"analysis":33},895442,"建设工程预算编制中的总预算由（）组成。",[513,515,517,519],{"key":20,"text":514,"correct":22},"综合预算和工程建设其他费、预备费",{"key":24,"text":516,"correct":22},"预备费、建设期利息及铺底流动资金",{"key":27,"text":518,"correct":22},"综合预算和工程建设其他费、铺底流动资金",{"key":31,"text":520,"correct":29},"综合预算和工程建设其他费、预备费、建设期利息及铺底流动资金",{"id":522,"libraryId":5,"type":15,"typeLabel":16,"stem":523,"options":524,"answer":31,"analysis":33},895443,"关于施工图预算文件的组成，下列说法中错误的是()。",[525,527,529,531],{"key":20,"text":526,"correct":22},"当建设项目有多个单项工程时，应采用三级预算编制形式",{"key":24,"text":528,"correct":22},"三级预算编制形式有建设项目总预算、单项工程综合预算、单位工程预算组成",{"key":27,"text":530,"correct":22},"当建设项目仅有一个单项工程时，可采用二级预算编制形式",{"key":31,"text":532,"correct":29},"二级预算编制形式的施工图预算文件包括综合预算表和单位工程预算表两个主要报表",{"id":534,"libraryId":5,"type":15,"typeLabel":16,"stem":535,"options":536,"answer":24,"analysis":33},895444,"招标人和中标人在签订合同的谈判中， 为了防范货币贬值或者通货膨胀的风险， 一般通过( )约定风险承担方式",[537,539,541,543],{"key":20,"text":538,"correct":22},"调整投标价格",{"key":24,"text":540,"correct":29},"价格调整条款",{"key":27,"text":542,"correct":22},"调整中标价格",{"key":31,"text":544,"correct":22},"调整工作范围",{"id":546,"libraryId":5,"type":15,"typeLabel":16,"stem":547,"options":548,"answer":24,"analysis":33},895445,"根据《中华人民共和国招标投标法》 及相关法规， 对必须招标的项目， 招标人行为符合要求的是( )。",[549,551,553,555],{"key":20,"text":550,"correct":22},"就同一招标项目向潜在投标人提供有差别的项目信息",{"key":24,"text":552,"correct":29},"委托两家招标代理机构， 设置两处报名点接受投标人报名",{"key":27,"text":554,"correct":22},"以特定行业的业绩、 奖项作为加分条件",{"key":31,"text":556,"correct":22},"限定或者指定特定的品牌",{"id":558,"libraryId":5,"type":15,"typeLabel":16,"stem":559,"options":560,"answer":20,"analysis":33},895446,"关于招标信息发布与修正的说法，正确的是（ ）.",[561,563,565,567],{"key":20,"text":562,"correct":29},"招标人在发布招标公告或发出投标邀请书后，不得擅自终止招标",{"key":24,"text":564,"correct":22},"招标人或其委托的招标代理机构只能在一家指定的媒介发布招标公告",{"key":27,"text":566,"correct":22},"自招标文件出售之日起至停止出售之日止，最短不得少于3日",{"key":31,"text":568,"correct":22},"招标人对已发出的招标文件进行修改，应当在招标文件要求提交投标文件截止时间至少5日前发出",{"id":570,"libraryId":5,"type":15,"typeLabel":16,"stem":571,"options":572,"answer":27,"analysis":33},895447,"关于工程建设项目是否必须招标的说法， 正确的是（ ）。",[573,575,577,579],{"key":20,"text":574,"correct":22},"使用国有企业事业单位自有资金的工程建设项目必须进行招标",{"key":24,"text":576,"correct":22},"施工单项合同估算价为人民币 100 万， 但项目总投资额为人民币 2000 万元的工程建设项目必须进行招标",{"key":27,"text":578,"correct":29},"利用扶贫资金实行以工代赈、 需要使用农民工的建设工程项目可以不进行招标",{"key":31,"text":580,"correct":22},"需要采用专利或者专有技术的建设工程项目可以不进行招标",[582,585,588,591,594,597],{"id":15,"name":583,"category":7,"favorite":584},"领导干部任职前廉政法规知识测试题",92,{"id":586,"name":587,"category":7,"favorite":15},595,"建筑结构与设备",{"id":589,"name":590,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":592,"name":593,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":595,"name":596,"category":7,"favorite":8},534,"BIM工程师",{"id":598,"name":596,"category":7,"favorite":8},535]